Loading...
GEO REPORT 5.9.19 - from BLD2019-0528-0530November 14, 2018 Project No. 18-358 Michael McMurray Seattle -Snohomish Mill Company, Inc. 533 5th Avenue South Edmonds, WA 98020 Subject: Geotechnical Report Proposed Development 550 Main Street, Edmonds, Washington Dear Mr. McMurray, FtinGE@ O R P O R A T E D Geotechnical & Earthquake Engineering Consultants RECEIVED MAY 0 9 20119 DEVEI.OPNIEW SthViUcS CTR. CITY OF EDMONDS Attached please find our geotechnical report for your proposed project. In summary, our test borings completed at the site encountered about 4 feet of generally dense fill overlying medium dense to dense native soils. In our opinion, conventional footings and concrete slab -on -grade floors are feasible to support the proposed new building and as well as the renovation of the existing building. The proposal art panels and signs may be supported on conventional footings or piles, depending on the magnitude of uplift forces. In our opinion, if practical, conventional footings should be used in lieu of piles/shafts as footing construction generally has less construction uncertainties than piles, and likely more economical than piles. We appreciate the opportunity to work on this project. Please call if there are any questions. Sincerely, Siew L. Tan, P.E. Principal Geotechnical Engineer Encl.: Geotechnical Report �21 I .ntlahr \vCIltic I_a"t. Suite 13 ~rattle. A\,A 981(t? el (206) 262-03)7II 1 av (200) 262-017.4 TABLE OF CONTENTS 1.0 INTRODUCTION...................................................................................................................1 2.0 PROJECT AND SITE DESCRIPTION............................................................................... 1 3.0 SUBSURFACE EXPLORATIONS....................................................................................... 2 4.0 SUBSURFACE CONDITIONS............................................................................................. 2 4.1 SOIL....................................................................................................................................... 2 4.2 GROUNDWATER..................................................................................................................... 3 5.0 GEOTECHNICAL RECOMMENDATIONS..................................................................... 4 5.1 SEISMIC DESIGN PARAMETERS............................................................................................... 4 5.2 FOUNDATION.......................................................................................................................... 4 5.2.1 Building Foundation...................................................................................................... 4 5.2.2 Foundation for Art Panels and Signs............................................................................. 6 5.3 RETAINING WALL DESIGN PARAMETERS............................................................................... 6 5.4 CONCRETE SLAB ON GRADE.................................................................................................. 8 5.5 PERMANENT DRAINAGE CONSIDERATIONS............................................................................ 8 5.6 PERMANENT SLOPES.............................................................................................................. H 6.0 CONSTRUCTION CONSIDERATIONS............................................................................ 9 6.1 FOOTING SUBGRADE.............................................................................................................. 9 6.2 TEMPORARY EXCAVATION AND DEWATERING...................................................................... 9 6.3 STRUCTURAL FILL AND COMPACTION.................................................................................... 9 6.4 EROSION AND DRAINAGE CONSIDERATIONS........................................................................ 10 6.5 WET EARTHWORK RECOMMENDATIONS.............................................................................. 10 6.6 INFILTRATION CONSIDERATIONS.......................................................................................... 1 1 7.0 LIMITATIONS..................................................................................................................... 11 8.0 REFERENCES...................................................................................................................... 14 LIST OF ATTACHMENTS Figure 1 Vicinity Map Figure 2 Site and Exploration Plan Appendix A Summary Boring Logs Figure A-1 Terms and Symbols for Boring an Test Pit Logs Figure A-2 Log of Test Boring PG-1 Figure A-3 Log of Test Boring PG-2 Figure A-4 Log of Test Boring PG-3 Figure A-5 Log of Test Boring PG-4 GEOTECHNICAL REPORT MAIN STREET COMMONS 550 MAIN STREET, EDMONDS, WASHINGTON 1.0 INTRODUCTION This report presents the results of our geotechnical studies that were undertaken to support the design and construction of the proposed project. We performed our geotechnical evaluations in general accordance with the scope of work outlined in our proposal dated October 23, 2018, which was subsequently approved by you on October 24, 2018. Our service scope included reviewing readily available geologic data, conducting a site reconnaissance, drilling four test borings at the site, and developing the conclusions and recommendations presented in this report. 2.0 PROJECT AND SITE DESCRIPTION The site consists of two parcels at 550 Main Street of Edmonds, Washington. The site is bordered to the north by Main Street, east by 61h Avenue South, south by an improved alley, and to the west by a mixed -use building. The site is currently occupied to the west by a commercial building, which will be remodeled during this project, and to the east by an asphalt parking lot to be removed for the additional proposed structures. The existing building has a partial basement that extends about 8 to 9 feet below the existing site grade. Based on the project topographic survey, the existing site grade descends gently from the east to the west property line, with a total elevation relief of about 8 feet, over a length of about 180 feet. A current view of the site is shown in Plate 1, at right. We understand that the existing arch - roofed building will be remodeled, and a new building will be constructed at the parking lot located immediately east of the existing building, in the northeast quadrant of Plate 1: Current view of 550 Main Street; looking northwest (1110712018) Geotechnical Report Main Street Commons: 550 Main Street, Edmonds, Washington November 14, 2018 the site. We also understand that three billboard type structures for art panels will be constructed at the property. 3.0 SUBSURFACE EXPLORATIONS Four test borings (borings PG-1 thru PG-4) were completed at the site on November 7, 2018. The approximate boring locations are shown on Figure 2. Boring PG -I was drilled to a depth of about 21 feet, while PG-2, PG-3, and PG-4 were drilled to a depth of 11'/z feet. These borings were progressed using a EC95 track -mounted drill rig owned and operated by Boretec, Inc. The drill rig was equipped with a 6-inch outside diameter hollow stem auger, and soil samples were obtained from the borings at 2'/z- and 5-foot depth intervals in general accordance with Standard Penetration Test (SPT) sampling methods (ASTM test method D-1586) in which the samples are obtained using a 2-inch outside diameter split -spoon sampler. The sampler was driven into the soil a distance of 18 inches below the tip of the auger using a 140-pound weight falling a distance of 30 inches. The number of blows required for each 6-inch increment of sampler penetration was recorded. The number of blows required to achieve the last 12 inches of sample penetration is defined as the SPT N-value. The N-value provides an empirical measure of the relative density of cohesionless soil, or the relative consistency of fine-grained soils. A geologist from PanGEO was present throughout the field exploration program to observe the drilling, assist in sampling, and to document the soil samples obtained from the borings. The completed borings were backfilled with bentonite chips and patched with asphalt. The soil samples retrieved from the borings were described using the system outlined on Figure A-1 of Appendix A and the summary boring logs are included as Figures A-2 and A-5. 4.0 SUBSURFACE CONDITIONS 4.1 SOIL According to the Geologic Map of the Edmonds East Quadrangle (Minard, 1983), the project site is underlain by Transitional Beds (Qtb) with Olympia Gravel (Qog) mapped to the north of the site. Transitional Beds are described as glacial and non -glacial deposits typically composed of both thick and thin beds of fine clay silt and sand particles, with gravel near to the base of the formation. These beds typically have a high water content. Olympia Gravel is described as a weakly cemented fluvial sand with pebble sized gravels. 18-358 550 main street, edmonds 2 PanGEO, Inc. Geotechnical Report Main Street Commons: 550 Main Street, Edmonds, Washington November 14, 2018 Based on our interpretation of the soil samples from the test borings, it appears that the site soil conditions are consistent with the mapped geology, with Transitional Beds overlying Olympia Gravel. A description of the generalized soil units encountered in our test borings is presented below: Asphalt — All 4 test borings were drilled through the existing parking lot pavement, and encountered 4 to 8 inches of asphalt. Soil Unit 1: Fill — Directly below the asphalt, the test borings encountered approximately 4 feet of fill. The fill generally consisted of a medium dense to dense, moist, grey to brown, slightly silty fine to medium sand with gravels. Based on the SPT N-values recorded in the test borings, the site fill appeared generally well compacted. Soil Unit 2: Transitional Beds (Qtb) — Below the fill, a medium dense to very dense, moist to wet layer of brown to grey silty fine to medium sand with gravel was encountered. Evidence of iron -oxide staining and perched groundwater was present throughout this unit. Borings PG-2, PG-3, and PG-4 were terminated in this unit. In boring PG-1 this unit ended at about 16 '/2 feet below ground surface. This unit appears consistent with the mapped Transitional Beds at the site. Soil Unit 3: Olympia Gravel (Qog) — Below the Transitional Beds in PG-1, a very dense, blue -grey, silty fine sand with pebble -sized gravels was encountered and extended to the maximum depth of the boring. This soil unit appears consistent with the Olympia Gravel mapped in the area just north of the site. 4.2 GROUNDWATER Perched groundwater seepage and evidence of iron -oxide staining was commonly present within the Transitional Beds of the test borings during drilling. In PG-1, at a depth of 20 feet, groundwater was reached and subsequently filled the boring with water to approximately 9'/z feet below ground surface. It should be noted that groundwater elevations are likely to vary depending on the season, local subsurface conditions, and other factors. Groundwater levels are normally highest during the winter and early spring. Presence of perched water at the fill contact is common during wet winter -spring months. 18-358 550 main street, edmonds 3 PanGEO, Inc. Geotechnical Report Main Street Commons: 550 Main Street, Edmonds, Washington November 14, 2018 5.0 GEOTECHNICAL RECOMMENDATIONS 5.1 SEISMIC DESIGN PARAMETERS The following provides seismic design parameters for the site that are in conformance with the 2015 International Building Code (IBC), which specifies a design earthquake having a 2% probability of occurrence in 50 years (return interval of 2,475 years), and the 2008 USGS seismic hazard maps. It is our opinion that Site Class D is appropriate for this project. 5.2 FOUNDATION 5.2.1 Building Foundation Based on the site subsurface condition encountered in our test borings, it is our opinion that conventional footings can be utilized for the proposed building renovation and the new building. The footings may be founded on the existing site fill, provided that the fill at the footing locations are well compacted, or on the undisturbed native soils below the fill. We recommend that the adequacy of all footing bearing surface be verified by PanGEO before placing reinforcing steel and formwork. Any loose soils should be completely removed from the footing excavations and replaced with properly compacted structural fill. Allowable Bearing Pressure — In our opinion, for footings placed on the suitable bearing soils or properly compacted structural fill as discussed above, the footings may be sized using a maximum allowable bearing pressure of 4,000 psf. For allowable stress design, the recommended allowable bearing pressure may be increased by 1/3 for transient conditions such as wind and seismic loadings. Spread and continuous footings should have minimum widths of 24 and 18 inches, respectively. Lateral Resistance — Lateral forces from wind or seismic loading may be resisted by a combination of passive earth pressures acting against the embedded portions of the foundations and walls, and by friction acting on the base of the foundations. Passive resistance values may be determined using an equivalent fluid weight of 300 pounds per cubic foot (pcf) for level backfill. This value includes a factor safety of at least 1.5 assuming that properly compacted structural fill will be placed adjacent to the sides of the footings. A friction coefficient of 0.35 may be used to determine the frictional resistance at the base of the footings. This coefficient includes a factor of safety of approximate 1.5. 18-358 550 main street, edmonds 4 PanGEO, Inc. Geotechnical Report Main Street Commons: 550 Main Street, Edmonds, Washington November 14, 2018 Foundation Performance — Total and differential settlements are anticipated to be within tolerable limits for footings designed and constructed as discussed above. Footing settlement under static loading conditions is estimated to be less than approximately 1 inch, and differential settlement between adjacent columns should be less than about '/2 inch. Most settlement will occur during construction as loads are applied. Our observations of the existing building performance indicate that localized footing settlement had occurred near the southeast corner of existing building (see rotated door frame in Plate 2, below). It is probable that a portion of the existing footings was constructed on loose soils. Depending on the final foundation design of the proposed building renovation, it may be necessary to locally retrofit the existing footings. Plate 2. Footing settlement resulted in twisted door frame and cracks in wall. SE corner of building, looking north. 18-358 550 main street, edmonds 5 PanGEO, Inc. Geotechnical Report Main Street Commons: 550 Main Street, Edmonds, Washington November 14, 2018 5.2.2 Foundation for Art Panels and Signs We understand that art panels and signs will be installed. The loading conditions on its foundation are not available at this time, but we understand that the foundation may be subjected to uplifts. It is our opinion that, if the uplift forces are not significant, and can be addressed with the mass of concrete footings, it is our opinion that footings should be used in lieu of piles. The recommendations outlined in Section 5.2.1 are also applicable for footings supporting the art panels and signs. However, if the uplift forces are significant and piles are needed, we recommend using cast -in - place concrete piles, such as augercast piles or drilled shafts. For design purposes, we recommend that an allowable skin friction of 1 ksf be used to size the augercast piles or drilled shafts, assuming the piles/shafts are at least 15 feet deep. An allowable end bearing of 20 ksf may also be used for piles/shafts in compression loads. Lateral forces from wind or seismic loading may be resisted by a combination of passive earth pressures acting against the embedded portions of the pile cap, and by the structural stiffness of the piles. If needed, PanGEO is available to perform a laterally -load pile analysis, based on the geometry and loading conditions provided by the structural engineer. 5.3 RETAINING WALL DESIGN PARAMETERS Presented below are our geotechnical recommendations for the design and construction of retaining walls. Lateral Earth Pressure — Cantilevered walls should be designed for an equivalent fluid pressure of 35 pcf for level backfills behind the walls assuming the walls are free to rotate. If walls are to be restrained at the top from free movement, such as basement walls, equivalent fluid pressures of 45 pcf should be used for level backfills behind the walls. Permanent walls should be designed for an additional uniform lateral pressure of 7H psf for seismic loading, where H corresponds to the buried depth of the wall. The recommended lateral pressures assume that the backfill behind the wall consists of a free draining and properly compacted fill with adequate drainage provisions. Wall Surcharge — Surcharge loads, where present, should also be included in the design of retaining walls. We recommend that a lateral load coefficient of 0.35 be used to compute 18-358 550 main street, edmonds 6 PanGEO, Inc. Geotechnical Report Main Street Commons: 550 Main Street, Edmonds, Washington November 14, 2018 the lateral pressure on the wall face resulting from surcharge loads located within the height dimension of the wall. Lateral Resistance — Lateral forces from wind or seismic loading and unbalanced lateral earth pressures may be resisted by a combination of passive earth pressures acting against the embedded portions of the foundations and by friction acting on the base of the foundations. Passive resistance values may be determined using an equivalent fluid weight of 300 pounds per cubic foot (pcf) for level backfill. A friction coefficient of 0.30 may be used to determine the frictional resistance at the base of footings. Both values include a safety factor of at least 1.5. Wall/Foundation Drainage — We recommend that perimeter wall/footing drains be installed to prevent a buildup hydrostatic pressure behind walls. As a minimum, 4-inch diameter perforated drainpipes should be installed next to the base of the footings and embedded in 12 to 18 inches of pea or washed gravel. The gravel should be wrapped in a geotextile filter fabric to prevent the migration of fines into the drain system. The drainpipe should be graded to direct water to a suitable outlet and should not be allowed to daylight over the slope. If the proposed basement wall will be constructed against the temporary shoring wall (soldier pile wall with timber lagging), prefabricated drainage mats, such as Mirafi 6000 or equivalent, may be installed behind the basement walls and the collected water should be directed to a 4-inch diameter perforated collector pipe located along the inside perimeter of wall footing and discharged to an appropriate outlet. Wall Backfill — Wall backfill, if needed, should consist of free draining granular soils. In our opinion, the native excavated soils consist of a high fines content, and are not suitable to be re -used as wall backfill. Imported wall backfill such as City of Seattle Type 17 Mineral Aggregates (Section 9.03.10 (1) of the 2017 Seattle Standard Specifications) or Gravel Borrow (Section 9.03.14 (1) of the 2018 WSDOT Standard Specifications) should be assumed for this project. The structural fill should be moisture conditioned to near its optimum moisture content, placed in loose, horizontal lifts less than 8 to 12 inches in thickness, and systematically compacted to a dense and relatively unyielding condition. The adequacy of the compaction should be verified by PanGEO. If density tests will be performed, the test results should 18-358 550 main street, edmonds 7 PanGEO, Inc. Geotechnical Report Main Street Commons: 550 Main Street, Edmonds, Washington November 14, 2018 indicate at least 95 percent of the maximum dry density, as determined using test method ASTM D 1557. Within 5 feet of the wall, the backfill should be compacted to 90 percent of the maximum dry density. Damp Proofing — Waterproofing considerations are beyond our scope of work. We recommend that a building envelope specialist be consulted to determine appropriate damp - proofing or water -proofing measures. 5.4 CONCRETE SLAB ON GRADE Conventional on -grade concrete slabs may be utilized for this project. The slab may be constructed on densely compacted fill, or undisturbed native soils. Interior concrete slab -on - grade floors should be underlain by a capillary break consisting of at least of 4 inches of compacted 3/4-inch, clean crushed rock (less than 3 percent fines). The capillary break material should also have no more than 10 percent passing the No. 4 sieve and less than 5 percent by weight of the material passing the U.S. Standard No. 100 sieve. The capillary break should be placed on the dense subgrade or subgrade that has been compacted to a dense and unyielding condition. A 10-mil polyethylene vapor barrier should also be placed directly below the interior slab. 5.5 PERMANENT DRAINAGE CONSIDERATIONS Permanent control of surface water and roof runoff should be incorporated in the final grading design. In addition to these sources, irrigation and rain water infiltrating into the proposed landscaped and planter areas adjacent to paved areas or building foundations should also be controlled. All collected runoff should be directed into conduits that carry the water away from the pavement or structure and into storm drain systems or other appropriate outlets and should not be discharged onto the slope. Adequate surface gradients should be incorporated into the grading design such that surface runoff is directed away from structures. 5.6 PERMANENT SLOPES It is our opinion that permanent slopes should be graded no steeper than 2H:IV. It is also our opinion that permanent slopes against the foundation or retaining wall should be graded no steep than 3H:IV. 18-358 550 main street, edmonds 8 PanGEO, Inc. Geotechnical Report Main Street Commons: 550 Main Street, Edmonds, Washington November 14, 2018 6.0 CONSTRUCTION CONSIDERATIONS 6.1 FOOTING SUBGRADE Any loose or softened soil should be removed from the foundation excavation. Foundation excavations and over -excavations should be observed by PanGEO to confirm that the exposed subgrade is consistent with the expected conditions and adequate to support the proposed building. Foundation over -excavation, if needed, should extend horizontally at least 1 foot beyond the edge of the footings. The footing subgrade will need to be protected from moisture -related disturbance if works will be performed during wet weather. One option is to pour 2 to 3 inches of lean -mix concrete or 4 to 6 inches of crushed rock on the exposed foundation subgrade to protect against moisture. Alternatively, the reinforcing steel can be prefabricated, and the placement of the steel and concrete can be placed immediately after the footing excavation is completed. This will minimize the exposure of the footing subgrade to moisture. 6.2 TEMPORARY EXCAVATION AND DEWATERING All temporary excavations should be performed in accordance with Part N of WAC (Washington Administrative Code) 296-155. Excavations more than 4 feet should be sloped or shored. The contractor is responsible for maintaining safe excavation slopes and/or shoring. For planning purposes, the temporary unsupported excavation may be sloped as steep as 1 H:1 V (Horizontal: Vertical). If areas of seepage are encountered during construction, the above - referenced angles of slope cuts may need to be flattened. We anticipate that the excavation will not be significantly impacted by groundwater. If groundwater seepage is encountered, we anticipate that the use of drainage ditches and sump pumps will provide adequate construction dewatering. 6.3 STRUCTURAL FILL AND COMPACTION The on -site soils generally have a high fines content, and are not suitable to be used as structural fill. For planning and budgeting purposes, we recommend granular import fill such as the City of Seattle Type 17 Mineral Aggregates (Section 9.03.10 (1) of the 2017 Seattle Standard Specifications) or Gravel Borrow (Section 9.03.14 (1) of the 2018 WSDOT Standard Specifications). 18-358 550 main street, edmonds 9 PanGEO, Inc. Geotechnical Report Main Street Commons: 550 Main Street, Edmonds, Washington November 14, 2018 Soil Compaction — The structural fill should be moisture conditioned to near its optimum moisture content, placed in loose, horizontal lifts less than about 12 inches in thickness, and systematically compacted to a dense and relatively unyielding condition. The adequacy of the compaction should be verified by PanGEO. If density tests will be performed, the test results should indicate at least 95 percent of the maximum dry density, as determined using test method ASTM D 1557. Within 5 feet of the wall, the backfill should be compacted to 90 percent of the maximum dry density. 6.4 EROSION AND DRAINAGE CONSIDERATIONS We recommend that the exposed slopes be covered with plastic sheeting. Surface runoff can be controlled during construction by careful grading practices. This could include the construction of shallow, upgrade perimeter ditches or low earthen berms in conjunction with silt fences to collect runoff and prevent water from entering excavations. Temporary erosion control may require the use of hay bales on the downhill side of the project to prevent water from leaving the site and potential storm water detention to trap sand and silt before the water is discharged to a suitable outlet. 6.5 WET EARTHWORK RECOMMENDATIONS It is our opinion that construction of the project can be accomplished during wet season. However, perfonning earthwork activities during wet season is anticipated to be more costly than during dry weather conditions. General recommendations relative to earthwork performed in wet weather or in wet conditions are presented below: • All footing surface should be protected against inclement weather unless the footings can be poured immediately after the subgrade is exposed. It is the contractor's responsibility to protect the footing subgrade from disturbance. One option is to place 2 to 3 inches of lean -mix concrete or 4 to 6 inches of crushed rock on the exposed foundation subgrade as soon as the subgrade is exposed. Alternatively, the footing pour may be made immediately after the footing excavation is completed. This will require the reinforcing steel to be pre -fabricated and lowered into the footing excavation once the excavation is completed. • Earthwork should be performed in small areas to minimize subgrade exposure to wet weather. Excavation or the removal of unsuitable soil should be followed promptly 18-358 550 main street, edmonds 10 PanGEO, Inc. Geotechnical Report Main Street Commons: 550 Main Street, Edmonds, Washington November 14, 2018 by the placement and compaction of clean structural fill. The size and type of construction equipment used may have to be limited to prevent soil disturbance. • During wet weather, the allowable fines content of the structural fill should be reduced to no more than 5 percent by weight based on the portion passing 3/4-inch sieve. The fines should be non -plastic. • The ground surface within the construction area should be graded to promote run-off of surface water and to prevent the ponding of water. • Geotextile silt fences should be strategically located to control erosion and the movement of soil. Erosion control measures should be installed along all the property boundaries. • Excavation slopes and soils stockpiled on site should also be covered with plastic sheets. 6.6 INFILTRATION CONSIDERATIONS Based on the site soil and groundwater conditions encountered in our test borings (i.e., multiple perched groundwater zones and iron staining), from the geotechnical engineering perspective, it is our opinion that infiltration of stormwater is not feasible at the site. It is our opinion that non - infiltration design approaches should be considered for stormwater management for this project. 7.0 LIMITATIONS We have prepared this report for use by Seattle -Snohomish Mill Company, Inc. and the project design team. Recommendations contained in this report are based on a site reconnaissance, review of pertinent subsurface information, a subsurface exploration program, and our understanding of the project. The study was performed using a mutually agreed -upon scope of work. Variations in soil conditions may exist between the explorations and the actual conditions underlying the site. The nature and extent of soil variations may not be evident until construction occurs. If any soil conditions are encountered at the site that are different from those described in this report, we should be notified immediately to review the applicability of our recommendations. Additionally, we should also be notified to review the applicability of our recommendations if there are any changes in the project scope. 18-358 550 main street, edmonds 1 I PanGEO, Inc. Geotechnical Report Main Street Commons: 550 Main Street, Edmonds, Washington November 14, 2018 The scope of our work does not include services related to construction safety precautions. Our recommendations are not intended to direct the contractors' methods, techniques, sequences or procedures, except as specifically described in our report for consideration in design. Additionally, the scope of our work specifically excludes the assessment of environmental characteristics, particularly those involving hazardous substances. We are not mold consultants nor are our recommendations to be interpreted as being preventative of mold development. A mold specialist should be consulted for all mold -related issues. This report may be used only by the client and for the purposes stated, within a reasonable time from its issuance. Land use, site conditions (both off and on -site), or other factors including advances in our understanding of applied science, may change over time and could materially affect our findings. Therefore, this report should not be relied upon after 24 months from its issuance. PanGEO should be notified if the project is delayed by more than 24 months from the date of this report so that we may review the applicability of our conclusions considering the time lapse. It is the client's responsibility to see that all parties to this project, including the designer, contractor, subcontractors, etc., are made aware of this report in its entirety. The use of information contained in this report for bidding purposes should be done at the contractor's option and risk. Any party other than the client who wishes to use this report shall notify PanGEO of such intended use and for permission to copy this report. Based on the intended use of the report, PanGEO may require that additional work be performed and that an updated report be reissued. Noncompliance with any of these requirements will release PanGEO from any liability resulting from the use this report. Within the limitation of scope, schedule and budget, PanGEO engages in the practice of geotechnical engineering and endeavors to perform its services in accordance with generally accepted professional principles and practices at the time the Report or its contents were prepared. No warranty, express or implied, is made. We appreciate the opportunity to be of service to you on this project. Please feel free to contact our office with any questions you have regarding our study, this report, or any geotechnical engineering related project issues. 18-358 550 main street, edmonds 12 PanGEO, Inc. Geotechnical Report Main Street Commons: 550 Main Street, Edmonds, Washington November 14, 2018 Sincerely, PanGEO, Inc. Spenser Scott Staff Geologist LAN l w asyig2 ,p 30 420 is ts,� S�V . A L Siew L. Tan, P.E. Principal Geotechnical Engineer 18-358 550 main street, edmonds 13 PanGEO, Inc. Geotechnical Report Main Street Commons: 550 Main Street, Edmonds, Washington November 14, 2018 8.0 REFERENCES ASTM International (ASTM), Annual book of standards, Section 04.08 Soil and Rock (1): D420- D5876: West Conshohocken, Pennsylvania City of Seattle, 2017, Standard Specifications for Road, Bridges, and Municipal Construction, Seattle, Washington. International Building Code (IBC), 2015, International Code Council. Minard, J.P., 1983, Geologic map of the Edmonds East and part of the Edmonds West Quadrangles, Washington: U.S. Geological Survey Miscellaneous Field Studies Map MF- 1541, scale 1:24000. Washington State Department of Transportation (WSDOT), 2018, Standard Specifications for Road, Bridges, and Municipal Construction, Olympia, Washington. Washington Administrative Code (WAC), 2013, Chapter 296-155 - Safety Standards for Construction Work, Part N - Excavation, Trenching, and Shoring, Olympia, Washington. 18-358 550 main street, edmonds 14 PanGEO, Inc. Edmonds-Kingsro ) erry Bracketts Landing shoreline 4. sanctuary aP Brackett's Landing North Edmonds Kingston Ferry Toll Booth Dayton Si caspMa S1 T14L BOWL qF EDMONDS Main St Project Site Edmonds Marsh [!1 Marina Beach Park Edmonds 7 City Palk 1104) PINE PARK NEIGHBORHOOD u N Base Map: Google Terrain NORTH Not to Scale PmGE@) Proposed Development VICINITY MAP 550 Main Street t N CUR PON AT@D Edmonds WA ' I'iulcr.l No 18-358 Piclwo No 1 Ir — 1 w --w - 7 .17 12" PVC sa 3 Hour Pork'vr Fog U. 7.17 12' PVC \ .67 12' PVC 17 - - Cangete u4 O 3 - - _ Bench ••�; - r. - - .- � C9T 1 • F - GE 81.82 b ON 8kdp IE NW 78.97 12 PVC s IEE79.0712'DI IE S 80.32 4' PVC BTM 77.97 pt "all O: I I O I of 3 G.�ot"g i55(3 ' N O by I a I o O Z V) ' i IE 8199 6 PVC 3 N 89'58'53". 59.98' P ` E3•127 —� —sue— ems= — —T1v< Lvt Legend: Approx. Boring Locations PanGEO, Inc., November 2018 Asphalt Street w C�_ w Yell t I Asphalt / Fo.• c r Su^'acc Mon/ S -1 w--7 \ 3M\ 3 Hour \ Rowr Parking n \ C9 \ \ lb - •Car Concrete Walk ! CAuryer ' kr[gotion x3 S ed 8r1kcak Conc �p .'1 P a ' . 19.97" Xtx Ca G-3 ( n kt a Bi e fB T l 84. S I i i ' ' NE Iq W 8844:58 oPC ,E 9TM 84.38 5 ,d w M.+2 r I I I IE N aJitt7 A' (h AllihMI/11111111ft lE E 4LJi W o J } I I r m i I E W ppOx&.�V V *9Z9'fi . QrPTsS�wRN. argar IE I I Il CC r.D t � ? I G ai • $ Tel. �N o 2I � r r Curb `c661 oJs .. I 8.5' I92.0' ." ., �� I a v IE N 84. 6' rn a aA E S 84. 6' 18TM 84. r 91 _Nat47.8' o I11 J 02,88.% EE 528'CP E Sb' CPiG-1 �rda� l 49-58'53- Na 9. 1H� - sp a -� �� ss— /I Nil- Approx. Scal 1 . 1"=30' Base map modified from Site Plan by DiMarco Architecture. dated October 31, , e ?018 Ev", Dl\CI SUMMARY BORING LOGS RELATIVE DENSITY / CONSISTENCY SAND / GRAVEL SILT / CLAY SPT Approx. Relative SPT Approx. Undrained Shear Density N-values : Density (/o) Consistency N-values Strength (psf) Very Loose <4 <15 Very Soft <2 <250 Loose 4 to 10 15 - 35 Soft 2 to 4 250 - 500 Med. Dense 10 to 30 35 - 65 Med. Stiff 4 to 8 500.1000 Dense 30 to 50 65 - 85 Stiff 8 to 15 1000.2000 Very Dense >50 85 -100 Very Stiff 15 to 30 2000.4000 Hard >30 >4000 UNIFIED SOIL CLASSIFICATION SYSTEM MAJOR DIVISIONS GROUP DESCRIPTIONS •�' GW: Well -graded GRAVEL Gravel GRAVEL (<5% fines) .....: ...................................................... 50% or more of the coarse 0 GP : Poorly -graded GRAVEL fraction retained on the #4 sieve. Use dual symbols leg. .................... o ..... :...................................... GM ..... .......... SiltyGRAVEL GP -GM) for 5% to 12% fines. GRAVEL (>12% fines) GC : .................................. Clayey GRAVEL .................................................a........ .............................................................. SW : Well -graded SAND Sand SAND (<5!° fines) :::.....: .................................. I ................... 50% or more of the coarse ays r,,, i SP : oor Pl raded SAND Poorly -graded fraction passing the #4 sieve. Use dualsymbols e . SP-SM ) SM : SiltySAND fors% to 1% fines. SAND (>12%fines) .......................................................... SC : Clayey SAND ...................................................................... ML : :. SILT Liquid Limit < 50 CL : ...................................I—.............. Lean CLAY Silt and Clay == _ ............................................................ OL : Organic SILT or CLAY 50%or more passing #200 sieve ............. ................. .... ......................................................... MH: Elastic SILT Liquid Limit> 50 CH : ...................................................... Fat CLAY ........................y........................................ OH : ................... .......... I ...... I................. Organic SILT or CLAY Highly Organic Soils u .....:...................................I................... PT : PEAT Notes: 1. Soil exploration to s contain material descriptions based on visual observation and field tests using a system modified from the Uniform Soil Classification System (USCS). Where necessary laboratory tests have been conducted (as noted in the "Other Tests" column), unit descriptions may include a classification. Please refer to the discussions in the report text for a more complete description of the subsurface conditions. 2. The graphic symbols given above are not inclusive of all symbols that may appear on the borehole logs. Other symbols may be used where field observations indicated mixed soil constituents or dual constituent materials. DESCRIPTIONS OF SOIL STRUCTURES Layered: Units of material distinguished by color and/or Fissured: Breaks along defined planes composition from material units above and below Slickensided: Fracture planes that are polished or glossy Laminated: Layers of soil typically 0.05 to 1 mm thick, max.1 cm Blocky: Angular soil lumps that resist breakdown Lens: Layer of soil that pinches out laterally Disrupted: Soil that is broken and mixed Interlayered: Alternating layers of differing soil material Scattered: Less than one per foot Pocket: Erratic, discontinuous deposit of limited extent Numerous: More than one per foot Homogeneous: Soil with uniform color and composition throughout BCN: Angle between bedding plane and a plane normal to core axis COMPONENT DEFINITIONS COMPONENT SIZE / SIEVE RANGE COMPONENT SIZE / SIEVE RANGE Boulder: > 12 inches Sand Cobbles: 3 to 12 inches Coarse Sand: #4 to #10 sieve (4.5 to 2.0 mm) Gravel Medium Sand: #10 to #40 sieve (2.0 to 0.42 mm) Coarse Gravel: 3 to 314 inches Fine Sand: #40 to #200 sieve (0.42 to 0.074 mm) Fine Gravel: 3/4 inches to #4 sieve Silt 0.074 to 0.002 mm Clay <0.002 mm TEST SYMBOLS for In Situ and Laboratory Tests listed in "Other Tests" column. ATT Afterberg Limit Test Comp Compaction Tests Con Consolidation DO Dry Density DS Direct Shear %F Fines Content GS Grain Size Perm Permeability PP Pocket Penetrometer R R-value SG Specific Gravity TV Torvane TXC Triaxial Compression UCC Unconfined Compression SYMBOLS SamplelIn Situ test types and intervals 2-inch OD Split Spoon, SPT (140-lb. hammer, 30" drop) OD Spilt Spoon H3.25-inch (300-lb hammer, 30" drop) Non-standard penetration test (see boring log for details) Thin wall (Shelby) tube Grab Rock core ® Vane Shear MONITORING WELL V Groundwater Level at 1 time of drilling (ATD) Static Groundwater Level Cement / Concrete Seal Bentonite grout I seal Silica sand backfill Slotted tip Slough Bottom of Boring MOISTURE CONTENT Dry Dusty, dry to the touch Moist Damp but no visible water Wet Visible free water Terms and Symbols for PanGE& I N C O R P O R A T E D Boring and Test Pit Logs Figure A-1 3 Phone: 206.262.0370 Project: 550 Main Street Surface Elevation: 87.Oft Job Number: 18-358 Top of Casing Elev.: N/A Location: 550 Main Street, Edmonds, WA Drilling Method: HSA Coordinates: Northing: , Easting: Sampling Method: SPT N-Value A o Z I c co U p PL Moisture LL L a H Q N L E MATERIAL DESCRIPTION p E] Recovery U) m O 0 50 100 0 8-inches of asphalt. Medium dense, moist, brown, slightly silty SAND; trace gravel. (Fill). 13 S-1 10 Perched groundwater encountered at approximately 4-feet. s Stiff, moist, light -grey, CLAY; trace silt, highly mottled. 5 Medium dense, moist to wet, brown, silty fine to medium SAND; trace — — 14 T. gravel, trace iron -oxide staining. S 2 14 (Qtb -Transitional Beds). Ems 14 12 S-3 13 15 Perched groundwater encountered at approximately 8.5-feet. 10 8 Increase in gravel at approximately 10-feet. S-4 10 10 20 S-5 22 Perched groundwater encountered at approximately 13-feet. 20 15 18 Perched groundwater encountered at approximately 15.5-feet. S-6 20 20 Disrupted layer of blue -grey to grey fines at base of Qtb. Very dense, moist to wet, blue -grey, silty fine SAND with pebble -sized gravel; slighty cemented, trace mottling. 20 (Qog - Olympia Gravel). S-7 29 32 20 Groundwater encountered at approximately 20-feet. S-$ 45 50/5 Boring terminated at 21 feet below ground surface. Perched goundwater was observed at approximately 4-feet, 8.5-feet, 10-feet, 13-feet, and 15.5-feet. Final groundwater level after drilling operations was approximately 9.5-feet. 25 Completion Depth: 21.5ft Remarks: Boring drilled using an EC95 track drill rig. Standard penetration test (SPT) Date Borehole Started: 11/7/18 sampler driven with a 140 lb. safety hammer. Hammer operated with a rope and cathead Date Borehole Completed: 11/7/18 mechanism. Surface elevation estimated from Topographic Survey by Emerald Land Logged By: S. Scott Surveying, Inc., dated October 10, 2017. Drilling Company: Boretec 1 F�GEO LOG OF TEST BORING PGA I ft C C P P O"•*■ o FigureA-2 The stratification lines represent approximate boundaries. The transition may be gradual. Sheet 1 Of 1 Project: 550 Main Street Job Number: 18-358 Location: 550 Main Street, Edmonds, WA Coordinates: Northing: , Easting: z T co N X _N H CL E a Z. N , Surface Elevation: 87.Oft Top of Casing Elev.: N/A Drilling Method: HSA Sampling Method: SPT MATERIAL DESCRIPTION N-Value PL Moisture LL 0) C13 p U) U) m O El 10 Recovery 0 0 50 100 E&I F10 t; U � 20 4-inches of asphalt. ......... ......... Medium dense, moist, brown, slightly silty fine to medium SAND; trace gravel, trace iron -oxide staining. (Fill). 4 S-1 5 15 Dense to very dense, moist to wet, grey -brown, silty fine to medium SAND; trace gravel, trace silt stringers, trace iron -oxide staining. 16 (Qtb - Transitional Beds). S-2 21 23 Perched groundwater encountered at approximately 5-feet. 21 S-3 30 33 S 4 49 33 39 Perched groundwater and increased gravels encountered at approximately 11-feet. Boring terminated at 11.5 feet below ground surface. Perched groundwater was observed at approximately 5-feet and 11-feet. No groundwater was observed at the bottom of the hole after drilling operations. r25L -- Completion Depth: 11.5ft Date Borehole Started: 11/7/18 Date Borehole Completed: 11/7/18 Logged By: S. Scott Drilling Company: Boretec 1 F�GE@) I N C O a P O a T■ O LOG OF TEST BORING PG-2 Figure A-3 The stratification lines represent approximate boundaries. The transition may be gradual. Sheet 1 Of 1 Project: 550 Main Street Surface Elevation: 91.Oft Job Number: 18-358 Top of Casing Elev.: N/A Location: 550 Main Street, Edmonds, WA Drilling Method: HSA Coordinates: Northing: , Easting: Sampling Method: SPT N-Value p Z aL c U) p PL Moisture LL p o ~ E MATERIAL DESCRIPTION�- p RQD Recovery ®12 fA 00 O 0 50 100 0 5-inches of asphalt. Medium dense, moist, grey to brown, slightly silty SAND with gravel. (Fill). 10 S-1 X 10 11 Dense, moist to wet, brown, silty fine SAND with gravel; trace silt 5 stringers, trace iron -oxide staining. 19 (Qtb - Transitional Beds). S-2 23 24 17 Perched groundwater encountered at approximately 7.5-feet. S-3 X 19 20 10 13 S-4 16 17 Boring terminated at 11.5 feet below ground surface. Perched groundwater was observed at approximately 7.5-feet. No groundwater was observed at the bottom of the hole after drilling operations. 15 20 25 Completion Depth: 11.5ft Remarks: Boring drilled using an EC95 track drill rig. Standard penetration test (SPT) Date Borehole Started: 11/7/18 sampler driven with a 140 lb. safety hammer. Hammer operated with a rope and cathead Date Borehole Completed: 11/7/18 mechanism. Surface elevation estimated from Topographic Survey by Emerald Land Logged By: S. Scott Surveying, Inc., dated October 10, 2017. Drilling Company: Boretec 1 LOG OF TEST BORING PG-3 RinGE@ I W C O a P u R a*■ G FigureA-4 The stratification lines represent approximate boundaries. The transition may be gradual. Sheet 1 Of 1 Project: 550 Main Street Surface Elevation: 90.0ft Job Number: 18-358 Top of Casing Elev.: N/A Location: 550 Main Street, Edmonds, WA Drilling Method: HSA Coordinates: Northing: , Easting: Sampling Method: SPT N-Value .. o Z cCn N p PL Moisture LL C a W ~ L E MATERIAL DESCRIPTION CL p 0 ® RQD RecoveryEJ O 0 50 100 0 5-inches of asphalt. Very dense, moist, grey to brown, slightly silty SAND; trace gravel. (Fill). 18 S-1 22 29 Very dense to dense, moist to wet, grey -brown, silty fine SAND; trace 5 coarse sand stringers, trace gravel, trace iron -oxide staining. 18 (Qtb - Transitional Beds). S-2 zz Perched groundwater encountered at approximately 5-feet. 28 21 Increase in gravel at approximately 5-feet. S-3 21 31 10 17 S-4 20 18 Boring terminated at 11.5 feet below ground surface. Perched groundwater was observed at approximately 5-feet. No groundwater was observed at the bottom of the hole after drilling operations. 15 20 25 Completion Depth: 11.5ft Remarks: Boring drilled using an EC95 track drill rig. Standard penetration test (SPT) Date Borehole Started: 11/7/18 sampler driven with a 140 lb. safety hammer. Hammer operated with a rope and cathead Date Borehole Completed: 11/7/18 mechanism. Surface elevation estimated from Topographic Survey by Emerald Land Logged By: S. Scott Surveying, Inc., dated October 10, 2017. Drilling Company: Boretec 1 LOG OF TEST BORING PG-4 F!anGE@) A M C O R P O R. T■ D FigureA-5 The stratification lines represent approximate boundaries. The transition may be gradual. Sheet 1 Of 1