APPROVED ENG BLD PLN RESUB 1-BLD2023-0992+Architectural_Plan+9.14.2023_2.21.45_PM+3783841BUILDING ENVELOPE GENERAL NOTES, DESIGN CRITERIA * LEGEND
GENERAL NOTES
I . DRAWINGS ARE INTENDED TO DESCRIBE REQUIREMENTS OF THE BUILDING
ENVELOPE ASSEMBLY WITH RESPECT TO AIR CONTROL, VAPOR CONTROL, AND
WATER MANAGEMENT.
2. WORK IS TO BE COMPLETED IN ACCORDANCE WITH REGULATIONS AND CODE PER
THE AUTHORITIES HAVING JURISDICTION. NOTIFY CONSULTANT IMMEDIATELY IF A
CONFLICT IS FOUND BETWEEN ENVELOPE DRAWINGS AND CODE. GENERALLY THE
MORE STRINGENT CODE REQUIREMENT APPLIES.
3. PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL NOTIFY THE
CONSULTANT OF DISCREPANCIES BETWEEN THE BUILDING ENVELOPE DRAWINGS
AND SITE CONDITIONS, MANUFACTURER RECOMMENDATIONS, CODES OR
REGULATIONS OF AUTHORITIES HAVING JURISDICTION.
4. DO NOT SCALE DRAWINGS. FIELD VERIFY ALL DIMENSIONS. CLADDING
REQUIREMENTS TO BE VERIFIED.
5. THE DRAWINGS ARE TO BE INTERPRETED IN CONJUNCTION AND IN A
COMPLIMENTARY MANNER WITH SPECIFICATIONS.
G. DO NOT SUBSTITUTE BUILDING ENVELOPE MATERIALS SPECIFIED WITHOUT
RECEIVING WRITTEN APPROVAL FROM THE CONSULTANT.
7. REFER THE MATERIAL DATA SHEETS AND MANUFACTURERS INSTRUCTIONS WITH
RESPECT TO COMPATIBILITY BETWEEN MATERIALS.
AIR BARRIERS AND ENVELOPE THERMAL PERFORMANCE
1. AB CALL -OUTS DENOTE AIR BARRIER COMPONENTS.
2. IDENTIFICATION MARK SHALL BE APPLIED TO ALL INSULATION MATERIALS AND
INSULATION INSTALLED SUCH THAT THE MARK IS READILY OBSERVABLE DURING
INSPECTION.
3. FENESTRATION PRODUCTS SHALL BE LABELED WITH NFRC U-FACTOR, SHGC, VT
AND LEAKAGE RATING.
4. PROJECT CLOSE OUT DOCUMENTATION IS REQUIRED INCLUDING APPLICABLE
CALCULATIONS, WSEC ENVELOPE COMPLIANCE REPORTS, AND FENESTRATION NFRC
RATING CERTIFICATES.
FIELD TESTING REQUIREMENTS
1. THE FOLLOWING TABLE PROVIDES REQUIRED FIELD TESTING OF BUILDING ENVELOPE
COMPONENTS, SYSTEMS AND ASSEMBLIES.
TESTED SYSTEM OR ASSEMBLY
QUANTITY
REFERENCE
WINDOW WATER PENETRATION RESISTANCE
TBD
ASTM E 1 105
SEALANT PULL -TAB ADHESION
TBD
ASTM C 1 193
WINDOWS � DOORS
1. PER SBC 1710, WINDOWS AND DOORS SHALL BE TESTED AND LABELED AS
CONFORMING TO THE NORTH AMERICAN FENESTRATION STANDARDS (NAFS)
AAMA/WDMA/CSA 101 /I52/A440 UNLESS EXEMPTED BY CODE.
2. THE FOLLOWING LIST PROVIDES RECOMMENDED SITE VISITS FOR MOCK-UP REVIEW
THAT WE ANTICIPATE WILL BE REQUIRED. THIS LIST IS NOT EXHAUSTIVE AND
SHOULD BE USED AS A GUIDE. MORE MOCK-UPS MAY BE REQUESTED BY THE
CONSULTANT.
2. 1. WINDOW INSTALLATION
3. MINIMUM PERFORMANCE GRADE OF WINDOWS AND DOORS IS AS FOLLOWS:
CORNER: PG LC G5 (WITHIN G.5 FT OF CORNER)
FIELD: PG LC 35.
Applicant shall repair/replace all
damage to utilities or frontage
improvements in City right-of-way
per city standards that is caused or
occurs during the permitted project.
WATER AND AIR BARRIERS (WRB)
ABBREVIATIONS:
PROJECT INI=ORMATION:
1. WRB TO BE INSTALLED BOTH AS A MOISTURE BARMIER AND AS A CONTINUOUS AIR
AB
AIR BARRIER
LAM
LIQUID APPLIED MEMBRANE
PROJECT NAME :
BARRIER AS SHOWN IN THE PROJECT DOCUMENTS.
ABLT
ANCHOR BOLT
LOC
LOCATION
SOUND VIEW PLAZA
ACOUS
ACOUSTICAL
LVR
LOUVER
2. THE FOLLOWING LIST PROVIDES SITE VISITS FOR MOCK-UP REVIEW PRIOR TO
AD
AREA DRAIN
MAS
MASONRY
PROJECT ADDRESS:
CONCEALMENT WITH CLADDING THAT WE ANTICIPATE WILL BE REQUIRED. THIS LIST
AFF
ABOVE FINISH FLOOR
MB
MOISTURE BARRIER
130 2ND AVENUE SOUTH, EDMONDS, WA 98020
IS NOT EXHAUSTIVE AND SHOULD BE USED AS A GUIDE. MORE MOCK-UPS MAY BE
AL
ALUMINUM
MECH
MECHANICAL
REQUESTED BY THE CONSULTANT.
ARCH
ARCHITECTURAL
MEMB
MEMBRANE
BETW
BETWEEN
MH
MANHOLE
BITUM
BITUMINOUS
NIC
NOT IN CONTRACT
2. 1 . TYPICAL MOUNTING BLOCK
BLDG
BUILDING
NTS
NOT TO SCALE
CONTACT INFORMATION
2.2. TYPICAL ELECTRICAL FIXTURE
BLKG
BLOCKING
0/
OVER
2.3. TYPICAL PLUMBING FIXTURE
BLW
BELOW
OC
ON CENTER
PROJECT MANAGER:
2.4. TYPICAL PIPE PENETRATION
BSMT
BASEMENT
OD
OVERFLOW ROOF DRAIN
CAELUM KOBEKTS, ASSOC. AIA LEED AP
2.5. TYPICAL VENT HOOD INSTALLATION
CB
CATCH BASIN
POLY
POLYETHYLENE
CAELUMR@TEAM4EA.COM
CC
CLOSED CELL
PPT
PRESERVATIVE PRESSURE TREATED
2.G. TYPICAL KNIFE PLATE PENETRATION
CIP
CL
CAST IN PLACE
CENTERLINE
PROP
PSF
PROPERTY
POUNDS PER SQUARE FOOT
PRINCIPAL IN CHARGE:
JEFF SPEEKT, AIA LEEDOAP
FURRING AND CLADDING
COL
COLUMN
PSI
POUNDS PER SQUARE INCH
JEFF5@TEAM4EA.COM
CONC
CONCRETE
PT
PRESSURE TREATED
1. ALL FURRING TO BE MINIMUM BORATE TREATED AWPA UC-2 UNLESS OPEN JOINT
CONT
CONTINUOUS
PTD
PAINTED
SKEET INDEX:
CAVITIES EXIST
CTR CENTER PVC POLYVINYL CHLORIDE
DEMO
DEMOLITION
RD
ROOF DRAIN
DDIA
DIAMETER
RET
RETAINING
2. PROVIDE NON -CORROSIVE MESH INSECT SCREEN AT TOP AND BOTTOM OF
DOWNSPOUT
RWL
RAIN WATER LEADER
SHEET DKAWING TITLE
RAINSCREEN WALL CAVITIES OR WHERE DEPICTED.
DWG
DRAWING
SAM
SELF ADHERED MEMBRANE
BE 100 NOTES AND INDEX
EL
ELEVATION
SBS
STYRENE BUTADIENE
BEI01 SITE PLAN
3. THE FOLLOWING LIST PROVIDES RECOMMENDED SITE VISITS FOR MOCK-UP REVIEW
ELEC
ELECTRIC
SOG
SLAB ON GRADE
BE200 LEVEL I FLOOR PLAN
THAT WE ANTICIPATE WILL BE REQUIRED. THIS LIST IS NOT EXHAUSTIVE AND
ELEV
ELEVATOR
SF INSUL
SPRAY FOAM INSULATION
BE201 LEVEL 2 FLOOR PLAN
SHOULD BE USED A5 A GUIDE. MORE MOCK-UPS MAY BE REQUESTED BY THE
EM
ELASTOMERIC MEMBRANE
SR INSUL
SEMI -RIGID INSULATION
BE202 PENTHOUSE � MAIN ROOF PLAN
CONSULTANT.
EC
ELASTOMERIC COATING
SS
STAINLESS STEEL
BE203 PENTHOUSE ROOF PLAN
EW
EACH WAY
STAG
STAGGERED
BE300 SOUTH AND EAST ELEVATIONS
3. 1. BASE OF WALL
EXH
EXHAUST
STC
SOUND TRANSMISSION CLASS
BE301 NORTH AND WEST ELEVATIONS
3.2. TOP OF WALL
EXST
EXISTING
STL
STEEL
BE400 WINDOW* DOOR SCHEDULE
EXT
EXTERIOR
STRUCT
STRUCTURAL
BE500 WALL * WINDOW DETAILS
3.3. OUTSIDE CORNER
FC
FIBER CEMENT
TB
TOP OF BEAM
BE50 I ROOF DETAILS
3.4. INSIDE CORNER
FD
FLOOR DRAIN
TC
TOP OF CURB
3.5. THROUGH WALL FLASHING
FDN
FOUNDATION
TD
TRENCH DRAIN
3.G. WINDOW TRIM
FF
FINISHED FLOOR
TF
TOP OF FOOTING
ENGINEERING DIVISION
3.7. DOOR TRIM
FG
FIBERGLASS
TJ
TOP OF JOIST
APPROVED AS NOTED
3.8. TYPICAL JOINT TRIM
FM
FACTORY MUTUAL
TOC
TOP OF CONCRETE
3.9. SOFFIT TRIM
FOC
FACE OF CONCRETE
TOP
TOP OF PARAPET
-�
11 /07/2023
FOS
FACE OF STUD
TOS
TOP OF STEEL
3. 10. PENETRATION TRIM
fT
FOOT OR FEET
U/
UNDER
***SEE
APPROVED SITE PLAN UNDER
FTG
FOOTING
VB
VAPOR BARRIER
RIGHT-OF-WAY PERMIT ENG2023-0568 FOR
4. PROVIDE ADDITIONAL VISUAL MOCK-UPS AS REQUIRED BY ARCHITECT FOR, COLOR,
GA
GAUGE
VENT
VENTILATION
APPROVED ALLOWED USE OF THE CITY's
AND AESTHETIC PURPOSES.
GALV
GALVANIZED
VERT
VERTICAL
ROW.***
GL
GLASS
WD
WOOD
GLB
GLUE -LAMINATED BEAM
WGL
WIRE GLASS
GLZ
GLAZING
WWM
WELDED WIRE MESH
GWB
GYPSUM WALL BOARD
WP
WATERPROOF
HB
HOSE BIB
WRB
WEATHER RESISTIVE BARRIER
APPROVED BY PLANNING
HC
HOLLOW CORE
iz
HRW
HT
HOT RUBBER WATERPROOFING
HIGH TEMPERATURE
Sep 28 2023
EXTERIOR JOINT SEALANTS
HVAC
HEATING, VENTILATION, AIR CONDITIONING
IN
INCHES
APPROVED BY PLANNING FOR STUCCO
1. JOINT SEALANTS TO BE INSTALLED WHERE SHOWN ON DRAWINGS AND WHERE
INCL
INCLUDING
AND WINDOW REPLACEMENT ONLY.
REQUIRED
INSUL
INSULATION
2. MOCK-UP TESTING TO BE PROVIDED FOR ALL SUBSTRATE CONDITIONS, TO VERIFY
THAT ADHESION IS OBTAINED AND TO DETERMINE NECESSARY PRIMERS. IT IS
RECOMMENDED THAT THE SEALANT PULL TESTS BE PERFORMED BY THE
MANUFACTURER OR AN AUTHORIZED REPRESENTATIVE.
3. SEALANT JOINT APPLICATIONS WITH CLOSED -CELL BACKER RODS (WHERE
MOVEMENT IS ANTICIPATED) ARE TO BE INSTALLED WITH THE FOLLOWING
GUIDELINES FOR PROPER GEOMETRY OF SEALANT JOINT:
UNLESS OTHERWISE NOTED, WIDTH - MINIMUM 3/8", MAXIMUM 1/2"
DEPTH TO WIDTH RATIO - NOT LESS THAN 2: 1 (WIDTH : DEPTH) OR AS
RECOMMENDED BY MFR
4. SEALANT IS TO BE INSTALLED CONTINUOUSLY AT INTERIOR PERIMETERS OF
WINDOWS AND DOORS FROM FRAME TO AIR BARRIER ELEMENT CONTINUITY OF AIR
BARRIER AS DEPICTED ON THE ENCLOSURE DRAWINGS.
5. THE FOLLOWING SEALANT SCHEDULE PROVIDES RECOMMENDED SEALANT TYPES
BASED ON DIFFERENT SUBSTRATE CONDITIONS, UNLESS OTHERWISE NOTED IN
SPECIFICATIONS. THIS LIST IS NOT EXHAUSTIVE AND SHOULD BE USED AS A GUIDE.
FINAL SEALANT SELECTIONS AND PRIMERS TO BE DETERMINED IN CONJUNCTION
WITH THE MANUFACTURER DURING MOCK-UP TESTING.
SUBSTRATE I
SUBSTRATE 2
SEALANT
CONCRETE
CONCRETE OR MASONRY
DOW CORNING 790
MASONRY
CONCRETE OR MASONRY
DOW CORNING 790
PAINTED METAL
PAINTED METAL
DOW CORNING 795
PVC
PAINTED METAL
DOW CORNING 795
TYVEK COMMERCIAL WRAP
OTHER
DOW CORNING 758
FIBER -CEMENT
OTHER
BASF MASTERSEAL NP 150
SYMBOLS:
DRAIN MAT
GATT INSULATION
_ WRB / AIR BARRIER
SAM
SBS
HOT RUBBER WP
LIQUID -APPLIED MEMB.
- - - - - - - - ELASTOMERIC COATING
- - - BENTONITE WP
VAPOR BARRIER
I I INSECT SCREEN
LJ
I) GASKET SEALANT
0(((( BACKER ROD * SEALANT
XX DETAIL DWG NUMBER
Ax.xx PAGE NUMBER
<x.x ASSEMBLY NUMBER
CONCRETE
SPRAY FOAM INSULATION
STEEL
SEMI -RIGID MINERAL WOOL INSULATION
FA
MASONRY UNIT
RIGID INSULATION
PLYWOOD SHEATHING
MORTAR NET
GYPSUM WALL BOARD / SHEATHING
DRAIN ROCK
FIBER CEMENT BOARD
0
PRESSURE TREATED WOOD
ALL WORK SUBJECT
TO FIELD
INSPECTION FOR
CODE COMPLIANCE
Per it is limited to repairs noted on plans. Additional repair locations found
duri g construction may require a plan revision to be submitted. Consult with
Inspector.
PLANS M
City Of Edmonds
Building Department
Work STUCCO AND WINDOW REPLACEMENT
------------------------------------------------------
----------------------------------------------------------------
A dress 120 2ND AVE S
---------------------------------------------------------
--------------------------------- - -- - ---------
Owner SOUNDVIEW PLAZA
-------------------------------------------------
Approved Date ' 10/OM023
-----------------------------------
.----------------------------------
6 ilding Official ; EIrI.Ci
Irmit Number'
------------------ B L D2023-0992
--------------------------- - -----------------------
VED
JST BE
A: EA
Building Science
12721 30th Ave. NE, 2nd Flom, Seattle, WA
98125
206.728.2358 1 team4ea.crm
9805
REGISTERED
AR E
FREY L PE RT
STATE OF W HINGTON
RESUB
Sep 14 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
PERMIT SET
Nn.
ISSUE / REVISION TITLE
Date
1
ISSUED FOR PERMIT
09-13-2023
ALL RIGHTS RESERVED, PROPERTY OF 4EA
BUILDING SCIENCE, USE OR REPRODUCTION
PROHIBITED WITHOUT PRIOR WRITTEN
PERMISSION.
SOUND VIEW PLAZA REPAIRS
NOTES AND INDEX
DATE: 09-13-2023
DRAWING No:
g E 100
SCALES
DESIGNEDs
CR
DRAWNs CR
PROJECT NPs
SE23014
REVIEWED.
R1
SLOPE
1 :48 MIN.
R1 i o--
NEW FASCIA
MOUNTED
RAILING
NEW PMMA
NEW 2X STRUCTURE MEMBRANE
0/ RAILING
KNIFEPLATE
NEW MULTIPLY SBS
ROOF MEMBRANE
SLOPE
1 :48 MIN.
R1
y
\/ \If
-------------I--t-Y-
8 ROOF STEP
BE501 1 1/2" = 1'-0"
NEW MULTI PLY SBS
ROOF MEMBRANE
EACH MAIN DRAIN OVERFLOW LOCATION TO
Gil //_7 BE BUMPED
NEW DECKING
NEW PMMA
SBS ROOF
114" SLOPE MIN.
-- — — — — — — —�
1 1
1
1 1
1
1 r —J
17
8" MIN
6 ROOF PARAPET
BE501 1 1/2" = 1'-0"
NEW 22 GA PREFINSHED
PARAPET COPING
NEW HT SAM -
EXTEND 0/ ROOFING
TERMINATIONS AND
LAP OVER WRB AT EXTERIOR
NEW SELF ADHERED WRB (AB)
NEW FC PANEL TRIM
EXISTING FRAMING
5 ROOF - HIGH PARAPET SUPPORT
BE501 1 1/2" = 1'-0"
NEW SEALANT
NEW PMMA MEMBRANE AT DRAIN SUMP, TYP.
NEW
EXIST
ORT
JLLY-
N5HING
SLOPE
1 :48 MIN.
"' 1._NETRATION CAP
AINUM PIPE PENETRATION
ZE TO PIPE * SET INTO
OF TARGET BASE PLY MEMB.
)-APPLIED FULLY -REINFORCED
5HING
1FR MASTIC @ END OF FIELD
;ET MEMBRANES
)RCING TARGET PLY
STACK FLASHING FLANGE
PLY SBS
IBRANE
3 PLUMBING STACK VENT, TYP.
BE501 I 112" = 1 '-0"
v
000
II
��
I1- I
00
EXIST. STUCCO CLADDING,
y
I - CUT ABOVE ROOF MEMBRANE
HEIGHT8"
_
EXIST. WRB LAP * SEAL 0/ SBS
BASE PLY SHEET
I
NEW MTL FLASHING, ATTACHMENT
_
_
— — \I00
I TUCKED BEHIND STUCCO CLADDING
—_
j NEW MULTI PLY SBS
ROOF MEMBRANE
00I
_ z
�
00
I
_
I
r
00
1
_00
j R1
yy /I
I
I
I---------------------
2 ROOF - BASE OF WALL
BE501 1 1/2" = 1'-0"
A • NEW 2 PLY SBS ROOF MEMBRANE
\/ I / \ \ I / \ I \ OOF SHEATHING • NEW COVER BOARD
• NEW TAPERED RIGID INSULATION FOR SLOPE
NOTE:
• NEW Gil RIGID INSULATION
LYWOOROOS
PROVIDE LOW PROFILE DRAINS � / \ / \ i / \ / MAIN ROOF * OVERFLOW . EXIST PD EXTERIOR F HEATHING
STRAINERS AT DRAIN LOCATIONS DRAIN, OVERFLOW DRAIN
UNDER ELEVATED DECKS TO HAVE " RING. DO NOT REPAIR AS NECESSARY
� TIE OVERFLOW DRAINS • EXIST STRUCTURE. EXIST GATT INSULATION
INSULATION IN ROOF CAVITY � INTO MAIN DRAIN • EXIST INTERIOR GYPSUM CEILING
NOT SHOWN FOR CLARITY PLUMBING
4 R00 F D RAI N
BE501 1 1/2" = 1'-0"
ROOF ASSEMBLY
B1501 112" = 1'-0"
NOTE:
BULLETS ARE TOP TO BOTTOM
STAGGER JOINTS OF INSULATION
WHERE 2 OR MORE LAYERS ARE
USED.
A: 1EA
Building Science
12721 30th Ave. NE, 2nd Flom, Seattle, WA
98125
206.728.2358 1 team4ea.crm
9805
REGISTERED
AR E
FREY L PE RT
STATE OF W HINGTON
RESUB
Sep 14 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
PERMIT SET
Nn.
ISSUE / REVISION TITLE
Date
1
ISSUED FOR PERMIT
09-13-2023
ALL RIGHTS RESERVED, PROPERTY OF 4EA
BUILDING SCIENCE, USE OR REPRODUCTION
PROHIBITED WITHOUT PRIOR WRITTEN
PERMISSION.
SOUND VIEW PLAZA REPAIRS
ROOF DETAILS
DATE: 09-13-2023
DRAWING No:
g E501
SCALES
DESIGNEDs
CR
DRAWN: CR
PROJECT NO,
SE23014
REVIEWED.