Loading...
DNS BLD2023-0557_Equipment_Schedule_05-08-2023_12_19_24_JMOS_PIZZA_-_PLUMBING_SCHEDULES_AND_CALCSPlumbing Fixture Calculations Updated: 12/27/2022 SYMBOL/ KITCHEN # DESCRIPTION Number W/V Cold Water Hot Water Remarks Fixtures DFU (EA) DFU (Total) FU (EA) FU (Total) FU (EA) FU (Total) GPM (EA) GPM (Total) GPH (EA) GPH (Total) FS-1 Floor Sink 5 3 15 -- -- -- -- -- 3 -- -- -- -- - -- -- -- -- -- -- -- 6 Ice well w/cold plate 1 Indirect to FS-1 -- -- -- -- 7 Soda Dispenser 3 -- -- 1 -- -- -- 8 Drink Pickup Tray drain 1 Indirect to FS-1 -- -- -- -- -- -- 9 Drain Board Drain 3 Indirect to FS-1 -- -- -- -- -- -- -- -- 10 Mixing Rail drain 1 Indirect to FS-1 -- -- -- -- -- -- -- -- 11 Jockey Cold Rail drain 1 Indirect to FS-1 -- -- -- -- -- -- -- -- 12 Mixology Station 1 Indirect to FS-1 1 1 1 1 1 1 5 5 13 Hand Sink 1 1 1 1 1 1 1 1 1 5 5 14 Dump Sink 1 Indirect to FS-1 2 2 2 2 1 1 10 10 15 Glass Washer 1 Indirect to FS-1 -- -- 3 3 1 1 20 20 18 Beer Taps w/drain & rinse 1 Indirect to FS-1 1 1 -- -- -- -- -- -- 45/46 Hand Sink 2 1 1 2 1 2 1 2 1 2 5 10 61/63 Pre -Rinse Sink & faucet 1 2 2 2 2 2 2 2 2 45 45 64 Dishwasher 1 Indirect to FS-1 -- -- 3 3 8 8 40 40 65/67 3 Compartment Sink & faucet 1 6 6 3 3 3 3 2 2 20 20 70 Refer Blower (Condensate) 1 Indirect to MS #80 -- -- -- -- -- -- -- -- 80/81 Mop Sink 1 3 1 3 3 3 3 3 2 2 20 20 85 Ice Machine 1 Indirect to FS-1 Indirect to FS-1 1 1 -- -- -- -- -- -- 86 Ice Storage Bin drain 1 -- -- -- -- -- -- -- -- 88/89 Prep Sink & Faucet 2 Indirect to FS-1 3 6 3 6 2 4 5 10 Totals --. Based on Table 703.2, a 4" service is rated for 256 DFU's (vertical) & 216 DFU's (horizontal) at 1/4"/L.F. slope. At 1/8"/L.F. slope, a 4" service is rated for 173 DFU's. 29 25 26 4" Cold Water Service Demand Total Fixture Units: Total GPM required: Available Pressure (STATIC): 24 185 CW 51 WSFU's 30 GPM 80 psi HW Tank (HWT) Sizing See A.O. Smith Water Heater Selection Report on this sheet. 26 WSFU's Domestic Water Service (MINIMUM): 18 GPM 2" Service @ 8 FPS = 300 Fixture Units or 80 GPM Pressure requred at Fixture: 35 psi 1-1/4" Pipe Size @ 5 FPS CW piping shall be sized for a maximum flow of 8 fps. Pressure loss due to elevation, see calc's: 10 psi 1/2" HWC HW piping shall be sized fro a maximum flow of 5 fps. Pressure loss in piping & valves, see calc's: 10 psi HWT sizing is based on ASHRAE 2019 Applications Chapter 51. Pressure loss thru meter & RPBP: 0 psi Total pressure required to serve fixtures: 55 •Smith® Innovation has a name. A. O. Smith Phone: 1.866.362.9898 www.hotwater.com Pressure difference between available vs. losses: Project Information Project #: 22-053 Prepared for: DBS Project Name: Johnny Mo's Location: Edmonds, WA Prepared by: MTW Engineer: BCE/MTW Contractor: DBS Selected Product BTH-199 Mxi Cyclone@ Mxi Modulating Pro -Size Selection Report December 27, 2022 # Heaters: Model Number: 1 BTH-199 Mxi Heater Recovery: 1 st Hour Delivery: 261 USGPH @ 90 °F Rise 331 USGPH ®_ Heater Storage (ea): 100 USG 3 Hour Average: 284 USGPH Input (ea): 199,000 Btu/hr Est. Storage Recovery: 23 min New External Tanks: 0 Tank Capacity (ea): 0 USG Total Usable Storage: 70 USG % Of Demand: 102% Model Number Hi Cube Trailer Gallon Recovery Capacity GPH Input BTU/HR Height Diameter ApproShipping Load Factor Capacity 100 Degree Rise Weight (Ibs.) BTH-199 Mxi 2.78 100 235 199,000 76 27.75 523 • Standard and Low profile concentric vent available • Vents with PVC, CPVC polypropylene and AL-29- • 4C Stainless steel • Venting distances of up to 120' on all models • Meets or exceed the thermal efficiency and /or standby loss requirements of the U.S. Department . of Energy and current edition of ASHRAE/IESNA 90.1 . • Meets NSF requirement's (no leg kit needed) Application Loads Summary Peak Demand: 325 USGPH Application Settings Up to 98% Thermal Efficiency Down -Fired Low-NOx Powered -Burner Design Fully Submerged, Spiral -Shaped Condensing Heat Exchanger Complies with SCAQMD Rule 1146.2 Sidewall and Vertical power vent and direct Vent Options Space -Saving Design, with Zero Clearance to Combustibles Temperature Rise: 90 °F Type: Food Service / Restaurant Building Use: Not Specified Cold Water Temp: 50 °F Peak Demand Period: 1.00 Hours Stored Water Temp: 140 °F Equipment: Water Heaters Only (no external Approx. Storage: 25% storage) # Storage Tanks: Not Specified Fuel Type: Natural Gas Existing Storage: None Location: Indoor The A. O. Smith Pro -Size sizing program is a tool that can be used to estimate water heater requirements for many common applications. Pro -Size is intended to assist in selecting water heaters or boilers that best meet the specific job requirements. It is the sole responsibility of the system designer to select the correct products needed for the specific application. A. O. Smith reserves the right to make changes to Pro -Size without notice. Page 1 of 2 25 psi KITCHEN PLUMBING EQUIPMENT FIXTURE SCHEDULE Date: 12/27/2022 SYM DESCRIPTION WASTE VENT DFU CW HW WSFU GAS GAS REMARKS MBTU See Note 1 6 Ice well w/cold plate 7 Soda Dispenser (x3) 1" -- -- -- -- -- -- -- Indirect sink drain to FS-1 -- -- 1 1/2" -- 1 -- -- 8 Drink Pickup Tray drain 1" -- 1 -- -- -- -- -- Indirect sink drain to FS-1 9 Drain Board Drain (0) 1" -- 1 -- -- -- -- -- Indirect sink drain to FS-1 10 Mixing Rail drain 1/2" -- 1 -- -- -- -- -- Indirect sink drain to FS-1 11 Jockey Cold Rail drain 1" -- 1 -- -- -- -- -- Indirect sink drain to FS-1 12 Mixology Station 1-1/2" -- 1 1/2" 1/2" 1 -- -- Indirect sink drain to FS-1 13 Hand Sink 2" 1-1/2" 1 1/2" 1/2" 1 w/ASSE 1070 compliant thermostatic mixing valve 14 Dump Sink 2" 1-1/2" 2 1/2" 1/2" 2 -- -- 15 Glass Washer 1" -- 3 -- 3/4" 3 -- -- Indirect sink drain to FS-1 18 Beer Taps w/drain & rinse 1" -- 1 1/2" -- 1 -- -- Indirect sink drain to FS-1 44 Double stack oven (x2) HandSink (x2) -- -- -- -- -- -- 3/4" 240 w/ASSE 1070 compliant thermostatic mixing valve 45/46 2" 1-1/2" 1 1/2" 1/2" 1 61/63 Pre -Rinse Sink & faucet 2" 1-1/2" 2 1/2" 1/2" 2 -- -- 64 Dishwasher 1" -- 3 -- 3/4" 3 -- -- Indirect sink drain to FS-1 65/67 3 Compartment Sink & faucet 2" -- 6 3/4" 3/4" 3 -- -- 70 Refer Blower (Condensate) 1/2" -- 1 -- -- -- -- -- Indirect sink drain to FS-1 80/81 Mop Sink 3" 2" 3 1/2" 1 1/2" 3 -- -- 85 Ice Machine 2" -- 1 3/4" -- 1 -- -- Indirect sink drain to FS-1 & RP-1 86 Ice Storage Bin drain 2" -- 1 -- -- -- -- -- 1/2" 3 -- -- I Indirect sink drain to FS-1 88/89 Prep Sink & Faucet (x2) 2" -- 2 1/2" Indirect sink drain to FS-1 NOTES: 1 Equipment on this list is provided by others, connections are by plumbing contractor, see Kitchen Sheet K-2. RECEIVED May 08 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT BLD2023-0557 5 - o A T +r 'o u3 rq � � v � v un a � 36534 �EGIISTE� y10NAL ES In H Z W O ILL. — 0 > LU D LI J U) N N O N ti N N T_ U) c O L O �--+ U E Ca U > N N 06 O _ cn > N O J ., CO M Q vJ W CM CM ,�ui � O O co u7 Lu DATE 12/27/2022 DRAWN CHECKED MTW DB PROJECT NO. CONTRACT DRWG. REF. DRAWING NO. P0.01 OF