Loading...
DNS BLD2023-0557_Plumbing_Plan-JOHNNY MOS_05-08-2023_12_18_53_JMOS_PIZZA_-_PLUMBING_PERMIT_-_2023-01-11 (1)7 00 I-� O N r C'7 N N \ r r �SCXSNIC) ® PLUMBING FIXTURE --- COLD WATER PIPE (CW) ---- HOT WATER PIPE (HW) ----- HOT WATER RECIRC PIPE (WWC) —GAN— SANITARY PIPE (SAN) ------- VENT PIPE (V) —S— STORM PIPE (S) Oft RAIN LEADER (RL) 0 RD ROOF DRAIN (RD) OO GD OVERFLOW DRAIN (OD) —G — GAS PIPE (G) —STM — STEAM PIPE (STM) —COND— CONDENSATE RTN. PIPE ICOND) is HOSE BIBB/WALL HYDRANT -- BALL VALVE --t>4— GATE VALE —D,411 GATE VALVE w/GAP —CP4— BALANCING VALVE ­�— GAS COCK/VALVE GLOBE VALVE --DO*— ANGLE GLOBE VALVE 3-WAY MOTORIZED VALVE CONTROL VALVE CHECK VALVE PRESSURE RELIEF VALVE PRESSURE REDUCING VALVE PRESSURE REDUCING STATION BACKFLOW PRE V. STATION —II PIPE CAP OR SANITARY CLEANOUT PIPE BREAK �c PIPE UP PIPE DOWN PIPE TEE UP PIPE TEE DOWN PIPE FLANGE —III— UNION FLEX CONNECTION (PIPE) STRAINER AIR VENT PRESSURE GUAGE THERMOMETER eHVACEQUIPMENT NUMBER/ PLUMBING FIXTURE DESIGNATION 24/12 RECTANGULAR DUCT SIZE I2"* ROUND/SPIRAL DUCT SIZE 24/12# OVAL DUCT SIZE CEILING DIFFUSER - SQUARE 0 CEILING DIFFUSER - ROUND mgmm L INEAR/SLOT DIFFUSER ®-+ RETURN AIR/EXHAUST GRILLE WEATHER LOUVER/WALL GRILLE SUPPLY AIR ARROW E1r RETURN AIR/EXHAUST ARROW THERMOSTAT/SENSOR $ SPIN -IN w/VOLUME DAMPER IIIIIIIIII FLEX DUCT (0) DUCT, RECT (*) / ROUND (*) W SOUNDL INED DUCT/DUCTBORD ® SUPPLY AIR DUCT DOWN ® SUPPLY AIR DUCT UP ® RET/EXH DUCT DOWN (*) m RET/EXH DUCT UP (*) ® ROUND/SPIRAL DUCT DOWN (0) ® ROUND/SPIRAL DUCT UP (*) RECT DUCT BREAK C ROUND/SPIRAL DUCT BREAK RECT ELBOW w/TURN VANES RADIUS ELBOW C* / m) 3:c TRANSITION SQUARE -ROUND TRANSITION FLEX CONNECTOR * EQPT. FIRE DAMPER +-}® SMOKE DAMPER +ij VOLUME DAMPER (VD) ++6 VOL. DMPR. w/REMOTE OPER. 4ft.~40 MOTORIZED DAMPER —MM — HYDRONIC WATER SUPPLY —WM— HYDRONIC WATER RETURN —016 — CONDENSER WATER SUPPLY —CM— CONDENSER WATER RETURN —CHB— CHILLED WATER SUPPLY —CHR— CHILLED WATER RETURN AAV AUTOMATIC AIR VENT AC AIR COMPRESSOR, AIR CONDITIONING AD AIR DRYER ADA AMERICANS WITH DISABILITIES ACT AFF ABOVE FINISHED FLOOR AHU AIR HANDLING UNIT AL ALUMINUM ALT ALTERNATOR, ALTERNATIVE APD AIR PRESSURE DROP ARC AIR RECEIVER ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AND AIR CONDITIONING ENGINEERS, INC ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS B BOILER BC BRANCH CONTROL BDD BACKDRAFT DAMPER BFF BELOW FINISHED FLOOR BOD BOTTOM OF DUCT BTUH BRITISH THERMAL UNITS PER HOUR BV BALANCING VALVE CA COMPRESSED AIR CC COOLING COIL CD CONDENSATE DRAIN CFH CUBIC FEET PER HOUR CFM CUBIC FEET PER MINUTE CLG CEILING CN CONDENSATE NUMBER CO CLEANOUT CONT CONTINUATION COP COEFFICIENT OF PERFORMANCE CP CIRCULATION PUMP CU CONDENSING UNIT MECHANICAL I455RIV I AT IONS DSN DOWN SPOUT NOZZLE HWR HEATING WATER RETURN RL RAIN LEADER DWV DRAIN, WASTE AND VENT HWS HEATING WATER SUPPLY RPBFP REDUCED PRESSURE BACKPLOW PREVENTOR DX DIRECT EXPANSION HX HEAT EXCHANGER RPM REVOLUTIONS PER MINUTE. EA EACH OR EXHAUST AIR HZ HERTZ 5 SINK EDB ENTERING DRY BULB TEMPERATURE ID INSIDE DIAMETER OR DIMENSION SA SUPPLY AIR EER ENERGY EFFICIENCY RATIO IE INVERT ELEVATION SAD SUPPLY AIR DAMPER EF EXHAUST FAN IN INCH SD SUPPLY DIFFUSER EFF EFFICIENCY KW KILOWATT SF SUPPLY FAN OR SQUARE FT EG EXHAUST GRILLE L LAVATORY SG SUPPLY GRILLE ERV ENERGY RECOVERY VENTILATOR L-X LOUVER SHR SHOWER ESP EXTERNAL STATIC PRESSURE L55 POUNDS SHT SHEET ET EXPANSION TANK LWT LEAVING WATER TEMPERATURE SIM SIMILAR EWB ENTERING WET BULB TEMPERATURE MAX MAXIMUM EWC ELECTRIC WATER COOLER MCA MINIMUM CIRCUIT AMPACITY EWT ENTERING WATER TEMPERATURE MECH MECHANICAL EXH EXHAUST MFR MANUFACTURER EXST EXISTING MIN MINIMUM, MINUTE F FILTER MOP MAXIMUM OVERCURRENT PROTECTION FC FAN COIL MTO MOUNTED) (INC) FCO FLOOR CLEANOUT NC NORMALLY CLOSED FO FLOOR DRAIN NG NATURAL GAS FF FINISHED FLOOR NIC NOT IN CONTRACT FLR FLOOR NO NUMBER OR NORMALLY OPEN FM FLUSHOMETER NOM NOMINAL FOB FLAT ON BOTTOM OD OUTSIDE DIAMETER/DIMENSION POT FLAT ON TOP OA OUTSIDE AIR FRD FIRE DAMPER P PUMP FRP FI5ERGLAS5 REINFORCED PLASTIC PF PLUMBING FIXTURE FSD FIRE t SMOKE DAMPER PH PHASE FT FEET, FOOT PIC PORTABLE INSTRUMENT CONNECTION GAL GALLON POC POINT OF CONNECTION CUH CABINET UNIT HEATER GALV CV CONTROL VALVE GPM D DRAIN WC DCW DOMESTIC COLD WATER HPDE DG DOOR GRILLE HP DHU DEHUMIDIFICATION UNIT HT DI DUCTILE IRON HVAC DIA DIAMETER HW DN DOWN HWP ADDRESS 550 MAIN STREET, SEATTLE, WA 98020 PROPERTY OWNER: GALVANIZED GALLONS PER MINUTE HEATING COIL HIGH DENSITY POLYTHYLENE HEAT PUMP HEIGHT HEATING, VENTILATION AND AIR CONDITIONING HOT WATER (DOMESTIC) HEATING WATER PUMP BUILDING INFO MIKE MCMURRAY, SEATTLE-SNOHOMISH MILL COMPANY, INC 533 5TH AVE S EDMONDS, WA 98020 GECK08080@GMAIL.COM (425) 263-2474 PROPERTY TAX ACCOUNT NUMBER 004342-120-015-00 AND 004342-120-017-00 (BEING COMBINED UNDER SEPARATE APPLICATION PRV PRESSURE REDUCING VALVE PSI POUNDS PER SQ INCH PSIG POUNDS PER SQ INCH GAGE PVC POLYVINYL CHLORIDE R RADIUS, RISER, RETURN RA RETURN AIR RAD RETURN AIR DAMPER SL SLOPE SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION Sp STATIC PRESSURE SR SUPPLY REGISTER SS STAINLESS STEEL STL STEEL T TEE OR TANK TD TRENCH DRAIN TG TRANSFER GRILLE TSP TOTAL STATIC PRESSURE TYP TYPICAL UR URINAL V VALVE, VOLT, VENT VAC VACUUM VAV VARIABLE AIR VOLUME VD VOLUME DAMPER VTR VENT THROUGH ROOF W WASTE WC WATER COLUMN OR WATER CLOSET WCO WALL CLEANOUT WG WATER GAGE WH WATER HEATER WPD WATER PRESSURE DROP YCO YARD CLEANOUT MC MECHANICAL CONTRACTOR EC ELECTRICAL CONTRACTOR RD ROOF DRAIN GC GENERAL CONTRACTOR RG RETURN GRILLE PC PLUMBING CONTRACTOR I Puri f1PCrRIPT10 \1 LOTS 15 AND 16, BLOCK 120, CITY OF EDMONDS ADDITION, ACCORDING TO THE PLAT THEREOF, RECORDED IN VOLUME 2 OF PLATS, PAGE 39, RECORDS OF SNOHOMISH COUNTY, WASHINGTON. AND; LOTS 17, 18, 19 AND 20, BLOCK 120, CITY OF EDMONDS ADDITION, ACCORDING TO THE PLATE THEREOF, RECORDED ION VOLUME 2 OF PLATS, PAGE 39, RECORDS OF SNOHOMISH COUNTY, WASHINGTON. F` n0 C �.-0aM p , acwwn o M—SITE v o Y9 . wa„E,p p ? p o VICINITY MAP PROJECT GENERAL NOTES (APPLIES TO ALL SHEETS 1. THIS PROJECT IS BASED ON A DESIGN BUILD CONCEPT & DEPICT SCOPE, EQUIPMENT, CAPACITIES, ZONING, GENERAL ROUTING & ARE INTENDED FOR PERMIT APPLICATION. THEY ARE DEVELOPED FOR EXCLUSIVE USE OF DB SOLUTIONS & THEIR SUBCONTRACTORS ONLY. COORDINATION/SHOP DRAWINGS WILL BE DEVELOPED AS REQUIRED FOR INSTALLATION AND IN CONJUNCTION WITH OTHER TRADES AND THE EXISTING ARCHITECTURAL AND STRUCTURAL BUILDING ELEMENTS. COORDINATION AND PLACEMENT OF EQUIPMENT AND SYSTEMS SHALL INCLUDE CONSIDERATION FOR MAINTENANCE, CEILING HEIGHTS, LIGHTING AND ELECTRICAL CLEARANCES. 2. THE INSTALLATION OF THIS PROJECT IS BASED ON THE 2018 VERSION OF ALL BUILDING, PLUMBING, MECHANICAL STATE & LOCAL CODES ALL EQUIPMENT& PIPING SHALL BE INSTALLED IN ACCORDANCE WITH ALL STATE, LOCAL AND APPLICABLE CODES. PROVIDE SEISMIC RESTRAINTS, HANGERS & SUPPORTS AS REQUIRED. 3. ALL PLUMBING SYSTEMS ARE PRESCRIPTIVELY DESIGNED BASED ON REQUIREMENTS AND METHODS OUTLINED IN UNIFORM PLUMBING CODE CHAPTERS 2 THRU 11. 4. MAINTAIN A COMPLETE SET OF CLEAN DRAWINGS ON SITE WITH "RED -LINE" MARK-UPS OF ANY FIELD MODIFICATIONS. DRAWINGS WILL BE PROVIDED TO OWNER AT END OF PROJECT FOR "RECORD AS-BUILTS". 5. ELECTRICAL SERVICES, PERMITS AND DRAWINGS SHALL BE BY THE ELECTRICAL CONTRACTOR AS REQUIRED FOR INSTALLATION OF WORK. 6. ALL SYSTEMS SHALL BE COMMISSIONED IN ACCORDANCE WITH WASHINGTON STATE ENERGY CODE & A REPORT PROVIDED TO LOCAL AUTHORITY UPON REQUEST. 7. CLOSE-OUT DOCUMENTS (I.E. ASBUILTS, O&M MANUALS, DOMESTIC WATER STERILAZATION & Cx REPORT) SHALL BE PROVIDED TO THE OWNER UPON COMPLETION OF PROJECT. 8. ALL FIRESTOPPING & CAULKING OF PLUMBING PENETRATIONS SHALL BE PROVIDED BY OTHERS. 9. WASTE LINE CLEANOUT SIZING SHALL BE AS FOLLOWS: 4" WASTE PIPE: 4" CLEANOUT WITH 3'/2" PLUG. 3" WASTE PIPE: 3" CLEANOUT WITH 2'/2" PLUG. 2" WASTE PIPE: 2" CLEANOUT WITH 11/2" PLUG. 10. PIPING MATERIAL SHALL BE AS NOTED IN THE PIPING MATERIAL SCHEDULE ON SHEET P0.01. 11. DOMESTIC WATER PIPING LOCATED OUTSIDE OF THE DWELLING UNITS WILL BE INSULATED W/MICRO-LOK INSULATION. THICKNESS OF INSULATION WILL BE REQUIRED BY UPC & WASHINGTON STATE ENERGY CODE, SEE PIPE INSULATION SCHEDULE ON SHEET P0.01. 12. ROOF DRAIN RAINWATER & STORM SYSTEMS ARE PROVIDED BY OTHERS. 13. ALL FLOOR DRAINS TO BE PROVIDED WITH MECHANICAL TRAP PRIMERS, SEE SCHEDULE. 14. FIRE SPRINKLER CONTRACTOR WILL FURNISH AND INSTALL ALL FIRE SERVICE LINES & D.C.V.A. 15. DOMESTIC POTABLE WATER SYSTEM SHALL BE DISINFECTED AND SANITIZED AS REQUIRED BY UNIFORM PLUMBING CODE SECTION 609.9. FINAL REPORT SHALL BE PROVIDED UPON REQUEST OF THE AUTHORITY HAVING JURISDICTION (AHJ). MAIN STREET 0,/ I i i i i ENTRY i i i i i ALLEY ------------------------------------------------------------------------------------------- ' 1 SITE PLAN AO.00 j SCALE :1/16 = I - - 0" PLUMBING SHEET LIST P0.00 Title Sheet, Bldg Info, Legend & Abbreviations P0.01 Plumbing Schedules / Calculations P0.02 Plumbing Riser Diagrams - Gas, Sanitary & Domestic Water P1.00 Underground Plumbing Plan P1.10 Level 1 Plumbing Plan P1.20 Level 2 Plumbing Plan P1.30 Roof Level Plumbing Plan U0 w Q BLD2023-0557 RECEIVED May 08 2023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT L C :�t- T 0 � � v LA � }3 o 0 o C T w, 36534 AEGITV �10NAL t U) z LU O IL — 0 � Uw W w N N O N ti N N U) CU O Z 06 O C6 CU O Q N E C� � 0) N O N N >E a) N J 00 0 rn m M N U) >Q CU U) U) 2 O LU DATE 12/27/2022 DRAWN CHECKED MTW I DB PROJECT NO CONTRACT DRWG. REF. DRAWING NO. P0.00 OF Plumbing Fixture Calculations Updated: 12/27/2022 SYMBOL/ KITCHEN # DESCRIPTION Number W/V Cold Water Hot Water Remarks Fixtures DFU (EA) DFU (Total) FU (EA) FU (Total) FU (EA) FU (Total) GPM (EA) GPM (Total) GPH (EA) GPH (Total) FS-1 Floor Sink 5 3 15 -- -- -- -- -- 3 -- -- -- -- - -- -- -- -- -- -- -- 6 Ice well w/cold plate 1 Indirect to FS-1 -- -- -- -- 7 Soda Dispenser 3 -- -- 1 -- -- -- 8 Drink Pickup Tray drain 1 Indirect to FS-1 -- -- -- -- -- -- 9 Drain Board Drain 3 Indirect to FS-1 -- -- -- -- -- -- -- -- 10 Mixing Rail drain 1 Indirect to FS-1 -- -- -- -- -- -- -- -- 11 Jockey Cold Rail drain 1 Indirect to FS-1 -- -- -- -- -- -- -- -- 12 Mixology Station 1 Indirect to FS-1 1 1 1 1 1 1 5 5 13 Hand Sink 1 1 1 1 1 1 1 1 1 5 5 14 Dump Sink 1 Indirect to FS-1 2 2 2 2 1 1 10 10 15 Glass Washer 1 Indirect to FS-1 -- -- 3 3 1 1 20 20 18 Beer Taps w/drain & rinse 1 Indirect to FS-1 1 1 -- -- -- -- -- -- 45/46 Hand Sink 2 1 1 2 1 2 1 2 1 2 5 10 61/63 Pre -Rinse Sink & faucet 1 2 2 2 2 2 2 2 2 45 45 64 Dishwasher 1 Indirect to FS-1 -- -- 3 3 8 8 40 40 65/67 3 Compartment Sink & faucet 1 6 6 3 3 3 3 2 2 20 20 70 Refer Blower (Condensate) 1 Indirect to MS #80 -- -- -- -- -- -- -- -- 80/81 Mop Sink 1 3 1 3 3 3 3 3 2 2 20 20 85 Ice Machine 1 Indirect to FS-1 Indirect to FS-1 1 1 -- -- -- -- -- -- 86 Ice Storage Bin drain 1 -- -- -- -- -- -- -- -- 88/89 Prep Sink & Faucet 2 Indirect to FS-1 3 6 3 6 2 4 5 10 Totals --. Based on Table 703.2, a 4" service is rated for 256 DFU's (vertical) & 216 DFU's (horizontal) at 1/4"/L.F. slope. At 1/8"/L.F. slope, a 4" service is rated for 173 DFU's. 29 25 26 4" Cold Water Service Demand Total Fixture Units: Total GPM required: Available Pressure (STATIC): 24 185 CW 51 WSFU's 30 GPM 80 psi HW Tank (HWT) Sizing See A.O. Smith Water Heater Selection Report on this sheet. 26 WSFU's Domestic Water Service (MINIMUM): 18 GPM 2" Service @ 8 FPS = 300 Fixture Units or 80 GPM Pressure requred at Fixture: 35 psi 1-1/4" Pipe Size @ 5 FPS CW piping shall be sized for a maximum flow of 8 fps. Pressure loss due to elevation, see calc's: 10 psi 1/2" HWC HW piping shall be sized fro a maximum flow of 5 fps. Pressure loss in piping & valves, see calc's: 10 psi HWT sizing is based on ASHRAE 2019 Applications Chapter 51. Pressure loss thru meter & RPBP: 0 psi Total pressure required to serve fixtures: 55 •Smith® Innovation has a name. A. O. Smith Phone: 1.866.362.9898 www.hotwater.com Pressure difference between available vs. losses: Project Information Project #: 22-053 Prepared for: DBS Project Name: Johnny Mo's Location: Edmonds, WA Prepared by: MTW Engineer: BCE/MTW Contractor: DBS Selected Product BTH-199 Mxi Cyclone@ Mxi Modulating Pro -Size Selection Report December 27, 2022 # Heaters: Model Number: 1 BTH-199 Mxi Heater Recovery: 1 st Hour Delivery: 261 USGPH @ 90 °F Rise 331 USGPH ®_ Heater Storage (ea): 100 USG 3 Hour Average: 284 USGPH Input (ea): 199,000 Btu/hr Est. Storage Recovery: 23 min New External Tanks: 0 Tank Capacity (ea): 0 USG Total Usable Storage: 70 USG % Of Demand: 102% Model Number Hi Cube Trailer Gallon Recovery Capacity GPH Input BTU/HR Height Diameter ApproShipping Load Factor Capacity 100 Degree Rise Weight (Ibs.) BTH-199 Mxi 2.78 100 235 199,000 76 27.75 523 • Standard and Low profile concentric vent available • Vents with PVC, CPVC polypropylene and AL-29- • 4C Stainless steel • Venting distances of up to 120' on all models • Meets or exceed the thermal efficiency and /or standby loss requirements of the U.S. Department . of Energy and current edition of ASHRAE/IESNA 90.1 . • Meets NSF requirement's (no leg kit needed) Application Loads Summary Peak Demand: 325 USGPH Application Settings Up to 98% Thermal Efficiency Down -Fired Low-NOx Powered -Burner Design Fully Submerged, Spiral -Shaped Condensing Heat Exchanger Complies with SCAQMD Rule 1146.2 Sidewall and Vertical power vent and direct Vent Options Space -Saving Design, with Zero Clearance to Combustibles Temperature Rise: 90 °F Type: Food Service / Restaurant Building Use: Not Specified Cold Water Temp: 50 °F Peak Demand Period: 1.00 Hours Stored Water Temp: 140 °F Equipment: Water Heaters Only (no external Approx. Storage: 25% storage) # Storage Tanks: Not Specified Fuel Type: Natural Gas Existing Storage: None Location: Indoor The A. O. Smith Pro -Size sizing program is a tool that can be used to estimate water heater requirements for many common applications. Pro -Size is intended to assist in selecting water heaters or boilers that best meet the specific job requirements. It is the sole responsibility of the system designer to select the correct products needed for the specific application. A. O. Smith reserves the right to make changes to Pro -Size without notice. Page 1 of 2 ti 0 N N N \ r r 25 psi KITCHEN PLUMBING EQUIPMENT FIXTURE SCHEDULE Date: 12/27/2022 SYM DESCRIPTION WASTE VENT DFU CW HW WSFU GAS GAS REMARKS MBTU See Note 1 6 Ice well w/cold plate 7 Soda Dispenser (x3) 1" -- -- -- -- -- -- -- Indirect sink drain to FS-1 -- -- 1 1/2" -- 1 -- -- 8 Drink Pickup Tray drain 1" -- 1 -- -- -- -- -- Indirect sink drain to FS-1 9 Drain Board Drain (0) 1" -- 1 -- -- -- -- -- Indirect sink drain to FS-1 10 Mixing Rail drain 1/2" -- 1 -- -- -- -- -- Indirect sink drain to FS-1 11 Jockey Cold Rail drain 1" -- 1 -- -- -- -- -- Indirect sink drain to FS-1 12 Mixology Station 1-1/2" -- 1 1/2" 1/2" 1 -- -- Indirect sink drain to FS-1 13 Hand Sink 2" 1-1/2" 1 1/2" 1/2" 1 w/ASSE 1070 compliant thermostatic mixing valve 14 Dump Sink 2" 1-1/2" 2 1/2" 1/2" 2 -- -- 15 Glass Washer 1" -- 3 -- 3/4" 3 -- -- Indirect sink drain to FS-1 18 Beer Taps w/drain & rinse 1" -- 1 1/2" -- 1 -- -- Indirect sink drain to FS-1 44 Double stack oven (x2) HandSink (x2) -- -- -- -- -- -- 3/4" 240 w/ASSE 1070 compliant thermostatic mixing valve 45/46 2" 1-1/2" 1 1/2" 1/2" 1 61/63 Pre -Rinse Sink & faucet 2" 1-1/2" 2 1/2" 1/2" 2 -- -- 64 Dishwasher 1" -- 3 -- 3/4" 3 -- -- Indirect sink drain to FS-1 65/67 3 Compartment Sink & faucet 2" -- 6 3/4" 3/4" 3 -- -- 70 Refer Blower (Condensate) 1/2" -- 1 -- -- -- -- -- Indirect sink drain to FS-1 80/81 Mop Sink 3" 2" 3 1/2" 1 1/2" 3 -- -- 85 Ice Machine 2" -- 1 3/4" -- 1 -- -- Indirect sink drain to FS-1 & RP-1 86 Ice Storage Bin drain 2" -- 1 -- -- -- -- -- 1/2" 3 -- -- I Indirect sink drain to FS-1 88/89 Prep Sink & Faucet (x2) 2" -- 2 1/2" Indirect sink drain to FS-1 NOTES: 1 Equipment on this list is provided by others, connections are by plumbing contractor, see Kitchen Sheet K-2. RECEIVED May 08 2023 CITY OF EDMONDS DEVELOPMENT SERVICES 5 - o A T +r 'o u3 � � v � v a � t=j 36534 �EGIISTE� y10NAL ES In H Z W 0 ILL. — 0 > LU Z) Ld U) N N O N ti N (N T_ U) c 0 L O �--+ U E Ca U > N N wx Wcn > > N 0 J ., CO M Q vJ W CM CM ,�ui � O 0 co u7 Lu DATE 12/27/2022 DRAWN CHECKED MTW DB PROJECT NO. CONTRACT DRWG. REF. DRAWING NO. P0.01 OF F� "G (2PSU, 480 1/2 "G (2PSI),199 MW GAS SOLENOID VALVE, "NORMALLY CLOSED GAS PRESSURE REGULATOR POWERED OPEN". INTERCONNECT w/FIRE ALARM w/RELIEF VENT THRU ROOF SYSTEM t0 CLOSE UPON SIGNAL. (TYPICAL) I f ROOF 2 V�11/4' G, 480 MBH) . 199 MBH GAS METER 4 PRIMARY SERVICE BY UTILITY COMPANY. GAS COCK/VALVE (TYP) FLEX CONNECTION (TYP) PIZZA OVEN 044 3/4 "G,120 MBH (TYP OF 4) FULL SIZE x 61. DIRT LEG (TYP) I" G, 240 MBH) LEVEL 2 LEVEL I GAS PIPING RISER DIAGRAM NO SCALE 11/2"V (1) TO �- HANDSINK 045 2"VTR (22 DFU) 2"V (12) 2V (3) TO MOP SINK w } 01 65 Y. 2"W (b) PONT OF CONNECTION t0 OU EXISTING 4" GREASE WASTE 4"GW (12 DFU) kn Gw --/ EXISTING 4" GREASE WASTE t0 EXISTING SITE GREASE INTERCEPTOR 2"V (3) TO FS-1 FOR %4 2"V (b) 2"V.(4) GAS PIPING CALCULATIONS NOTES: I. PRIMARY GAS PIPING (METER t0 PRESSURE REGULATOR) SIZING IS BASED ON 2018 IFGC TABLE 12162(2) SCHEDULE 40 METALLIC PIPE FOR 2 PSI 4 1& W.C. PRESSURE DROP. THE EQUIVALENT LENGTH OF PIPING IS 100'. 2. SECONDARY GAS PIPING (DOWNSTREAM OF PRESSURE REGULATOR) SIZING IS BASED ON 2018 IFGC TABLE 121620) SCHEDULE 40 METALLIC PIPE FOR PRESSURE LESS THAN 2 PSI 4 OV WL. PRESSURE DROP. THE EQUIVALENT LENGTH OF PIPING IS 50'. 3. SEE PIPING SCHEDULE ON SWEETP0.01 FOR PIPING MATERIALS. 4. PIZZA OVENS REQUIRE A 6 TO 14 WL. GAS SERVICE TO APPLIANCE REGULATOR, VERIFY wAQTCHEN CONTRACTOR rl, I1/2 "V (1) TO HANDSINK 045 11/2"V (2) TO M PREP SINK +161 2"GW (3) LEVEL I GREASE WASTE RISER DIAGRAM NO SCALE 2"CW SHUT-OFF VALVE 4 SERVICE (50 WSFU) POINT OF CONNECTION TO & NVICW (30) EXISTING 2" DOMESTIC WATER--- I"HW-140F (23) T4P VALVE wA:ULL SIZE — RELIEF PIPED t0 MOP SINK SIESMIC RESTRAINTS PER UPC (TYPICAL v '/2"H4CW (1), SET c� DISCH FOR IIOT- GWH-1 TO BE INSTALLED ON WALL SHELF. J COORD w)GL. FOR SHELF 4 LOCATION. PROVIDE w/DRAN PAN 4 DRAIN PIPING TO MOP SINK BELOW. l 1 0' o o T 'o � � n +r Ln CDrq � � v � v 1"CW(12) UNION (TYP) a^ a^-�' /2 "HNC CHECK VALVE (TYP)CIA a I"HW-140F lll) SHUT-OFF VALVE (TYP) at 3/4"CW(11) �z llWWC I"HW-140F (10) I � 3 LA -- - --- -- -- - f- -- -- -- 3/4°HW 120 '4) o --1�/4"CW l29) - - I I i I I 4 3/4"14W-140 (3) ROUTED BELOW �^ �^ �^ a^ «� �^ �� a^ «� „�'� 'iz"CW (1) T COUNTER SEE FLOOR PLANS 12 13 14 15 IS 1 '/2"144CW (U, � I �------- --�{ -'---� -----}------- -ice SET DISC 4 3/4" CW (8) i I Et I/s"H4CW (U, I I I I I FOR IIOT- '/z HWC I 1/(�)a SET DISGH s I s I s s I s I 3i4"HW-14OF (1) I I -- 3i4"HW-120F (4) I pF AS FOR 110'F 81 bl 89 64 61 46 w/DR41N t0 FS-1 LEVEL 2 , ' �^�"' I RP 4--CW (3) 3 89 /4"14W-14OF (3) e (TYPICAL) -� ---------- ---- '/,"CW (1) 36534 7 IST _ �`r _ mac. _ moo. X ♦ m�� �+► �� .r 0,- x .r �� ♦ �N .r IONAL DOMESTIC WATER RISER DIAGRAM NO SCALE W4 W-i h Wtu o WE pa 0 0 w- ofS ow u 2� %W uu w- _ wC fu lu ^ POINT OF CONNECTION TO M 211W N H EXISTING 4" SANITARY (3) 2" SANITARY 3"SAN 3"SAN 311SAN 2 "SAN (10 DFU) (9) (6) (3) EXISTING 4"W (4 DFU) EXISTING 4" SANITARY LEVEL I KITCHEN SANITARY RISER DIAGRAM NO SCALE EXISTINCs 4" 5ANITART BAR AREA SANITARY RISER NO SCALE RECEIVED DIAGRAM82023 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT U) H z w O u- — 0 � Z w U) c/) w N N O N ti N N T- L m U - -_1 U) O E O 0 06 i m .E C/) L: U)O M 0 N i cn a) N E > N N i� > N J 00 Q Cn cm cm ,� ) m 0 E E O 00 Lo E Ln Lu DATE 12/27/2022 DRAWN CHECKED MTW I DB PROJECT NO CONTRACT DRWG. REF. DRAWING NO. P0.02 OF 15"-61/ " 24'- 8 1/ 1 "_011 UNDERGROUND PLUMBING PLAN SCALE: 1/4" = 1'-0" O u J ti O N C`7 0 N \ r q12 4' O 1 /2" l 1 �' o CD T � +r 'o � n Ln rq � N N � � v u � v LA 4 v O fk O O T v5 N � 4I11�; R n1Y 36534 �EGI�TE �10NAL t U) H Z W O IL - 0 > Lu D W U) c (Y N N O N ti N N T- L O E 0) > N N N a� O ) O _Z3 O �--. d7 C!) E_ OLo-0 Z) 0- Lu DATE 12/27/2022 DRAWN CHECKED MTW I DB PROJECT NO. PROJECT NORTH R E C E V CONTRACT DRWG. REF. DRAWING NO. 0 2' 4' 8' may P 1.00 CITY OF EDMONDS DRAWING SCALE: 1/4" = 1'-0" (UNLESS NU ER�T WISE) 0F LEVEL 1 PLUMBING PLAN SCALE: 1 /4" = V-0" 7 'ti u J ti 0 N C`7 N 0 N l 1rn 0 o o T � +r 'o � n Ln � N N � � v u � v c LA 4 }3 0 n o o T u; N 4I11�; R AN 36534 �EGI�TE� �10NAL V U) W, 2°V (3) ~ z 'W(U045 w O 4ANDSINK 0- — O ILL - 0 � Z) w "CO, 2"V (3) U � N N O N ti N N T- PW (3) W ARY :)R CONT PROJECT NORTH REC I 0 2' 4' 8' M ay M 2 DS DRAWING SCALE: 1/4" = l'-0" (UNLESS NO��GPO�rl�fERMISF-) DEPARTMENT z, 0 a� E 0 N > 0 N N CD > N 0 m� a)Q _� cm > E Op Lo Lu DATE 12/27/2022 DRAWN CHECKED MTW DB PROJECT NO. CONTRACT DRWG. REF. DRAWING NO. P1.10 OF 9 10 11 12 13 I I I I I I I I I - — — — — — — — — — — — — — — — — — — — — — — —I— — — — — — — - - — — — — — — — — -- — — — — — — — — — — — — — — —I— — — — — — — — I I I I I I 2"V (3), ROUTE PIPING BELOW CABINET 2"V (1) HOLD TIGHT TO WALL 4 CORNER COORDINATE wK FOR FNGLOSl1RF_ ri1 0 (36 N C`7 N N LEVEL 2 PLUMBING PLAN - - - - - - - - - - - - - - - - -- A.1 A.8 C.21 V2"CW 4 HW-140F, 2"V (3) /&a 11/4" H4CW (26 WSFU) w/34" 144CW TO MOP SINK 81 )r2NV5(3) - 3/4"HWC LTOaMV-1, SEE DIAGRAM ON SHEET P0.02 -11/4"CW (29) w/I1/4"CW (26) TO EWH-I - D.4 �- 3/4" CONDENSATE PIPING E.5 CONFIRUCTION NOTE5: iO GAS SOLENOID VALVE. CONNECT TO FIFE ALAIRM SYSTEM TO CLOSE UPON SIGNAL. O ROUTE 2" GAS (4W MBH) TO METER 0 2"V (22 DFU) UP TO VTR. O3-COMP SINK wK3) 2"W CONNECTIONS 4 CLEANOUTS ROUTED TO GREASE WASTE SYSTEM. O ROUTE SERVICES DOWN WALL 4 OFFSET BELOW WINDOW TO SERVE FIXTURE. OLOOP HW-120F SERVICE DOWN TO HANDSINK 4 CONTINUE AS INDICATED. O 2" DOMESTIC COLD WATER SERVICE w/SHUT-OFF VALVE, 50 WSFU. CONNECT TO EXISTING BUILDING 2" CW SERVICE, VERIFY LOCATION ON -SITE. gOROUTE 1/2"HW-140F DOWN 4 CONNECT 1/2"CW TO TMV-1. SET DISCHARGE TEMP TO 1107 4 CONNECT TO HAND SINK O34 PVC FLUE 4 COMBUSTION AIR UP TO CONCENTRIC ADAPTER AT 'ROOF. ROUTE TO GWH-I CONNECTIONS. 10 3/4" MED PRESSURE 2PSI GAS SERVICE TO GWH-1 (199 MBH). PROVIDE w/SHUT-OFF VALVE, PRESSURE REGULATOR w/VENT TO ROOF, FLEX CONNECTION 4 6" DIRT LEG, SEE DIAGRAMS ON P001. II GAS PRESSURE REGULATOR w/VENT TO ROOF, SEE DIAGRAMS ON PO.01. 4W MBH, 2PSI TO 6"WC (VERIFY DISCHARGE PRESSURE FOR PIZZA OVENS wAQTCHEN CONTRACTOR NORTH RECEINM 0 2' 4' 8' May 08'20 DRAWING SCALE: 1/4" = 1'-0" (UNLESS hatWZ MWkSE) DEPARTMENT l 1 0' o CD T � +r 'o � n Ln rq � N N � � v u un o Lry t=j 36534 �EGI�STE� �10NAL tS U) H z w 0- - O L - o � D w U) N N O N ti N N T- i O N E o N > 0 N N > CD N J co m� o �Q C/ cm N •� EO � J _ r2 � W � DATE 12/27/2022 DRAWN CHECKED MTW DB CONTRACT DRWG. REF. DRAWING NO. P 1.20 OF 9 10 11 12 13 I I I I I I I I I I I I I I I I I I I I - - - - - - - - - - - - - - - - - - - - - - -I- - - - - - - - - - - - - - - - - - - - - - - - -t - - - - - - - - - - - -t - - - - - - - - - - - - - - - - - - - - - - - -t - - - - - - - - - - -- - - - - - - - - - -- - - - - - - - - - - - - - - -I- - - - - - - - - - - - - - - - - - - - - - - - -I- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - I I I I I I I I A.1 EXISTS❑ DRAIKNE I I I I I I I I I I I I I I I I I I I I I I I i I I I I Do I I I I I I I I I I I I I I I ,02"VTR (1 M) I I I A:o �*EF U- I EXI5TING ARCH 5CREENING X �� 0 2' FOR I I VW CRAB'w I I I I I I I I I - - - - - - - - - - - - - -V - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - n n �CI�,STINCx �r�-I I - I Li Li S EXISTIN R PIPE 5NAFT I I L----- --J TIE PLC o z ti I V::� CD � N � I tiro Izz ROOF LEVEL PLUMBING PLAN 7 L0 O 66 O N C`7 N N r L--- EXISTING ❑LEVAT❑R T❑WER CE FLAT R❑❑E ASSEMBLY CC SSUSE MEMBRANE R❑❑❑S❑ ❑/ TAPERED CCD INSUC 7" MIN, (R-38 MIN,) CLASS —A RATED R07N❑ LAYER 1/2" PCYW❑❑D DECK ❑/ 2X CPR DECKS❑ ❑/ ❑CB PURCINS ❑N STEEL BEAMS c.2 MECHANICAL EQUIPMENT ACCESS — D.4 SEXISTS❑ C❑LS❑ C❑NDENSER -EXISTING DRAINAGE E.5 S❑UTHEAST SCUPPER -THR❑U❑H PARAPET (EXISTING) PROJECT NORTH RECEIV 0 2' 4' 8' May 0$620 CITY OF EDMONDS DRAWING SCALE: 1/4" = 1'-0" (UNLESS N&TE0E9TEISE) DEPARTMENT l 1 �' o CD T � +r � � n Ln rq N N � u LA t17 36534 �EGI�STE� �10NAL tS U) z w 0 U' IL - o > D W N N O N ti N N 0 N 0) N c� o N N a� o cm 0 NO °�Q co > a) cm c .� ) J ca o o O Lo -0 0 --.) Uc, w DATE 12/27/2022 DRAWN CHECKED MTW DB PROJECT NO. CONTRACT DRWG. REF. DRAWING NO. P1.30 OF