Loading...
APPROVED ENG 20432 - Pipe Anchors - Keck & HathawayGEorrEcx CONSULTANTS, INC_ Kevin Keck and Heather Hathaway 538 Battery Street, Apt. 508A Seattle, Washington 98121 via email. kevkeck(@me.com Subject: Stormwater Pipe Anchors Proposed Single -Family Residence 15722 — 72nd Avenue West Edmonds, Washington Dear Mr. Keck and Ms. Hathaway: 2401 10th Ave E Seattle, Washington 98102 (425) 747-5618 July 20, 2022 J N 20432 RECEIVED Jul 22 2022 1,111 Iy1QIl 1,011 ENGINEERING DIVISION APPROVED AS, NOTED Our firm has prepared many reports for this project in the last few years. Now the project is in construction. It has come to our attention that "pipe anchors" are needed for any stormwater pipes that slope 20 percent or greater. The plans indicate that one, or possibly a few more, "runs" of pipe have a slope of 20 percent or greater. Based on the project plans, the pipes will be buried about 3 to 4 feet below the ground. We have attached a detail per for soil cement blocks to be used as typical pipe anchors where a pipe slopes 20 percent or greater. One pipe anchor should be placed in the middle of pipe run that has a slope is 20 percent or greater. We believe these pipe anchors are very suitable for the project in our professional opinion because the soil of the project site is very competent and stable at the 3- to- 4-foot level (bottom of pipe). We trust that this letter meets your immediate needs for the proposed development. Please contact us if we can be of further service. Respectfully submitted, GEOTECH CONSULTANTS, INC. D. Robert Ward, P.E. Principal Attachment: Pipe Anchor Detail cc: Studio Zerbey - Kyle Zerbey via email: Kyle(a)-studiozerbey.com BACKFILL PER STANDARD SOIL/CEMENT BLOCKS PLACED AS DIRECTED BY ENGINEER 12"MIN ^-J NOTES: 1. SOIL CEMENT BLOCKS REQUIRED ON PIPE SLOPES OF 20% OR GREATER. PIPE CLAM P PIPE CITY INSPECTION OF PIPE CLAMPS AND TRENCH REQUIRED PRIOR TO PLACEMENT OF SOIL/CEMENT MIX. 2. SOIL CEMENT BLOCKS PLACED OVER AND AROUND. TAMPED INTO PLACE BEFORE BACKFILLING_ USE 10% CEMENT WITH 9096 NATIVE SOIL MIX- ADD ENOUGH WATER TO FORM A DRY MIX THAT WILL HOLD FrS SHAPE WHEN MOLDED INTO A BALL_ 3. PLACE TWO PIPE CLAMPS, 4" FROM BLOCK ENDS TO PROVIDE ANCHORAGE TO SOILICEM ENT MIX. GEOTECH CONSULTANTS, INC. PILE ANCHOR 15722 - 72nd Avenue West Edmonds, Washington Job No: Date: Plate: 20432 1 July 2022