DNS Doc #16 -Geotechnical_Report+7.15.2021GEOTECH
CONSULTANTS, INC_
Johnston Design Group
411 University Ridge, Suite D
Greenville, South Carolina 29601
Attention: Scott Johnston
via email: Scott@johnstondesigngroup.us
Subject: Geotechnical Engineering Study
Proposed Ahern Residence
15722 — 72nd Avenue West
Edmonds, Washington
2401 1 Oth Ave E
Seattle, Washington 98102
(425) 747-5618
October 16, 2017
J N 17557
Our firm has prepared a geotechnical engineering study for the proposed Meadowview Estates
short -plat project dated October 9, 2013. The proposed single-family residence that is under
consideration in this report is located in the more southwestern portion of the short -plat. This report
relies on the information contained in the study for the short -plat property, and provides
geotechnical engineering design parameters for the new residence.
The western edge of the short -plat property and the subject residential property contains a very
steep slope. However, only a mostly gentle to moderate slope rise to the east above this steep
slope. One of the main conclusions and recommendations noted in our study was that, based on
stability analyses performed regarding the steep western slope, a 65-foot setback from the steep
western slope should be maintained for new residences if standard footing foundations were used
for new residences. Based on a recent site plan we received for the project, which was prepared by
Johnston Design Group, the new residence on the subject site will indeed be located at least 65
feet from the steep western slope. In addition, we understand that stormwater from impervious site
surfaces will discharge to an existing stormwater system.
If the scope of the project changes from what we have described above, we should be provided
with revised plans in order to determine if modifications to the recommendations and conclusions of
this report are warranted.
CONCLUSIONS AND RECOMMENDATIONS
GENERAL THIS SECTION CONTAINS A SUMMARY OF OUR STUDY AND FINDINGS FOR THE
PURPOSES OF A GENERAL OVERVIEW ONLY. MORE SPECIFIC RECOMMENDATIONS AND
CONCLUSIONS ARE CONTAINED IN THE REMAINDER OF THIS REPORT. ANY PARTY
RELYING ON THIS REPORT SHOULD READ THE ENTIRE DOCUMENT.
GENERAL
Several test pits and borings were conducted in the past as noted in our 2013 study in the area of
the proposed residence, and these explorations encountered medium -dense to dense, sometimes
very dense, gravelly sand soils at shallow depths. This soil is very competent for supporting building
loads, and thus conventional footings that bear on this competent soil can be used as the
foundation of the new residence. These soils also have high shear strength against slope instability.
GEOTECH CONSULTANTS, INC.
Johnston Design Group J N 17557
October 19, 2017 Page 2
As was noted in October 9, 2013 study for the entire short -plat, an "alteration" is needed per
Edmonds Code for this project because the overall setback of 65 feet noted above is shorter than
the default overall setback of about 95 to 105 feet (equal to the height of the western steep slope
plus 15 feet). Based on the code, ECDC•23.BO.060.A, an alteration to a Landslide Hazard Area
and associated buffer may occur for activities that:
1. Will not increase the threat of the geologic hazard to adjacent properties beyond
predevelopment conditions;
2. Will not adversely affect other critical areas;
3. Are designed so that the hazard to the project is eliminated or mitigated to a level equal
to or less that predevelopment conditions; and
4. Are certified as safe as designed and under anticipated conditions by a qualified engineer
licensed in the State of Washington.
In addition, ECDC 23.BO.070.A.3 indicates that alterations of a Landslide Hazard Area and
buffer may occur for activities for which a hazards analysis is submitted and certifies that:
1. The development will not increase surface water discharge or sedimentation to adjacent
properties beyond predevelopment conditions;
2. The development will not decrease slope stability on adjacent properties; and
3. Such alterations will not adversely impact other critical areas.
As noted above, we performed full stability analysis on the property that included the steep
western slope and an overall setback of 65 feet met all of the stability requirements. In addition,
as is recommended earlier, all loads for the residence will be founded on medium -dense to
dense or denser native soil. Because of these reasons, because the site stormwater will be
taken to an existing stormwater system (which lowers the amount of water that reaches the
western slope and thus provides some increase to the slope's stability), it is our professional
opinion that this proposed development meets the seven standards noted above in both ECDC
23.80.060 and 070 provided the recommendations of this report are followed.
The erosion control measures needed during the site development will depend heavily on the
weather conditions that are encountered. We anticipate that a silt fence will be needed around the
downslope sides of any cleared areas. Existing pavements, ground cover, and landscaping should
be left in place wherever possible to minimize the amount of exposed soil. Rocked staging areas
and construction access roads should be provided to reduce the amount of soil or mud carried off
the property by trucks and equipment. Wherever possible, the access roads should follow the
alignment of planned pavements. Trucks should not be allowed to drive off of the rock -covered
areas. Cut slopes and soil stockpiles should be covered with plastic during wet weather. Following
clearing or rough grading, it may be necessary to mulch or hydroseed bare areas that will not be
immediately covered with landscaping or an impervious surface. On most construction projects, it is
necessary to periodically maintain or modify temporary erosion control measures to address
specific site and weather conditions.
The drainage and/or waterproofing recommendations presented in this report are intended only to
prevent active seepage from flowing through concrete walls or slabs. Even in the absence of active
seepage into and beneath structures, water vapor can migrate through walls, slabs, and floors from
the surrounding soil, and can even be transmitted from slabs and foundation walls due to the
concrete curing process. Water vapor also results from occupant uses, such as cooking and
bathing. Excessive water vapor trapped within structures can result in a variety of undesirable
GEOTECH CONSULTANTS, INC.
Johnston Design Group J N 17557
October 19, 2017 Page 3
conditions, including, but not limited to, moisture problems with flooring systems, excessively moist
air within occupied areas, and the growth of molds, fungi, and other biological organisms that may
be harmful to the health of the occupants. The designer or architect must consider the potential
vapor sources and likely occupant uses, and provide sufficient ventilation, either passive or
mechanical, to prevent a buildup of excessive water vapor within the planned structure. Geotech
Consultants, Inc. should be allowed to review the final development plans to verify that the
recommendations presented in this report are adequately addressed in the design. Such a plan
review would be additional work beyond the current scope of work for this study, and it may include
revisions to our recommendations to accommodate site, development, and geotechnical constraints
that become more evident during the review process. We recommend including this report, in its
entirety, in the project contract documents. This report should also be provided to any future
property owners so they will be aware of our findings and recommendations.
Geotech Consultants, Inc. should be allowed to review the final development plans to verify that the
recommendations presented in this report are adequately addressed in the design. Such a plan
review would be additional work beyond the current scope of work for this study, and it may include
revisions to our recommendations to accommodate site, development, and geotechnical constraints
that become more evident during the review process.
We recommend including this report, in its entirety, in the project contract documents. This report
should also be provided to any future property owners so they will be aware of our findings and
recommendations.
SEISMIC CONSIDERATIONS
In accordance with the International Building Code (IBC), the site class within 100 feet of the ground
surface is best represented by Site Class Type D (Stiff Soil Class). As noted in the USGS website,
the mapped spectral acceleration value for a 0.2 second (S5) and 1.0 second period (S1) equals
1.33g and 0.52g, respectively.
The site soils are not susceptible to seismic liquefaction during a large earthquake because of their
dense nature and/or the absence of near -surface groundwater.
CONVENTIONAL FOUNDATIONS
The proposed structure can be supported on conventional continuous and spread footings bearing
on undisturbed, medium -dense to dense, native sand soil. We recommend that continuous and
individual spread footings have minimum widths of 16 and 24 inches, respectively. Exterior footings
should also be bottomed at least 18 inches below the lowest adjacent finish ground surface for
protection against frost and erosion. The local building codes should be reviewed to determine if
different footing widths or embedment depths are required. Footing subgrades must be cleaned of
loose or disturbed soil prior to pouring concrete. Depending upon site and equipment constraints,
this may require removing the disturbed soil by hand.
An allowable bearing pressure of 3,000 pounds per square foot (psf) is appropriate for footings
supported on competent native sand soil. A one-third increase in this design bearing pressure may
be used when considering short-term wind or seismic loads. For the above design criteria, it is
anticipated that the total post -construction settlement of footings founded on competent native soil
will be about one-half inch, with differential settlements on the order of one-half inch in a distance of
50 feet along a continuous footing with a uniform load.
GEOTECH CONSULTANTS, INC.
Johnston Design Group JN 17557
October 19, 2017 Page 4
Lateral loads due to wind or seismic forces may be resisted by friction between the foundation and
the bearing soil, or by passive earth pressure acting on the vertical, embedded portions of the
foundation. For the latter condition, the foundation must be either poured directly against relatively
level, undisturbed soil or be surrounded by. level, well -compacted fill. We recommend using the
fallowing ultimate values for the foundation's resistance to lateral loading:
PARAMETER ULTMATE
Coefficient of Friction 0.50
Passive Earth Pressure 300 pcf
Where: pcf is Pounds per Cubic Foot, and Passive Earth
Pressure is computed using the Equivalent Fluid Density.
If the ground in front of a foundation is loose or sloping, the passive earth pressure given above will
not be appropriate. We recommend maintaining a safety factor of at least 1.5 for the foundation's
resistance to lateral loading, when using the above ultimate values.
FGLINDA TION A ND RETAINING WALLS
Retaining walls backfilled on only one side should be designed to resist the lateral earth pressures
imposed by the soil they retain. The following recommended parameters are for wails that restrain
level backfill:
Active Earth Pressure *
35 pcf
Passive Earth Pressure
300 pcf
Coefficient of Friction
0.50
Soil Unit Weight
130 pcf
Where: pcf is Pounds per Cubic Foot, and Active and Passive
Earth Pressures are computed using the Equivalent Fluid
Pressures.
* For a restrained wall that cannot deflect at least 0.002 times its
height, a uniform lateral pressure equal to 10 psf times the height
of the wall should be added to the above active equivalent fluid
pressure.
The design values given above do not include the effects of any hydrostatic pressures behind the
walls and assume that no surcharges, such as those caused by slopes, vehicles, or adjacent
foundations will be exerted on the walls. If these conditions exist, those pressures should be added
to the above lateral soil pressures. Where sloping backfill is desired behind the walls, we will need
to be given the wall dimensions and the slope of the backfill in order to provide the appropriate
design earth pressures. The surcharge due to traffic loads behind a wall can typically be accounted
for by adding a uniform pressure equal to 2 feet multiplied by the above active fluid density. Heavy
construction equipment should not be operated behind retaining and foundation walls within a
distance equal to the height of a wall, unless the walls are designed for the additional lateral
pressures resulting from the equipment. The values given above are to be used to design only
GEOTECH CONSULTANTS, INC.
Johnston Design Group
October 19, 2017
A 17557
Page 5
permanent foundation and retaining walls that are to be backfilled, such as conventional walls
constructed of reinforced concrete or masonry. It is not appropriate to use the above earth
pressures and soil unit weight to back -calculate soil strength parameters for design of other types of
retaining walls, such as soldier pile, reinforced earth, modular or soil nail walls. We can assist with
design of these types of walls, if desired. The passive pressure given is appropriate only for a shear
key poured directly against undisturbed native soil, or for the depth of level, well -compacted fill
placed in front of a retaining or foundation wall. The values for friction and passive resistance are
ultimate values and do not include a safety Restrained wall soil parameters should be utilized for a
distance of 1.5 times the wall height from corners or bends in the walls. This is intended to reduce
the amount of cracking that can occur where a wall is restrained by a corner.
Wall Pressures Due to Seismic Forces
The surcharge wall loads that could be imposed by the design earthquake can be modeled
by adding a uniform lateral pressure to the above -recommended active pressure. The
recommended surcharge pressure is 8H pounds per square foot (psf), where H is the design
retention height of the wall. Using this increased pressure, the safety factor against sliding
and overturning can be reduced to 1.2 for the seismic analysis.
Retaining Wall Backfill and Waterproofing
Backfill placed behind retaining or foundation walls should be coarse, free -draining structural
fill containing no organics. This backfill should contain no more than 5 percent silt or clay
particles and have no gravel greater than 4 inches in diameter. The percentage of particles
passing the No. 4 sieve should be between 25 and 70 percent. If the native sand is used as
backfill, a drainage composite similar to Miradrain 6000 should be placed against the
backfilled retaining walls. The drainage composites should be hydraulically connected to the
foundation drain system. The later section entitled Drainage Considerations should also
be reviewed for recommendations related to subsurface drainage behind foundation and
retaining walls.
The purpose of these backfill requirements is to ensure that the design criteria for a retaining
wall are not exceeded because of a build-up of hydrostatic pressure behind the wall. Also,
subsurface drainage systems are not intended to handle large volumes of water from
surface runoff. The top 12 to 18 inches of the backfill should consist of a compacted,
relatively impermeable soil or topsoil, or the surface should be paved. The ground surface
must also slope away from backfilled walls to reduce the potential for surface water to
percolate into the backfill. Water percolating through pervious surfaces (pavers, gravel,
permeable pavement, etc.) must also be prevented from flowing toward walls or into the
backfill zone. The compacted subgrade below pervious surfaces and any associated
drainage layer should therefore be sloped away. Alternatively, a membrane and subsurface
collection system could be provided below a pervious surface. It is critical that the wall
backfill be placed in lifts and be properly compacted, in order for the above -recommended
design earth pressures to be appropriate. The wall design criteria assume that the backfill
will be well -compacted in lifts no thicker than 12 inches. The compaction of backfill near the
walls should be accomplished with hand -operated equipment to prevent the walls from
being overloaded by the higher soil forces that occur during compaction. The section entitled
General Earthwork and Structural Fill contains additional recommendations regarding the
placement and compaction of structural fill behind retaining and foundation walls.
GEOTECH CONSULTANTS, INC.
Johnston Design Group
October 19, 2017
A 17557
Page 6
The above recommendations are not intended to waterproof below -grade walls, or to
prevent the formation of mold, mildew or fungi in interior spaces. Over time, the performance
of subsurface drainage systems can degrade, subsurface groundwater flow patterns can
change, and utilities can break or develop leaks. Therefore, waterproofing should be
provided where future seepage through the walls is not acceptable. This typically includes
limiting cold -joints and wall penetrations, and using bentonite panels or membranes on the
outside of the walls. There are a variety of different waterproofing materials and systems,
which should be installed by an experienced contractor familiar with the anticipated
construction and subsurface conditions. Applying a thin coat of asphalt emulsion to the
outside face of a wall is not considered waterproofing, and will only help to reduce moisture
generated from water vapor or capillary action from seeping through the concrete. As with
any project, adequate ventilation of basement and crawl space areas is important to prevent
a buildup of water vapor that is commonly transmitted through concrete walls from the
surrounding soil, even when seepage is not present. This is appropriate even when
waterproofing is applied to the outside of foundation and retaining walls. We recommend
that you contact an experienced envelope consultant if detailed recommendations or
specifications related to waterproofing design, or minimizing the potential for infestations of
mold and mildew are desired.
The General, Slabs -On -Grade, and Drainage Considerations sections should be reviewed
for additional recommendations related to the control of groundwater and excess water
vapor for the anticipated construction.
SLABS -ON -GRADE
The building floors can be constructed as slabs -on -grade atop firm native sand or on structural fill.
The subgrade soil must be in a firm, non -yielding condition at the time of slab construction or
underslab fill placement. Any soft areas encountered should be excavated and replaced with select,
imported structural fill.
Even where the exposed soils appear dry, water vapor will tend to naturally migrate upward through
the soil to the new constructed space above it. This can affect moisture -sensitive flooring, cause
imperfections or damage to the slab, or simply allow excessive water vapor into the space above
the slab. All interior slabs -on -grade should be underlain by a capillary break drainage layer
consisting of a minimum 4-inch thickness of clean gravel or crushed rock that has a fines content
(percent passing the No. 200 sieve) of less than 3 percent and a sand content (percent passing the
No.4 sieve) of no more than 10 percent. Pea gravel or crushed rock are typically used for this layer.
As noted by the American Concrete Institute (ACI) in the Guides for Concrete Floor and Slab
Structures, proper moisture protection is desirable immediately below anyon-grade slab that will be
covered by tile, wood, carpet, impermeable floor coverings, or any moisture -sensitive equipment or
products. ACI also notes that vapor retarders such as 6-mil plastic sheeting have been used in the
past, but are now recommending a minimum 10-mil thickness for better durability and long term
performance. A vapor retarder is defined as a material with a permeance of less than 0.3 perms, as
determined by ASTM E 96. It is possible that concrete admixtures may meet this specification,
although the manufacturers of the admixtures should be consulted. Where vapor retarders are used
under slabs, their edges should overlap by at least 6 inches and be sealed with adhesive tape. The
sheeting should extend to the foundation walls for maximum vapor protection. If no potential for
vapor passage through the slab is desired, a vapor barrier should be used. A vapor barrier, as
defined by ACI, is a product with a water transmission rate of 0.01 perms when tested in
accordance with ASTM E 96. Reinforced membranes having sealed overlaps can meet this
requirement.
GEOTECH CONSULTANTS, INC.
Johnston Design Group J N 17557
October 19, 2017 Page 7
In the recent past, ACI (Section 4.1.5) recommended that a minimum of 4 inches of well -graded
compactable granular material, such as a 5/8-inch-minus crushed rock pavement base, be placed
over the vapor retarder or barrier for their protection, and as a "blotter" to aid in the curing of the
concrete slab. Sand was not recommended by ACI for this purpose. However, the use of material
over the vapor retarder is controversial as noted in current ACI literature because of the potential
that the protection/blotter material can become wet between the time of its placement and the
installation of the slab. If the material is wet prior to slab placement, which is always possible in the
Puget Sound area, it could cause vapor transmission to occur up through the slab in the future,
essentially destroying the purpose of the vapor barrierl retarder. Therefore, if there is a potential that
the protection/blotter material will become wet before the slab is installed, ACI now recommends
that no protection/blotter material be used. However, ACI then recommends that, because there is a
potential for slab curl due to the loss of the blotter material, joint spacing in the slab be reduced, a
low shrinkage concrete mixture be used, and 'other measures" (steel reinforcing, etc.) be used.
ASTM E-1643-98 "Standard Practice for Installation of Water Vapor Retarders Used in Contact with
Earth or Granular Fill Under Concrete Slabs" generally agrees with the recent AClliterature. We
recommend that the contractor, the project materials engineer, and the owner discuss these issues
and review recent ACI literature and ASTM E-1643 for installation guidelines and guidance on the
use of the protection/blotter material.
The General, Permanent Foundation and Retaining Walls, and Drainage Considerations
sections should be reviewed for additional recommendations related to the control of groundwater
and excess water vapor for the anticipated construction.
EXCAVATIONS AND SLOPES
Excavation slopes should not exceed the limits specified in local, state, and national government
safety regulations. Temporary cuts to a depth of about 4 feet may be attempted vertically in
unsaturated soil, if there are no indications of slope instability. However, vertical cuts should not be
made near property boundaries, or existing utilities and structures. Based upon Washington
Administrative Code (WAC) 296, Part N, the soil at the subject site would generally be classified as
Type B. Therefore, temporary cut slopes greater than 4 feet in height should not be excavated at an
inclination steeper than 1: 1 (Horizontal:Vertical), extending continuously between the top and the
bottom of a cut.
The above -recommended temporary slope inclination is based on the conditions exposed in our
explorations, and on what has been successful at other sites with similar soil conditions. It is
possible that variations in soil and groundwater conditions will require modifications to the
inclination at which temporary slopes can stand. Temporary cuts are those that will remain
unsupported for a relatively short duration to allow for the construction of foundations, retaining
walls, or utilities. Temporary cut slopes should be protected with plastic sheeting during wet
weather. It is also important that surface runoff be directed away from the top of temporary slope
cuts. Cut slopes should also be backfilled or retained as soon as possible to reduce the potential for
instability. Please note that sand can cave suddenly and without warning. Excavation, foundation,
and utility contractors should be made especially aware of this potential danger. These
recommendations may need to be modified if the area near the potential cuts has been disturbed in
the past by utility installation, or if settlement -sensitive utilities are located nearby.
All permanent cuts into native soil should be inclined no steeper than 2: 1 (H:V). Water should not
be allowed to flow uncontrolled over the top of any temporary or permanent slope. exposed slopes
GEOTECH CONSULTANTS, INC.
Johnston Design Group J N 17557
October 19, 2017 Page 8
should be seeded with an appropriate species of vegetation to reduce erosion and improve the
stability of the surficial layer of soil.
DRAINAGE CONSIDERATIONS
Footing drains should be used where: (1) Crawl spaces or basements will be below a structure; (2)
A slab is below the outside grade; or, (3) The outside grade does not slope downward from a
building. Drains should also be placed at the base of all earth -retaining walls. These drains should
be surrounded by at least 6 inches of 1-inch-minus, washed rock that is encircled with non -woven,
geotextile filter fabric (Mirafi 140N, Supac 4NP, or similar material). At its highest point, a perforated
pipe invert should be at least 6 inches below the bottom of a slab floor or the level of a crawl space.
The discharge pipe for subsurface drains should be sloped for flow to the outlet point. Roof and
surface water drains must not discharge into the foundation drain system.
As a minimum, a vapor retarder, as defined in the Siabs-On-Grade section, should be provided in
any crawl space area to limit the transmission of water vapor from the underlying soils. Crawl space
grades are sometimes left near the elevation of the bottom of the footings. As a result, an outlet
drain is recommended for all crawl spaces to prevent an accumulation of any water that may
bypass the footing drains. Providing even a few inches of free draining gravel underneath the vapor
retarder limits the potential for seepage to build up on top of the vapor retarder.
The excavation and site should be graded so that surface water is directed off the site and away
from the tops of slopes. Water should not be allowed to stand in any area where foundations, slabs,
or pavements are to be constructed. Final site grading in areas adjacent to the residence should
slope away at least 2 percent, except where the area is paved. Surface drains should be provided
where necessary to prevent ponding of water behind foundation or retaining walls. A discussion of
grading and drainage related to pervious surfaces near walls and structures is contained in the
Foundation and Retaining Walls section. Water from roof, storm water, and foundation drains
should not be discharged onto slopes; it should be tight lined to a suitable outfall located away from
any slopes.
GENERAL EARTHWORK AND STRUCTURAL FILL
All building and pavement areas should be stripped of surface vegetation, topsoil, organic soil, and
other deleterious material. The stripped or removed materials should not be mixed with any
materials to be used as structural fill, but they could be used in non-structural areas, such as
landscape beds. Structural fill is defined as any fill, including utility backfill, placed under, or close
to, a building, behind permanent retaining or foundation walls, or in other areas where the
underlying soil needs to support loads. All structural fill should be placed in horizontal lifts with a
moisture content at, or near, the optimum moisture content. The optimum moisture content is that
moisture content that results in the greatest compacted dry density. The moisture content of fill is
very important and must be closely controlled during the filling and compaction process. The
allowable thickness of the fill lift will depend on the material type selected, the compaction
equipment used, and the number of passes made to compact the lift. The loose lift thickness should
not exceed 12 inches. We recommend testing the fill as it is placed. If the fill is not sufficiently
compacted, it can be recompacted before another lift is placed. This eliminates the need to remove
the fill to achieve the required compaction. The following table presents recommended relative
compactions for structural fill: or Filled slopes and behind 90% retaining walls 95% for upper 12
inches of Beneath pavements subgrade; 90% below that level Where: Minimum Relative
GEOTECH CONSULTANTS, INC.
Johnston Design Group J N 17557
October 19, 2017 Page 9
Compaction is the ratio, expressed in percentages, of the compacted dry density to the maximum
dry density, as determined in accordance with ASTM Test Designation D 1557-91 (Modified
Proctor).
LIMITATIONS
The conclusions and recommendations contained in this report are based on site conditions as they
existed at the time of our exploration and assume that the soil and groundwater conditions
encountered in earlier explorations on and near the subject site are representative of subsurface
conditions on the site. If the subsurface conditions encountered during construction are significantly
different from those observed in our explorations, we should be advised at once so that we can
review these conditions and reconsider our recommendations where necessary. Unanticipated
conditions are commonly encountered on construction sites and cannot be fully anticipated by
merely taking samples in explorations. Subsurface conditions can also vary between exploration
locations. Such unexpected conditions frequently require making additional expenditures to attain a
properly constructed project. It is recommended that the owner consider providing a contingency
fund to accommodate such potential extra costs and risks. This is a standard recommendation for
all projects.
The recommendations presented in this report are directed toward the protection of only the
proposed structure from damage due to slope movement. Predicting the future behavior of steep
slopes and the potential effects of development on their stability is an inexact and imperfect science
that is currently based mostly on the past behavior of slopes with similar characteristics. Landslides
and soil movement can occur on steep slopes before, during, or after the development of property.
The owner of any property containing, or located close to steep slopes, must ultimately accept the
possibility that some slope movement could occur at or near the steep western slope.
This report has been prepared for the exclusive use of Johnston Architects, the homeowners, and
their representatives, for specific application to this project and site. Our conclusions and
recommendations are professional opinions derived in accordance with our understanding of
current local standards of practice, and within the scope of our services. No warranty is expressed
or implied. The scope of our services does not include services related to construction safety
precautions, and our recommendations are not intended to direct the contractor's methods,
techniques, sequences, or procedures, except as specifically described in our report for
consideration in design. Our services also do not include assessing or minimizing the potential for
biological hazards, such as mold, bacteria, mildew and fungi in either the existing or proposed site
development.
ADDITIONAL SERVICES
In addition to reviewing the final plans, Geotech Consultants, Inc. should be retained to provide
geotechnical consultation, testing, and observation services during construction. This is to confirm
that subsurface conditions are consistent with those indicated by our exploration, to evaluate
whether earthwork and foundation construction activities comply with the general intent of the
recommendations presented in this report, and to provide suggestions for design changes in the
event subsurface conditions differ from those anticipated prior to the start of construction. However,
our work would not include the supervision or direction of the actual work of the contractor and its
employees or agents. Also, job and site safety, and dimensional measurements, will be the
responsibility of the contractor. During the construction phase, we will provide geotechnical
GEOTECH CONSULTANTS, INC.
Johnston Design Group
October 19, 2017
JN 17557
Page 10
observation and testing services when requested by you or your representatives. Please be aware
that we can only document site work we actually observe. It is still the responsibility of your
contractor or on -site construction team to verify that our recommendations are being followed,
whether we are present at the site or not.
We trust that this letter meets your immediate needs for the proposed development. Please contact
us if we can be of further service.
DRW:mw
Respectfully submitted,
GEGTECH CONSULTANTS, INC.
D. Robert Ward, P.E.
Principal
rYI
GEOTECH CONSULTANTS, INC.