Loading...
REV1 Revision Description ChangesSTUMO ZERBEY Architecture + Design Wednesday, July 20, 2022 BLD2021-0985 Permit Revision 3 Drawing Updates To whom it may concern, Below is a list of drawing updates for the uploaded revision 4 drawings. A100 • Added a third linear drain in driveway right in front of garage doors A101 • Near grid C2 - Added a short 16" tall site wall • Near grid 4F - showing shower drain location on this plan (not adding a new drain) • Near grid H between grid 4 & 5 - added top of concrete plinth elevation • Near grid H7 - showing floor drain location on this plan (not adding a new drain) A102 • Near grid C2 - Added a short 16" tall site wall • Near grid H between grid 4 & 5 - slightly adjusted column plinth location A103 • Near grid 5C - added exterior door stop • Near grid 8F - added shower glass above partial height wall (will be safety glass) • Along grid 7 - Added a third linear drain in driveway right in front of garage doors A104 • Near grid 9H - slightly adjusted roof hatch location A202 • Near grid C - Added a short 16" tall site wall • Between G & F - adjusted floor joist size from 14" to 9 1/z" for short span condition A203 • Near grid F - adjusted floor joist size from 14" to 9 1/z" for short span condition A301 • Between H & F - adjusted floor joist size from 14" to 9 1/a" for short span condition A302 Page 1 of 3 • Between 7&8 - changed from 9 1/z" joists to 14" • Grid 7 - Added a third linear drain in driveway right in front of garage doors A303 • Near grid 4 - changed from 14" joists to 9 1/z" joists at short span condition S2.1 • Grid A between 1 & 4 - Slightly adjust stem wall location by inches • Near grid C2 - Added a short 16" tall site wall • Near grid F4 - updated for thickened slab • Near grid 8b - changed from 4" slab to 6" slab S2.2 • Near grid 1C - optimized floor framing layout • Near grid A3 - provided secondary option for joist size & spacing • Grid 4B - changed column size to 4x6 • Grid D4 - added positive connection from Steel to GLB • Grid 3 between F&G - changed from 14" to 9-1/2" beam at short span • Near grid F between 4&5 - changed from 14" to 9-1/2" joist at short span • Near grid 5I - slightly adjusted front porch footing locations • Near 7F - changed shower pan joists from 2x10 to 2x12 to reduce mortar bed weight • Near grid D7 - adjusted floor framing to accommodate recessed pocket roller shades • Near grid F10 - changed shower pan joists from 2x10 to 2x12 to reduce mortar bed weight • Grid 7 between J & I adjusted garage door threshold detail S2.3 • Multiple locations on page - Ripping 1" of bottom of oversized fascia to accommodate soffit venting detail • Near grid A2 - slightly adjusted column location and upgraded shear wall • Grid A4 and 6B - clarified header connection • Grid 4C - dimensioned post location • Near grid 5H- changed flush beam to 11 7/8" • Near grid 9I - added shear wall length S2.4 • Multiple locations on page - Ripping 1" of bottom of oversized fascia to accommodate soffit venting detail • Near grid 1C and 111 - clarified venting holes in TJI's for soffit venting S3.2 S3.3 S3.4 • Detail 3, 11, & 12 -Updated dimensions for step in top of concrete for insulation • Detail 12 - updated detail to clarify deck ledger attachment Page 2 of 3 • Detail 1 - added detail for better attachment of wood beam to concrete wall • Detail 12 - added ledger spacers for better drainage at ledger • Added new sheet to clarify details at entry porch framing S3.5 • Added clarifying details for entry porch S4.1 • Detail 12 - Updated shear wall schedule to allow for upgraded 3/4" wall sheathing to accommodate siding manufacturers installation requirements S4.2 • Detail 4 - Updated guardrail detail to show max height and overflow scupper detail S4.3 • Detail 10 - added inverted hanger and solid web wood filler S5.1 • Detail 1- clarified steel beam to wood post detail • Detail 6 - updated steel beam to wood beam bolting pattern • Detail 7 - clarified weld type at mitered steel beams S5.2 • Detail 1 - clarified steel to wood beam connection • Detail 2 - clarified steel beam to beam bolting • Detail 3 - adding LTT19 and web filler • Detail 10 & 11 - added deck guardrail steel sizes for cable rail guardrail • Detail 12 - added 2x6 flat blocking, LTT19 and welded threaded stud locations Kyle J. Zerbey, Architect 206.930.5147 Page 3 of 3