Loading...
Building Permit'S IDENTIAL BLDG Permit PERMIT NUM of Edmonds EdmondsCity 98020BLD2020-044313 wwm www.edmondswa.gov Type: RESIDENTIAL BLDG Owner/ Business: GARTH AND LAURA HITCHENS Status: ISSUED Subtype: NEW SINGLE FAMILY Parcel No: 00914200001100 Site Address: 17901 VISTA DEL MAR DR EDMONDS,WA 98026 Applied: 5/4/2020 Subdivision: LLA LL-2003-185, 009142, LLA PLN20120008, LLA LL-2003-92, Lot: 0 Issued: 3/25/2021 MAPLE MANOR (UNRECORDED) Fire Sprinklers: Yes Lot Area: 23,087 Zoning: RS-12 Final: Valuation: $657,558.36 Occupancy Type: R3 Construction Type: VB Expiration Date: 3/20/2022 Code Edition: 2015 No. Stories: 2 # of Dwelling Units: 1 Issued by: NED Scope of Work: HITCHENS- NEW SFR, P&M INCL (4 permits total to issue) WA State Contractor L & I #: KEARSH1005NH City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT KEARSLEY HOMES 6631 NORMA BCH ROAD, (425)478-6380 r@kearsleyhomes.com EDMONDS WA 98026 CONTRACTOR KEARSLEY HOMES 6631 NORMA BCH ROAD, (425)478-6380 r@kearsleyhomes.com EDMONDS WA 98026 OWNER GARTH AND LAURA 3380 120TH AVE NE, BELLEVUE (425)941-8305 GHITCHENS@ME.COM HITCHENS WA 98005 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 3/25/21 R11252 PERMITS 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 3/25/21 R11252 PERMITS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 3/25/21 R11252 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $255.00 $255.00 3/25/21 R11252 TRAP EACH VENT OR EXHAUST NOT CONNECTED TO A HEATING OR AC 001.000.322.10.000.00 $30.00 $30.00 3/25/21 R11252 SYTEM ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $1,100.00 $1,100.00 3/25/21 R11252 FAN CONNECTED TO SINGLE DUCT 001.000.322.10.000.00 $120.00 $120.00 3/25/21 R11252 FURNACE OR FIREPLACE 001.000.322.10.000.00 $60.00 $60.00 3/25/21 R11252 GAS PIPING - NEW OR LOCATED 001.000.322.10.000.00 $30.00 $30.00 3/25/21 R11252 PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $4,290.00 $4,290.00 3/25/21 R11252 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $3,646.50 $3,646.50 5/4/20 R5153 RECORDING FEE 001.000.345.89.030.00 $206.50 $206.50 8/7/20 R6885 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 3/25/21 R11252 STORMWATER ENGINEER REVIEW 001.000.341.82.000.00 $455.00 $455.00 3/25/21 R11252 FEE Printed: Thursday, March 25, 2021 1:46:48 PM 1 of 4 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # WATER HEATER - INCLUDING 001.000.322.10.000.00 $15.00 $15.00 3/25/21 R11252 EXPANSION TANK TOTALS: $10,354.50 $10,354.50 Tok MD we Mk CONDITION TYPE STATUS NOTES 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests FOR shall be established by Council and shall be paid upon submittal and are nonrefundable. ALL BUILDING PERMITS INFORMATION 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. Pre -inspection required. Street to be cleaned of debris. Side sewer must be capped at DEMOLITION REQUIREMENTS FOR Property line. Water Service must be disconnected from Water Meter and or hose bib INFORMATION with AVB installed. Dump at approved dump site only. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, FOR employees, and agents from any and all claims for damages of whatever nature, arising HOLD HARMLESS INFORMATION directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. HOSE BIBBS FOR Hose Bibbs are required to have a permanently affixed anti -siphon device installed. NFORMATION FOR Maintenance Bond(s) required at FINAL. INFORMATION MAINTENANCE BONDS FOR Landscape maintenance bond required before final. Bond amount is $13,515. INFORMATION Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Printed: Thursday, March 25, 2021 1:46:48 PM 2 of 4 MIDENTIAL BLDG PermitCity • • • • PERMITNU Edmonds98020 1 1 1 - www.edmondswa.gov K11 REQUIRED SPECIAL INSPECTIONS FOR INFORMATION SPECIAL INSPECTION BUILDING DIVISION FOR INFORMATION Special inspections have been called for on this project and are noted on the approved construction plans. It is the owner and or contractors responsibility to ensure that reports are provided to the City on a weekly basis. SPECIAL INSPECTION REPORTS FOR NFORMATION Submit all special inspection reports to the City Building Official on a weekly basis. WHOLE HOUSE FAN FOR INFORMATION Installer shall provide the manufacturer installation, operating instructions, and a whole house ventilation system operation description. A label shall be affixed to the whole house timer control that reads "Whole house ventilation, see operating instructions". INSPECTIONS - Schedule Online SEQID INSPECTION TYPE INSPECTOR at: https://Inspection.MvBuildingPermit.com COMPLETED DATE RESULT NOTES A-1 BUILDING PRECON B-1 SETBACKS B-2 FND DAMPPROOFING B-2 FOOTINGS B-2 FOUNDATION WALL B-2 RETAINING WALL B-2 SLAB INSULATION B-2 STRUCTURAL SLAB B-3 EXT WALL SHEATHING B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 PLUMB GROUND WK B-3 PLUMB ROUGH IN B-3 REFR LINE TEST B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 FIRESTOPPING B-4 FRAMING B-4 HEIGHT VERIFICATION B-4 INTERIOR SHEAR B-4 SHOWER PAN B-5 BLDG SPECIAL INSPECTION B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" B-3 PRE ROCK SHAFTS ETC Printed: Thursday, March 25, 2021 1:46:48 PM 3 of 4 'SIDENTIAL BLDG Permit - City of • • • 98020 1 1 1 www.edmondswa.Sov wm li7iJdhL OiL A-1 TESC AND MOBILIZE E-3 STRM COVENANT E-3 STRM TIGHTLINE E-4 WATER SERVICE LINE E-5 DRIVEWAY SLOPE E-9 COMPOST AMEND X-2 ENGINEERING FINAL E-3 STRM FOOTING DRAIN E-3 STRM MGMT FACILITY E-4 STRM STUB CONNECT E-7 DWY APPROACH P-1 PLANNING LANDSCAPE INSP Printed: Thursday, March 25, 2021 1:46:48 PM 4 of 4