Loading...
Building Permit 2020•M MERCIAL BLDG PermitCity PERMITNUM 1[7 • • • • 98020 1 1 ' www.edmondswa.gov Type: COMMERCIAL BLDG Owner/ Business: MAIN STREET COMMONS - REMODEL Status: ISSUED Subtype: EXISTING TENANT REMODEL Parcel No: 00434212001500 Site Address: 550 MAIN ST EDMONDS,WA 98020-3183 Applied: 5/9/2019 Subdivision: 004342 Lot: Issued: 12/9/2020 Fire Sprinklers: Yes Lot Area: 0 Zoning: BD1 Final: Valuation: $700,000.00 Occupancy Type: A2/A3/S1 Construction Type: VB Expiration Date: 12/4/2021 Code Edition: 2015 No. Stories: 2 # of Dwelling Units: 0 Issued by: NED Scope of Work: MAIN ST. COMMONS - PHASE 1, REMODEL OF WEST BLDG. WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS.Ida j NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT DIMARCO ARCHITECTURE 1319 E HOWELL ST, SEATTLE WA (206)355-6795 ARCHITECT@ICLOUD.COM 98122 CONTRACTOR WILCOX CONSTRUCTION, 234 5TH AVE S, EDMONDS WA (425)774-4185 Mmcisaac@wilcoxconstruction.com INC. 98020-3425 OWNER MAIN STREET COMMONS - 535 5TH AVE S, EDMONDS WA (425)263-2474 GECK08080@GMAIL.COM REMODEL 98020-2956 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# B-BUILDING PERMIT FEE 001.000.322.10.000.00 $5,380.00 $5,380.00 12/9/20 R9018 B-BUILDING PLAN REVIEW FEE 001.000.345.83.000.00 $4,488.00 $4,488.00 5/9/19 REC076284 B-STATE BUILDING CODE 001.000.237.150 $25.00 $25.00 12/9/20 R9018 SURCHARGE X-TECHNOLOGY FEE 001.000.321.99.100.00 1 $35.00 1 $35.00 1 12/9/20 1 R9018 TOTALS: $9,928.00 $9,928.00 CONDITIONS CONDITION TYPE STATUS NOTES 48 HRS NOTICE-ENGR FINAL FOR 48 Hours notice is required when requesting your FINAL engineering inspection. NFORMATION Contractor/Owner shall be responsible for repair/replacement of all damage to utilities DAMAGE TO FRONTAGE FOR and/or frontage improvements in city right of way per city standards that is caused by or IMPROVEMENTS INFORMATION occurs during the permitted project. Partial demolition of the western building has been calculated at 47% of the building's replacement value. As per ECDC 17.40.020(F) if 75% or more of the existing building is DEMOLITION REQUIREMENTS O demolished, the entire building will need to be rebuilt to come into full compliance as for INFORMATION new structures. A post -demolition inspection is required to determine compliance. See permit inspection card. ELECTRICAL PERMIT O Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. ORMATION ESC REQUIRED FOR Maintain erosion & sediment control per city standards. NFORMATION Printed: Wednesday, December 09, 2020 11:15:01 AM 1 of 3 •MMERCIAL BLDG Permit PERMIT NU of Edmonds EdmondsCity •:0i D2019-0529 www.edmondswa.gov• Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, Hold Harmless arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. Final approval on a project or final occupancy approval must be granted by the Building Occupancy Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. OTHER FOR PARK IMPACT FEES not required for this project, since new floor area is less than existing. NFORMATION Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Permit Disclaimer Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. FOR PROJECT ASBUILT INFORMATION The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. FOR Separate Permit Required For: Tenant Improvements, Plumbing, HVAC, Commercial SEPARATE PERMIT REQUIRED INFORMATION Kitchen Hoods, Electrical, Elevator, Fire Alarm, Fire Sprinkler Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of Sound/Noise 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. SPECIAL INSPECTIONS ARE REQUIRED FOR: SPECIAL INSPECTION BUILDING FOR SOILS; DIVISION INFORMATION STRUCTURAL, including Concrete, Bolts in Concrete, Structural Masonry, Structural Steel & Welding, Lateral Wood. SPECIAL INSPECTION REPORTS FOR Submit all special inspection reports to the City Building Official on a weekly basis. NFORMATION UNDERGROUND UTILITY FOR Call for locates of underground utilities prior to any excavation. LOCATES INFORMATION FOR All new extended rebuilt or relocated electrical utility and/or service shall be placed UNDERGROUND WIRING INFORMATION underground. INSPECTIONS - -. •nline at: https://Inspection.MvBuildingPermit.co COMPLETED SEQID INSPECTION TYPE INSPECTOR RESULT NOTES DATE A-1 BUILDING PRECON B-2 DEMO AMT VERIFICATION B-2 FOOTINGS B-2 FOUNDATION WALL Printed: Wednesday, December 09, 2020 11:15:01 AM 2 of 3 - City •Edmonds 7121 98020 1 1 ' ww.edmondswa.Sov '- 1: B-2 ROOF TEAR OFF B-3 EXT GYP SHEATHING B-3 EXT WALL SHEATHING B-3 RETROFIT ANCHORAGE B-3 ROOF SHEATHING B-4 CEILING GRID B-4 DRYWALL FASTENING B-4 FRAMING B-4 HEIGHT VERIFICATION B-4 INTERIOR SHEAR B-4TRASH ENCLOSURE B-5 BLDG SPECIAL INSPECTION B-5 CROSS CONN FINAL B-5 INSULATION ENERGY B-5 WSEC COMPLIANCE REPORTS B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" E-4 WATER SERVICE LINE E-5 TRASH ENCLOSURE X-2 ENGINEERING FINAL Printed: Wednesday, December 09, 2020 11:15:01 AM 3 of 3