Loading...
DEMO 75 per cent formPermit # C� y OF EvMo�O Address: Home Owner: Contractor: This form may be used to help establish the percentage of demolition work performed to an existing home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing home's replacement cost, the structure will be required to be rebuilt to the standards of new construction. Replacement cost of existing home $ How was the value determined? Component Value of Existing Component Percentage removed Replacement cost of removed component Notes Foundation Floor Framing Floor Insulation Wall Framing Wall Insulation Siding Roof Framing Attic Insulation Windows Doors Plumbing Electrical HVAC D rywa I I Cabinets Painting, Flooring and Finishes Deck Other Total Percentage Removed (Total of Column 4 divided by Column 2) equals Owner Date Contractor Date