DEMO 75 per cent formPermit #
C� y OF EvMo�O
Address:
Home Owner:
Contractor:
This form may be used to help establish the percentage of demolition work performed to an existing
home in the course of a remodel. Once demolition has met or exceeded 75% of the value of the existing
home's replacement cost, the structure will be required to be rebuilt to the standards of new
construction.
Replacement cost of existing home $
How was the value determined?
Component
Value of
Existing
Component
Percentage
removed
Replacement
cost of removed
component
Notes
Foundation
Floor Framing
Floor Insulation
Wall Framing
Wall Insulation
Siding
Roof Framing
Attic Insulation
Windows
Doors
Plumbing
Electrical
HVAC
D rywa I I
Cabinets
Painting, Flooring
and Finishes
Deck
Other
Total
Percentage Removed (Total of Column 4 divided by Column 2) equals
Owner
Date
Contractor Date