Building PermitI Type: ADU Subtype: ADU ADDITION REMODEL I Status: FINAL I
Parcel No: 27032500215200
Subdivision: SP S-3-78
Fire Sprinklers:
Valuation: $66,451.84
Code Edition: 0
Site Address: 521 HEMLOCK WAY EDMONDS,WA 98020
Lot: 0
Lot Area: 6098 Zoning: RS-6
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: RODRIGUES-ADU, PLUMBING NOT INCL
Applied: 4/7/2022
Issued:11/14/2022
Final: 5/6/2024 KRL
Expiration Date: 11/9/2024
Issued by: JOK
I WA State Contractor L & I #: AURACCL787JR I
CONTACTS
NAME TYPE NAME
ADDRESS
PHONE
EMAIL
APPLICANT LINDA BROWN
5130 EVERGREEN WAY 100,
(360)688-4786
INFO@KAIXMARKETING.COM
EVERETT WA 98203
CONTRACTOR AURA CONSTRUCTION
LLC 914 164TH ST. B12 #511, MILL
(360)688-4786
info@kaixmarketing.com
CREEK WA 98012
OWNER ADLER F & MERCEDES F 521 HEMLOCK WAY, EDMONDS
(206)972-0221
mercrodl0@gmail.com
RODRIGUES
WA 98020
FEE INFORMATION
DESCRIPTION
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT#
1 - BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
11/10/22
R24385
PERMITS
AIR HANDLERS - 10,000 CFM OR
001.000.322.10.000.00
$30.00
$30.00
11/10/22
R24385
LESS
APPLIANCE VENTS
001.000.322.10.000.00
$15.00
$15.00
11/10/22
R24385
BLD - PERMIT RENEWAL
001.000.345.83.000.00
$217.25
$217.25
11/6/23
R32492
BUILDING - ADDITIONAL REVIEW
001.000.345.83.000.00
$220.00
$220.00
11/10/22
R24385
HOURS
BUILDING - ADDITIONAL REVIEW
001.000.345.83.000.00
$55.00
$55.00
11/10/22
R24385
HOURS
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
4/7/22
R19305
PER PERMIT
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$220.00
$220.00
11/10/22
R24385
ENGINEERING REVIEW FEE - OVER 3
001.000.341.82.000.00
$385.00
$385.00
11/10/22
R24385
REVIEWS
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$15.00
$15.00
11/10/22
R24385
GAS PIPING - NEW OR LOCATED
001.000.322.10.000.00
$30.00
$30.00
11/10/22
R24385
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$869.00
$869.00
11/10/22
R24385
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$738.65
$738.65
4/7/22
R19305
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
11/10/22
R24385
TOTALS:
$2,891.40
$2,891.40
CONDITIONS
Printed: Thursday, May 23, 2024 1:25:25 PM 1 of 4
ADU Permit
-
City of • • •
98020 1 1 � � �
www.edmondswa.gov � •
6
CONDITION TYPE
STATUS
NOTES
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
\r\n2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.\r\n3- SOUND OR NOISE - Sound/Noise originating from temporary
FOR
construction sites as a result of construction activity are exempt from the noise limits of
ALL BUILDING PERMITS
INFORMATION
ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am
to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the
noise originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.\r\n4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. \r\n5 - PLUMBING - Plumbing contractor license laws are regulated by
Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the
risks and potential monetary liability for work performed by unlicensed plumbing
contractors. For more information contact L&I Department of Licensing at 1-800-647-
0982.
GAS PIPE TEST
FOR
Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted
NFORMATION
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
provide manufactures installation instructions on site for Building Inspector.
FOR
Heat pumps, AC units and similar equipment greater than 36 inches in height are not
SIDE YARD EQUIPMENT
INFORMATION
allowed within required building setbacks.
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
INSPECTIONS
- Schedule Online
at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR
COMPLETED
RESULT
NOTES
B-2 FOOTINGS
12/29/2022
CORRECTION
Not ready
12:00:00 AM
REQUIRED
B-2 FOOTINGS
12/30/2022
PARTIAL
Footing for new door opening at north end ok.
12:00:00 AM
APPROVAL
Remaining footings to be inspected prior to pouring
concrete
B-2 FOOTINGS
3/14/2023
CORRECTION
CONTRACTOR IS TO SCHEDULE PRE -CON PRIOR TO
12:00:00 AM
REQUIRED
ANY FURTHER INSPECTIONS.
Printed: Thursday, May 23, 2024 1:25:25 PM 2 of 4
ADU Permit
City of • • • I
121 5th Ave N, Edmonds WA 98020BLD2022-0444
www.edmondswa.gov � •
B-2 FOOTINGS
3/14/2023
CORRECTION
Corrections. This is a slab footing mono pourl. Clean
12:00:00 AM
REQUIRED
debris Out of the footing areal. Maintain 3 inch
clearance from rebar to soi13. Provide SDHD 10 on
corners as per plans4. Provide space between
insulation and bottom bar south wa115. Remove
Debris on top of slab pour 6. Provide a 2 foot overlap
on rebar
B-2 FOOTINGS
3/16/2023
CORRECTION
Corrections 1. Contractor mentioned that it may take
12:00:00 AM
REQUIRED
2 weeks to pour concrete. Another inspection is
required. 2. Maintain clearances from bar to soil. 3.
Provide 2' over lap.
A-1 BUILDING PRECON
3/16/2023
APPROVED
Approved. Had meeting with contractor on the
12:00:00 AM
phone.
B-2 FOUNDATION WALL
3/20/2023
CORRECTION
Inspections sched for 3/20 - cancelled. Contractor not
12:00:00 AM
REQUIRED
ready (DR)
B-2 SLAB INSULATION
3/20/2023
CORRECTION
12:00:00 AM
REQUIRED
B-2 FOOTINGS
3/20/2023
CORRECTION
12:00:00 AM
REQUIRED
B-2 SLAB INSULATION
3/21/2023
APPROVED
Approved
12:00:00 AM
B-2 FOOTINGS
3/21/2023
APPROVED
footings OK.
12:00:00 AM
B-3 GAS PIPING TEST
4/7/2023
APPROVED
12:00:00 AM
B-3 EXT WALL SHEATHING
5/15/2023
APPROVED
Approved
12:00:00 AM
B-3 ROOF SHEATHING
5/15/2023
APPROVED
approved
12:00:00 AM
B-3 MECH ROUGH IN
7/10/2023
APPROVED
Ducting approved. Verify pipe sealing at framing
12:00:00 AM
inspection
B-4 FRAMING
7/17/2023
APPROVED
12:00:00 AM
B-5 INSULATION ENERGY
7/19/2023
CORRECTION
9.30-10am
12:00:00 AM
REQUIRED
B-5 INSULATION ENERGY
7/19/2023
CORRECTION
Provide rock wool insulation in fire rated wall as per
12:00:00 AM
REQUIRED
plans
B-4 DRYWALL FASTENING
8/21/2023
CORRECTION
10am
12:00:00 AM
REQUIRED
B-4 DRYWALL FASTENING
8/21/2023
CORRECTION
Corrections Provide a GA file or a UL listing for the fire
12:00:00 AM
REQUIRED
rated assembly. If there is two layers of gyp, provide a
base inspection to verify overlap.
B-4 DRYWALL FASTENING
8/29/2023
PARTIAL
Provide a stamped letter from the Architect on record
12:00:00 AM
APPROVAL
regarding the one layer 5/8" gyp X fire rated wall.
B-4 DRYWALL FASTENING
9/11/2023
APPROVED
Approved
12:00:00 AM
Printed: Thursday, May 23, 2024 1:25:25 PM 3 of 4
ADU Permit
-
City of • • •
IL
MM&
www.edmondswa.gov/425.7 •
B-2 FOUNDATION WALL
3/21/2023
APPROVED
approved with footings.
12:00:00 AM
B-5 INSULATION ENERGY
9/11/2023
APPROVED
approved
12:00:00 AM
B-3 UNDERFLR FRAMING
2/14/2024
NOT REQUIRED
slab
12:00:00 AM
X-2 ENGINEERING FINAL
2/15/2024
APPROVED
1100hrs. - Site soils are stabilized. All BMPs have been
12:00:00 AM
removed. Approved.
A-1 TESC AND MOBILIZE
2/15/2024
APPROVED
1100hrs - Site soils are stabilized and armored with
12:00:00 AM
3/4s inch washed rock. BMPs are removed. No site
discharges should be anticipated.Approved.
B-7 BUILDING OTHER INSP
2/21/2024
APPROVED
Final consultation.
12:00:00 AM
B-4 SHOWER PAN
3/25/2024
NOT REQUIRED
No inspection required.
12:00:00 AM
X-3 BUILDING FINAL"
3/25/2024
CORRECTION
corrections
12:00:00 AM
REQUIRED
1. Provide kitchen ventilation
2. Provide an air gap for the DW drain.
3. Provide the approved set of plans
4. Provide an anti -tip device on the range
S. Provide weather stripping on the attic access cover.
6. Provide insulation attached to the attic access
cover.
7. Provide inter -connection of smoke alarms.
8. Provide CO detectors.
This is not a complete inspection.
X-3 BUILDING FINAL"
4/15/2024
CORRECTION
Provide a code compliant 20 Min door between ADU
12:00:00 AM
REQUIRED
and existing home
B-4 SHOWER PAN
5/6/2024
NOT REQUIRED
12:00:00 AM
B-3 UNDERFLR FRAMING
5/6/2024
NOT REQUIRED
slab construction
12:00:00 AM
B-3 EXTERIOR INSULATION
5/6/2024
NOT REQUIRED
12:00:00 AM
X-3 BUILDING FINAL"
5/6/2024
APPROVED
Approved
12:00:00 AM
Printed: Thursday, May 23, 2024 1:25:25 PM 4 of 4