Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
APPROVED BLD PLN RESUB 2 - BLD2021-0797+Mechanical_Plan+12.14.2021_9.53.35_AM+2570844
GENERAL SYMBOLS HVAC SPECIALTIES DUCTWORK @ AT p,-� DOUBLE LINE SINGLE LINE O DIAMETER MOTORIZED CONTROL DAMPER RECTANGULAR DUCT WITH 12/8 =10/6= SIZE IN INCHES FIRST SIZE IS IN PLANE OF PAPER �� INCHES OR FS ROUND DUCT WITH INSIDE 12QJ = 80= DIAMETER IN INCHES & AND COMBINATION FIRE/SMOKE DAMPER OR � ) [ FIRE DAMPER AND SMOKE DAMPER (R) 12�J DUCTWORK TO BE DEMOLISHED X X DEGREES (ANGLE =(R) 8Q1= �� O KEYED NOTE DESIGNATION BACKDRAFT DAMPER WITH FLOW DIRECTION (E) 12QJ �(E) 8f�= EXISTING DUCTWORK TO REMAIN O OWNER'S EQUIPMENT NUMBER MANUAL BALANCING DAMPER R_W R = 1.5xW RADIUS ELBOW M301 DETAIL OR DETAIL REFERENCE (INSIDE) (CENTERLINE) FIRE PARTITION SLEEVE - EXHAUST AIR UP 10 ELEVATION M301 DUCT LINER - IN DOUBLE LINE DUCT C� � EXHAUSTAIR DOWN 6 J SECTION TAKEN AT �� RETURN AIR UP M301 _ DUCT LINER - IN SINGLE LINE DUCT T� RETURN AIR DOWN AH-1 EQUIPMENT TAG � EXHAUST GRILLE �� � SUPPLY OR OSA UP d�] EXISTING EQUIPMENT RETURN REGISTER OR GRILLE � � SUPPLY OR OSA DOWN NEW EQUIPMENT �� SUPPLY DIFFUSER MITER ELBOW WITH TURN VANES EQUIPMENT TO BE REMOVED GRD FILL PANEL FOR LAY -IN CEILING POINT OF CONNECTION (WHERE USED) � � � SIDEWALL DIFFUSER OR GRILLE � W1 + W2 MITER TEE PIPING LABELS � RG1 12/12 GRD CALLOUT FOR SQUARE GRILLES 200 � NECK SIZE HWS HEATING WATER SUPPLY TYPE W1� W1+ W2 MITER ELBOW BRANCH AIRFLOW (CFM) HWR HEATING WATER RETURN �I 2-WAY CWS CHILLED WATER SUPPLY 4-WAY OPPOSED 3-WAY DIFFUSER PATTERN -LIGHT SECTIONS ❑OTTT INDICATE THROWS (AIRFLOW DIRECTIONS) WxA �:<,\\ Wx(A+B) MITER ELBOW BRANCH CWR CHILLED WATER RETURN ""� "' 3-WAY 2-WAY �� CS CONDENSER WATER SUPPLY CORNER m CR CONDENSER WATER RETURN � RETURN AIR PLENUM GRILLE WITH RL REFRIGERANT LIQUID SOUND ATTENUATION BOOT (SEE ALSO DETAIL) OFFSET RS REFRIGERANT SUCTION RD REFRIGERANT DISCHARGE (HOT GAS) � SD2 8-2/1-24 SLOT DIFFUSER: TYPE, INLET DIAMETER - HGBP - REFRIGERANT HOT GAS BYPASS 200 NO. OF SLOTS /SLOT WIDTH -LENGTH R� R _ OFFSET UP (RISE) AND CFM LPS LOW PRESSURE STEAM SUPPLY LPC LOW PRESSURE CONDENSATE � RG2 2/1-24 SLOT RETURN GRILLE: TYPE, D� D _ OFFSET DOWN (DROP) 200 NO. OF SLOTS /SLOT WIDTH -LENGTH MPS MEDIUM PRESSURE STEAM SUPPLY AND CFM TRANSITION MPC MEDIUM PRESSURE CONDENSATE �5° MAX HPS HIGH PRESSURE STEAM SUPPLY � AIR TERMINAL UNIT HPC HIGH PRESSURE CONDENSATE ATTENUATOR SECTION �� RECTANGULAR TO ROUND TRANSITION HEATING COIL (WHEN USED) GLS GROUND LOOP SUPPLY CONTROLS ENCLOSURE GLR GROUND LOOP RETURN CLEARANCE SPACE �;��_ ;� FLEXIBLE DUCT - HCS - HEATING/CHILLED WATER SUPPLY HCR HEATING/CHILLED WATER RETURN O THERMOSTAT OR TEMPERATURE SENSOR WYE BRANCH F°-X-X WITH UNIT SERVED PC PUMPED CONDENSATE FOS FUEL OIL SUPPLY � WINDOW POSITION SENSING SWITCH OUND FOR FUEL OIL RETURN CONICAL TAP (ROUND ON RECT.) FOV FUEL OIL VENT MU MAKEUP WATER VALVES ECT D EQUIPMENT DRAIN CONICAL TAP (ROUND ON ROUND) NAME MISCELLANEOUS - � �� TWO WAY CONTROL VALVE (E) NAME - EXISTING PIPING ��� THREE WAY CONTROL VALVE HEEL TAP (ROUND ON RECT.) ��(R) NAME�� EXISTING PIPING TO BE REMOVED - - (R) NAME EXISTING PIPING TO BE REMOVED BALL VALVE 1-1/4" '� � GATE VALVE PIPE PIPING WITH TYPE LABEL AND NOMINAL (IPS) SIZE - � - EXAMPLE: 1-1/4" REPRESENTS ''�' GLOBE VALVE HEEL TAP (ROUND ON ROUND) NOMINAL 1-1/4" IRON PIPE SIZE (1.38" LD. BASED ON SCH. 40 STEEL) � 1� BUTTERFLY VALVE ���� NEEDLE VALVE PIPE FITTINGS � GAS COCK PIPING SPECIALTIES �� CHECK VALVE ��� SOLENOID VALVE � FLANGE �-�� PRESSURE REDUCING VALVE - � FLEXIBLE PIPE CONNECTOR � UNION K PIPING REDUCER � RELIEF(R), OR SAFETY(S) VALVE - � � EXPANSION JOINT Q PRESSURE GAUGE PIPE SLEEVE BALANCING VALVE -, }� PIPE ANCHOR � AUTOMATIC FLOW LIMITING VALVE - THERMOMETER 4AV AUTOMATIC AIR VENT - ,� ELBOW INTO PAPER PLANE STRAINER, STRAINER W/BLOWOFF O ELBOW OUT OF PAPER PLANE � MV MANUAL AIR VENT r, TEE OUT OF PAPER PLANE HOSE END DRAIN VALVE T TEMPERATURE/PRESSURE TEST PORT - TEE INTO PAPER PLANE - f SENSOR WELL M VALVE IN RISER t HOSE BIBB - - PIPE CAP OR PLUG - RPBP REDUCED PRESSURE BACKFLOW PREVENTER � FLOW ARROW PUMP, IN SCHEMATIC PRESENTATION Z DOUBLE CHECK VALVE �� STEAM TRAP < BREAK IN LINE ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE APPROVED PLANS MUST BE ON JOB SITE MECHANICAL GENERAL NOTES 1. MATERIALS AND METHODS SHALL COMPLY WITH CURRENT BUILDING CODE AND LOCAL REQUIREMENTS. 2. VERIFY CURRENT ARCHITECTURAL FLOOR PLANS AND CEILING PLANS AND COORDINATE WITH CURRENT LAYOUTS AND OTHER TRADES. 3. PROVIDE PIPING AND DUCTWORK INSTALLATION DRAWINGS AND EQUIPMENT SUBMITTALS TO ARCHITECT FOR APPROVAL PRIOR TO PURCHASE AND INSTALLATION. 4. COORDINATE WITH ELECTRICAL WORK IN OTHER DIVISIONS FOR POWER WIRING TO EQUIPMENT AND LOW VOLTAGE WIRING INCLUDING SENSOR WIRING AND CONNECTIONS TO FIRE ALARM PANEL. 5. VERIFY LAYOUT, INSTALLATION REQUIREMENTS, AND PHYSICAL DIMENSIONS OF THE ACTUAL EQUIPMENT PROVIDED, AND COORDINATE TO PROVIDE CLEARANCES FOR MAINTENANCE AND EQUIPMENT OPERATION, AND TO MEET ELECTRICAL CLEARANCE REQUIREMENTS. 6. COORDINATE VOLTAGE, PHASE, AND POWER REQUIREMENTS FOR POWERED EQUIPMENT WITH ELECTRICAL POWER PROVIDER. REPORT CONFLICTS TO ENGINEER PRIOR TO SUBMITTAL REVIEW AND PURCHASE OF EQUIPMENT. 7. PROVIDE VIBRATION ISOLATION FOR VIBRATING EQUIPMENT HUNG FROM STRUCTURE. 8. PROVIDE ENGINEERED SEISMIC BRACING FOR EQUIPMENT WEIGHING GREATER THAN 75 POUNDS. USE SLACK RESTRAINT SYSTEM SUCH AS CABLES TO ENSURE THAT BRACING DOES NOT SHORT-CIRCUIT VIBRATION ISOLATION. 9. DUCTWORK, PIPING, AND EQUIPMENT PLANS ARE SCHEMATIC IN NATURE AND DO NOT SHOW EXACT ROUTING REQUIRED AND DO NOT SHOW ALL OFFSETS NEEDED FOR COORDINATION. COORDINATE BETWEEN TRADES AND VERIFY ALL REQUIRED CLEARANCES PRIOR TO COMMENCING WORK. ABBREVIATIONS AC AIR CONDITIONING F FAHRENHEIT (R) REMOVE ACH AIR CHANGES PER HOUR FC FORWARD CURVED OR FAN COIL R RADIUS AD ACCESS DOOR FCU FAN COIL UNIT RA RETURN AIR AF AIR FOIL FLA FULL LOAD AMPS RAD RETURN AIR DAMPER AFF ABOVE FINISHED FLOOR FLR FLOOR (RL) RELOCATE AH AIR HANDLING UNIT FPM FEET PER MINUTE READ REQUIRED ALT ALTERNATE FPS FEET PER SECOND RF RETURN FAN AMP AMPERE FT FEET RG RETURN GRILLE AP ACCESS PANEL RH ROOF HOOD ARCH ARCHITECTURAL G NATURAL GAS RM ROOM ASSY ASSEMBLY GA GAUGE RPM REVOLUTIONS PER MINUTE GAL GALLON B BOILER GALV GALVANIZED SA SUPPLY AIR BAS BUILDING AUTOMATION SYSTEM GPM GALLONS PER MINUTE SAD SUPPLY AIR DAMPER BG BELOW GRADE GRD GRILLE, REGISTER, OR DIFFUSER SCH SCHEDULE BHP BRAKE HORSEPOWER GSM GALVANIZED SHEET METAL SD SUPPLY DIFFUSER BI BACKWARD INCLINED SF SQUARE FEET BLDG BUILDING HC HEATING COIL SHT SHEET BOP BOTTOM OF PIPE HP HORSEPOWER, OR HEAT PUMP SP STATIC PRESSURE BS BELOW SLAB HRV HEAT RECOVERY VENTILATOR SQ SQUARE BTU BRITISH THERMAL UNIT HZ HERTZ SR SPRING RANGE BTUH BRITISH THERMAL UNITS PER HOUR I.D. INSIDE DIAMETER SS STAINLESS STEEL IN INCHES STD STANDARD C COMMON IPS IRON PIPE SIZE CA COMPRESSED AIR, COMBUSTION AIR TDH TOTAL DYNAMIC HEAD CAP CAPACITY KW KILOWATTS TEMP TEMPERATURE, OR TEMPORARY CB CIRCUIT BREAKER KWH KILOWATT HOURS TOS TOP OF SLAB CC COOLING COIL L LENGTH TSP TOTAL STATIC PRESSURE CD CEILING DIFFUSER LAT LEAVING AIR TEMPERATURE TTC TIGHT TO CEILING CFCI CONTRACTOR FURNISHED, TYP TYPICAL LBS POUNDS CONTRACTOR INSTALLED LRA LOCKED ROTOR AMPS CFM CUBIC FEET PER MINUTE LTG LIGHTING UNO UNLESS NOTED OTHERWISE CH CHILLER LWT LEAVING WATER TEMPERATURE UH UNIT HEATER CLG CEILING CMU CONCRETE MASONRY UNIT MAX MAXIMUM V VOLTS COND CONDENSER, CONDENSATE MBH THOUSAND BTUH VA VOLT-AMPERE CONT CONTINUATION MCU MODE CONTROL UNIT VAV VARIABLE AIR VOLUME COP COEFFICIENT OF PERFORMANCE MCA MINIMUM CIRCUIT AMPACITY VEL VELOCITY CTE CONNECT TO EXISTING MEZZ MEZZANINE VFD VARIABLE FREQUENCY DRIVE CU CONDENSING UNIT MFR MANUFACTURER VOL VOLUME MIN MINIMUM VV VARIABLE VOLUME DB DRY BULB, OR DECIBEL MISC MISCELLANEOUS DDC DIRECT DIGITAL CONTROL MTD MOUNTED W/ WITH DET DETAIL MTG MEETING WB WET BULB DIA DIAMETER DIM DIMENSION (N) NEW WC WATER COLUMN DN DOWN NC NORMALLY CLOSED WG WATER GAGE DWG DRAWING NO NORMALLY OPEN, OR NUMBER W/O WITHOUT NPT NATIONAL PIPE THREAD (E) EXISTING NTS NOT TO SCALE EA EACH, OR EXHAUST AIR EAD EXHAUST AIR DAMPER OC ON CENTER EAL EXHAUST AIR LOUVER OD OUTSIDE DIAMETER EAT ENTERING AIR TEMPERATURE OFCI OWNER FURNISHED, EF EXHAUST FAN CONTRACTOR INSTALLED EFF EFFICIENCY OFOI OWNER FURNISHED, EG EXHAUST GRILLE OWNER INSTALLED ELEV ELEVATION OAL OUTSIDE AIR LOUVER ENT ENTERING OSA OUTSIDE AIR EQUIP EQUIPMENT OSAD OUTSIDE AIR DAMPER ERV ENERGY RECOVERY VENTILATOR OSB ORIENTED STRAND BOARD ESP EXTERNAL STATIC PRESSURE P PUMP ET EXPANSION TANK PC PUMPED CONDENSATE ETR EXISTING TO REMAIN PD PRESSURE DROP EUH ELECTRIC UNIT HEATER PH PHASE EWT ENTERING WATER TEMPERATURE PLBG PLUMBING EXT EXTERIOR PLC PROGRAMMABLE LOGIC CONTROL PRV PRESSURE REDUCING VALVE PSI POUNDS PER SQUARE INCH City Of Edmonds Building Department Work MECHANICAL Address 559 MAIN ST Owner MAIN STREET COMMONS Approved Date 12/20/2021 Building Official EI'ili L:IGt•V�'P.ir Permit Number BLD2021-0797 PSIG POUNDS PER SQUARE INCH GAGE HVAC ENERGY CODE NOTES 1. REFER TO EQUIPMENT SCHEDULES FOR NOMINAL ENERGY EFFICIENCY. EQUIPMENT SHALL MEET OR EXCEED CODE -REQUIRED ENERGY EFFICIENCY. 2. THERMOSTATIC CONTROLS IN THE SAME ZONE OR IN NEIGHBORING ZONES CONNECTED BY OPENINGS LARGER THAN 10 PERCENT OF THE FLOOR AREA SHALL BE INTERLOCKED TO NOT ALLOW SIMULTANEOUS HEATING AND COOLING. 3. HEAT PUMPS SHALL INCLUDE SUPPLEMENTARY HEAT AS REQUIRED TO MAINTAIN DISCHARGE TEMPERATURE DURING DEFROST CYCLE. HEAT PUMPS WITH SUPPLEMENTARY ELECTRIC HEAT SHALL INCLUDE MICROPROCESSOR CONTROLS THAT MINIMIZE ELECTRIC HEAT USAGE DURING STARTUP, SETUP, AND DEFROST CONDITIONS AND MINIMIZE SIMULTANEOUS HEATING AND COOLING. CONTROLS SHALL ANTICIPATE NEED FOR HEAT AND USE COMPRESSION HEATING AS THE FIRST STAGE OF HEATING. CONTROLS SHALL INDICATE WHEN ELECTRIC HEATING IS BEING USED THROUGH VISUAL MEANS. ELECTRIC HEAT SHALL NOT OPERATE WHEN OAT IS ABOVE 40F. 4. THERMOSTATIC CONTROLS SHALL BE CAPABLE OF PROVIDING HAVE A 5F DEADBAND BETWEEN HEATING AND COOLING SETPOINTS. 5. THERMOSTATS SHALL BE 7-DAY PROGRAMMABLE WITH AUTOMATIC SETBACK CONTROL SET DOWN TO 55F AND UP TO 85F. CONTROLS SHALL MAINTAIN PROGRAMMING FOR AT LEAST 10 HOURS DURING LOSS OF POWER. CONTROLS SHALL HAVE A MANUAL 2 HOUR OVERRIDE FOR TEMPORARY OPERATION. CONTROLS SHALL ADJUST THE DAILY START TIME FOR MORNING WARMUP PRIOR TO SCHEDULED OCCUPANCY. 6. PROVIDE AMCA CLASS 1 MOTORIZED CONTROL DAMPERS AT OUTSIDE AIR INTAKES, EXHAUST OUTLETS, RELIEF OPENINGS, STAIRWAY AND SHAFT VENTS, AND AIRSIDE ECONOMIZERS. 7. AIR-COOLED DIRECT -EXPANSION UNITS WITH A COOLING CAPACITY OF 54 MBH OR GREATER EQUIPPED WITH AN ECONOMIZER SHALL INCLUDE FAULT DETECTION AND DIAGNOSTICS. 8. GAS -FIRED HEATING EQUIPMENT OVER 225 MBH SHALL HAVE MODULATING OR STAGED COMBUSTION CONTROL. 9. THERMOSTATS IN GROUP R OCCUPANCY SHALL HAVE 5-2 SCHEDULE PROGRAMMABLE WITH AT LEAST 2 SETBACK PERIODS PER DAY. 10. INSULATE DUCTS AND PLENUMS PER ENERGY CODE REQUIREMENTS. 11. SEAL ALL TRANSVERSE AND LONGITUDINAL SEAMS OF DUCTS WITH WELDS GASKETS, OR WATER -BASED LISTED DUCT SEALER. 12. PROVIDE PIPING INSULATION WITH THICKNESS SUFFICIENT TO MEET ENERGY CODE R-VALUES. 13. SINGLE FANS OR MULTIPLE FANS IN PARALLEL WITH COMBINED MOTOR NAMEPLATE HORSEPOWER OVER 5HP SHALL HAVE A FAN EFFICIENCY GRADE (FEG) OF 67 OR HIGHER AND SHALL BE SELECTED TO OPERATE WITHIN 15% OF THE MAXIMUM TOTAL EFFICIENCY OF THE FAN. 14. COOLING SYSTEMS 65 MBH AND GREATER SHALL HAVE TWO -SPEED FAN CONTROL OR MODULATING FAN CONTROL. 15. FAN AND PUMP MOTORS 7.5HP AND GREATER SHALL BE PROVIDED WITH A VFD. 16. ECONOMIZERS SHALL BE INTEGRATED WITH MECHANICAL COOLING AND SHALL BE CAPABLE OF PROVIDING PARTIAL ECONOMIZER COOLING EVEN WHEN ADDITIONAL MECHANICAL COOLING IS NEEDED. 17. AIR ECONOMIZERS SHALL HAVE FIXED DRY-BULB HIGH -LIMIT SHUTOFF CONTROL NOT TO EXCEED 75 DEG. F. 18. ELECTRIC MOTORS SHALL MEET OR EXCEED CODE EFFICIENCY REQUIREMENTS. 19. FAN MOTORS 1/12 HP TO 1 HP SHALL BE ECM TYPE. 20. LABEL ALL PIPE AND DUCT INSULATION WITH ITS THICKNESS AND INSULATING VALVE (R OR K). APPROVED BY PLANNING �Z����� Dec 15 2021 HVAC PIPING INSTALLATION NOTES 1. PIPING SIZES SHOWN ARE NOMINAL IPS INSIDE DIMENSION EXCEPT REFRIGERATION TUBING WHICH IS OUTSIDE DIAMETER. MODIFY PIPING SIZES WHERE REQUIRED BY EQUIPMENT MANNUFACTURER. 2. PIPING CONSTRUCTION SHALL COMPLY CURRENT MECHANICAL CODE AND ASME B31.9 BUILDING SERVICES PIPING. 3. SEAL SCREWED PIPING JOINTS WITH TEFLON TAPE EXCEPT USE RECTORSEAL OR SIMILAR LIQUID SEALANT AT FUEL GAS PIPING. 4. ROUTE REFRIGERATION PIPING TO PROVIDE OIL DRAINBACK AND ROUTE TO NOT EXCEED EQUIPMENT MANUFACTURER'S MAXIMUM LENGTH AND RISE/FALL. 5. INSULATE PIPING, VALVES, AND FITTINGS TO CODE -REQUIRED R-VALUE WITH PREFORMED FIBERGLASS WITH FSK JACKET AND PVC FITTING COVERS, ZEST -ON OR SIMILAR. 6. BASIS OF DESIGN FOR REFRIGERANT PIPING IS SEAMLESS COPPER TUBING, TYPE L, WITH JOINTS SOLDERED USING LEAD-FREE SOLDER. 7. USE FULL 20-FOOT LENGTHS OF PIPING AND TUBING WHERE POSSIBLE. 8. USE PREFABRICATED FITTINGS FOR CHANGE IN DIRECTION. FITTINGS FOR COPPER TUBING SHALL BE FACTORY FABRICATED FOR SWEATED/SOLDERED INSTALLATION. BENDING OF PIPING AND TUBING IS NOT ACCEPTABLE. SADDLE TAPS, PULLED TEES, AND FIELD -FABRICATED FITTINGS ARE NOT ACCEPTABLE EXCEPT WHERE SPECIFIED OR SHOWN. 9. REAM CUT PIPE ENDS TO IPS SIZE AND EXPAND TUBING ENDS TO TUBING INSIDE DIAMETER. 10. INSTALL PIPING AND TUBING CONCEALED AND PARALLEL TO BUILDING STRUCTURE EXCEPT WHERE SHOWN. 11. INSTALL RISERS PLUMB. 12. INSTALL HORIZONTAL PIPING SLOPED TO DRAIN. FOR HORIZONTAL WATER PIPING PROVIDE DRAIN OR AUXILIARY DRAIN AT EACH LOW POINT. 13. INSTALL PIPING AND SUPPORTS ARRANGED TO ALLOW FOR EXPANSION AND CONTRACTION USING OFFSETS, SLIDING SUPPORTS, AND SWING JOINTS. 14. USE REPLACEABLE REDUCERS. CLOSE NIPPLES AND BUSHINGS ARE NOT ACCEPTABLE. 15. FOR IPS PIPING WITH SCREWED JOINTS WITH NPT (TAPERED) THREADS COORDINATE THREAD CUTTING LENGTH/DEPTH WITH PIPE SIZE SO LESS THAN 2 PERCENT OF THREADS ARE EXPOSED AFTER INSTALLATION. 16. WHERE PIPING PENETRATES NON -BEARING BUILDING FRAMING DO NOT EXCEED CODE -ALLOWED HOLE SIZES. 17. PIPING SHALL PENETRATE STRUCTURAL MEMBERS INCLUDING CONCRETE BEAMS, STEEL BEAMS, GLULAM BEAMS, AND SOLID -WEB TRUSSES ONLY WHERE APPROVED BY STRUCTURAL ENGINEER OF RECORD. 18. PIPING SUPPORT FASTENERS SHALL ATTACH TO BUILDING STRUCTURAL MEMBERS INCLUDING STEEL BEAMS, GLULAM BEAMS, AND SOLID -WEB TRUSSES ONLY AS APPROVED BY STRUCTURAL ENGINEER OF RECORD. 19. COORDINATE LOCATIONS OF SHUTOFF VALVES MOUNTED ABOVE ACCESSIBLE CEILINGS AND ACCESS DOORS WITH CEILING -MOUNTED APPURTENANCES INCLUDING THOSE SHOWN ON ARCHITECTURAL REFLECTED CEILING PLANS. 20. SUPPORT PIPING RISERS AT EACH FLOOR. 21. PROVIDE UNIONS OR FLANGES AT PIPING CONNECTIONS TO EQUIPMENT TO ALLOW DISASSEMBLY FOR MAINTENANCE. ARRANGE PIPING TO ALLOW PULL SPACE FOR EQUIPMENT REMOVAL. 22. PROVIDE REFRIGERANT ISOLATION VALVES AT EQUIPMENT FOR INSTALLATION, CHARGING, AND MAINTENANCE. 23. PROVIDE ESCUTCHEONS AT EXPOSED PIPING PENETRATIONS INTO FINISHED ROOMS. 24. PROVIDE AIRTIGHT SEAL WITH FLEXIBLE SILICONE CAULK AT PIPING PENETRATIONS THROUGH ARCHITECTURAL SURFACES. 25. PROVIDE ACCESS DOORS AT SERVICEABLE ITEMS LOCATED BEHIND WALLS AND REQUIRING ADJUSTMENT, REPAIR, OR REPLACEMENT INCLUDING VALVES. 26. TEST PIPING BEFORE INSULATING OF CONCEALING IN ACCORDANCE WITH MECHANICAL CODE REQUIREMENTS. ISOLATE CONNECTED EQUIPMENT. REPAIR ANY LEAKAGE AND RE -TEST. 27. FIRESTOP PIPING PENETRATIONS THROUGH PROTECTIVE ELEMENTS OF FIRE RATED ASSEMBLIES. REFER TO ARCHITECTURAL DRAWINGS FOR LOCATIONS OF ASSEMBLIES. 28. INSULATE PIPING WITH PREFORMED FIBERGLASS WITH FSK JACKET OR CLOSED CELL NEOPRENE FOAM INSULATION, ARMSTRONG ARMAFLEX OR SIMILAR. 29. INSULATION EXPOSED TO WEATHER SHALL BE PROTECTED FROM PHYSICAL DAMAGE, UV LIGHT, SOLAR HEAT, MOISTURE, AND WIND. PROVIDE JACKETS AND ALUMINUM COVERS. ADHESIVE TAPE NOT PERMITTED EXPOSED OUTDOORS. HVAC DUCTWORK INSTALLATION NOTES 1. DUCTWORK SIZES SHOWN ARE NOMINAL INSIDE FREE DIMENSION INSIDE LINER WHERE REQUIRED. MODIFY ASPECT RATIO (WIDTH /HEIGHT) OF DUCTS AND TRANSITION FROM ROUND TO RECTANGULAR DUCTS WHERE REQUIRED FOR COORDINATION, MAINTAINING EQUIVALENT DUCT SIZE AT FRICTION RATE OF 0.08" (W.G.) PER 100 LINEAL FEET. 2. DUCTWORK CONSTRUCTION SHALL COMPLY CURRENT MECHANICAL CODE AND SMACNA STANDARDS. 3. SEAL DUCT JOINTS PER CODE WITH GASKETS OR LISTED WATER -BASED DUCT SEALANT. 4. FLEXIBLE DUCTS IF USED SHALL NOT EXCEED 3 FEET IN LENGTH AND SHALL BE USED FOR OFFSETS ONLY. FLEXIBLE DUCTS SHALL NOT BE USED IN LIEU OF RIGID ELBOWS. 5. INSULATE DUCTS PER CURRENT ENERGY CODE REQUIREMENTS. 6. FIRESTOP OR PROVIDE FIRE AND SMOKE DAMPERS AS REQUIRED AT PENETRATIONS OF RATED ASSEMBLIES. REFER TO ARCHITECTURAL PLANS FOR RATED ASSEMBLIES. 7. PROVIDE DUCT SMOKE DETECTORS WHERE REQUIRED BY CODE AND WHERE INDICATED ON DRAWINGS. INTERLOCK EQUIPMENT POWER FOR SHUTDOWN ON ACTIVATION OF SMOKE DETECTOR AND ON GENERAL SIGNAL FROM FIRE ALARM CONTROL PANEL. 8. PROVIDE BALANCING DAMPER AT EACH AIR INLET AND OUTLET. INDICATE ON PLANS. COMMISSIONING NOTES 1. BUILDING COMMISSIONING SHALL BE COMPLETED FOR MECHANICAL SYSTEMS, SERVICE WATER HEATING SYSTEMS, AND PLUMBING SYSTEMS ON THIS PROJECT IN ACCORDANCE WITH ENERGY CODE REQUIREMENTS AND NATIONAL COMMISSIONING STANDARDS. PROVIDE COMMISSIONING DOCUMENTATION TO CONFIRM THAT EQUIPMENT, CONTROLS, AND CONTROLS SEQUENCING OPERATES AS INTENDED AND AS NEEDED TO COMPLY WITH ENERGY CODE. PROVIDE THE FOLLOWING ITEMS/TASKS: 2. COMMISSIONING PLAN: A PLAN WHICH OUTLINES THE ORGANIZATION, SCHEDULE, AND ALLOCATION OF RESOURCES AND DOCUMENTATION REQUIREMENTS OF THE COMMISSIONING PROCESS. PLAN SHALL BE PROVIDED WITH THE MECHANICAL EQUIPMENT SUBMITTALS. 3. PRELIMINARY COMMISSIONING REPORT: REPORT SHALL NOTE DEFICIENCIES FOUND DURING TESTING, CORRECTIVE ACTION TAKE, OR THE ANTICIPATED DATE OF CORRECTION, CONDITIONS UNDER WHICH THE TESTING WAS PERFORMED, AND THE STATUS OF ANY DEFERRED TESTS. PROVIDE REPORT PRIOR TO APPLICATION FOR SUBSTANTIAL COMPLETION. 4. WITHIN 90 DAYS OF RECEIPT OF THE BUILDING CERTIFICATE OF OCCUPANCY, THE PROJECT RECORD DRAWINGS, O&M MANUALS, FINAL BALANCING REPORT, FINAL COMMISSIONING REPORT, AND DOCUMENTATION OF COMPLETED OWNER O&M TRAINING SHALL BE SUBMITTED FOR REVIEW. 5. RECORD DRAWINGS: LOCATION AND PERFORMANCE DATA ON EACH ITEM OF INSTALLED EQUIPMENT AS -INSTALLED CONFIGURATION OF DUCTWORK AND PIPING WITH SIZES AND DIMENSIONS, AND FINAL AIR AND WATER FLOW RATES. 6. OPERATION AND MAINTENANCE MANUALS TO INCLUDE THE FOLLOWING: A. EQUIPMENT SIZE, SELECTED OPTIONS, AND REQUIRED MAINTENANCE. B. MANUFACTURERS' O&M MANUALS FOR ALL EQUIPMENT. C. NAME AND ADDRESS OF SERVICE AGENCY. D. CONTROLS MAINTENANCE AND CALIBRATION INFORMATION INCLUDING WIRING DIAGRAMS, SCHEMATICS, RECORD DRAWINGS, AND CONTROL SEQUENCES. INITIAL AND RECOMMENDED SETPOINTS SHALL BE RECORDED IN THESE DOCUMENTS. E. NARRATIVE OF HOW EACH SYSTEM IS INTENDED TO OPERATE. 7. SYSTEM ADJUSTING AND BALANCING: HVAC, HYDRONIC, AND SERVICE WATER HEATING SYSTEMS SHALL BE BALANCED BY A LICENSED AND NEBB CERTIFIED TESTING, ADJUSTING, AND BALANCING (TAB) AGENCY IN ACCORDANCE WITH NEBB STANDARDS. FINAL FLOW RATES SHALL BE WITHIN 5% OF FLOWS INDICATED. 8. FUNCTIONAL PERFORMANCE TESTING (FPT): PROVIDE AND EXECUTE WRITTEN PROCEDURES WHICH CLEARLY DESCRIBE THE INDIVIDUAL SYSTEM TESTS, EXPECTED SYSTEM RESPONSES, ACCEPTANCE CRITERIA FOR EACH PROCEDURE, ACTUAL RESPONSE DATA, AND FINDINGS INCLUDING PASS/FAIL AND OTHER NOTES AS NEEDED TO INSTITUTE CORRECTIVE ACTIONS. TESTING SHALL AFFIRM OPERATION DURING ACTUAL OR SIMULATED WINTER AND SUMMER CONDITIONS AND DURING MINIMUM AND 100%OUTSIDE AIR CONDITIONS. A. EQUIPMENT FPT SHALL DEMONSTRATE THE CORRECT INSTALLATION AND OPERATION OF EQUIPMENT COMPONENT, SYSTEM, AND SYSTEM -TO -SYSTEM INTERTIE RELATIONSHIP. TESTING SHALL INCLUDE ALL MODES AND SEQUENCES OF OPERATION INCLUDING FULL -LOAD, PART -LOAD, EMERGENCY, ALARMS, AND LOSS/RESTORATION OF POWER. B. CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT CONTROLS DEVICES, COMPONENTS, EQUIPMENT, AND SYSTEMS ARE CALIBRATED, ADJUSTED, AND OPERATE IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. SEQUENCE OF OPERATION SHALL BE FUNCTIONALLY TESTED TO DOCUMENT THAT THEY OPERATE AS REQUIRED. C. ECONOMIZERS SHALL UNDERGO AN FPT TO VERIFY THAT THEY OPERATE IN ACCORDANCE WITH MANUFACTURERS' RECOMMENDATIONS. 9. OWNER TRAINING: PROVIDE SYSTEM/EQUIPMENT OVERVIEW INCLUDING DESCRIPTION, OPERATION, AND INTERFACES. REVIEW O& M MATERIALS AND TOOLS. REVIEW PROJECT RECORD DRAWINGS. PROVIDE HANDS-ON DEMONSTRATION OF ALL NORMAL MAINTENANCE AND REPAIR PROCEDURES, NORMAL OPERATING MODES, AND EMERGENCY SHUTSDOWN AND START-UP PROCEDURES. PROVIDE WRITTEN DOCUMENTATION OF THE COMPLETION OF EACH COMPONENT OF TRAINING. 10. FINAL COMMISSIONING REPORT SHALL BE PROVIDED AND INCLUDE THE FOLLOWING: A. DISPOSITION OF ALL DEFICIENCIES FOUND DURING TESTING, INCLUDING DETAILS OF CORRECTIVE AND PREVENTIVE ACTIONS USED OR PROPOSED. B. ALL FPT PROCEDURES USED DURING THE COMMISSIONING PROCESS INCLUDING MEASURABLE CRITERIA FOR TEST ACCEPTANCE, AND DATA FOR JUDGEMENT OF REPEATABILITY. 11. SUBSTANTIAL COMPLETION OF THE MECHANICAL WORK IS DEPENDENT ON APPROVAL OF THE COMMISSIONING REPORT BY THE MECHANICAL ENGINEER. U� J`� JN �o N O Q 0 °' N r� N_ V � VNN � L.I. � N W� O ZN W� U� _� c 0 J� 0 `� w rn o VJ � © Copyright 2021 11/15/2021 Z O � N O � W V z �.�..� a � 0 � W � J � � OWC Q O a W 0 �, o RESUB Dec 14 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PROJECT N0: 21-106 ISSUE DATE: XX-XX-2021 DRAFT DATE: DRAWN BY: CHECKED BY: REVISED: REVISION N0: REVISED: REVISION N0: MECHANICAL SYMBOLS AND ABBREVIATIONS M-001 SHEET 1 OF 8 NOTE: SCALING PORTIONS OF THESE DRAWINGS AND PRINTING WITH 1/8" FONT REQUIRES PLOTTING AT ORIGINAL SHEET SIZE OF 42 INCHES x 30 INCHES C C C C C C C C � � � � � � � � I I I ,� � � I � � I I � I a I I I I I I f I I I I I I ® I I I f I I I I I I I I I � I I I � � I I I I I I f I Q I I I I I 10/4 SA UP 10/4 SA IN WALL � I � � I � S D 1 10/6 140 � I I I I I I I C C I f I ® I I I I I I MP�IN I-EVEI- SI-P� ❑N HR�CE �B❑CE THIS ARE � TYP I I I 0 I I I I I I I I I I I H Q H I I I I I I I I o I I I I I I I I I I I I I I I I I I I I I° I I I I I I I I I I I I � D I I I I I I I I � I � I � � � � D HVAC PCAH EOWER EEVEC SCALE: 1 /4"=1' 0" U� J `° JN �o A N {11i N O L SZ O � N N N V � a>7 V � N W� O N Z �� 7 W`� i © copy��9ht 202� 11/15/2021 Z O O � � W � V Z W Q � � � W � � � J � � � � Z 0 � Q z z ~ � � - � � a Woo o LC� W RESUB Dec 14 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PROJECT N0: 21-106 ISSUE DATE: XX-XX-2021 DRAFT DATE: DRAWN BY: CHECKED BY: REVISED: REVISION N0: REVISED: REVISION N0: MECHANICAL LOWER LEVEL PLAN NOTE: SCALING PORTIONS OF THESE DRAWINGS AND PRINTING WITH 1/8" FONT REQUIRES PLOTTING AT ORIGINAL SHEET SIZE OF 42 INCHES x 30 INCHES M-200 SHEET 2 OF 8 H VAC U CAH CR OU H D UUVUU SCALE: 1 /4"=1' 0" U� J `° JN �o A N {11i N O L SZ O � N N N V � a>7 V � N W� O N Z �� 7 W`� © copy��9ht 202� 11/15/2021 Z 0 � O � � W � V Z W Q � � W � � � J � � � � Z 0 � Q z z ~ � � — � � a Woo o � � �c, W RESUB Dec 14 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PROJECT N0: 21-106 ISSUE DATE: XX-XX-2021 DRAFT DATE: DRAWN BY: CHECKED BY: REVISED: REVISION N0: REVISED: REVISION N0: MECHANICAL GROUND LEVEL PLAN NOTE: SCALING PORTIONS OF THESE DRAWINGS AND PRINTING WITH 1/8" FONT REQUIRES PLOTTING AT ORIGINAL SHEET SIZE OF 42 INCHES x 30 INCHES M-201 SHEET 3 OF 8 HVAC PCAH UPPER CEVC� SCALE: 1 /4"=1' 0" F_ i r, H KEYED SHEET NOTES O SHEETMETAL RETURN AIR PLENUM 12" HIGH WITH 2" LINER AND RETURN AIR OPENING SIZED AS SHOWN ON TOP OF PLENUM O2 32/18 RA DUCT UP THROUGH CURB TO RTU O3 18/18 SA DUCT UP THROUGH CURB TO RTU ® 24/14 RA DUCT UP THROUGH CURB TO RTU O RAD TO MODULATE INVERSELY TO OAD POSITION. RED TO MODULATE EQUAL TO OAD POSITION. ��► U� J `° JN �o A N {11i N O L SZ 0 °' N N N V � a>7 V � N W� O N Z �� 7 W`� U� �� 0 Q� J � 0�w �� © copy�l9ht 202� 11/15/2021 Z 0 � O � � W � V Z W Q � � W � � � J � � � � Z 0 � Q z z ~ � � — � � a Woo o � � �c, W RESUB Dec 14 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PROJECT N0: 21-106 ISSUE DATE: 11-16-2021 DRAFT DATE: DRAWN BY: CHECKED BY: REVISED: 12-7-2021 REVISION N0: �1� REVISED: 12-8-2021 REVISION N0: �2� MECHANICAL UPPER LEVEL PLAN M-202 NOTE: SCALING PORTIONS OF THESE DRAWINGS AND PRINTING WITH 1/8" FONT REQUIRES PLOTTING AT ORIGINAL SHEET SIZE OF 42 INCHES x 30 INCHES SHEET 4 OF 8 HVAC O�AH R00� �CC� SCALE: 1 /4" 1'-0" 0 KEYED SHEET NOTES O ON HP START OPEN OSA DAMPER TO MINIMUM POSITION. OPEN OSA DAMPER 100% ON HP CALL FOR COOLING WHEN OSA TEMPERATURE IS BELOW ADJUSTABLE ECONOMIZER SETPOINT, INITIALLY 65F. �' RAD TO MODULATE INVERSELY TO OAD POSITION. RED TO MODULATE EQUAL TO OAD POSITION. U� J `° JN �o A N {11i N O L SZ 0 °' N N N V � a>7 V � N W� O N Z �� 7 W`� U' �� Q' J r0 v/ © Copyright 2021 11/15/2021 Z 0 � O � � W � V Z W Q � � W � � � J � � � � Z 0 � Q z z ~ � � — � � a Woo o � � �c, W RESUB Dec 14 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PROJECT N0: 21-106 ISSUE DATE: 11-16-2021 DRAFT DATE: DRAWN BY: CHECKED BY: REVISED: 12-7-2021 REVISION N0: �1� REVISED: 12-8-2021 REVISION N0: �2� MECHANICAL ROOF LEVEL PLAN 3 6 3 J NOTE: SCALING PORTIONS OF THESE DRAWINGS AND PRINTING WITH 1/8" FONT REQUIRES PLOTTING AT ORIGINAL SHEET SIZE OF 42 INCHES x 30 INCHES M-203 SHEET 5 OF 8 1 /2" HANGER F ATTACH TO STR HEAVY—DUTY C � HANGER: GRINN FIGURE 260 VAPOR BARRIER INSULATION 12" LONG x 12U BEND RIGID INSULATION OE SAME THICKNESS AS PIPE INSULATION, OR EULE RIGID INSULATION 12" LONG SMIC BRACING WHERE REQ. � SPEC IEICATIONS ;KING NUT PPORT NUT D AND NUT GAUGE ZINC COATED SHEET STEEL SADDLE AT LEAST 12" EONG X 180° BEND DUTA U DUHC CUDDORT SCALE: NOT TO SCALE SHEETMETAL RAIN COVER CANT AS REQUIRED ROOFING BY OTHERS \ ROOF DGTA U SUPPORT AT BASE MINIMUM OF PIPE RISER OPENING RCUR GGRAH � U U CG THROUGH R00U SCALE: NOT TO SCALE 4 — 4 ., 4 - � Q �. - 4 a p a as a a a 0 0 � � � � SUSPEND UNIT FROM STRUCTURE CEILING MOUNTED EXHAUST FAN ILING D CA U C�H AU C DAC �' ,; i .i H ; (E) ROOF DECKING (N) CLASS I LOW LEAK DAMPER (N) SHEETMETAL DAMPER SHELF ALL AROUND WALL LOUVER SUSPENDED CEIHNG, SEE ARCHITECTURAL D ETA U DOU VUR COH H CCT OC SCALE: NOT TO SCALE ROOF CAP, SPUN ALUMINUM ROOF CURB FLASHING AND ROOFING IN ARCHITECTURAL WORK DUCT RISER (N) CLASS I LOW LEAK DAMPER WHERE REQUIRED DCA U CHAUCT TCU CATOC �i�niT Tnn�nininTn PIPE SIZE PI (MIN.) AND WHERE INDIC ON DRAWING D ETA U COH D C OATD D U H C SCALE: NOT TO SCALE CEILING WALL MOUNTEC FAN COIL UNIT LINESET WALL DUCT KIT RECTORSEAL "FORTRESS" MODEL LDK 4-1/2" WIDE, COLOR TO MATCH UNIT CABINET RUN REFRIGERANT PIPING AND CONDENSATE DRAIN LINE IN DUCT FROM UNIT TO ABOVE CEILING INSTALL PER MANUFACTURER'S INSTRUCTIONS OELEVATION STEEL STUD WALL STEEL ----__ STUD LATERAL (TYP.) LAG SCREW - � SIZE &NUMBER PER MANUFACTURER'S INSTALLATION INSTRUCTIONS (TYP.) 4" MIN.��� CEILING O WALL MOUNTED FAN COIL UNIT INSTALL UNIT ON FACTORY SUPPLIED MOUNTING BRACKET PER MANUFACTURER'S INSTRUCTIONS CONDENSATE PUMP KIT J MOUNTED IN UNIT CABINET "ASPEN" MINI -AQUA OR SIMILAR COMPLETE W/ PLUG-IN POWER CABLE, RESERVOIR, DRAIN CONNECTOR KIT, ANTI -SIPHON DEVICE INSTALL PER MANUFACTURER'S INSTRUCTIONS SECTION D ETA U 1�/AUU U OU H TUD AC U H T U� J `° JN �o A N {11i N O O � � sZ 0 °' N N Q � � � a� W W o Lu o N �� W`� U �' 0 J Ow � �� © copy��9ht 202� 11/15/2021 Z O o � o � o0 � � � W � V Z W Q � � W � � � J � � � � Z 0 � Q z z ~ � � - � � a Woo o � � � W RESUB Dec 14 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PROJECT N0: 21-106 ISSUE DATE: XX-XX-2021 DRAFT DATE: DRAWN BY: CHECKED BY: REVISED: REVISION N0: REVISED: REVISION N0: MECHANICAL DETAILS SCALE: NOT TO SCALE SCALE: NOT TO SCALE SCALE: NOT TO SCALE M-501 NOTE: SCALING PORTIONS OF THESE DRAWINGS AND PRINTING WITH 1/8" FONT � SHEET 6 OF 8 REQUIRES PLOTTING AT ORIGINAL SHEET SIZE OF 42 INCHES x 30 INCHES OUTDC MASO1� NEOPF TYP. UNIT MOUN1 LEG, T` HEX Nl LOCK � ROOF DETA � AC OR VR� OU TOOOR U D T U OU D T D � SCAEE: NOT TO SCALE ORIENT UNIT FOR UNOBSTRUCTED AIRFLOW. MOUNTING STRUTS SHOWN ARE REPRESENTATIVE FOR SUPPORT ONLY. HEAT PUMP CONDENSING UNIT REFRIGERANT LINES, SEE FLOOR PLANS FOR NUMBER, SIZE, AND ROUTING NEOPRENE PAD, TYP. UNIT MOUNTING LEG, TYP. 1 5/8" X 1 5/8" P1000 HS UNISTRUT CHANNEL ACROSS SPAN OF PLATFORM 3/8"0 x 3" ANCHOR BOLT W/ WASHER &SILICONE SEAL MIN. 2 1/2" EMBEDMENT, TYP. MECHANICAL EQUIPMENT GASKETING SELF -TAPPING SCREW, QUANTITY AS REQUIRED (� 3 RIGID INSULATION, R-8 MIN. SEISMIC ATTACHMENT - CURB TO STRUCTURE (SEE ARCHITECTURAL OR STRUCTURAL DWGS) ROOF �� U\ �` �� �� ��� ��` WOOD NAILER FLASHING AND COUNTERFLASHING PER ROOFING REQUIREMENTS SHETMETAL PITCHED ROOF CURB ROOFING (SEE ARCH DWGS) ��'� CANT STRIP AS NEEDED PER ROOFING REQUIREMENTS KEYED NOTES ��1� QUANTITY, DIMENSIONS, GAUGE OF CLIPS, AND NUMBER AND SIZE OF FASTENERS SHALL BE SUFFICIENT TO RESIST SEISMIC AND WIND FORCES PER CODE. 02 PROVIDE HINGED LPH MOUNTING WITH TOOL -LESS LATCHES IF MOUNTING SHUTOFF DAMPER WITHIN CURB. 30 IF MOUNTING SHUTOFF DAMPER WITHIN ROOF CURB PROVIDE REINFORCED GASKETED SEAL IN LIEU OF DUCT FLANGE. DETA U RTU VOUDT U� SCALE: NOT TO SCAEE U� J `° JN �o A N {11i N O L SZ 0 °' N N N V � a>7 V � N W� O N Z �� 7 W`� U' �� Q' J r0 v/ © Copyright 2021 11/15/2021 Z O o � � O 00 � � � W � V Z W Q � � W � � � J � � � � Z 0 � Q z Z ~ � � � a Woo O � � � W RESUB Dec 14 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PROJECT N0: 21-106 ISSUE DATE: XX-XX-2021 DRAFT DATE: DRAWN BY: CHECKED BY: REVISED: REVISION N0: REVISED: REVISION N0: MECHANICAL DETAILS 3 6 3 J NOTE: SCALING PORTIONS OF THESE DRAWINGS AND PRINTING WITH 1/8" FONT REQUIRES PLOTTING AT ORIGINAL SHEET SIZE OF 42 INCHES x 30 INCHES M-502 SHEET 7 OF 8 SPLIT SYSTEM -INDOOR UNIT SENSIBLE COOLING TOTAL COOLING SPACE COOLING AIR ASSOCIATED NOMINAL COOLING CAPACITY CAPACITY HEATING CAPACITY FLOW RATE ESP OSA NEW TAG AREA SERVED OUTDOOR UNIT MANUFACTURER TYPE MODEL TONS BTUH BTUH BTUH CFM IN. S.P. CFM REFRIGERANT PIPING CONN. ELECTRICAL LIQUID GAS VOLTS PHASE MCA WEIGHT REMARKS IN IN AMPS LBS HP-T2 TENANT 2 CU-T2 MITSUBISHI UPFLOW FCU PVA-A36AA7 3 32,000 36,000 38,000 1120 0.8 750 3/8 5/8 208 1 5.5 78 [1] [2] [3] [4] [5] AC-1 ELEVATOR MACHINE ROOM CU-EMR DAIKIN WALL MOUNTED FAN COIL FTKB09AXVJU 3/4 7,165 8,800 -- 350 -- -- 1/4 1/2 208 1 [6] 20 [5] [6] NOTES: [1] MANUFACTURER'S DIGITIAL CONTROL SYSTEM WITH AE-200 CENTRAL CONTROLLER [2] CONTROL POWER SUPPLY KIT [3] 1"PLEATED MERV 8 FILTER IN MANUFACTURER'S ACCESSORY FILTER BOX [4] PROVIDE SMART MA CONTROLLER FOR EACH INDOOR UNIT [5] ACCESSORY CONDENSATE RUMP [6] INDOOR UNIT POWERED BY OUTDOOR UNIT SPLIT SYSTEM -OUTDOOR UNIT TAG SERVICE MANUFACTURER MODEL NOMINAL CAPACITY AHRI EFFICIENCIES [1] CAPACITY COOLING HEATING SEER EER HSPF TONS MBH MBH REFRIGERANT LIQUID LINE GAS LINE CONNECTION TYPE CONNECTION IN. IN. ELECTRICAL LOAD MOP VOLTS PH FLA MCA WT NOTES LBS CU-T2 HP-T2 MITSUBISHI PUZ-A36NKA7 3 38.0 36.0 19.3 -- 9.5 R-410A 3/8 5/8 208 / 230 1 1 25 31 214 [1] CU-EMR AC-1 DAIKIN RKB09AXVJU 3/4 7.5 -- 17.0 11.0 -- R-410A 1/4 3/8 208/230 1 0.19 6.95 15 53 [1] NOTES: [1] AS TESTED PER AHRI 210/240 PACKAGED ROOFTOP UNIT TAG AREA SERVED NOMINAL ARI COOLING CAPACITY TONS TOTAL KBTUH EFFICIENCY IEER /SEER EER HEATING INPUT MBH 120 HEATING OUTPUT MBH 96 ELECTRICAL REMARKS [1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] MANUFACTURER TRANE TRANE MODEL SENS AIR FLOW MIN OSA ESP IN WC 0.75 POWER NOMINAL HP BHP 3.0 1.83 AFUE WT VOLTS 208 PH 3 LOAD KBTUH CFM 3,000 CFM 1,000 % 81 LBS 1200 MCA 39 RTU-1 TENANT 1 YHC092 7.5 94.8 73.8 12.7 IEER 14.0 SEER 11.2 RTU-2 TENANT 2 YSC036 3 37.1 29.9 12.0 1,200 750 0.75 0.75 0.55 80 64.8 81 700 208 3 39 NOTES: [1] SPRING ISOLATION CURB MASON "RSC" [2] MERV 8 FILTERS 2" THICK [3] R-410a [4] POWERED CONVENIENCE OUTLET [5] ECM MOTOR [6] SCROLL COMPRESSOR [7] SINGLE POINT ELECTRICAL CONNECTIONI [8] SINGLE -STAGE HEAT [9] DOWNFLOW DUPPLY AND RETURN [10] FACTORY SMOKE DETECTOR [11] FACTORY CONTROLS PACKAGE WITH 24 VOLT TRANSFORMER [12] ACCESSORY AIR ECONOMIZER WITH BAROMETRIC RELIEF VENTILATION FANS TAG SERVICE MANUFACTURER MODEL TYPE WT FLOW RATE TSP SPEED DRIVE HP VOLTS PH FLA REMARKS LBS CFM IN WC RPM EF-1 SINGLE TOILET ROOMS PANASONIC FV-0511VK2 CEILING 15 70 0.25 1180 DIRECT 15.4W 120 1 5.8 [1] [2] EF-2 MULTIPLE TOILET ROOMS GREENHECK SP-A200 CEILING 24 210 0.25 900 DIRECT 54 W 120 1 0.46 [1] [2] NOTES: [1] OPERATES AT SCHEDULED FLOW IN RESPONSE TO INTEGRAL MOTION SENSOR [2] BACKDRAFT DAMPER VENTILATION PER ASHRAE STD 62.1 ASHRAE DEFAULT OCCUPANT EQUIVALENT EQUIVALENT PEOPLE EXHAUST AREA PEOPLE OSA BREATHING ZONE SA DISTRIBUTION ZONE OSA REQUIRED, ZONE OSA PROVIDED, EXHAUST DISTRIBUTION ZONE EXHAUST ZONE TRANSFER DENSITY ZONE POPULATION ZONE POPULATION ZONE POPULATION RATE, R AREA RATE, Ra REQ. OSA REQ. REQ. OSA, Vbz EFFECTIVENESS, Ez Voz SUPPLY AIR MIN. OSA FRACTION Voz EFFECTIVENESS REQUIRED ZONE EXHAUST PROVIDED AIRFLOW NOTES SYSTEM TAG UNIT TAG ROOM N0. ROOM OR ZONE NAME OCCUPANCY TYPE CLASSIFICATION AREA, SQFT p SQ FT PER OCCUPANT PEOPLE/1000 SQ FT PEOPLE PEOPLE CFM/PER CFM/SQFT CFM CFM CFM CFM RATIO CFM CFM DIMENSIONLESS CFM RATIO CFM CFM CFM RTU-1 -- 1 TENANT1 RETAIL SALES 4,643 67 14.93 69.3 25 7.5 0.12 - - 557 188 745 0.8 931 3100 0.33 1023 - - - - - - - - - - 2 MSRM TOILET -PUBLIC TOILET -PUBLIC 151 -- -- -- -- -- -- 210 -- -- 210 -- -- 210 69 0.8 263 263 263 [1] 3 MR ROOM 110 -- -- -- -- -- -- 210 -- -- 210 -- -- 210 69 0.8 263 263 263 [1] 4 STAIR ELEVATOR MACHINE ROOM CORRIDORS 75 -- -- -- -- -- 0.06 -- 5 -- 5 0.8 6 20 7 -- -- -- -- -- 5 ELECT. EQPMTROOM 42 -- -- -- -- -- 0.06 -- 3 -- 3 0.8 4 15 5 -- -- -- -- -- TOTAL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 941 3,555 -- -- 525 525 -- -- RTU-2 - - 1 OFFICE OFFICE SPACE 147 200 4.76 1 1 5 0.06 -- 9 5 14 0.8 17 100 0.61 61 -- -- -- -- -- 2 LOFT BAR BARS, COCKTAIL LOUNGES 379 10 100.00 38 6 7.5 0.18 - - 68 45 113 0.8 142 255 156 - - - - - - - - - - 3 REC ROOM LOBBY CORRIDORS 98 - - - - - - - - 0.06 - - 6 - - 6 0.8 8 25 15 - - - - - - - - - - 4 REC ROOM GAME ARCADES BOWLING ALLEY (SEATING) CORRIDORS CORRIDORS 480 50 20.00 10 6 7.5 0.18 - - 86 45 131 0.8 164 320 195 - - - - - - - - - - 5 BOWLING LANES STAIR 502 25 40.04 20 6 10 0.12 - - 60 60 120 0.8 150 335 204 - - - - - - - - - - 6 502 -- -- -- -- -- 0.06 -- 30 -- 30 0.8 38 125 76 -- -- -- -- -- 7 95 -- -- -- -- -- 0.06 -- 6 -- 6 0.8 8 25 15 -- -- -- -- -- 8 SERVICE AREA STORAGE ROOMS 175 - - - - - - - - - - 0.12 - - 21 - - 21 0.8 26 45 27 - - - - - - - - - - 9 MECH LOFT STORAGE ROOMS 334 -- -- -- -- -- 0.12 -- 40 -- 40 0.8 50 85 52 -- -- -- -- -- TOTAL -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- 602 1,315 -- 802 -- -- -- -- -- CU-T2 HP-TU2 1 STORAGE STORAGE ROOMS 912 - - - - - - - - - - 0.12 - - 109 - - 109 0.8 137 225 0.66 149 - - - - - - - - - - 2 STAIR CORRIDORS 95 -- -- -- -- -- 0.06 -- 6 -- 6 0.8 7 25 17 -- -- -- -- -- 3 WATERCLO STORAGE ROOMS 61 -- -- -- -- -- 0.12 -- 7 -- 7 0.8 9 20 13 -- -- -- -- -- 4 ELEC CLO TENANT 2 ELECT. EQPMT ROOM 97 - - - - - - - - - - 0.06 - - 6 - - 6 0.8 7 25 17 - - - - - - - - - - 5 SALES 67 15.01 20.90 10 7.5 0.12 -- 167 75 242 0.8 303 345 228 -- -- -- -- -- 6 TENANT 2 W TOILET TOILET -PUBLIC 42 - - - - - - - - - - -- 70 - - -- 70 1.0 -- 70 46 0.8 88 88 88 [1] 7 TENANT2ETOILET TOILET -PUBLIC 42 -- -- -- -- -- -- 70 -- -- 70 1.0 -- 70 46 0.8 88 88 88 [1] 8 TENANT 2 STAIR CORRIDORS 69 - - - - - - - - - - 0.06 - - 4 - - 4 0.8 5 20 13 - - - - - - - - - - TOTAL -- -- 468 800 -- 528 -- 175 175 -- -- NOTES: [1] TRANSFER AIR U� J `° JN �o A N {11i N O 0 � � a O � N N Q �� � L v a� W W o Lu o N 7 W`� U� � N LJ� � 0 J O � w � '^ o © Copyright 2021 11/15/2021 Z O O � � W � V W Q W � � � J � � Z 0 � Q z Z � � O a Woo 0 RESUB Dec 14 2021 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PROJECT N0: 21-106 ISSUE DATE: XX-XX-2021 DRAFT DATE: DRAWN BY: CHECKED BY: REVISED: REVISION N0: REVISED: REVISION N0: MECHANICAL SCHEDULES NOTE: SCALING PORTIONS OF THESE DRAWINGS AND PRINTING WITH 1/8" FONT REQUIRES PLOTTING AT ORIGINAL SHEET SIZE OF 42 INCHES x 30 INCHES M-601 SHEET 8 OF 8