APPROVED ENG BLD2023-0292+TIA+3.7.2023_3.37.06_PM+3407230RECEIVED
3/13123
CITY OF EDP
DEVELOPN
SERVICES DEP
4-0
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
www.edmondswa.gov
BLD2023-0292
APPENDIX A
Page I of 2
Transportation Impact Analysis
Worksheet
Name of Proposed Project: 8923 220th St SW, BLD2023.0292
(Lot 1 of 8929 220th St SW Short Plat, PLN2021-0038)
Owner/Applicant Applicant Contact Person:
Select Homes
Name
8304 212th St SW
Street/Mailing Address
Edmonds WA 98026
City State Zip
Kayla Clark Nichols
Name
8304 212th St SW
Street/Mailing Address
Edmonds WA 98026
City State Zip
Telephone: (425) 742-6044 Telephone: (206) 963-3365
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
RAM Engineering, Inc. Rob Long, PE
Firm Name Contact Name
Telephone: (425) 678-6960
1. PROJECT DESCRIPTION
E-mail: RobL@RAMengineeringlnc.com
a. Location - Street address: 8923 220th St. SW ( Lot 1 of 8929 220th Short Plat)
(Attach a vicinity map and site plan.)
b. Specify existing land use: Single Family Residential
c. Specify proposed type and size of development: Single Family Residential, One Lot/SFR
(# of residential units and/or square footage of building)
d. Date construction will begin and be completed: Start April 2023 / End December 2023
e. Define proposed access locations: Shared driveway from 220th St SW per Short Plat.
APPENDIX A
Page 2 of 2
f. Define proposed sight distance at site egress locations:
Shared driveway access to 220th St SW, adequate access sight distance.
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
❑ CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used.
ITE Land Use Category I Per Unit
Fee Rate
New Use $ X
Prior Use $ X
Units in
square feet,
# of dwelling,
vfb. etc.
Fee
New Use Fee: $ - Prior Use Fee: $ $ 1
0 NEW DEVELOPMENT
New Use
❑ OTHER
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
SFR, ITE 210 $ 6249.14 X 1 =
(Lot 2 to take credit for existing residence)
MITIGATION FEE RECOMMENDATION:
$ 6249.14
INDEPENDENT FEE CALCULATION: $240.00 + consultant fee
$
TOTAL TRANSPORTATION IMPACT FEE
$ 6249.14
J6-Awvie,Zuia,f, Eng,�4� TeJv 4/20/2023
City of Edmonds, Engineering Division Approval Date
1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.