BLD20171835ov EDAf
A,
TP
CITY OF EDMONDS
1215THAVENUENORTH -EDMONDS, WA 98020
PHONE: (425) 771-0220 - FAX: (425) 771-0221
STATUS: ISSUED 11/06/2018 Pertnit4: BLD20171835'
BUILDING PERMIT
Expiration Date: 11/06/2019 Project Address: 20904 72ND AVE W, EDMONDS
Parcel No: 00566900200302
P&OP-ONA-VOWNER APPLICANT CONTRACTOR
CUMMINGS DEVELOPMENT LLC CUMMINGS DEVELOPMENT LLC SLATER HOMES CORPORATION
C/O MARK CUMMINGS C/O MARK CUMMINGS CIO MARK CUMMINGS
9718 SLATER LANE 9718 SLATER LANE 9718 SLATER AVE NE
KIRKLAND, WA 98033 KIRKLAND,WA 98033 KIRKLAND, WA 98033
(42 5) 890-3 3 97 (425) 890-3397 (425) 890-3397
F,— 1, 9, [/ \� � LICENSE #: SLATEHC90OD6 EXP:04/18/2020
NEW 4-UNIT APARTMENT BUILDING. INCLUDES FIRE
PLUMBING, MECHANICAL & FIRE SPRINKLER TO BE UNDEl:C5ff_ARA 'TEPERM ITS.
VALUATION: $402,926
PERMIT TYPE: Commercial
PERMIT GROUP: 06 - Apart m ent/Co ndo Ncw
GRADING: N CYDS: 0
TYPE OF CONSTRUCTION: VB
RETAINING WALL ROCKERY:
OCCUPANT GROUP: R2
OCCUPANT LOAD: 19
FENCE: 0 X 0 FT.)
CODE: 2015
IOTHER: ------- OTHER DESC:
IZONE: RM-1.5
[NUMBER OF S ORIES: 2
VESTED DATE:
INUMBER OF DWELLING UNITS: 4
LOT #:
EXISTING ARE%
IBASEMLN 1: 0 1 ST FLOOR: 0 2ND FLOOR: 0
PROPOSED ARFA
�13ASEMENT, 0 IST FLOOR: 1771 2ND FLOOR: 2140
13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD
FLOOR: 0 GARAGE: 0 DECK: 120 OTHER: 0
1BEDROOMS: 0 BATHROOMS: 0 IBEDROOMS:
)0 BATHROOMS: 6
FRONT SETBACK SIDESETBACK REARSETBACK
REQUIRED: E = IS' PROPOSED: 151+ IT =QUIRED: N 10' PROPOSED: 10' IREQUIRED: W = 15, PROPOSED: 15'
HEIGHT ALLOWED:O PROPOSED:O REQU I RED: S 10' PROPOSED: 10'
SETBACK NOTES:
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO
PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMENS COMPENSATION
INSURANCE AND RCW 18:27.
N THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HISMER DEPUTY AND ALL FEES ARE PAID.
�A I, Kk_ (tJ m k I t,46 to 1t1,e&&g- 11/6/18
ature
Date
ATTENTION
ITIS UNLAWFUL TO USE OR OCCUPY A BUILDYNG OR STRI IE UNIT]- A FINAL INSPEC71ON HAS BEEN' MADE AND APPROVAL ORA CER11FiCATE OF
OCCUPANC Ht, BEEN GRANTED. UBC109/ JBCI 10/IRCI 10.
FIRE APPLICANT ASSESSOR CITY
Z_
43
.*�.A ", ,
of
40�� ,, av
t,16. -%
V;,N,w
STATUS: ISSUED BLD20171835
CONDITIONS
• Lot line stakes must be in place at the time of foundation/setback inspection.
• All new, extended, re -built or relocated electrical utility and/or service shall be placed underground.
• Separate Permit Required For: Plumbing, Mechanical, Fire Sprinklers, Fire AlanTi, L&I Electrical
• Separate Permit Required For:
• Obtain Electrical Permit fi-om State Department of Labor & Industries. 425-290-1309
• Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of
the building or structure. Check thejob card for all required City inspections including final project approval and final
occupancy inspections.
• Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from
adopted codes, ordinances or policies must be specifically requested iri writing and be called out and identified. Processing
fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable.
• Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been
specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision
of city code or state law does not approve any items not to code specification.
• Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits
of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
Sundays and Federal Holidays. At all othertimes the noise originating from construction sites/activities must comply with the
noise limits ofChapter 530, unless a variance has been granted pursuant to ECC 5.30.120.
• Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold
harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly fromthe issuance for this permit. Issuance of this pennit shall not be deemed to
modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
• The building enclosure must be inspected by a qualified inspector in accordance with RCW 64.55.030, 64.55.040, and 64.55.050.
A building enclosure certification letter fromthe inspector must be submitted to the Building Division prior to final inspection
by the City Building Inspector in accordance with RCW 64.55.060.
• Where phasing of construction occurs, coordinate inspection with the City Building Inspector to insure that all required
inspections are performed. Inspection bythe building enclosure inspector to meet RCW 64.55 does not substitute for required
City building inspections which must be performed by the City Building Inspector.
• SPECIAL INSPECTIONS ARE REQURED FOR THEFOLLOWING
Sods, as per Geotechn ical report
Concrete Construction, Including Reinforcement
Prior to Final Inspection by the Building Division, Final Special Inspection Reports are Required From All Special
Inspectors.
Applicant shall repair/replace all damage to utilities or frontage improvements in Cir\ ri.-lit-of-way per City standards that is
caused by or occurs during the permitted project.
THIS PERMIT AUTHORIZES ONLY THEWORK NOTED. THIS PERMIT COVERS WORK TO BE DONEON PRIVATE PROPERTY ONLY. ANY
CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT
TIME LIMIT: SEE ECDC 19.00.005(A) (6)
I BUILDING I I ENGINEERING (425) 771-0220 EXT. 1326 1
1. Go to: www.edmondswa.gov Building Department Inspections
2. Then: Services are now scheduled online. If you
3. Then: Perm its/Development have difficulties, please call the
4. Then: Online Permit Info Building Department front desk for
5: If you don't have one already, create a assistance during office hours.
FIRE (425) 775-7720
PUBLIC WORKS (425) 771-0235
1,- 1, ..141
login (upper right hand comer) (425) 771-0220
6.- Schedule vour insoection I
RECYCLING (425) 276-4801
When calling for an inspection please leave the follovAng information: Permit Number, Job Site Address, Type of Inspection
— being requested, Contact Name and Phone Number, Date Preferred, and whether you prefer morning or afternoon,
• E-Pre-Con
• E-Erosion Control/Mobilization
• EStorm Tightline
EInfiltration System
E-Footing Drywell
&Water Service Line
EDouble Check Detector Assem Vault
E-Pavement Striping
E-Trash Enclosure
• E-Engineering Final
• E-Provide Electronic As built
• B-Preconstruction meeting
• B-Setbacks
• B-Footings
• B-Foundation Wall
• B-Foundation Drainage
• B-Retaining Wall
• B-Trash Enclosure
• B-.First Floor Framing
• B-E)derior Wall Sheathing
• B-Roof Sheathing
• B-Building Enclosure progress
• B-ShearNailing
• B-Height Verification
• B-Framing
• B-Wall Insulation/Caulk
• B-Insulation/Fnergy
• B-SheetrockNail
• B-Cross Connection Final
• B-Building Enclosure special inspec
• B-Special Inspections
• B-Building Final
• F-Extinguishers
• F-Fire Dept Inspection
• F-Addressing Visibility
• F-Fire Final
• P-Planning Final
of El))-4f
CITY OF EDMONDS
PHONE: (425) 771-0220 - FAX: (425) 771-0221
1215TH AVENUENORTH - EDMONDS, WA 98020
/17 IS90
*PERNUT MUST BE POSTED ON JOBSITE*
STATUS: ISSUED ENG20180443
RIGHT OF WAY PERMIT (2-Multi-Family)
Permit Number: ENG2018044' ) Expiration Date: 11/06/2019
Job Address: 20904 72ND AVE W, EDMONDS Location:
APPLICANT CONTRACTOR
CUMMINGS DEVELOPMENT LLC CUMMINGS DEVELOPMENT LLC
C/O MARK CIJMMINGS C/O MARK CUMMINGS
9718 SLATER LANE 9718 SLATER LANE
KIRKLAND, WA 98033 KIRKLAND, WA 98033
(425) 890-3397
LICENSE#: SLATEHC90OD6 EXP: 04/18/2020
JOB DESC'?,T1-Y41N
UTILITYAND FRONTAGE IMPROVEMENTS PER APPROVED PLANS - SLD20171835
DISRLTIION INFORMATION
ASSESSED VALUE: $000 PROPERTY AREA: 0
SIDEWALK: (OXO) DURATION IN MONTHS: 0 FEE: $0.00 STREET DISRUPTION TRENCH CUT: 0 x 0
PARKING: (OXO ) DURATION IN MONTHS 0 FEE: $0.00 YEAR OF OVERLAY- 0 FEE: $0.00
ALLEY: ( OX0 ) DURATION IN MONTHS: 0 FEE: $0.00
INDEMNITY- The Applicant has signed an application Ii)hich states helshe holds the City ofEdmonds harmlessfrom injuries,
damages or claims ofanj, kind or description ivhalsoeverforeseen or unforeseen, that may be made against the City ofEdmonds or
any ofits departments or employees, including but not limited to the defense ofany legal proceedings including defense costs and
atforneyfees by reason ofgranting this permit.
THECONTRACTOR IS RESPONSIBLEFOR WORKMANSHIP AND MATERIALS FOR A PERIOD OFONEYEAR FOLLOWING TBEFIINAL
INSPECTION AND ACCEPTANCE OF THE'IXORK
• Traffic Control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must
be trained as required by (WAC) 296-155-305 and must have certification ver4ing completion of the required training in their
possesion.
• Restoration is to be in accordance With City codes. All street -cut trench work shall be patched with asphalt or City approved
material prior to the end of the workday- NO EXCEPTIONS.
• Three sets of construction drawings of proposed work are required with the permit application.
CALL DIAL -A -DIG (1 -800-424-5555) BEFOREANY EXCAVATION
CALL FOR INSPECTION (425) 771-0220 EXT. 1326
24 HOUR NOTICEREQUIRED FOR ALL INSPECTION REQUEST'S
THIS APPLICATION IS NOTA PERMITUNTIL SIGNED BY THE CITY ENGINEER OR HISIHER DEPUTY: AND FEES ARE PAID. AND RECEIPTIS ACKNOWLEDGED IN
SPACEPROVIDED.
RELEASED BY
Printed: Tuesdav, November
TE
7 FILECOPY 7 INSPECTOR COPY 7 APPLICANT COPY
STATUS: ISSUED
ENG20180443
• Restore ROW to City standards
• Restore Landscape to like or better conditions.
• Call for locates of underground utilities prior to any excavation.
• Alert affected residents and/or businesses prior to work start.
• Conform to approved working drawings and Traffic Control plan.
• Public utilities maintain 5'separation from City Utilities.
• Verify clear bore crossings
• Utility patch restoration to be in accordance with Edmonds Standard detail E2.3
• Maintain erosion &sedimentation control. Keep street clean.
• Call for required inspections as noted.
• Traffic Control per approved plan and MUTCD. Refer to City of Edmonds traffic control requirements.
• Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is
caused by or occurs during the pen-nitted project.
• Sound/Noise originating from temporary construction s ites as a result of construction activity are exempt from the nois e limits
of ECC Cbapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00prn on Saturdays, excluding
Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the
noise lirnits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
• Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold
harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to
modify, waive or reduce any requirements of any City ordinance not limit in any way the City's ability to enforce any ordinance
provision.
• E-Pre-Con
• E-Erosion Control/Mobilization
• E-Traffic Control
• E-Curb/Gutter Pre -Pour
• E-Sidewalk Pre -Pour
• E-Curb/Gutter Post -Pour
• E-Sidewalk Post -Pour
• E-Driveway Form & Slope Ver.
• E-Pavement Subgrade
• E-Pavement Compaction Test Report
• E-Pavement Striping
• E-Sewer Lateral Installation
• E-Sewer Lateral Pressure Test
• E-Fire Hydrant
• E-2" Fire Line
• E-Mailbox Location, Pre -Install
• E-Storm Main Installation
• E-Engineering Final
PARTIAL INSPECTION DATE: INITIAL: NOTES:
PARTIAL INSPECTION DATE: INITIAL: NOTES:
FINAL INSPECTION APPROVED DATE: INITIAL:
ov EL))
CITY OF EDMONDS
121 5TH AVENUE NORTH -EDMONDS, WA 98020
PHONE: (425) 771-0220 - FAX: (425) 771-0221
STATUS: ISSUED ENG20180446
WATER METER RECORD
Penrift Number: ENG20180446
Job Address: 20904 72ND AVE W, EDMONDS
PROPERT17OWNER CONTRACTOR
CUMMINGS DEVELOPMENT LLC CUMMINGS DEVELOPMENT LLC
9718 SLATER LANE 9718 SLATER LANE
KIRKLAND, WA 98033 KIRKLAND, WA 98033
(425) 890-3397
LICENSE 4: SLATEHC90OD6 EXP� 04/18/2020
JOB DES CRIPTION
DESCRIPTION OF WORK:
2" Fire Line. REFER TO PLANS WITH BLD20171835.
METER Sln: I
Y NEW SERVICE FROM CITY MAIN TO PROPERTY LINE
• A SP14A LT/CONCRETE CUT
• FINAL PATCH BY CONTRA CTOR
OWNERNAME:
BILLINGADDRESS:
INSTALLATION FEE. $0.00
CONNEC-71ON FEE. $0.00
STREET' CUT DEPOSIT: $0.00
N SFR IRRIGATION F-N-] APARTMENT / CONDO - UNITS:
N DUPLEX FIRECONNECTION FN__] MIXED USB-COMMERCIAL FLOORS:
N TRIPLEX OTHER:
N COMBO FIRE/DOMESTIC BACKFLOW A SSEMBLY REQUIRED
RESIDENTIAL UNITS: 0
PUBLIC WORKS INS TALLATION-UlFtLr]FY BILLING
IMMOUTCOMM, UNTLOCM) PROJECT NUMBER:
METERNUMBER:
STYL,F_
METERREADING
MANUFACTURER'S #:
METER LOCATION:
SERVICE MATERIAL-
DATEOFWORK:
REMARKS:
U/B ACCOUNT:
READ AFTER ADDRESS:
LOCA TE REQUEST #:
DATECALLED:
AND
REGISTER
PRESSURE. 0 GPM: 0
WORK BY.
***ATTACH DRAWTNG WHEN NECESSARY***
ROUTE -
WATER SUPPLIER:
ISSUED ENG20180446
WATER METER-STREEIF CUT
TYPE OF REPAIR
AREA REPAIRED
Asphalt Roadway/Walkway
( Ft X
Ft)= Sq. Yds
( Ft X
Ft) = Sq. Yds
( Ft X
Ft) = Sq. Yds
Concrete Sidewalk
( Ft X
Ft) = Sq. Yds
( Ft X
Ft) = Sq. Yds
( Ft X
Ft) = Sq. Yds
Concrete Curb
Lineal Ft
Lineal Ft
LinealFt
REPAIR COST
Total Repair Costs:
Less Street Cut Deposit: $0.00
Invoice/Refund:
OV EDAf
un CITY OF EDMONDS
PHONE: (425) 771-0220 - FAX: (425) 771-0221
121 5TH AVENUE NORTH -EDMONDS, WA 98020
STATUS: ISSUED ENG20180445
WATER METER RECORD
Permft Number: ENG20180445
Job Address: 20904 72ND AVE W, EDMONDS
PROPERTY OWNER CONTRACTOR
CUMMINGS DEVELOPMENT LLC CUMMINGS DEVELOPMENT LLC
9718 SLATER LANE 9718 SLATER LANE
KIRKLAND, WA 98033 KIRKLAND, WA 98033
(425) 890-3 3 97
LICENSE #: SLATEHC900136 EXP: 04/18/2020
JOB DES CRIPTION
DESCRIPTION OF WORK:
I " DOMESTIC WATER METER TO NORTH OF DRIVEWAY APPROACH. REFER TO PLANS WITH BLD20171835.
METER SUE: 1
Y NEW SERVICE FROM CITY MAIN TO PROPERTY LINE
Y A SPl-fA LT/CONCRETE CUT
Y_ FINAL PATCH BY CONTRA CTOR
OWNERNAME:
BILLINGADDRESS:
INSTALLATION FEE. $2,970.00
CONNECTION FEE. $12,624.00
STREET CUT DEPOSIT: $0.00
N SFR N IRRIGATION M APARTMENT / CONDO - UNITS:
N DUPLEX N FIRE CONNECTION N I MIXED USE -COMMERCIAL FLOORS
Rl
N_ TRIPLEX N OTHER:
N_ COMBO FIREIDOMESTIC BACKFLOW ASSEMBLY REQUIRED
RESIDENTIAL UNITS
PUBLIC WORKS INS TALLATION-UTILMB ILLING
a
UNLOCM) PROJECT NUMBER:
METERNUMBER:
STYLE:
METERREADFNGr.
MANUFAC'FURER'S #:
METERLOCATION:
SERVICE MATERIAL:
DATE OF WORK:
REMARKS:
U/B A CCOUNT:
READ AFTER ADDRESS:
LOCATE REQUEST #:
DA TE CA LLED:
AND
REGISTER
PRESSURE: 0 GPM: 0
WORK BY:
* * *ATTACH DRAWING WHEN NECESSARY* * *
ROUTE:
WATER SUPPLIER.
ISSUED
102010,426". IN
F--j Asphalt Roadway/Walk-way
= Concrete Sidewalk
= Concrete Curb
AREA REPAIRED
Ft X Ft Sq. Yds
Ft X Ft Sq. Yds
Ft X Ft Sq. Yds
( Ft X Ft ) = Sq. Yds
( Ft X Ft ) = Sq. Yds
( Ft X Ft ) = Sq. Yds
Lineal Ft
Lineal Ft
Lineal Ft
Total Repair Costs:
Less Street Cut Deposit:
Invoice/Refund:
ENG20180445
REPAIR COST
$0.00
OV ED Af
0"t,
C-)
CITY OF EDMONDS
121 5TH AVENUE NORTH -EDMONDS, WA 98020
-0220 - FAX: (425) 771-0221
C 4�1 S PHONE: (425) 771
*PERMIT MUST BE POSTED ON JOBSITE*
STATUS: ISSUED ENG20180444
SIDE SEWER PERMIT (2-Mulfi-Fanfily)
Pen -nit Number: ENG20180444 Expiration Date: 11 /06/2019
Job Address: 20904 72ND AVE W, EDMONDS
APPLICANT CONTRACTOR
CUMMINGS DEVELOPMENT LLC CUMMINGS DEVELOPMENT LLC
9718 SLATER LANE 9718 SLATER LANE
KIRKLAND, WA 98033
KIRKLAND, WA 98033
(425) 890-3397
I.1CF.N.SF. fi- ',I.ATFPcQnnT)r Fyp: ni/i sz/,)n,)n
N
JOB DESCRIPTION
'REPA IR N PROPOSE TO REUSE LATERAL LID NUMBER:
GRINDER PUA4P HN PROPOSE TO REUSE SIDE SEWER DRA INA GE
SANITA RY SIDE SEWER TO SERVE 4 TOWNHOME UNITS
LAS EMENT INTORMATION
_�]N
ECT CROSSES OTHER PRIVA TE PROPERTY
VERIFICA TION OF RECORDED EA SEM ENTS COMPLETE
IADEMNITY- The Applicant has signed an application which states helshe holds the City ofEdmonds harmlessfrom injuries,
damages or claims ofany kind or description 14,halsoel,er, foreseen or unforeseen, that may he made against the City of.Edmonds or
any ofits departments or employees, including but not limited to the defense ofany legal proceedings including defense costs and
afforneyfees by reason ofgranting this permit.
CALL DIAtA-DIG (1 -800-424-5555) BEFORE ANY EXCAVATION
CALL FOR INSPECTION (425) 771-0220 EXT. 1326
24 HOUR NOTICEREQUIRED FOR ALL INSPECTION REOUESTS
THIS APPLTCA'nON IS NOTA PERMTUNTIL SIGNED BY THE CITY ENGINEER OR HISMER DEPUTY: AND FEES ARE PAID, AND RECEIPT IS ACKNOWLEDGED IN
A SPACE PROVIDED.
Film
Printed: Tuesday, November 06, 2018
DA
F FILECOPY F-] INSPECTOR COPY F1 APPLICANT COPY
STATUS: ISSUED ENG20180444
• Restore ROW to City standards
• Restore Landscape to like or better conditions.
• Call for locates of underground utilities prior to any excavation.
• Alert affected residents and/or businesses prior to work start.
• Confonn to approved working drawings and Traffic Control plan.
• Public utilities maintain 5'separation fi-om City Utilities.
• Verify clear bore crossings
• Utility patch restoration to be in accordance with Edmonds Standard detail E2.3
• Maintain erosion & sedimentation control. Keep street clean.
• Call for required inspections as noted.
• Traffic Control per approved plan and MUTCD. Refer to City of Edmonds traffic control requirements.
• A 6" cleanout with 12" locking cast iron lamphole cover is required at the property line.
• Condition of the existing sanitary side sewer to be verified prior to obtaining approval for reuse. TV inspection required. Video
to be submitted to City for review.
• Applicant shall repair/replace all damage to utilities or frontage improvements, in City right-of-way per City standards that is
caused by or occurs during the permitted project.
• Owner/Contractor to provide Side Sewer asbuilt at final inspection. See City Standards for requirements.
• Sound/Noise originating from temporary construction s ites as a result of construction activity are exempt from the noise limits
of ECC Cbapter 5.30 only during the hours of 7:00am to 6:00prn on weekdays and 10:00am and 6:00pm on Saturdays, ex0luding
Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the
noise limits of Cbapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
• Applicant, on behalf ofhis or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold
han-dess the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this pen -nit shall not be deemed to
modify, waive or reduce any requirements of any City ordinance not limit in any way the City's ability to enforce any ordinance
provision.
I INSPECTIONS
• E-Condition of Existing Side Sewer
• E-Sanitary Side Sewer Inspection
• E-Engineering Final
PARTIAL INSPEC71ON DATE: INITIAL: NOTES:
PARTIAL INSPECTION DATE: IMTIAL- NOTES:
FINAL INSPECTION APPROVED DATE: INITIAL:
DEVELOPMENT SPRVICES
-FAMILY BUILDING
COMMERCIAL & MULTI
PERMIT APPLICATION
121 5�h Avenue N, Edmonds, WA 98020
Phone 425.771.0220 11 Fax 425.771.0221
CiiN of Edmonds
PLEASE PJI,'FR TO'rHE COMMEKL4L & AlUL77-FAMILYBUILDING CHECKLIS't'FOR,!;IiB,,IfITT?IL REQUIRE. -VENTS
PROJECT ADDRESS (Street, Suite 4, Cit-*, State, zip):
Parcel 9:
2Z,q 0 � V,/ A �2 2
= r; Vo 62 2 Q a C2
- - -12-
Subdivision/Lot 4:
Project Valuation: S 4 -7 c) C)
APPLICANI':
Phone:
4Z_5 IFF1 Q 339 -� I
Fax:
-
Address (Street. City, State, Zip):
--f-71eSLAiE2_LqE_ Ale QLLLAJDWA��3
E-Mail Address:
J'ROPERTV ON NER:
Phone:
Fax:
Address (Street, City. State. Zip):
C -1 [P -5 J?r b VA eZ3
I j,_SL-Al -
E-Mail Address:
+e- r 1) V') P_ 0 r P C M
LE,NDING AGENCY:
1 L?ALj V-
Phone:
'A55 9'�*Q
Fax:
zl�� �ar2 12940
Address (Street, City. State. Zip):
E-Mail Address:
> rS- �� -r #��Q Y25_LLT-_\/VF= \NA 'Ri"005
JI]it I TH 5
whal + t-g bov\ L. com
CONTRACTOR-*
(OR-P NAIL 6U611-21L,20
Phone:
Fax:
Address (Street. City. State, Zip):
L A fz- e- �4 E V-4 O-LML) VVA I
E-Mail Address
WA State License #/Exp. Date:
*Contractor n7US1 have a valid CitY of h,'(finoncls business license prior lo
"�L a(--la2 1A, LILLI
City Business License 411",xp, Date.,
doing work in the City. Conface 1he Cin, Clerk's 0j:1-ke ai 425.775.2.525
T16D
DETAIL T14L SCOPE OF WORK: LD C- f- 0 �-_E K T i
F
e,)X
]PRO POSED NEW SQUARE FOOTAGE FOR THIS PROJECT:
I st Floor: -7 F-)V _sq. ft.
2"' Floor: o4 L) ---_sq.
ft.—
'd
3 Floor: S�. 11.
Basenient: s2. ft.
Gar;ge: ___ sq. ft.
Deck,Cvrd Porch: sq. ft.
Other: sq. ft. �
Retaining Wall; YesLj
No
Fire Sprinklers: Yes rX_� No Lj
Occupancy Group(s): EL��!25V�rd
OCCUpant Load(s):
Type(s) of Construction: WMENNEMEME&_
Grading.-Cut_cu.yds. ' Fill cu.vds. I
Cut/Fill iii Critical Area: Yes
Lj ___ _No
I declare underpetralf), of1jerjuty laws that the itt rination I have provided on thisforittlapplication
00 is true, correct and
conyVele, and that I am the propert), owner or diit�, authorized ogent qfthe properi)! owner to submit aperinit application to
the City of Ednioads.
Owner [AAgent/0thcrE
Print Name: M /4 U, [\A I tr-- (speci fy):
Signature: Date: /2-?- / I,-;
I f
4
FORM E L:�,BUILDING DIVISION FILCS�OONE & x-Rrred to I. -Building -New d&cTonn E 2014,docx Upd3tcd: 111712014
Appliance Type
AC Unit
BTUs:
Appliance/Equipment Information (new and relocated) Total 4
Location(s):
Furnace
BTUs: --
Location(s):
Water Heater
BTUsf,�\G 112�0, Location(s)A-2- V1\N1 ry—
Boiler
BTUs:
Locatiou(s):
Other;
BTUS:
_ Location(s):
Fireplacelinsert
BTUs:
Location(s),
Stove/Range/Oven
Dryer
Outdoor BBQ
—J TOTAL OUTLETS
PLUMBING FIXTURE COUNT
Fixture Type (newand relocated) Total # Fixture Type (new and relocated) Total
Water Closet (Toilet)
Pressure Reduction Valve/Pressure Regulator
Sink (kitchen,111undn.12VOOM hRr,eYtWAS1], Cie-)
7�
Water Service Line
Tub/Shower
Fountain
Dishwasher
4-
_Drinking
Clothes Washer
Hose Bib
Backflow Prevention Device (<,.g. RHPA, DCDA, ANT)
Water Heater Tankless? Ves E No
Hydronic Heat in: Floor will
Floor Drain/bloor Sink
O(her-
Refrigerator water supply (for waterlicedispenser)
Other,
FORM E LABUILDING DIVISION FammNE & x-ferred to L-Building-New driveM-omi E 2014.docx Updated, 1/17/2014
H
J.C. Mc DONNELL ENGINEERING, P.C.
Consulting Civil Engineers
6608-216th St. SW #306
Mountlake Terrace, WA. 98082
Stormwater Polftution Prevention Plan'C'77 CaPY
For
Prepared For:
Northwest Regional Office
3190- 160" Avenue SE
Bellevue, WA 98008-5452
425-649-7000
Owner: Developer
Mr. Mark Cummings Mr. Mark Cummings
Slater Homes Corp. Same
9718 Slater Ave. NE. 9718 Slater Ave. NE
Kirkland, WA. 98033 Kirkland, WA. 98033
425 330-7440 425 330-7440
DEC 2 8 2017
DEVELOPMENT SERVICES
COUNTER
Operator/Contractor
To Be Determined
Project Site Location: 20904 — 72ND Ave. W., Edmonds, WA
PFN.-
The proposed project is an existing Single -Family Lot located at 20904 — 72ND Ave. W., in Edmonds,
WA. The property is in the southeast quadrant of Section 12, Township 26 N and Range 4E in Edmonds,
Snohomish County, Washington.
Certified Erosion and Sediment Control Lead
Dean Furr, PE, CESCL OR OTHER
425 744-0916
SWPPP Prepared By
J.C. McDonnell Engineering PC
6608 216' ST SW#806
Mountlake Terrace, WA
425-744-0916
Issue Date: October 18,2017
Project Construction Date: APR 1, 2018 — OCT 1, 2018
J.C. Mc DONNELL ENGINEERING, P.C.
Consulting Civil Engineers
6608-216 th St. SW #306
Mountlake Terrace, WA. 98082
Stormwater Polluflon Prevenflon Plan
For
Prepared For:
Northwest Regional Office
3190- 160"' Avenue SE
Bellevue, WA 98008-5452
425-649-7000
Owner:
Mr. Mark Cummings
Slater Homes Corp.
9718 Slater Ave. NE.
Kirkland, WA. 98033)
425 330-7440
Developer
Mr. Mark Cummings
Same
9718 Slater Ave. NE
Kirkland, WA. 98033
425 330-7440
Operator/Contractor
To Be Determined
Project Site Location: 20904 — 72ND Ave. W., Edmonds, WA
PFN.
The proposed project is an existing Single -Family Lot located at 20904 — 7211 Ave. W., in Edmonds,
WA. The property is in the southeast quadrant of Section 12, Township 26 N and Range 4E in Edmonds,
Snohomish County, Washington.
Certified Erosion and Sediment Control Lead
Dean Furr, PE, CESCL OR OTHER
425 744-0916
SWPPP Prepared By
J.C. McDonnell Engineering PC
6608 2166 ST SW#806
Mountlake Terrace, WA
4ZD- [44-UV 10
Issue Date: October 18, 2017
Project Construction Date: APR 1, 2018 — OCT 1, 2018
Cummings 4-plex
Storm SWPPP
10.18.17
I hereby state that this Construction Stormwater Pollution Prevention Plan for Edmonds 4-Unit @
20904 — 72" Ave. W., in Edmonds has been prepared by me or under my supervision and meets the
standard of care and expertise, which is usual and customary in this community for professional
engineers. I understand that Pierce County does not and will not assume liability for sufficiency,
suitability or performance of Construction SWPPP BMP's prepared by me.
Cummings 4-plex
Storm SWPPP
10.18.17
Table of Contents
1.0 Introduction ..................................................................... ............................................ 1
2.0 Description ........................................................................................................................... 3
2.1 Existing Conditions .......................................................................................................... 3
2.2 Proposed Construction Activities ......................................................................................
3
2.3 Construction Phasing And Bmp Implementation ............................................................ 5
3.0 Construction Stormwater BMPs ........................................................................................... 5
4.0 Construction Phasing and BMP Implementation ...............................................................
15
5.0 Pollution Prevention Team ........................................................................................... 6 .....
16
6.0 Site Inspections and Monitoring .........................................................................................
17
7.0 Stormwater Quality Monitoring ..........................................................................................
18
8.0 Reporting and Recordkeeping ............................................................................................
21
Recordkeeping......................................................................................................................
21
Reporting...............................................................................................................................
21
AppendixA - Site Plans ........................................................................................................
23
Appendix B - Construction BMPs ........................................................................................
24
AppendixC - Alternative BMPs ...........................................................................................
25
Appendix D - General Permit ...............................................................................................
26
Appendix E - Site Inspection Forms (and Site Log) .............................................................
27
Cummings 4-plex
Storm SWPPP
10.18.17
1.0 Introduction
The proposed site is a developed, 7,798 sf, residential lot located at 20904 — 72ND Ave. W.,
Edmonds, WA. The site is bound to the north by the Turnberry Lane Condominiums, 72 nd
Ave. W. to the east, residential house to the south and an undeveloped "vacant land" to the
west. Currently, the site has a single-family house, concrete patio and gravel driveway
approximately 2,500sf impervious surface. The site vegetation is mostly grass and typical
urban landscaping, The site slopes at 3.9% downgradient in a southwest direction.
Construction activities will include excavation, grading, installation of utilities, and
construction of the single-family units. The purpose of this SWPPP is to describe the proposed
construction activities and all temporary and permanent erosion and sediment control (TESC)
measures, pollution prevention measures, inspection/monitoring activities, and record keeping
that will be implemented during the proposed construction project. The objectives are to:
I Implement Best Management Practices (BMPs) to prevent erosion and
sedimentation, and to identify, reduce, eliminate, or prevent stormwater
contamination and water pollution from construction activity.
2. Prevent violations of surface water quality, ground water quality of sediment
management standards.
3. Prevent, during the construction phase, adv se water quality impacts including
impacts on beneficial uses of the receiving water by controlling peak flow rates
and volumes of stormwater runoff at the Permittee's outfalls and downstream of
the outfalls.
This SWPPP was prepared using the Ecology SWPPP template downloaded from the
Ecology website. This SWPPP was prepared based on the requirements set forth in the
Construction Stormwater Permit, Stormwater Management Manual for Western
Washington (SWMMWW 2014). The report is divided into seven main sections with
several appendices that include stormwater related reference materials.
The topics presented in each of the main sections are:
Section I - Introduction. This section provides a summary description of the
project and the organization of the SWPPP document.
Section 2 - Site Description. This section provides a detailed description of the
existing site conditions, proposed construction activities and calculated stormwater
flow rates for existing conditions and post -construction conditions.
Section 3 - Construction BMPs. This section provides a detailed description of the
BMPs to be implemented based on the 13 required elements of the SWPPP
(SWMMWW 2005)
Section 4 - Construction Phasing and BMP Implementation. This section provides
a description of the timing of the BMP implementation in relation to the project
schedule.
Page I
Cummings 4-plex
Storm SWPPP
10.18.11,
Section 5 - Pollution Prevention Team. This section identifies the appropriate
contact names (emergency and non -emergency) monitoring personnel and the
onsite temporary erosion and sedimentation control inspector.
Section 6 - Inspection and Monitoring. This section provides a description of the
inspection and monitoring requirements such as the parameters of concern to be monitored
sample locations, sample frequencies, and sampling methods for all stormwater discharge
locations from the site.
Section 7 - Recordkeeping. This section describes the requirernents for documentation of
the BMP implementations, site inspections, monitoring results, and changes to the
implementation of certain BMPs due to site factors experienced during construction.
Supporting documentation and standard forms are provided in the following Appendices:
Appendix A - Site Plans
Appendix B - Construction BMPS
Appendix C - Alternative Construction BMP List
Appendix D - General Permit
Appendix E - Site Log and Inspection Forms
Appendix F - Engineering Calculations
Cummings 4-plex
Storm SWPPP
10.18.17
2.0 Description
2.1 Existing Conditions
The project proposes to construct a 4-unit apartment building, asphalt driveway/parking, trash
enclosure, stormwater infiltration facility and drainage, underground utilities and landscaping.
Additionally, the city requires that the project provide frontage improvements that consist of
curb/gutter/sidewalk along the parcels 72nd Ave. W. right-of-way line. A depressed concrete gutter
will be constructed across the proposed driveway entrance to convey the road flowline stormwater
to a downstream catch basin near the southeast property corner.
The Subject property has a total net area of 0.18 acres. The project consists of 4 new attached
single-family apartment units. Construction activities will include excavation, grading, installation
of utilities, and construction of the residential units. A geotechnical investigation of the site was
performed by Cobalt Geosciences dated September 25, 2017. The subsurface investigation
consisted of two test pits on the east side of the parcel (TP- I and TP-2 respectively) and two hand
dug pits in the west side of the parcel (HB- I and HB-2). TP- I and TP-2 encountered 6-10 inches
of topsoil, underlain by 3 to 4.5 feet of loose to medium grained sand with organic debris and silt.
This layer is underlain by medium dense to dense, fine medium grained sand with trace gravel and
silt (Outwash component), which continued to the termination depth of the test pits. Hand borings,
HB-1 and HB-2, encountered 8 inches of grass and topsoil underlain by 2 feet of loose, silty -fine
to medium grained sand with gravel underlain by medium to dense, silty -fine to medium grained
sand with gravel (Glacial Till), which continued to the termination depth of 4 feet.
Overall, the site consists of Vashon Glacial Till and Vashon Advance Outwash.
This soil type has a slow runoff potential and the hazard of water erosion is medium. Slopes on
the project site range from zero to twenty percent. Runoff from the site naturally flows westerly
into the adjacent property. There are no wetlands onsite. Detention/100 % Infiltration for the site
will be provided in Stormtech SC-740 structures with supporting gravel beds. Surrounding
property will be protected per the City of Edmonds (COE) Construction Standards.
2.2 Proposed Construction Activities
This project will include 4 new attached units. The subject property has total area of approximately
0. 18 acres. Construction activities will include excavation, grading, installation of utilities, and
construction of the detached units. Stormwater will be detained onsite as indicated and then
released into the site soils with an emergency overflow to the storm drainage network.
Construction activities will include site preparation, TESC installation, excavation for the building
foundations, poured concrete foundations, site -wide grading, and asphalt paving.
Page 3
Cummings 4-plex
Storm SWPPP
10.1.8.17
The following summarizes details regarding the site areas: Total site area:
. Percent impervious area before construction: 32%
0 Percent impervious area after construction: 60%
0 Disturbed area during construction:
* Disturbed area that is characterized as impervious 7,700
SF
0 o IE access roads, staging, parking
2-year stormwater runoff peak flow prior to construction (existing)
0.0031 CFS
0 1 0-year stormwater runoff peak flow prior to construction (existing)=
0.0062 CFS
0 2-year stormwater runoff peak flow during construction
0.03 CFS
0 1 0-year stormwater runoff peak flow during construction:
0.05 CFS
0 2-year stormwater runoff peak flow after construction
0.0 CFS
0 1 0-year stormwater runoff peak flow after construction
0.0 CFS
All Ston-nwater flow calculations are provided in Appendix F: Full Drainage Report
Cummings 4-plex
Storm SWPPP
10,18.17
3.0 Construction Phasing and BMP Implementation
The BMP implementation schedule will be driven by the construction schedule. The following
provides a sequential list of the proposed construction schedule milestones and the corresponding
BMP, implementation schedule. This list contains key milestones such as wet season construction.
The BMP implementation schedule listed below is keyed to proposed phases of the construction
project, and reflects differences in BMP installations and inspections that related to wet season
construction. The project site is located west of the Cascade Mountain Crest. As such, the dry
season is from May I to September 30 and the wet season is from October I to April 30.
• Install stabilized construction entrance: 04/01/18
• Begin Clearing and Grubbing: 04/01/18
The construction sequence for this project is provided on the TESC Plan as part of the Drainage
Plans. The project is likely to be constructed under a single phase, however, the contractor is
encouraged to phase the project as much as feasible, making sure to stabilize portions of the site
that are to be unworked for significant periods of time. -
A construction schedule has not yet been established. The owner and contractor shall discuss the
project schedule with the City at or before the preconstruction conference to determine the best
way to mitigate any wet -season construction concerns
4.0 Construction Stormwater BMPs
The 13 BNIP Elements
Element 41 - Mark Clearing Limits
To protect adjacent properties and to reduce the area of soil exposed to construction, the limits of
construction will be clearly marked before land -disturbing activities begin. Trees that are to be
preserved, as well as all sensitive areas and their buffers, shall be clearly delineated, both in the field
and on the plans. In general, natural vegetation and native topsoil shall be retained in an undisturbed
state to the maximum extent possible. The BMPs relevant to marking the clearing limits that will be
applied for this project include:
* High Visibility Plastic or Metal Fence (BMP C103)
Or
* Silt Fence (BMP C233)
Fence will be installed at the clearing limits prior to construction.
Alternate BMPs for marking clearing limits are included in Appendix C as a quick reference tool for
the onsite inspector in the event the BMP(s) listed above are deemed ineffective or. inappropriate
during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D).
Page 5
Cummings 4-plex
Storm SWPPP
10.18.17
To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES
Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and Sediment
Control Lead will promptly initiate the implementation of one or more of the alternative BMPs listed
in Appendix C after the first sign that existing BMPs are ineffective or failing.
Element 92 - Establish Construction Access
Construction access or activities occurring on unpaved areas shall be minimized, yet where necessary,
access points shall be stabilized to minimize the tracking of sediment onto public roads, and wheel
washing, street sweeping, and street cleaning shall be employed to prevent sediment from entering
state waters. All wash wastewater shall be controlled on site. The specific BMPs related to establishing
construction access that will be used on this project include:
0 Stabilized Construction Entrance (BMP C105)
Stabilized construction entrance will be installed prior to construction.
Alternate construction access BMPs are included in Appendix C as a quick reference tool for the
onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during
construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D). To
avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES
Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and Sediment
Control Lead will promptly initiate the implementation of one or more of the alternative BMPs
listed in Appendix C after the first sign that existing BMPs are ineffective or failing.
Element 43 - Control Flow Rates
To protect the properties and waterways downstream of the project site, stormwater discharges
from the site will be controlled. The specific BMPs for flow control that MAY be used on this
project include:
Temporary Sediment Trap (BMP C240)
Temporary Sediment Trap will be installed prior to construction for Winter Construction as needed.
Alternate flow control BMPs are included in Appendix C as a quick reference tool for the onsite
Inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during
construction to satisfy the requirements set forth in the General NPDES Permit (Appendix D).
To avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES
Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and Sediment
Control Lead will promptly initiate the implementation of one or more of the alternative BMPs
listed in Appendix C after the first sign that existing BMPs are ineffective or failing. The project
site is located west of the Cascade Mountain Crest. As such, the project must comply with
Minimum Requirement 7 (Ecology 2012).
Cummings 4-plex
Storm SWPPP
10.18.17
In general, discharge rates of stormwater from the site will be controlled where increases in
impervious area or soil compaction during construction could lead to downstream erosion, or where
necessary to meet local agency stormwater discharge requirements (e.g. discharge to 1combined
sewer systems),
Element #4 - Install Sediment Controls
All stormwater runoff from disturbed areas shall pass through an appropriate sediment removal
BMP before leaving the construction site or prior to being discharged to an infiltration facility.
The specific BMPs to be used for controlling sediment on this project include:
- Silt Fence (BMP C233)
Silt fence will be installed at the base of all slopes which have the potential to produce runoff.
Alternate sediment control BMPs are included in Appendix C as a quick reference tool for the
onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate
during construction to satisfy the requirements set forth in the General NPDES Permit (Appendix
D). To avoid potential erosion and sediment control issues that may cause a violation(s) of the
NPDES Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and
Sediment Control Lead will promptly initiate the implementation of one or more of the alternative
BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or failing.
In addition, sediment will be removed from paved areas in and adjacent to construction work areas
manually or using mechanical sweepers, as needed, to minimize tracking of sediments on vehicle
tires away from the site and to minimize washout of sediments from adjacent streets in runoff.
Whenever possible, sediment laden water shall be discharged into onsite, relatively level, vegetated
areas (BMP C240 paragraph 5, page 4-102). In some cases, sediment discharge in concentrated
runoff can be controlled using permanent stormwater BMPs (e.g., infiltration swales, ponds,
trenches). Sediment loads can limit the effectiveness of some permanent stormwater BMPs, such
as those used for infiltration or biofiltration; however, those BMPs designed to remove solids by
settling (wet ponds or detention ponds), can be used during the construction phase. When
permanent stormwater BMPs will be used to control sediment discharge during construction, the
structure will be protected from excessive sedimentation with adequate erosion and sediment
control BMPs. Any accumulated sediment shall be removed after construction is complete and the
permanent stormwater BMP will be re -stabilized with vegetation per applicable design
requirements once the remainder of the site has been stabilized.
The following BMPs will be implemented as end -of -pipe sediment controls as required to meet
permitted turbidity limits in the site discharge(s). Prior to the implementation of these technologies,
sediment sources and erosion control and soil stabilization BMP efforts will be maximized to
reduce the need for end -of -pipe sedimentation controls.
Page 7
Cummings 4-plex
Storm SWPPP
10.18.17
0 Temporary Sediment Pond (BMP C24 1)
0 Construction Stormwater Filtration (BMP C25 1)
E Construction Stormwater Chemical Treatment (BMP C 250)
(implemented only with prior written approval from Ecology).
Element 45 - Stabilize Soils
Exposed and unworked soils shall be stabilized with the application of effective BMPs to
prevent erosion throughout the life of the project. The specific BMPs for soil stabilization
that shall be used on this project include:
c Temporary and Permanent Seeding (BMP C120)
o Mulching (BMP C121)
o Plastic Covering (BMP C123)
Soil will be stabilized throughout the duration of the project.
Alternate soil stabilization BMPs are included in Appendix C as a quick reference tool for
the onsite inspector in the event the BMP(s) listed above are deemed ineffective or
inappropriate during construction to satisfy the requirements set forth in the General
NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that
may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in
Appendix D), the Certified Erosion and Sediment Control Lead will promptly initiate the
implementation of one or more of the alternative BMPs listed in Appendix C after the first
sign that existing BMPs are ineffective or failing.
The project site is located west* of the Cascade Mountain Crest. As such, no soils shall
remain exposed and unworked for more than 7 days during the dry season (May I to
September 30) and 2 days during the wet season (October I to April 30). Regardless of the
time of year, all soils shall be stabilized at the end of the shift before a holiday or weekend
if needed based on weather forecasts. In general, cut and fill slopes will be stabilized as
soon as possible and soil stockpiles will be temporarily covered with plastic sheeting. All
stockpiled soils shall be stabilized from erosion, protected with sediment trapping
measures, and where possible, be located away from storm drain inlets, waterways, and
drainage channels.
Element 46 - Protect Slopes
All cut and fill slopes will be designed, constructed, and protected in a manner than
minimizes erosion. The following specific BMPs will be used to protect slopes for this
project:
Cummings 4-plex
Storm SWPPP
10.18.17
- Temporary and Permanent Seeding (BMP C120)
Unstable slopes will be protected throughout the duration of the project.
Alternate slope protection BMPs are included in Appendix C as a quick reference tool for
the onsite inspector in the event the BMP(s) listed above are deemed ineffective or
,inappropriate during construction to satisfy the requirements set forth in the General
NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that
may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in
Appendix D), the Certified Erosion and Sediment Control Lead will promptly initiate the
implementation of one or more of the alternative BMPs listed in Appendix C after the first
sign that existing BMPs are ineffective or failing.
Element #7 - Protect Drain Inlets
All storm drain inlets and culverts made operable during construction shall be protected to
prevent unfiltered or untreated water from entering the drainage conveyance system.
However, the priority is to keep all access roads clean of sediment and keep street wash
water separate from entering storm drains until treatment can be provided. Storm Drain
Inlet Protection (BMP C220) will be implemented for all drainage inlets and culverts that
could potentially be impacted by sediment -laden runoff on and near the prqJJect site. The
following inlet protection measures will be applied on this project:
9 Excavated Drop Inlet Protection
Block and Gravel Drop Inlet Protection
Gravel and Wire Drop Inlet
Protection 9 Catch Basin Filters
Alternative BMP not included in the SWMMWW (2005) or
SWMMEW (2004)
Culvert Inlet Sediment Trap
Alternative BMP not included in the SVR�WW (2005) or SWMMEW (2004)
If the BMP options listed above are deemed ineffective or inappropriate during
construction to satisfy the requirements set forth in the General NPDES Permit (Appendix
D), or if no BMPs are listed above but deemed necessary during construction, the Certified
Erosion and Sediment Control Lead shall implement one or more of the alternative BMP
inlet protection options listed in Appendix C.
Element #8 - Stabilize Channels and Outlets
Where site runoff is to be conveyed in channels, or discharged to a stream or some other natural
drainage point, efforts will be taken to prevent downstream erosion. The specific BMPs for
channel and outlet stabilization that shall be used on this project include:
- BMPs to be implemented
Page 9
Cummings 4-plex
Storm SWPPP
10.18.17
Channels will be protected per DOE BMP C209.
Alternate channel and outlet stabilization BMPs are included in Appendix C as a quick
reference tool for the onsite inspector in the event the BMP(s) listed above are deemed
ineffective or inappropriate during construction to satisfy the requirements set forth in the
General NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues
that may cause a violation(s) of the NPDES Construction Stormwater permit (as provided in
Appendix D), the Certified Erosion and Sediment Control Lead will promptly initiate the
implementation of one or more of the alternative BMPs listed in Appendix C after the first sign
that existing BMPs are ineffective or failing.
The project site is located west of the Cascade Mountain Crest. As such, all temporary on -site
conveyance channels shall be designed, constructed, and stabilized to prevent erosion from the
expected peak 10-minute velocity of flow from a Type I A, 10-year, 24-hour recurrence
interval storm for the developed condition. Alternatively, the I 0-year, I -hour peak flow rate
indicated by an approved continuous runoff simulation model, increased by a factor of 1.6,
shall be used. Stabilization, including armoring material, adequate to prevent erosion of
outlets, adjacent streambanks, slopes, and downstream reaches shall be provided at the outlets
of all conveyance systems.
Element #9 - Control Pollutants
All pollutants, including waste materials and demolition debris, that occur onsite shall be handled
and disposed of in a manner that does not cause contamination of stormwater. Good housekeeping
and preventative measures will be taken to ensure that the site will be kept clean, well -organized,
and free of debris. If required, BMPs to be implemented to control specific sources of pollutants
are discussed below. Vehicles, construction equipment, and/or petroleum product
storage/dispensing:
I All vehicles, equipment, and petroleum product storage/dispensing areas will
be inspected regularly to detect any leaks or spills, and to identify maintenance
needs to prevent leaks or spills.
" Oil -site fueling tanks and petroleum product storage containers shall include
secondary containment.
I Spill prevention measures, such as drip pans, will be used when conducting
maintenance and repair of vehicles or equipment. To perform emergency
repairs on site, temporary plastic will be placed beneath and, if raining, over
the vehicle.
Contaminated surfaces shall be cleaned immediately following any discharge or
spill incident.
Concrete and grout:
Cummings 4-plex
Storm SWPPP
10.18.17
m Process water and slurry resulting from concrete work will be prevented from
entering the waters of the State by implementing Concrete Handling measures
(BMP C151).
The facility does not require a Spill Prevention, Control, and Countermeasure (SPCC) Plan under
the Federal regulations of the Clean Water Act (CWA).
Element #10 - Control Dewatering
There will be no dewatering as part of this construction project.
Alternate dewatering control BMPs are included in Appendix C as a quick reference tool for the
onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate during
construction to satisfy the requirements set forth in the General NPDES Pen -nit (Appendix D). To
avoid potential erosion and sediment control issues that may cause a violation(s) of the NPDES
Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and Sediment
Control Lead will promptly initiate the implementation of one or more of the alternative BMPs
listed in Appendix C after the first sign that existing BMPs are ineffective or failing.
Element 411 - Maintain BMPs
All temporary and permanent erosion and. sediment control BMPs shall be maintained and repaired
as needed to assure continued perfon-nance of their intended function. Maintenance and repair shall
be conducted in accordance with each Bmp's specification. Visual monitoring of the BMPs will be
conducted at least once every calendar week and within 24 hours of any rainfall event that causes
a discharge from the site. If the site becomes inactive, and is temporarily stabilized, the inspection
frequency will be reduced to once every month.
All temporary erosion and sediment control BMPs shall be removed within 30 days after the final
site stabilization is achieved or after the temporary BMPs are no longer needed. Trapped sediment
shall be removed or stabilized on site. Disturbed soil resulting from removal of BMPs or vegetation
shall be permanently stabilized.
Element #12 - Manage the Project
Erosion and sediment control BMPs for this project have been designed based on the
following principles:
Design theproject to fit the existing topography, soils, and drainage
patterns.
I Emphasize erosion control rather than sediment control.
I Minimize the extent and duration of the area exposed.
Page 11
00
Cummings 4-plex
Storm SWPPP
10.18.17
0
0
Keep runoff velocities low.
Retain sediment on site.
' Thoroughly monitor site and maintain all ESC measures.
0 Schedule major earthwork during the dry season.
In addition, project management will incorporate the key components listed below:
As this project site is located west of the Cascade Mountain Crest, the project will be
managed according to the following key project components:
Phasing of Construction
The construction project is being phased to the extent practicable to prevent soi I erosion,
and, to the maximum extent possible, the transport of sediment from the site
during construction.
Revegetation of exposed areas and maintenance of that vegetation shall be an integral
part of the clearing activities during each phase of construction, per the
Scheduling BMP (C 162).
Seasonal Work Limitations
from October I through April 30, clearing, grading, and other soil
disturbing activities shall only be permitted if shown to the satisfaction of the local
permitting authority that silt -laden runoff will be prevented from leaving the site through
a combination of the following:
Site conditions including existing vegetative coverage, slope, soil type, and
proximity to receiving waters; and
11 Limitations on activities and the extent of disturbed areas; and
11 Proposed erosion and sediment control measures.
Based on the information provided and/or local weather conditions, the
local permitting authority may expand or restrict the seasonal limitation on site
disturbance.
"'the following activities are exempt from the seasonal clearing and grading
limitations:
0 Routine maintenance and necessary repair of erosion and sediment control
BMPs;
711
Cummings 4-plex
Storm SWPPP
10.18.17 ,
Routine maintenance of public facilities or existing utility structures that do
not expose the soil or result in the removal of the vegetative cover to soil;
and
El Activities where there is 100 percent infiltration of surface water runoff
within the site in approved and installed erosion and sediment control
facilities.
Coordination with Utilities and Other Jurisdictions
0 Care has been taken to coordinate with utilities, other construction projects, and
the local jurisdiction in preparing this SWPPP and scheduling the construction
work.
Inspection and Monitoring
0 All BMPs shall be inspected, maintained, and repaired as needed to assure
continued performance of their intended function. Site inspections shall be
conducted by a person who is knowledgeable in the principles and practices of
erosion and sediment control.
0 This person has the necessary skills to:
0 Assess the site conditions and construction activities that could impact
the quality of stormwater, and
El Assess the effectiveness of erosion and sediment control measures used
to control the quality of stormwater discharges.
0 A Certified Erosion and Sediment Control Lead shall be on -site or on -call
always.
Whenever inspection and/or monitoring reveals that the BMPs identified in this
SWPPP are inadequate, due to the actual discharge of or potential to discharge a
significant amount of any pollutant, appropriate BMPs or design changes shall be
implemented as soon as possible.
Maintaining an Updated Construction SWPPP
* This SWPPP shall be retained on -site or within reasonable access to the site.
0 The SWPPP shall be modified whenever there is a change in the design,
construction, operation, or maintenance at the construction site that has, or
co uld have, a significant effect on the discharge of pollutants to waters of
the state.
N The SWPPP shall be modified if, during inspections or investigations
conducted by the owner/operator, or the applicable local or state regulatory
Page 13
Cummings 4-plex
Storm SWPPP
10.18.17
authority, it is determined that the SWPPP is ineffective in eliminating or
significantly minimizing pollutants in stormwater discharges from the site.
The SWPPP shall be modified as necessary to include additional or
modified BMPs designed to correct problems identified. Revisions to the
SWPPP shall be completed within seven (7) days following the inspection.
Element 913 — LID Protection
The proposed infiltration gallery area will be fenced with silt and high visibility construction fence
during the first phases of construction to restrict heavy construction equipment from over compacting the
sub -surface soil. During the infiltration gallery construction, it is recommended that a track hoe be used to
scrape the soil out the infiltration pit and finally scarify the bottom infiltrative surface. A note on the plans
directs the contractor to protect the infiltrative surface from receiving turbid surface water.
Cummings 4-plex
Storm SWPPP
10.18.17
4.0 Construction Phasing and BNIP Implementation
The BMP implementation schedule will be driven by the construction schedule. The following provides
a sequential list of the proposed construction schedule milestones and the corresponding BMP
implementation schedule. This list contains key milestones such as wet season construction.
The BMP implementation schedule listed below is keyed to proposed phases of the construction project,
and reflects differences in BMP installations and inspections that related to wet season construction.
The project site is located west of the Cascade Mountain Crest. As such, the dry season is from May I
to September 30 and the wet season is from October I to April 30.
Install stabilized construction entrance: 04/01/18
Begin clearing and Gru bbing: 04/01/18
The project is likely to be constructed under a single phase, however, the contractor is encouraged to
phase the project as much as feasible, making sure to stabilize portions of the site that are to be
unworked for significant periods of time.
A construction schedule has not yet been established. The owner and contractor shall discuss the project
schedule with the City at or before the preconstruction conference to determine the best way to mitigate
any wet -season construction concerns.
Page 15
Cummings 4-plex
Storm SWPPP
10.18.17
5.0 Pollution Prevention Team
Roles and Responsibilities
The pollution prevention team consists of personnel responsible for implementation of the SWPPP,
including the following:
E Certified Erosion and Sediment Control Lead (CESCL) - primary contractor
contact, responsible for site inspections (BMPs, visual monitoring, sampling,
etc.); to be called upon in case of failure of any ESC measures.
0 Resident Engineer - For projects with engineered structures only (sediment
ponds/traps, sand filters, etc.): site representative for the owner that is the
project's supervising engineer responsible for inspections and issuing
instructions and drawings to the contractor's site supervisor or representative
0 Emergency Ecology Contact - individual to be contacted at Ecology in case of
emergency.
B Emergency Owner Contact - individual that is the site owner or
representative of the site owner to be contacted in the case of an
emergency.
N Non -Emergency Ecology Contact - individual that is, the site owner or
representative of the site owner than can be contacted if required.
0 Monitoring Personnel - personnel responsible for conducting water quality
monitoring; for most sites, this person is also the Certified Erosion and
Sediment Control Lead.
Team members
Names and contact information for those identified as members of the pollution prevention team are
nmvided in the ffillowing table.
Title
Name(s)
Phone Number
Certified Erosion and Sediment Control Lead (CESCL)
TBD
-
Project Engineer
J.C. McDonnell
(425) 744-0916
Emergency Ecology Contact
Mark Henley
(425) 649-7033
Emergency Owner Contact
Mark Cummings
(425) 890-3397
Non -Emergency Ecology Contact
Ryan Albrecht
(425) 242-2650
Monitoring Personnel
(425)
Cummings 4-plex
Storm SWPPP
10.18.17
6.0 Site Inspections and Monitoring
Monitoring includes visual inspection, monitoring for water quality parameters of concern, and
documentation of the inspection and monitoring findings in a site log book. A site log book will
be maintained for all on -site construction activities and will include:
0 A record of the implementation of the SWPPP and other
permit requirements;
R Site inspections; and,
0 Stormwater quality monitoring.
For convenience, the inspection form and water quality monitoring forms included in this
SWPPP include the required information for the site log book. This SWPPP may function as the
site log book if desired, or the forms may be separated and included in a separate site log book.
However, if separated, the site log book but must be maintained on -site or within reasonable
access to the site and be made available upon request to Ecology or the local jurisdiction.
Site Inspection
All BMPs will be inspected, maintained, and repaired as needed to assure continued performance
of their intended function. Site inspections will be conducted by a person who is knowledgeable
in the principles and practices of erosion and sediment control. The onsite inspector will have the
skills to assess the potential for water quality impacts because of the type of construction activities
occurring on site, and the knowledge of the appropriate and effective ESC measures needed to
control the quality of stormwater discharges.
Site inspection will occur in all areas disturbed by construction activities and at all stormwater
discharge points. Stormwater will be examined for the presence of suspended sediment, turbidity,
discoloration, and oily sheen. The site inspector will evaluate and document the effectiveness of
the installed BMPs and determine if it is necessary to repair or replace an)' of the BMPs to improve
the quality of stormwater discharges. All maintenance and repairs will be documented in the site
log book or forms provided in this document. All new BMPs or design changes will be
documented in the SWPPP as soon as possible.
Site Inspection Frequency
Site inspections will be conducted at least once a week and within 24 hours following any rainfall
event which causes a discharge of stormwater from the site. For sites with temporary stabilization
measures, the site inspection frequency can be reduced to once every month.
Site Inspection Documentation
The site inspector will record each site inspection using the site log inspection forms provided in
Appendix E. The site inspection log forms may be separated from this SWPPP document, but will
be maintained on -site or within reasonable access to the site and be made available upon request to
Ecology or the local jurisdiction.
Page 17
Cummings 4-plex
Storm SWPPP
10.18.17
7.0 Stormwater Quality Monitoring
The proposed site development may have a specific water quality requirement, if the site
discharges to a water body listed as impaired under Section 303(d) of the Clean Water Act. The
following text describes the site -specific monitoring for the proposed development.
Turbidity Sampling
Monitoring requirements for the proposed project will include either turbidity or water
transparency sampling to monitor site discharges for water quality compliance with the 2005
Construction Stormwater General Permit (Appendix D). Sampling will be conducted at all
discharge points at least once per calendar week.
Turbidity or transparency monitoring will follow the analytical methodologies described in
Section S4 of the 2005 Construction Stormwater General Permit (Appendix D). The key
benchmark values that require action are 25 NTU for turbidity (equivalent to 32 cm transparency)
and 250 NTU for turbidity (equivalent to 6 cm transparency). If the 25 NTU benchmark for
turbidity (equivalent to 32 cm, transparency) is exceeded, the following steps will be conducted:
Ensure all BMPs specified in this SWPPP are :Installed and
functioning as intended.
2. Assess whether additional BMPs should be implemented, and
document revisions to the SWPPP as necessary.
Sample discharge location daily until the analysis results are less
than 25 NTU (turbidity) or greater than 32 cm (transparency).
If the turbidity is greater than 25 NTU (or transparency is less than 32 cm) but less than 250 NTU
(transparency greater than 6 cm) for more than 3 days, additional treatment BMPs will be
implemented within 24 hours of the third consecutive sample that exceeded the benchmark value.
Additional treatment BMPs to be considered will include, but are not limited to, off -site treatment,
infiltration, filtration and chemical treatment.
If the 250 NTU benchmark for turbidity (or less than 6 cm transparency) is exceeded at any
time, the following steps will be conducted:
1. Notify Ecology by phone within 24 hours of analysis (see Section 5.0 of
this SWP`PP for contact information).
2. Continue daily sampling until the turbidity is less. than 25 NTU (or
transparency is greater than 32 cm).
3. Initiate additional treatment BMPs such as off -site treatment, infiltration,
filtration and chemical treatment within 24 hours of the first 250 NTU
exceedance.
Page 18
Cummings 4-plex
Storm SWPPP
10.18.17
4. Implement additional treatment BMPs as soon as possible, but within 7
days of the first 250 NTU exceedance.
5. Describe inspection results and remedial actions taken in the site log book
and in monthly discharge monitoring reports as described in Section 7.0
of this SWPPP.
Turbidity Sampling
Monitoring requirements for the proposed project will include turbidity sampling to monitor site
discharges for water quality compliance with the 2005 Construction Stormwater General Permit
(Appendix D). Sampling will be conducted at all site discharge points at least once per calendar
week.
Turbidity monitoring will follow the analytical methodologies described in Section S4 of the
2016 Construction Stormwater General Permit (Appendix D). The key benchmark values that
require action include 25 NTU and 250 NTU for turbidity. If the 25 NTU benchmark for
turbidity is exceeded, the following steps will be conducted:
Ensure all BMPs specified in this SWPPP are installed and functioning as
intended.
2. Assess whether additional BMPs should be implemented and
revise the SWPPP as necessary.
Sample the discharge location daily until the analysis results are
less than 25 NTU (turbidity) or 32 cm (transparency).
If the turbidity is greater than 25 NTU but less than 250 NTU for more than 3 days,
additional treatment BMPs will be implemented within 24 hours of the third consecutive
sample that exceeded the benchmark value. Additional treatment BMPs will include, but are
not limited to, off -site treatment, infiltration, filtration and chemical treatment.
If the 250 NTU benchmark for turbidity is exceeded at any time, the following steps will be
conducted:
Notify Ecology by phone within 24 hours of analysis.
2. Continue daily sampling until the turbidity is less than 25 NTU.
3. Initiate additional treatment BMPs such as off -site treatment,
infiltration, filtration and chemical treatment within 24 hours of the
first 250 NTU exceedance.
4. Implement additional treatment BMPs as soon as possible, but
within 7 days of the first 250 NTU exceedance.
5. Describe inspection results and remedial actions that are taken in
the site log book and in monthly discharge monitoring reports.
Page 19
Cummings 4-plex
Storm SWPPP
10.18.17
pH Sampling
Stormwater runoff will be monitored for pH starting on the first day of any activity that includes
more than 40 yards of poured or recycled concrete, or after the application of "Engineered Soils"
such as, Portland cement treated base, cement kiln dust, or fly ash. This does not include
fertilizers. For concrete work, pH monitoring will start the first day concrete is poured and
continue until 3 weeks after the last pour. For engineered soils, the pH monitoring period begins
when engineered soils are first exposed to precipitation and continue until the area is fully
stabilized.
Stormwater samples will be collected daily from all points of discharge from the site and
measured for pH using a calibrated pH meter, pH test kit, or wide range pH indicator paper. If the
measured pH is 8.5 or greater, the following steps will be conducted:
I . Prevent the high pH water from entering storm drains or surface water.
2. Adjust or neutralize the high pH water if necessary using
appropriate technology such as CO2 sparging (liquid or dry ice).
3. Contact Ecology if chemical treatment other than CO2 sparging is
planned.6.2.2 pH Sampling
Stormwater runoff will be monitored for pH starting on the first day of any activity that includes
more than 40 yards of poured or recycled concrete, or after the application of "Engineered Soils"
such as, Portland cement treated base, cement kiln dust, or fly ash. This does not include
fertilizers. For engineered soils, the pH monitoring period begins when engineered soils are first
exposed to precipitation and continue until the area is fully stabilized. Stormwater samples will
be collected daily from all points of discharge from the site and measured for pH using a
calibrated pH meter, pH test kit, or wide range pH indicator paper. If the measured pH is 8.5 or
greater, the following steps will be conducted:
Prevent the high pH water from entering storm drains or surface water.
2. Adjust or neutralize the high pH water if necessary using appropriate
technology such as CO2 sparging (liquid or dry ice).
3. Contact Ecology if chemical treatment other than CO2 sparging is planned.
Page 20
Cummings 4-plex
Storm SWPPP
I
1 0. 18.17
8.0 Reporting and Recordkeeping
Recordkeeping
Site Log Book
A site log book will be maintained for all on -site construction activities and will include:
A record of the implementation of the SWPPP and other permit
requirements;
Site inspections; and,
8 Stormwater quality monitoring.
For convenience, the inspection form and water quality monitoring forms included in this SWPPP
include the required information for the site log book.
The site log book will be maintained within this document.
Records Retention
Records of all monitoring information (site log book, inspection reports/checklists, etc.), this Stormwater
Pollution Prevention Plan, and any other documentation of compliance with permit requirements will be
retained during the life of the construction project and for a minimum of three years following the
termination of permit coverage in accordance with permit condition S 5.C.
Access to Plans and Records
The SWPPP, General Permit, Notice of Authorization letter, and Site Log Book will be retained on site
,or within reasonable access to the site and will be made immediately available upon request to Ecology
or the local jurisdiction. A copy of this SWPPP will be provided to Ecology within 14 days of receipt of
a written request for the SWPPP from Ecology. Any other information requested by Ecology will be
submitted within a reasonable time. A copy of the SWPPP or access to the SWPPP will be provided to
the public when requested in writing in accordance with permit condition S 5. G.
Updating the SWPPP
In accordance with Conditions S3, S4. B, and S9. B.3 of the General Permit, this SWPPP will be
modified if the SWPPP is ineffective in eliminating or significantly minimizing pollutants in
stormwater discharges from the site or there has been a change in design, construction, operation, or
maintenance at the site that has a significant effect on the discharge, or potential for discharge, of
pollutants to the waters of the State. The SWPPP will be modified within seven days of determination
based on inspection(s) that additional or modified BMPs are necessary to correct problems identified,
and an updated timeline for BMP implementation will be prepared.
Reporting
Discharge Monitoring Reports
Discharge Monitoring Report (DMR) forms will not be submitted to Ecology because water quality
sampling is not being conducted at the site.
Page 21
Cummings 4-plex
Storm SWPPP
10.18.17
Notification of Noncompliance
If any of the terms and conditions of the permit are not met, and it causes a threat to human health or
the environment, the following steps will be taken in accordance with permit section S5. F:
Ecology will be immediately notified of the failure to comply.
2. Immediate action will be taken to control the noncompliance issue and to
correct the problem. If applicable, sampling and analysis of any
noncompliance will be repeated immediately and the results submitted to
Ecology within five (5) days of becoming aware of the violation.
A detailed written report describing the noncompliance will be submitted to
Ecology within five (5) days, unless requested earlier by Ecology.
Permit Application and Changes
In accordance with permit condition S 2. A, a complete application form will be submitted to Ecology
and the appropriate local jurisdiction (if applicable) to be covered by the General Permit.
Page 22
Appendix A - Site Plans
�ARCEL. PJM954605305X- !0NE DF Ax-l!E TIFL E,
-c'. 7- "D AVEN.' 'E Ass 7
6:86?646-
0144YER.
KI �mft
RrT WILL',
97.23
1111WE "W
T
SITE &W12 Q5 3.
SLA-1
. . . . . . . ........
: - - .. .........
ELE�11&74
ct
9435
SITE UTILITY PLAN 0
Kf F.
DESIGN BY OTHERS C41 blime m ft
THIS IS A SKETCH. NOTHING IN THIS VIEW RELA-flNG TO VERIZON, PUD POWER LINES OR
OTHER POWERED UTILITIES SHALL BE CONSTRUED AS A DESIGN OF SAID UTILITIES BY
J.C. MCDONNELL ENGINEERING, PC. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR
SHALL CONSULT THE APPROPRIATE UTILITY OR THE EDMONDS INSPECTOR TO RESOLVE
ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION.
SWQUAR7XR OFSEC77ON20 TOWNSHM271V RANGE 04E
'Wlj� �;A.l' LO
MA
EU 1� 00
7
Fri
mRs
YI, ............. ... .......
........ .............
... . . Wm
. .
. .......
... ......................
............ .
wl
111111119
. ...........
7.Or
It
It I
.......................
......................
.......................
U
301
Sr� —1 -------
4
N
w '(6 E
s
10 0 10 21
--- agnap'sksw-
?AM
5
AW
BROCRMAKAMDA7W.-
SCALE 1* - 20011
1. HORIZONTAL DATUM: 2.
BASIS OF POSITION:
ASSUMED BASED ON EVERGREEN CONDOMINIUMS
HELD THE MONUMENT IN THE CENTERLINE OF 72ND AVENUE WEST AT THE
AS RECORDED IN VOLUME 60 OF PLATS, PAGES 56 THROUGH 59,
SOUTHEAST CORNER OF THE ABOVE NOTED PLAT OF AURORA HEIGHTS.
RECORDS OF SNOHOMISH COUNTY, WASHINGTON,
SEE MAP FOR PLOTTED LOCATION AND DESCRIPTION.
THE FOLLOWING RECORDS WERE ALSO REFERENCED:
3.
BASS OF BEARING:
A) RECORD OF SURVEY, AS RECORDED LNDER RECORDING NUMBER
HELD THE BEARING BETWEEN THE ABOVE NOTED BASIS OF POSITION AND
201409025004, RECORDS OF SNOHOMISH COUNTY. WASHINGTON.
THE FOUND MONUMENT AT THE CENTERLINE INTERSECTION ON
B) RECORD OF SURVEY AS RECORDED IN VOLUME 49 OF SURVEM
72ND AVENUE WEST AND 208TH STREET SOUTHWEST TO BE
PAGES 213, RECORDS OF SNOHOMISH COUNTY. WASHINGTON.
N 02'13' 02" W PER DIRECT INVERSE. SEE MAP FOR PLOTTED LOCATION
C) PLAT OF AURORA HEIGHTS, ACCORDING TO THE PLAT THEREOF
AND DESCRIPTION.
RECORDED IN VOLUME 12 OF PLATS, PAGE 120, RECORDS OF
SNOHOMISH COUNTY, WASHINGTON. 4.
VERTICAL DATUM: ASSUMED
D) PLAT OF SEATTLE HEIGHTS DfVSON FOUR, ACCORDING TO THE PLAT
MASTER BENCHMARK:
THEREOF RECORDED IN VOLUME 9 OF PLATS, PAGE 11 RECORDS OF
THE MONUMENT IN THE CENTERUNE OF 72ND AVENUE WEST AT THE
SNOHOWSH COUNTY, WASHINGTON.
SOUTHEAST CORNER OF THE ABOVE NOTED PLAT OF
E) SNOHOMISH COUNTY ASSESSORS MAP FOR THE SOUTHYIEST
AURORA HEIGHTS. SEE MAP FOR PLOTTED LOCATION AND DESCRIPTION.
OUARTER OF SECTION 20, TOWNSHIP 27 NORTH, RANGE 4 EAST, W.M.
ELEVATION = IDO.00 FEET
SITE BM#l: NEST RIM OF SANITARY SEWER MA14HOLE OPPOSITE THE SITE 30
FEET SOUTH OF A UTIUTY POLE ON THE EAST SIDE OF 72ND AVENUE
MEAMIPULLOTCOMAM
WEST A14D 3 FEET EAST OF THE EAST EDGE OF PAVEMENT OF 72NO AVENUE
PROPERTY TOTAL AREA- 7,798 SF (0. 179 AC)
WEST ELEVATION - 100.11
STRUCTURAL IMPERVIOUS- 2,734 SF
PERCENT COVERAGE- 274%
SITE BM#2: GOLDSMITH SURVEY CONTROL POINT SLA-1 - SET REBAR AND
CAP IN BACK YARD. 18.3 FEET WEST OF THE NORTHWEST HOUSE CORNER
AND 71 FEET SOUTH OF A 6 FOOT WOOD FENCE RUNNING ALONG THE
lvm
NORTH PROPERTY LINE. ELEVATION = 96.74
WATER / SEWER SERVYCE LINE AS SHOWN ARE
SCHEMATIC ONLY CONTRACTOR TO FIELD VERIFY
LOCATION AND USABILITY OF EXISTING LINES.
HEIGHT CALC&
COORDINATE WITH ENGINEER.
A-96.75
B-07 60
WA 7M AIM SMVM PM VE"
C-95*50
D-96.26
CITY OF EDA40NDS
AVE GRADE-IM.25
ACTUAL-110.30
V7MffYIYM
MA)IJMUM-121.26
1. IF RE-USWG EXISTING SIDE SEWER (FROM PROPERTY LINE TO HOUSE):
PROPERTY OWNER MUST HAVE COND17ION VERIFIED AND PROVIDE A REPORT
TO THE PUBLIC WORKS DEPARTMENT,
2. F RE -USING EXISTING SEWER LATERAL (rROA4 PROPERTY LINE TO CITY MAIN):
CONDITION MUST BE VERIFIED BY PUBLIC WORKS DEPARTMENT, CONIACT
EDMONO'S SEWER DIVISION AT 425-771-0236.
3. A ?-INCH METER MAY BE NECESSARY OF FIRE SPRINKLING IS REQUIRED BY
THE FIRE MARSHALL. IF FIRE SPRINKLING IS REQUIRED, BLDG SVC LINE ON
PROPERTY MUST BE UPSIZED TO 1.5-INCH
PARCELAREA
7,798 SF
EASTING ROOF=
2.164 SF
EXI[STING PAVEMENT-
336 SF
PERVIOUS-
7,789 SF
PROPOSED ROOF-
2,134 SF
PROPOSED PAVING=
2,561 SF
LANDSCAPING-
7.798
PROPOSED NEW-
4.695 SF
% COVERAGE=
60.2X
SWQUAR7ER OFSECITON20TOWNSBY"271V RANGE 04E
9.
0 11P i 1
PN[; A.1f7i'llip NF37
I
SIN ONO2
—74 7
lz
a
Z.
JBIr;
t
a 4R\
v
V
tBR
PROTECT 11ON AREA—"'V'_��
0 A I
f
L
_Q
, �Vr 4, fF"
A-
Q0N=UCMNmm6vmN=
1. SCHEDULE A PRE -CONSTRUCTION MEETING WTH CITY ENGINEERING
DIVISION AT 425- 771-0220. EXT. 1326. TWO DAY (48 HR)
NOTICE is REOUIRED.
2. REVIEW TEMPORARY EROSION AND SEDIMENT CONTROL NOTES.
3. CALL FOR U71UTY LOCATES.
4. INSTALL TESC MEASURES AND MAINTAIN DUST CONTROL WHILE
PREVENTING DISTURBANCE OF ANY AREAS OF VEGETATION OUTSIDE
THE CONSTRUCTION ZONE.
5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF
EDMONDS CITY ENGINEERING INSPECTOR. ALL TEMPORARY
SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN
PLACE AND INSPECTED PRIOR TO ANY CONSTRUCTION OR SITE
CLEARING. EROSION AND SEDIMENTATION CONTROL PRACTICES
AND/OR DEVICES SHALL BE MAINTAINED UNTIL PERMANENT
VEGETATION IS ESTABLISHED.
6. DEMOLISH EXISTING STRUCTURES.
7- ROUGH GRADE SITE AS REOUIRED TO INSTALL DRAINAGE FEATURES.
B. CLEAR, GRUB & ROUGH GRADE STE. REVEGETATE DISTURBED
AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE
IMMEDIATELY AFTER ROUGH GRADING. (OTHER EXPOSED
AREAS SHALL BE STABILIZED PER EROSION CONTROL NOTES
ON SHEET CS)
9. INSTALL UTIUTIES AND OTHER SITE IMPROVEMENTS, INCLUDING
FRONTAGE IMPROVEMENTS.
13. STABILIZE AND COMPOST AMEND ALL EXPOSED SOILS PRIOR TO
REVEGETATION OF ENTIRE SITE.
14. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION, ALL
TEMPORARY EROSON CONTROL MEASURES SHALL BE REMOVED
UPON FINAL STE STABILIZATION AND APPROVAL BY CITY
INSPECTOR-
0
Krg f.
Cd b*N.Vm 4
_-v
THE CONTRACTOR SHALL BE RESPONSIBLE FOR AftnWIG THE LOCATION, DMENSONL AND
DEPTH OF ALL DUSTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOY. BY
POTHOLJNG,THE UTILITIES AND SURVEYNG THE HORIZONTAL AND VERTICAL LOCATION PRIOR
$0 CONSTRUCTION. THIS SHALL INCLUDE CALLING UTL17Y LOCATE 9 I-DOD-424-11M AND
THEN PoTmouNG ALL or THE EXISTING UTILIVES AT LOCATONS OF NEW UTILITY CROSSINGS
To PHYSICALLY VERIFY WHETHER OR NOY CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES
AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUDUC INFORMATION AND
ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD Occulk THE CONTRACTOR SHALL
CONSULT 4C. MCDOMMELL DMEUMOL PC 70 RESOLVE ALL PROBLEMS PRIOR TO
PROCEEDING MTN CONSTRUCTION.
flo-
1.0 0 10 20
1 bxh - 10 fL
CONTRACTOR'S NOTE:
SEE SOILS RECOMMENDATION PER SOILS REPORT
BY COBALT GEOSCIENCES, DATED SEPTEMBER 25, 2017.
T_rscLwfflv
(�E) rN-Y-f BWP C102 CLEAJNG LUTS
SW C105 TEMPORARY CONSTRUCTION ENTROICE (IF
REQUIRED)
-SF
BMP C233 SILT FENCE
(E)
STOCK PILE BWP CW '"TIC CMFdNG'
OCBI
CATCH BASIN NSERT
- - - - - -
SAWCUT LINE
REMOVE ASPHALT/GRAVEL
SUNWOR GOLDSMITH LAND DEVELOPMENT SERVICES
1215 114TH AVE SE
BELLEVUE, WA 98004
PO BOX 3565, BELLEVUE, WA 981
425-462-1080
9718 SLATER AVE NE
KIRKLAND, WA 98033
slaterhoeYescorp0hotmail.com
ANCWMT J3 ARCHITECTS. LLC
' 1702 98TH AVE NE. SUITE 104
KIRKLAND. WA 98034
smwima
(TEL) 425-242-0369
C� OF 5 TESC PLAN
RYAN
C2 OF 55 GRADNG PLAN
)ALBRECHT
(CELL 206-931-2650
C3 OF 5 DRAJNAGE AND U71Ll7Y PLAN
Pjt0jBCTj2VGW= J.C. MCDONNELL ENGINEERING, PC
CA Of' 5 DETAILS
C5 OF 5 NOTES
6608 216TH ST SW, SUITE 306
MOUNTLAKE TERRACE, VIA 98043
(TEL) 425-744-0916 (FAX) 425-744-0946
john0jemcdon.cm
LWALDESCEPTM.'
SEATTLE HEIGHTS 04V 4 SLK 002 D-02 - N 75n OF TH PIN LOT 3 BLK
2 LY WHN THES 1/2 OF BLK 2
APPROVED FOR CONSTRUCTION
LOT AREA 7,798 SF (0.18 ACRES)
CITY OF EDMONDS
DATE:
00566900200302 2090,4 - 72ND AVENUE W.
EDMONDS, WA. 98020
CUT 300 CY syl ----
_FTTE4GNEER*G
FILL 300 CY NNISON
IL 9 1 a I I
r J.C.McDONNELL 9
MMONW4-UMT
ENMMEN, Y PC I
sscnON20 7V*W"Slff27X RA&W 04E
DRAWN BY DA
BY DATE
MANAGERI
SCALE
�LL i44-0111li
ik
TIN 11/14/vIr
1PROJECT
J.C. McDwAd
Ps !tn
BOX 131". Cwn' W;%" YoL-j,41
DRAWING FILE NAME
CM. BY F.D. NO.
JOB NO.
SHT.
0 T__TFA
wo a mom mus"
I " I
I we
I C7
Appendix B - Construction BMPs
High Visibility Plastic or Metal
Fence (BMP C103) Stabilized
Construction Entrance (BMP
C 105) Temporary Sediment
Pond (BMP C241)
Silt Fence (BMP C233)
Temporary and Permanent
Seeding (BMP C120)
Mulching (BMP C121)
Plastic Covering (BMP C123)
Temporary and Permanent Seeding (BMP C 120)
See Specific BMP Documentation in Section 11, Department of Ecology 2012
Stormwater Management Manual for Western Washington as amended in
2014.
Appendix C - Altemative BNIPs
The following includes a list of possible alternative BMPs for each of the 13 elements not described
in the main SWPPP text. This list can be referenced in the event a BMP for a specific element is not
functioning as designed and an alternative BMP needs to be implemented.
Element #1 - Mark Clearing Limits
Element #2 - Establish Construction Access
Element #3 - Control Flow Rates
Element 44 - Install Sediment Controls
Advanced BMPs:
Element #5 - Stabilize Soils
Element #6 - Protect Slopes
Element 48 - Stabilize Channels and Outlets
Element 410 - Control Dewatcring
Additional Advanced BMPs to Control Dewatering:
Appendix D - General Permit
The General Permit will be included in this document once it has been issued by the
Washington Department of Ecology.
Appendix E - Site Inspection Forms (and Site Log)
The results of each inspection shall be summarized in an inspection report or checklist that
is entered or attached to the site log book. It is suggested that the inspection report or
checklist be included in this appendix to keep monitoring and inspection information in
one document, but this is optional. However, it is mandatory that this SWPPP and the site
inspection forms be kept onsite always during construction, and that inspections be
performed and documented as outlined below.
At a minimum, each inspection report or checklist shall include:
a. Inspection date/times
b. . Weather information: general conditions during inspection,
approximate amount of precipitation since the last inspection, and
approximate amount of precipitation within the last 24 hours.
C. A summary or list of all BMPs that have been implemented, including
observations of all erosion/sediment control structures or practices,
d. The following shall be noted:
i. locations of BMPs inspected,
ii. locations of BMPs that need maintenance,
iii, the reason maintenance is needed,
iv. locations of BMPs that failed to operate as designed or
intended, and
V. locations where additional or different BMPs are needed, and the
reason(s) why
e. A description of stormwater discharged from the site. The presence of suspended
sediment, turbid water, discoloration, and/or oil sheen shall be noted, as
applicable.
f. A description of any water quality monitoring performed during inspection, and
the results of that monitoring.
9. General comments and notes, including a brief description of any BMP repairs,
maintenance or installations made because of the inspection.
h. A statement that, in the judgment of the person conducting the site inspection, the
site is either in compliance or out of compliance with the terms and conditions of
the SWPPP and the NPDES
permit. If the site inspection indicates that the site is out of
compliance, the inspection report shall include a summary of the
remedial actions required to bring the site back into compliance,
as well as a schedule of implementation.
i. Name, title, and signature of person conducting the site inspection;
and the following statement: "I certify under penalty of law that
this report is true, accurate, and complete, to the best of my
knowledge and belief.
When the site inspection indicates that the site is not in compliance with any terms and
conditions of the NPDES permit, the Permittee shall take immediate action(s) to: stop,
contain, and clean up the unauthorized discharges, or otherwise stop the noncompliance;
correct the problem(s); implement appropriate Best Management Practices (BMPs),
and/or conduct maintenance of existing BMPs; and achieve compliance with all
applicable standards and permit conditions. In addition, if the noncompliance causes a
threat to human health or the environment, the Pennittee shall comply with the
Noncompliance Notification requirements in Special Condition S5. F of the permit.
Construction Stormwater Site Inspection Form
Project Name
Permit #
Inspection Date
Name of Certified Erosion Sediment Control Lead (CESCL) or qualified inspector if less than one acre
Print Name:
Approximate rainfall amount since the last inspection (in inches):
Approximate rainfall amount in the last 24 hours (in inches):
Current Weather Clear F—] CloudyF—] Mist [—] Rain F—] Wind [� Fog F-1
A. Type of inspection: Weekly F-1 Post Storm Event F-1 Other F7
B. Phase of Active Construction (check a// that apply):
Time
Pre Construction/installation of erosion/sediment controls Clearing/Demo/Grading E Infrastructure/storm/roads
Concrete pours Vertical Construction/buildings Utilities
Offsite improvements Site temporary stabilized HFinal stabilization
C. Questions:
1. Were all areas of construction and discharge points inspected?
Yes
No
2. Did you observe the presence of suspended sediment, turbidity, discoloration, or oil sheen
Yes
No
3. Was a water quality sample taken during inspection? (refer to permit conditions S4 & S5)
Yes
No
4. Was there a turbid discharge 250 NTU or greater, or Transparency 6 cm or less?*
Yes
No
5. If yes to #4 was it reported to Ecology?
Yes
No
6. Is pH sampling required? pH range required is 6.5 to 8.5.
Yes
No
If answering yes to a discharge, describe the event. Include when, where, and why it happened; what action was taken,
and when.
*If answering yes to # 4 record NTU/Transparency with continual sampling daily until turbidity is 25 NTU or less/ transparency is 33
cm or greater.
Sampling Results:
Date:
Parameter
Method (circle one)
Result
Other/Note
NTU
cm
pH
Turbidity
tube, meter, laboratory
pH
Paper, kit, meter
Page 1
Construction Stormwater Site Inspection Form
D. Check the observed status of all items. Provide "Action Required "details and dates.
Element #
Inspection
BIVIPS
BIVIP needs
BMP
Action
Inspected
maintenance
failed
required
yes
no
n/a
(describe in
section F)
1
Before beginning land disturbing
Clearing
activities are all clearing limits,
Limits
natural resource areas (streams,
wetlands, buffers, trees) protected
with barriers or similar BMPs? (high
visibility recommended)
2
Construction access is stabilized
Construction
with quarry spalls or equivalent
Access
BMP to prevent sediment from
being tracked onto roads?
Sediment tracked onto the road
way was cleaned thoroughly at the
end of the day or more frequent as
necessary.
3
Are flow control measures installed
Control Flow
to control stormwater volumes and
Rates
velocity during construction and do
they protect downstream
properties and waterways from
erosion?
If permanent infiltration ponds are
used for flow control during
construction, are they protected
from siltation?
4
All perimeter sediment controls
Sediment
(e.g. silt fence, wattles, compost
Controls
socks, berms, etc.) installed, and
maintained in accordance with the
Stormwater Pollution Prevention
Plan (SWPPP).
Sediment control BIVIPs (sediment
ponds, traps, filters etc.) have been
constructed and functional as the
first step of grading.
Stormwater runoff from disturbed
areas is directed to sediment
removal BIVIP.
5
Have exposed un-worked soils
Stabilize
been stabilized with effective BMP
Soils
to prevent erosion and sediment
deposition?
Page 2
Construction Stormwater Site Inspection Form
Element #
Inspection
BMI)s
BMP needs
BIVIP
Action
Inspected
maintenance
failed
required
yes
no
n/a
(describe in
section F)
5
Are stockpiles stabilized from erosion,
Stabilize Soils
protected with sediment trapping
Cont.
measures and located away from drain
inlet, waterways, and drainage
channels?
Have soils been stabilized at the end of
the shift, before a holiday or weekend
if needed based on the weather
forecast?
Has stormwater and ground water
6
been diverted away from slopes and
Protect
disturbed areas with interceptor dikes,
Slopes
pipes and or swales?
Is off -site storm water managed
separately from stormwater generated
on the site?
Is excavated material placed on uphill
side of trenches consistent with safety
and space considerations?
Have check dams been placed at
regular intervals within constructed
channels that are cut down a slope?
7
Storm drain inlets made operable
Drain Inlets
during construction are protected.
Are existing storm drains within the
influence of the project protected?
8
Have all on -site conveyance channels
stabilize
been designed, constructed and
Channeland
stabilized to prevent erosion from
Outlets
expected peak flows?
Is stabilization, including armoring
material, adequate to prevent erosion
of outlets, adjacent stream banks,
slopes and downstream conveyance
systems?
9
Are waste materials and demolition
Control
debris handled and disposed of to
Pollutants
prevent contamination of stormwater?
Has cover been provided for all
chemicals, liquid products, petroleum
products, and other material?
Has secondary containment been
provided capable of containing 110%
of the volume?
Were contaminated surfaces cleaned
imm diately after a spillincident?
Were BMPs used to prevent
contamination of stormwater by a pH
modifying sources?
Page 3
Construction Stormwater Site Inspection Form
Element #
Inspection
BIVIPs
BIVIP needs
BIVIP
Action
Inspected
maintenance
failed
required
(describe in
n/a
section F)
9
Wheel wash wastewater is handled
Cont.
and disposed of properly.
10
Concrete washout in designated areas.
Control
No washout or excess concrete on the
Dewatering
ground.
Dewatering has been done to an
approved source and in compliance
with the SWPPP.
Were there any clean non turbid
clewatering discharges?
11
Are all temporary and permanent
Maintain
erosion and sediment control BMPs
BMP
maintained to perform as intended?
12
Has the project been phased to the
Manage the
maximum degree practicable?
Project
Has regular inspection, monitoring and
maintenance been performed as
required by the permit?
Has the SWPPP been updated,
implemented and records maintained?
13
Is all Bioretention and Rain Garden
Protect LID
Facilities protected from
sedimentation with appropriate BMPs?
Is the Bioretention and Rain Garden
protected against over compaction of
construction equipment and foot
traffic to retain its infiltration
capabilities?
Permeable pavements are clean and
free of sediment and sediment laden -
water runoff. Muddy construction
equipment has not been on the base
material or pavement.
Have soiled permeable pavements
been cleaned of sediments and pass
infiltration test as required by
stormwater manual methodology?
Heavy equipment has been kept off
existing soils under LID facilities to
retain infiltration rate.
E. Check all areas that have been inspected. V
All in place BIVIPs, F] All disturbed soils [—] All concrete wash out area F7AII material storage areas F1
All discharge locations F-] Ali equipment storage areas F-1 All construction entrances/exits R
Page 4
Construction Stormwater Site Inspection Form
F. Elements checked "Action Required" (section D) describe corrective action to be taken. List the element number;
be specific on location and work needed. Document, initial, and date when the corrective action has been completed
and inspected.
Element Description and Location Action -Required Completion. Initials
Date
_q
Attach additional page if needed
Sign the following certification:
"I certify that this report is true, accurate, and complete, to the best of my knowledge and belief'
inspected by: (print)
Title/Qualification of Inspector:
(Signature)
Date:
Page 5
17 /S- 3 �_
Cffrry C(13]?,y RESUB
J U N 1 1 2018
8UILDIpG DEPARTMEW
CJT� OF Fr)
_ MONDS
Edmonds Multi -Unit
Structural Calculations
2090472 nd Avenue West
Edmonds, WA 98026
Snohomish County
Sidesway Project No. 17071.01
Prepared By:
5 IDE WAY
ENGINEERING
Edmonds Multi -Unit
TABLE OF CONTENTS
April 13,2018
Project No. 17071.01
DESCRIPTION PAGE NO.
Project Summary
Structural Plan Sketches
Roof Level
SK1
Floor Level
SK2
Foundation Level
SK3
Floor Level Beams
SK4
Gravity System
Design Loads
1.01
Roof/Floor Design
1.02(a) - 1.02(b)
Floor
1.03-1.05
Crawl Space Design
1.06
Foundation Design
1.07- 1.08
Lateral System
Seismic & Wind Loads
2.01 -2.04
Shear Wall, Diaphragm, Chord Design
2.05 -2.10
Roof Level Lateral Markup
2.11
Floor Level Lateral Markup
2.12
20305 87th Ave. W.
5WAY Edmonds, WA 98026
DE (425) 673-4160
Si"''
EWGINEERING
Edmonds Multi -Unit
Project Description
April 13,2018
Project No. 17071.01
Sidesway Engineering was retained by Slater Homes Corporation to perform analysis and
design as necessary to obtain a building permit for the proposed 2-story multi -unit residential
building to be located at 20904 72 nd Avenue West in Edmonds Washington,
The proposed structure will be conventionally wood framed with a combination of roof trusses
and sawn lumber joists spanning to and from stud bearing walls and beam lines. The structure
will bear atop continuous exterior concrete footings at frost depth and an interior crawl space.
The lateral force resisting system consists of sheathed roof and floor diaphragms spanning to
wood stud shear walls.
Scope of Work
Provide gravity and lateral calculations for the proposed structure as required to obtain a
building permit. Provide structural drawings detailing construction requirements as needed for
permit.
Design Criteria
2015 International Building Code (IBC)
ASCE 7-10 Minimum Design Loads for Buildings and Other Structures
Applicable Material Reference Standards (ACI, MSIC, AISC, NDS)
This is a Risk Category II structure designed for the following loads:
Dead Loads:
15psf (roof), 20/17psf (floor), 9psf/7psf (ext/int walls)
Live Loads:
40psf (residential), 60psf (decks), 100psf (corridors)
Snow Loads:
25psf
Wind Loads:
110mph, Exp. B, K,t = 1.0, /�=1.0 (refer to wind loads)
Seismic Loads:
R = 6.5, Site Class V, SDC'D' (refer to seismic loads)
Geotechnical:
Cobalt Geosciences Report dated September 2017
Project Summary
The proposed multi -unit building as designed in the following calculations conforms to the 2015
IBC. Refer to the calculations and construction drawings for structural framing requirements.
20305 87th Ave. W.
DE Edmonds, WA 98026
Si--` 5WAY (425) 673-4160
ENGINEERING
SIDE
A,'VlAil
,FAFIVO.
sws
6
EXTEIZ, rft-L;SS ',C�
FRAME ARCqFACALW
TYP lnl
+
T 11
+ + +
+
+ + + +
+ + +
+ + + +
+ +
+ +
4- + * +
+ +
+
+ + +
+
+ + +
+ +
+ +
\++
+ + + + +
+
+ + +
+ +
+ +
+ +
+
+ + + + +
+
+ + +
+
t t
+ t
t +
t + + + +
+
+ + +
+
+ +
+ +
.
. . . . .
+
+ + +
+ +
+
+
+ + + +
+ +
+ +
4+
-1
+
+
+ + +
+
+ +
1-41>pqt-
+
+ + +
4
+
+
+ +
+
---I
+
SAS
1 -6/
F
GIROEH rRUSS
W
+
+ + +
+
+
+ + +
+ +
+ + + t
+ +
+ + +
+
+
+
12
+
+ +
+
N\
+
+
v �
I
F
sm;
Ir
sills
T
TYP WIY4
I ILH
L
ve: L_
51<1--
1�.
1*012 �.
Jl�mf.f
SITE
P I
Cow,
.'!?' U
HOW;
swe
sw8
S V4
:r
Tylp
C.
i
2x'? #11--920 W VC
Zp l.VJ',F#Z
cm frac
Z0214 92 W 16" OC
�fi AP C-A -:5. w
12 �fFr?
2 il #2 ik) 5 Uc
P,
SW6
'W6
r
2
"m 114 -wF-v4
iro 0 Ci W�
W G"
V
A P-11 HFV
49 WOC
fisusaog.12 -
P�
PT2W%ZL R
cc
stvc
POST LINED VP
Z-5
POST LIVED UP
PCSTMEOUP
16�
POST Alm Up
11
SW;
WOM POS.' A80W'
f'G.51 44WOVE.
Wif,-A W�Sl MOVI
ilffl"006.1 AIRM
0
-twyA-F#ZiP WOC
I USP!C I A SUN
to
I U5,710! ASOM pp
iL
IM ep) 6' cc
z9k, i lr#2 (Y) 11 a c
LUSMSCSOE pp
LUS21DEASWE
p-
%6
40-
Pr2xf2J4FA*-
4 -�p -ire-Oc
svifi
Ki
I
iFA SOE
L L
Vr2�WLEVUCR sm
svie
2 HFAV
PT. W
L US412 EA 8 IVE'-
LCMCR
Typ
vvz Hrn"--e (kPAA j
Ln
SLOPECUTPiFRAR014
%c;pEcEsrpv ARcH
1
.2
womm
P T 4.02 NF#2 RIPPED TC
s Lv.
OFAV, Vl:�
rG
f,f-v ftf, HuvavO tA.514;J.,
V1',
ql.XQ4S.1 . -
7�
L-14 t-
-9= (2 EAJWW-'
L
HUG! ,.#I SVY-
6-1 rz__
le T�
.5Kq
4VE -N 91, rE—f op Xw"
PROODEF '2� 04 CONTA ToBOT
It
TL
rl A
K%l
v
WDE 9' —ErCVNr
-WL� DF
f-WERIOR %, 0 T4';G PRO
Q
#4 LON
ITAT Or.
lop, AAL
2x (J -(F 0
21410 Df All
s!s' cc 9 EP FTG
W,
11 'Sol, ; Yp
EA IVAYB
P c SPA Uvo
:0 0F*2
& cc, 1.61, VIC
I
6
-cc r
cab 161 oa
�1, "'.v 1/ZZ- �v
�F-A VY,
A Y 1810 IT
2*-O'x 8* DEEP FTG
W-,'3) #4 1 A VIA V W) 1, t VP
2V 2'4' x 8* DEEP F-VG
6% CPA 14Q SPACE, VNO
W I.'! Ad L A PYA v IK.Il ! YP
P CRA Viel SPACEZ I 1 *1
- - - - - - - - - - - - - ---
MCKEN SCAU r?
90TOFSrAlaWELL.
REFER TO I I.-M,
V31k "Of
2* -6";t 47� S' x -.YDEEP FTO W,
FAIIIVAYW� Tyr, 40(.VA141.rAls
CM7, 9.4ALL RUX
5k,77:�
r- - - -- - - - - - - - - - - - - - - - - - - - - - I
EZ�Lz
gm -4
------------ --------- ----
At
Li- - - - - - - -- - - - - - -
11
%jN
9<� -
6 V-� I:- � -.
f--)r,AD 41
69v
o
r-;>
7,0
C- 1--, //J IJ F'L
-7
'7
�T v r- �- k2; -:-- p,
TZA L— L-rf>/ r,
3.� '72 -5,
r4.r., :� 2---) -7z F�, V-5F *ee-), r-, F-7 8, 3�� p,-F
uesc-pprion BY Project No.
Date lip, f7b7loi
IDE WAY Project Checked Sheet No.
5. 5
ENGINEERING DRt,- 1.01
Ol (7- A4AJ 1> 5;� 6-4J Ft-afo --4nD
v,)A 76_
422
(2,-F HPR- 5",
L-"- 41 FAfL 4,?AJ
AIJD
t L. P4
IM
1010
3 C77-
ES60
tj E 1,,; P!�- r
60) V?)
91M 0 C-(2-pJ:l�-)
10,15 (�-6?��
q Y5 D f-,fi 2-
I il"00 171q
HX(O >P"I'l Z� 0,70
1 77( -Z s -?, S
41 ,,-/ -Z 2r,:J� -Z 9,0-,7
Li
/V, 7 1- 41AS
JAW
O>X?4
S-3
4:� , , -1
I-
Z�
'Fz j
Description BY P. olect No.
Date
IDEWAY project Checked Sheet No.
ENGINEERING
1,10-2 1-.!, 4/1--, 1 ;� a5f
4 b
o"t?
,g 7-' -+ 2-5
LA,5 Z6 OL.-
J,A 2,p
V 0. 04
ro
�0, if r V L.J
OL -f xs
�s F"s, L-tl-)
ll��lll *FJ r - , " , r Q,
cf, !�� /( r- — v �3 J[,-- & 1, U>
BY Pf'oject No.
Date
OlLo-dii) 17C,7�,Ol
IDEWAY Project M C4 --IT u. l') --L —1 Checked Sheet No.
S: s ENGINEERING I I Date I , , o2Q
IF�Cvf�- FP-Ajk4��4
r 7,-
W A d�f-
13 1. q
f2-
1
t 611 � Cf
�f�- fO
C,6,
t
S6
'�Xl 7- D
On o
41,0z
Z5-� 7
�7
,;�,
1 iz. L;C 6-4, 13
7
a-Ife-t-r- (1) r 1, f��
z�w -r3-1 C -:;:�4 -,r, p ;:-, 4z- r.x
VL 7- 1 -5 Li
L +7-5 KC -40
L /n L
6,� z ro 7- 2,0-; L-4
� 1/14 r-, 2 -
4FA,4
�7 C�
:- I/q,71
L-b , -h I
DLf- Ltz-Z,3 L-1- —fZ772-15�,L — IL137'
Descrip BY �;lo Pfoject No.
Date 1
IDE WAY Project Check d sheal, No.
ENGINEERING I Dat6 1.0-2,
5PA-IJ
P7::
V:-- 1-b
If 4
l7o?
A-f 37
L45"C S /'S C,
t--zz
Fl,
50
v 10 7"b
-Y3 wl-
414
Lg
4
,6
3
--2 14
I-,F PL F;' ,�- -e
PO "JOPL,
r: 7.k
e5
c) 7�
,j
A 0--Z'� Ab7� ( 11 -, = 0-,!� VA ,,
Description
By Prolect No.
C,
17D71,01
/lei
DE WAY Project tuk Checked Sheet No.
ENGINEERING Date L4
1, t7 I
2-1 -7�
V: Nift" 24
A
54>�,r f-L
SJ-
31Z - Of, fler
LA- /P r /e)( 2- 1, V
A-
42
ZN-
k �, E 'I X12 Hr-,l Z—
ll:�
0 "
V-- 0, its 4L-
--lpw
7, a,,—' i�i t 7 Fe-d Cr p-�.
6 MA 1- 75
Gi
(551A (9)
--r-f
VL
llrcz� 6(-z-
Z. w ;- f,4 r*15;P- S
Description
t>—,- &::&
IDE WAY Prolect tA L& L-1 T� —
ENGINEERING
Ly"6- Ze-
, P5 F� JP L L- L)
L-)'7 't'- C7,o ?5F > 1, -4 40T�,F 4� -+ r::,j-1-7 t> ,
Ilk u _5 - F-,
m A0.7
r-L5t 165all-F1'
/(17.7 - /,7. ) -:
BY
pfoject No.
Dai
17071,01
Checked
Sheet No.
Date
1.0 C
Ice
L-J
L4�,-,r a Z, V, " 10
3 -743 Cq I tz�
Ei�77J
0.37 �1.35 7, r--- L-)A U- ZA O(L Z-1) , F,?.' 5��O -7 '�t,
F�t Z, C? 07- -1��S
-, PArc--
4/f 0,71
V.77
A
LA.±L
FMOR �-,- - -
(2� ?f
F-6-
r A- 2� /19A ff
Q!� C I - 6 QP
+3e, 1
ID L
83 ',[17F5,, -'rO Rr-l-J Llt-�, r Pl-
Desuiption By Project No.
.......... -1�
Date-,,,,,W -7
A146 /;3 1 b-7/,O(
Project Checked Sheet No.
IDESWAY "Li--r 3� -
s ENGINEERING Date
F-,c- z-A rle--T -ri 9 X, -37-Sr-> ?'i-x
-Ir �LfONW-4--2
D + Zf o F
As"o
Pl�f 1> i- y- 10 6 FL-- F S f, TZ ?p 1� F L�
f I
O'l TZ, 150 ?Z- 4-7 4 d7z�,L- F- I'
-rl
"y
IJ A-Y, -r,,
-�Ippc'lo R-111, xy;-,�-Ill�
Fp x, ci.� I'- 41d rl- 5 3 , A I !� —1 /r:- s-2. -� 6- , - -
T� IP L --t- 111 -L 3 '- ", L 4 -9 -.1 a"S L -4- 57- lil "' f.-; c;� := I q
"Z7
4, r- o r Z.
.--LA 5,r= -.2 t- /. ' -,(, "' e 9 " b ? -// Lf
� U
Fl�;- For.,- kMr-I -,I� A)
r r
T.::7 7q 3 4,1,( -fe �rz -b � s 6,:� 1-6
14 -"6 -Z , 70
7- sovoe'r
3 'x v C, 0 'T C") -� (11,s 72;,?-)
Liescripiton BY Projoc,No.
Date 1749 71. t2(
IDE WAY Project M v Checked Sheet No.
5 s
ENGINEERING Date I,o7
I Nt'ou n d A c' 81 let
,11 rou n tl,�c
spc: T,.",
Woodwav
wol I cjki isw
k1fl"
Elevation
41
%-nnw On
U citn on d
I
oil to I tk c
Woodwav 1�1
SNOHO#A ISW
Elevation Shark eleve'nor, "th grades
400 -7f—
H
LVf
0 a
091
D"w"M Topography
3y
JMD
A No.
Dale
11/20117
0
IDE WAY
Profect
Edmonds Multiunit
ClecKed
f.
ENGINEERING
1�07
I LJ-r�D Ar-*w6
"rJ6-Lo�F-D 'Sr-M?4-r- 07-A-rl-4PAC-�
C> c r?- A -rf,*
Aw�r rz F-�- Y-5; r- z -z ?5 iz
Z, 0
2. ee
V-10F
L-, ') /,,. i- , - I ( O;wr,-,3�
14 r-T-
2 '7P-SF Z,6
,1--r rzl- UAlw-) F�F'- 1q, -Z 4 3 'YqFY-4, I
7 F 7- - 7 FN
3c�, -e
COVE
Noq--eH /5.:7e. --
12-Or Aa-dAf,: 4=0E-r'
Z-
Fi,c,,r-A,cAs,- A -;�
Z, - 2-ot i::--, Z-
-znF --zz-z-F7�2-- t-z- -7mF
5 Igo 6
A';,f> '-;,CJ-kp%Ov-y (0, �. r-.,)
Fnfl.rz- 6 -Fr-oof,
xv - w 7 t 7L-
�,.3L�6
Description project WO
Vate
IDE WAY "rojec, Checkeb,, Sheel No.
s s ENGINEERING Date I z /, / J-� -2 1 O-L-
i NDesign Maps Summary Report
a, mg-, U S G S
User -Specified Iniput
Building Code Reference Document ASCE 7-10 Standard
,(v,,hbch ubla" USGS hazard data ava�lab4 �n 2008.�
Site Coordinates 47.80950N, 122.33045OW
Site Soil Classification Site Class D - "Stiff Soil -
Risk Category VII/111
A V R� _c
T,
LynnWigod
Edmonds! a
Mountlake Teri ace*
of
- ,, � " 1, C4 (4 Bothell
C 0, Indianola *Shoreline
Suquamish XM&W-
USGS-Provided Output
S, = 1.276 g S�a = 1.276 Q Sm = 0.851 o
S. = 0.499 9 S.. = 0.749 9 S,, = 0.499 9
For information on how the SS and S1 values above have been calculated from probabdtstic (nsk-targeted) and
deterministic ground motions in the direction of maximum horizontal response, please return to the application and
select the '2009 NEHRP' building code reference document.
%C,P, Response Spectrum Destgn Response Spectrum
P,Wbm T (soc)
Seismic Design Maps (USGS) JMD
Dare 11/20/17 /701/ , 01
Edmonds Multiunit ShoW Alm
SIDESWAY Dam
C711 r T N) C :: Q T fA C P 7,/, /1-7)
MSFRS Seismic Loads
Seismic Parameters:
Latitude/Longitude
47.8095, -122.33045
Risk Category
1I
(ASCE 7-10, Table 1.5-1)
Importance Factor, 1,
1.00
(ASCE 7-10, Table 1.5-2)
Soils Site Class
D
(Per geotech, else V assumed)
SDS
0.851
(USGS)
SDI
0.499
(USGS)
Seismic Design Category
D
(ASCE 7-10, Table 11.6-1, -2)
Building Properties:
Response Modification Coefficient, R
6.5
(ASCE 7-10, Table 12.2-1)
Overstrength Factor, no
3.0
(ASCE 7-10, Table 12.2-1)
Deflection Amplification Factor, Cd
4.0
(ASCE 7-10, Table 12.2-1)
Fundamental Period, T,
Cthn X
Ct = 0.02 (ASCE 7-10,
0.184
x= 0.75 Table 12.8-2)
k
1
(ASCE 7-10, Section 12.8.3)
Seismic Response Coefficient, C,:
V = 0.044SDSI (Minimum)
0.037
W
v = (SDSIW)/R
0.131
W GOVERNS
V = (S,),I)/RT, (Maximum)
0.418
W
Vertical Distribution of Seismic Forces:
Diaphragm
DL
Area
WDL
Story
WjhjK
W'hx"
Force F),
Sum
Level
(psf)
(ft.,
(kips)
Ht. (ft)
(k-ft)
k
I wihi
(kips)
F.
Roof Framing
20
2272
45.4
19.25
875
0.59
6.09
6.09
2nd Framing
30
2272
68.2
9.1
620
0.41
4.32
10.41
Base Shear (ULT)
Base Shear (ASD)
Diaphragm Design Forces:
E = 113.6 1495 1.00 10.41
14.87 kips
10.41 kips
Diaphragm
w!
I Wi
Fj
I Fj
I Fj - wp,
F., (Min) Fp, (Max)
FPX
Level
(kips)
(kips)
(kips)
(kips)
2: wi '
o.2SDslw,, 0.4SDsIwp,
Govern
Roof Framing
45.4
45.4
6.1
6.1
6.1
5.41 10.83
6.09
2nd Framing
68.2
113.6
4.3
10.4
6.2
8.12 16.24
8.12
s -eismic Loads JMD
3/3012018 17071.01
S, D E 5WAY Fro,-t Edmonds Multiunit Chackod - SheetIvo.
ENGINEER114G Date "21 1 Oq
L—A-rfr0t R'Or
�-,OaoAfjb
-2 (215
--2-71-7' L-/�' = 12, 52
p- -,�? �- /0 q,.) 1- 1,17 :;: �s 1 6
L�,, !& A�Joo �v 1�
F7q:�- to Iva A � z to 10?� 1- 1.
L:�-,J5 0 'A 7qfzO",/z - � -s 6." , "
L- J�tj i�: E)
t�,* - Fzv-"L-6
+
10q. 6 rl
4�>
+
31,
- - L-6
:�77 -�. - I j. I Pl.
q I -sl
Description project lvo.
Project Sheet No-
5 Date
Date
IDE WAY
ENGINEERING
Shear Une#
Lw (ft)
W to Line (Lb)
E to Line (Lb)
SW Ht (ft)
Wall Wt (psf)
Rf/Fl wt (psfl
Dist. to HD (ft)
Wind U.S. plf
EQ U.S. plf
SIDS
SW Needed
Line 1
A
A
B
I
Shear Line#
2
14.5
Lw (ft)
45.9
989
W to Line (Lb)
1978
1523
E to Line (Lb)
3045
10.15
SW Ht (ft)
10.15
9
Wall Wt (psf)
9
is
Rf/FI wt (psf)
15
0.25
Dist. to HD (ft)
0.25
68
Wind U.S. plf
43
105
EQ U.S. plf
66
0.851
SW6
SW Needed
SW6
Gross (W)
I Gross (EQ)
(0.6-DL)
753.031
1159.621
112.8555
8.31 713.801 1099.211 302.1615
3.11 753.031 1159.621 112.8555
igth
Gross (W)
Gross (EQ)i
(0.6*DL)
18.1
443.53
682.78
658.9305
13.9
445.41
685.68
506.0295
1
13.9
445.41
685.68
-
506. 295
0
0.00
0.00
0
gth
Gross (W)
Gross (EQ)j
(0.6*DL)
3.1
7S3.03
11S9.62
112,8555
83
713-80
1099.21
302.1615
3.1
753.03
1159.62
112.8555
0
0.00
0.00
0
Shear Line#
3
Lw (ft)
14.5
SUM OF
W to Line (Lb)
989
3956
E to Line (Lb)
1523
6091
SW Ht (ft)
10.15
Wall Wt (psq
9
Rf/Fl wt (psf)
15
Dist. to HD (ft)
0,25
Wind U.S. plf
68
EQ U.S. plf
105
SW Needed
SW6
(.6,14sds)DL
ULFA (W)
Net (W)l
ULFA (EQ)j
Net (EQ)
90.4
01
640.171
0.001
1069.17
Holdown Req'd
MST 37
242.2
1 411.641
1 857.05
Holdown Req'd
MST 37
90.4
1 640.171
1069.17
Holdown Req'd
MST 37
0.0
1 0.001
1 0.00
Holdown Req'd
0.0
1 0.001
1 0,001
Holdown Rea'd
I
(.6-.14sdS)DLULFA(W)j
Net (W)JULFA(EQ)l
Net (EQ)
528.1
01
-215.4
0.001
154.7
Holdown Req'd
---- _
Neglible, No HD Req'd
405.5
1 -60.621
1 280.13
Holdown Req'd
Neglible, No HD Req'd
405.5
1 -60.621
1 280.13
Holdown Req'd
Neglible, No HD Req'd
0.0
1 0.001
1 0.00
Holdo n Req'd
I
(.fi-.14sds)DL
ULFA (W)l
Net (W)
I ULFA (EQ)
I Net (EQ)
90.4
01
640.171
0.001
1069.17
-
Holdown Req'd
MST37
242.2
4
857.05
Holdown Req'd
MST 37
90.4
T-640.171
11069.17
Holdown Req'd
MST 37
0.0
0.001
1
0.00
Holdown Reci'd
-
Proffict h/O.
Shear Wall Design -
Roof Level Lines 1, 2, and 3 Dwe 3/30/2018 17071.01
IDE WAY Edmonds MultiUnit Cha�2ked
1 ENGINEERING I Owe 06
Shear Line#
Lw (ft)
W to Line (Lb)
E to Line (Lb)
SW Ht (ft)
Wall Wt (psf)
Rf/Fl wt (psf)
Dist. to HD (ft)
Wind U.S. plf
EQ U.S. plf
SDS
SW Needed
Line A
A
26.6
1359
3045
10.15
9
is
0.25
51.1
114.5
0.851
SW6
Shear Line#
Lw (ft)
W to Line (Lb)
E to Line (Lb)
SW Ht (ft)
Wall Wt (psq
Rf/F1 wt (psf)
Dist. to HD (ft)
Wind U.S. plf
EQ U.S. plf
SW Needed
B
24.5
1359
3045
10.15
9
15
0.25
55.5
1243
SW6
SW#
Trib
Length
Gross (W)
Gross (EQ)
(0-.6'-DL)f
(.Ei--14,.d,)DL
UL��
(W)
I ULFA (EQ)j
Net (EQ)
1
10.9
13.3
528.50
1184.17
1010-8671
810.1
01
-482.371
0.001
374.02
1
Holdown Req'd SW I
Negligible, No HD Req'd
2
10.8
0.00
0.00
01
0.0
6.66F-
6.66
21
Holdown Req'd SW 2
31
10.8
13.3
528.50
1184.17
1010.867
810.1
-482.371
1 374.02
3
Holdown Req'd SW 3
Negligible, No HD Req'd
4
0
-----o
0.00
0.00
--
OF
0,0
0.001
1 0.00
4
1
1
1
Holdown Req'd SW 4
5
0
01
0.001
0.001
01
0.0
1 0.001
1 0.00
51
Holdown Req'd SW 5
Line
B
#
Trib
Length
Gross (W)
Gross (EQ)
(0.6*DL)i
(.6-.14sdS)DL
ULFA (W)
Net (W)
I ULFA (EQ)j
N'et (EQ)
1
8.5
4.75
594.29
1331.58
311.86131
249.9
282.431
1 1081.65
1
Holdown Req'd SW 1
MST 24
2
10.3
3.1
612.40
1372.16
228.64051
183.2
383.76]
1188.92
2
Holdown Req'd SW 2
MST 24
3
10.3
4.4
596.93
1337.49
324.5221
260.1
T-272.411
11077.41
3
Holdown Req'd SW 3
MST 24
4
10.3
4.4
596.93
1337.49
324.S221______
260.1
1
272.411
11077.41
41
Holdown Req'd SW 4
MST 24
5
10.3
3.1
612.40
1372.16
228.6TOT5
183.2,
1
383.761
1
1188.92
S
Holdown Req'd SW 5
MST 24
6
8.5
4.75
594,291
1331.58
311.86131
249.91
1
282.431
1
1081.6S
6
1
1
1
Holdown Req'd SW 51
_ _
MST 24
-
IDE WAY
ENGINEERING
D9=7pon
Shear Wall Design
Root LVL Lines A and B
BY
JMD
p/qkv Na
17071.01
Daw 3/30/2018
Edmonds MultiUnit
Chock6d
Ca'a
Sheaf ft.
cq-7
Shear Une# 1
Lw (ft) 19.7
W to Line (Lb) 2282
E to Line (Lb) 2603
SW Ht (ft) 9.1
Wall Wt (psf) 9
Rf/Fl wt (psf) 20
Dist. to HD (ft) 0.5
Wind U.S. plf 115.8
EQ U.S. plf 132.1
SDS 0.851
SW Needed SW6
Line 1
Shear Line# 2
Lw (ft) 39
W to Line (Lb) 4565
E to Line (Lb) 5205
SW Ht (ft) 9.1
Wall Wt (psf) 9
Rf/Fl wt (psf) 20
Dist. to HD (ft) 0.5
Wind U.S. plf 117.1
EQ U.S. plf 133.5
SW Needed SW6
Shear Line# 3
Lw (ft) 13.4 SUM OF
W to Line (Lb) 2282 9129
E to Line (Lb) 2603 10411
SW Ht (ft) 9.1
Wa I I Wt (Psf) 9
Rf/Fl wt (psf) 20
Dist. to HD (ft) 0.5
Wind U.S. plf 170.3 0.991325
EQ U.S. plf 194.3
SW Needed SW6
SW#
Trib
Length
Gross (W)
Gross (EQ)
(0.6*DL)i
(.6-14sds)DL
ULFA (W)
Net (W)
ULFA (EQ)
Net (EQ)
A
5
8.3
1121.69
1279.48
452.9311
363.0
411.64
1080.40
857.05
1773.53
A
Holdown Req'd
LSTH8RJ
B
5
5.1
1168.70
1333.10
278.307f
223.0
640.17
1530.57
1069.17
2179.22
B
Holdown Req'd
LSTHD8FU
C
5
6.3
1144.99
1306.06
343.7911 275.5
801.201 1 1030.53
C
Holdown Req'd
LSTH8RJ
D
0
0
0.00
0100
01
0.0
0.001
1 0.00
D
I
I Holdown Req'd
E
0
0
o-ooL
nol
ol
0.0
1 0.001
1 0.00
E
Holdown Req'd
Line 2
#
Trib
Length
.-Gross (W)
Gross (EQ)
(0.6*DL)
(.6-.14sds)DL
ULFA (W)
Net (W)
ULFA (EQ)
Net(EQ)
A
9.5
18.1
1095.43
1249.00
1476.417
1183.2
0.001
-380.99
154.rc)l
720.44
A
Holdown Req'd
Negligible, No HD Req'd
8
5.8
12.2
1110-69
1266.40
724.314
580's
0
1 386.371
280.131
966.05
B
Holdown Req'd
LSTHD8RJ
C
5.8
8.7
1130.12
1288-55
516.519
414.00
J_
28013F,154.73
C
Holdown Req'd
_ _613.601
LSTHD8RJ
D
0
0
0.00
0.00
0
0.01
1 0.0c)
DI
I
Holdown Req'd
-0.001
Line 3
#
Trib
Length
Gross (W)
Gross (EQ)
(0.6*DL)
(.6-.14sds)DL
ULFA JW)
Net (W)
ULFA (EQ)
Net (EQ)
A
5
8.3
1649.06
1881.02
4S2.931
363 0
11.641
1607.76
857.05
2375.08
A
Holdown Req'd
STHD10RJ
8
5
5.1
1718.16
1959.85
278.307
2210
640.17 1
2080.03
1069.17
2805.98
BI
Holdown Req'd
STHD10RJ
C
0
0
0.00
0.00
0
0.0
O.00l-
1 0.00
C
Holdown Req'd
D
0
0
0.00
0.00
01
0.0
0-00]�
0.00
D
Holdown Req'd
......
IDE WAY
ENGINEERING
Description
Shear Wall Design
Floor Lines 1, 2, and 3
JMD
3/30/2018
pmjm Iva
17071.01
Project Edmonds MultiUnit
Checked
Dare
Sheet Na.
Shear Line#
A
Shear Line#
a
Lw (ft)
36
Lw (ft)
31.4
W to Line (Lb)
2236
W to Line (Lb)
4256
E to Line (Lb)
3586
E to Line (Lb)
6824
SW Ht (ft)
9.1
SW Ht (ft)
9.1
Wall Wt (psq
9
Wall Wt (psf)
9
Rf/Fl wt (psf)
20
Rf/F1 wt (psf)
20
Dist. to HD (ft)
0.5
Dist. to HD (ft)
0.5
Wind U.S. plf
62.1
Wind U.S. pif
135.5
EQ U.S. plf
99.6
EQ U.S. plf
217.3
SDS
0.851
SW Needed
SW6
SW Needed
SW6
vv
-fi PL- t:
Line A
SW#
Trib
Length
Gross(W)
Gross(EQ)
(0.6*DL)l
(.6-.14sds)DL
ULFA(VJ)j
Net (W)JULFA(E�)j
Net (EQ)
1
2
4.2
641.59
1028.96
153.5941
123.1
0 1
488.001
_��,001
905.86
1
Holdown Req'd SW 1
No HD Req'd, See Ab;�
2.
2
9.3
597.33
957.96
340.1011
272.6
0 1
257.221
374.0211059.42
2
Holdown Req'd SW 2
No HD Req'd, See Abv
3
2
9
S98.46
959.78
329.131
263.8
0.00
1 269.331
0.001
696.01
3
Holdown Req'd SW 3
No H D Req'd, See Abv
4
2
9.3
597.33
957.96
340,1011
272.6
0
1 257.221
374.0211059.42
41
Holdown Req'd S 4
No HD Req'd, See Abv
51
2
4.2
641.59
1028.96
153.5941
123.1
0
1 488.001
01
90536
Holdown Req'd SW 5
No HD Req'd, See Abv
Line
B
#
Trib
Length
Gross (W)
Gross (EQ)
(0.6*DL)i
(.6-.14sds)DL
ULFA (W�-Net
(W)
I ULFA (EQ)j
Net (EQ)
1
4
11.3
1290.53
2069.21
548.8411
439.9
282.43
024.121
1081.6.51
2711.00
1
Holdown Req'd SW 1
STHD10RJ
2
4
4.4
1391.56
2231.20
211708
171.3
1 1177.851
12059,93
21
Holdown Req'd SW 2
LSTH DS RJ
31
4
4.4
1391.56
2231.20
213.708
1713
1 1177.851
1_ 2059,93
3
Holdown Req'd SW 3
LSTHD8RJ
4
4
11.3
1290.53
2069.21
548.841
439.9
1 741.691
11629.35
4
1
L
Holdown Req'd SW 4
LSTHD8RJ
5
4
0
0.001
0.001
0
0.0
0.0
0.00
5,
I
I
Holdown Req'd SW 5
-
Descrquan
Shear Wall Design
ey
JMD
ProOcr Ab.
DaM - -- --
17Z�
S 5
Floor Lines A and B
3130120111
IDE WAY
MultiUnit
Chftked
Shoot No.
Edmonds
lz,ori
are
ENGINEERING
W 77 � -7 /7-/� PL F
V—Z Aif
7Yp f,- 3�- —Fo r .d C-_ 12f-,
&A(-- IS&ZL-L �-,
I p (7") -Zl 6 1>0, 7i, P FLA-, C I
-vi-
L2,
OrA A i>coaw�-r-,-
t - V�-r
Description By Project No.
Date I t 7(2-7( Of
IDE5WAY Pro'ect KA,� L-- -r Checked Sheet No.
5. ENGINEERING I I Date —Z. I
MS-c 37
N)5T 21
SwE
-CO6
yc
M
G
ROOF
all
6
5t->4
5WI.-
m
tAAr.rJ FLooz. "rga, -- mA Lz. wP
Z-[2_
After recording return to:
City Clerk
City of Edmonds
121 Fifth Avenue North
Edmonds, WA 98020
Document Title(s)
Declaration of Covenant - Private Stormwater Facility
Reference Number(s) of Related Documents
City of Edmonds (permit number)
Grantor(s) (Ust, First and Middle Initial)
Grantee(s) ("st. Firstand Middle Initial)
City of Edmonds
Legal Description (abtxeviated fonn, i,e- 101, plAt or Section, township, range. quarter/quarter)
Assessor's Property Tax Parcel/Account Number at the Time of Recording:
c., cl C) C> -2- 0 0 3
The Auditor/Recorder win reky on the information provided art this form. The staff will not rvad tile document to vcrifv� the accuracy or
completeness of tile indexing informal ion provided herein.
DECLARATION OF COVENANT
Private Stormwater Facility
WHEREAS, the undersigned.Declarant(s) have installed one or more stormwater
facilities under Edmonds Community Development Code Chapter 18.30 known as a "Jow impact
development best management practices (LID BMP)" as selected below:
Q Permeable Pavement
13 Rain Garden / Bioretention Cell
A Drywell
X Infiltration Trench
13 Gravelless Chamber
U Other -
WHEREAS, the City of Edmonds has allowed installation of the LID BNW, subject to the
execution and recording of this Declaration of Covenant; NOW, THEREFORE,
THE UNDERSIGNED DECLARANT(S), being the owners of thereal property ("the
Property") located at the following address-, -�_6cj 0J —7 ^4 AVF— vi
__ in the City of
Edmonds, Washington, and legally described on -Exhibit A attached hereto and incorporated
herein by this reference as if set forth in full, hereby covenants and agrees, on behalf of
himself/hei-self/theinselves/it,self,ind llis/her/their/its successors and assigns, as follows:
Declarant(s) warrant that be/she/they are the owners of the property described on Exhibit
A and have the authority to impose this covenant on the property and bind all future owners,
successors. and assigns of the Declarant(s). The Declarant(s), future owners, successors,
and assigns of the Declarant(s) shall be referred to collectively as "Owners."
2. The Owners of the Property agree that the Property contains one or more stortriwater
management facilities referred to as an "LID BMP," which was installed to mitigate the
stormwater quantity and quality impacts of some or A of the impervious or non-native
pervious surfaces on the property. "Low impact development" means development
conducted in a way that seeks to minimize or completely prevent alterations to the natural
hydrology of the site. Low impact development includes site planning and design to reduce
alterations of natural soil and vegetation cover, minimize impervious surfaces, and specific
practices that help to replicate natural hydrology such as permeable pavements, green
roofs, soil amendments, bioretention systems, and dispersion of runoff,
1 The Owners shall maintain the size, placement, and design of the LID BM.P as depicted on
the approved site plan, Exhibit B, and design details shall be maintained and may not be
changed without written approval either from the Engineering Division of the City of
Edmonds or through a future development permit fi-om the. City of Edmonds. Chemical
fertilizers and pesticides shall not be used where LID BMP is located. All costs of
maintenance and repair shall be the sole responsibility of the Owners.
4. The Owners shall inspect LID BMPs annually for physical defects. After major storm
events, the system shall also be checked to ensure that the overflow system is working
properly. The Owners also shall maintain all LID BN/1Ps so they function as designed on a
year-round basis,
The City of Edmonds is hereby granted by the Owners the right, but not the obligation, to
enter upon the Property described on Exhibit A at all reasonable times for the purpose of
inspecting theprivate stormwater LID BMP facility. If, as the result of any such inspection,
the City of Edmonds determines that the LID BN4P is in disrepair, requires maintenance or
repair, or is otherwise not functioning as provided in the BMP site plan, the City Engineer
or his designee shall have the right, but not the obligation, to order the Owners to maintain
or repair the same.
6. If the City of Edmonds determines that the LID BMP requires maintenance or repair
pursuant to Section 5, the City of Edmonds shall proxide notice to the Owners of the
deadline within which such maintenance or repair must be completed- Said notice may
further advise that, should the violator fail to perforrn required maintenance or make repairs
within the established deadline, the work may be done by the city or a contractor designated
by the City Engineer and the expense thereof shall be charged to the Owners. The City's
officers, agents, employees, and contractors shall have the right, which is hereby granted
by the Owners, to enter upon the Property described on Exhibit A in order to perform such
work. The Owners shall bear the cost of all work performed.
7. The Owners shall indemnify, defend and hold harmless the City of Edmonds. its officers,
officials, employees and agents fi-om any and all claims, demands, suits, penalties, losses,
damages.
Judgments, attorneys' fees and/or costs of any kind whatsoever, arising out of or
in any way resulting from the approval of the LID BMP(s), the installation and presence
of the LID BMP(s), and the acts or omissions of the Owners, their officers, employees,
contractors, and agents relating to the construction, operation and maintenance of the LID
BMP(s) on the Property, except for the City's intentional and willful tortious acts, and
waive and release the City of Edmonds from any and all claims for damages and injunctive
relief which the Owners may themselves have now or in the future, by reason of the
construction, maintenance and operation of said LID BNT(s).
8. This covenant shall run with the land and be binding upon the Owners
0
Dated: 8.) -L
DECLARANT(S)-
(Signatire)
0MA-1F-k— C-U/-AAlr'fC-25
(Print Name)
(Signature)
(Print Name)
State of Washington
SS.
County of Snohomish
APPROVED:
CITY OF EDMONDS
(Signature)
(Print Name)
(Title)
On this day personally appeared before me I'Apt
fDeclarant(s)) to ine known to be the individual ', or individuals descrit in and who executed
the within and foregoing instrument, and acknowledged tha lie she/they signed the same as
,a
(S,�her/their free and voluntary act and deed, for the uses and purposes therein mentioned.
SUBSCRIBED AND SWORN before me this ZY j day of 201%.
FEMILY MULKA
NOTARY PUBLIC
STATE OF WASHINGTON
mycommissicon Expires September 9.2 0
(Signature)
(Name legibly printed or stamped)
Notary Pubfic in and for the State of Washington.
Residing at: t<t kke-,ok
My commission expires - o 9 62 q A C) X")
Exhibit A
Legal Desciiption
THE NORTH 75 FEET OF THAT PORTION OF LOT 3. BLOCK 2. SEATTLE HEIGHTS DIVISION 4, LYING WITHIN
THE SOUTH HALF OF SAID BLOCK 2, SEATTLE HEIGHTS DIVISION 4, ACCORDING TO THE PLAT THEREOF
RECORDED IN VOLUME 9 OF PLATS, PAGE 11, RECORDS OF SNOHOMISH COUNTY, WASHINGTON.
Exhibit B
Site Plan
'
|!
` /
k
»
-- -- ------- -- -- -
�STORMTECH
� DRAINAGEPROPOSED BLDG
� `^
' \\ MAIN ^-^' FACILITY
\ -~ ��
- -
+
`
�
\ \ -
| `--URfWELL
CB TYPE I(TYP)
CB TYPE |
EXHIBIT B
SC-740 END CAP
SC-740 CH
ADS 601T OR EQUIVALENT
OVER ENTIRE jSOLATOR ROW
AASHTO M288 CLASS 2
NON -WOVEN GEOTEXTILE
K
2 LAYERS OF ADS 315 FILTER FABRIC
ON BOTTOM OF ISOLATOR ROW
DESIGN ENGINEER IS RESPONSIBLE FOR-J
ENSURING SUITABILITY OF SUBGRADE SOILS*
aj0-RMTECq--.%Q
.DETAIL
GRANULAR WELL GRADED SOIL/AGGREGATE MIXTURES,
I"
<35% FINES. COMPACT IN 6 IN LIFTS TO 957. PROCTOR DENSITY.
SEE THE TABLE OF ACCEPTABLE FILL MATERIALS IN
STORMTECH'S DESIGN MANUAL, INSTALLATION MANUAL,
OR ftlk STORM TECH, COM.
PAVEMENT
SEE DETAIL
6, 1- 51 "
7
97.25 MIN
-j 96.00
6"MIN. 95.50
30'
92.50
LDEPTH
OF STONE
TO BE DETERMINED
BY DESIGN ENGINEER
6" MIN.-
12" MIN. TYP.
*SEE STORMTECH'S DESIGN MANUAL
EXHIBIT C
Catch Sa*in
Cv�ucl Ora"
f low
DRY WELL
36 1 rv,,,h Dia meluar
H91e Ffliedwith
PLAN VIEW
NTS
1 V2- 3Washed
Drain ock
MWkCftftr0fHQ1e
with 1'Capped FVC
or Qlher ryeams
Topl-al
Flt4hwftb Strface-
J�ow
Fine fbvlesh Scamiem Min. d aL
P111C ipe
(WC4 DrsdN
36 1 nrh Dia meter
Sides W Hole
Hole Fiffedwith
Urvedwah
1112-XWazhed
FifterFabric
Drain A ock
DETAIL
Mk,.
DRY WELL
SECTION
EXHIBITD
Prescriptive Energy Code Compliance for All Climate Zones in Washington
Project Information Contact Information
Edmonds -Multi Unit Neil Jorgensen
20904 72ND AVE W Units 101, 102,201 & �02 J3 Architects LLC
EDMONDS, WA 98026 1 206.412.9296
This project will use the requirements of the Prescriptive Path below and incorporate the
the minimum values listed. In addition, based on the size of the structure, the appropriate
number of additional credits are checked as chosen by the permit applicant.
Authorized Representative
All Climate Zones
R-Value a
U-Factor a
Fenestration U-Factofb
n/a
0.30
Skylight U-Factor
n/a
0.50
Glazed Fenestration SHGCb,e
n/a
n/a
Ceilingk
44
0.026
Wood Frame Wallg,m,n
21 int
0.056
Mass Wall R-Value'
21/21 h
0.056
Floor
309
0.029
Below Grad Wall"m
10/15/21 int + TB
0.042
JSlab d R-Value & Depth
10, 2 ft
n/a
*Table R402.1.1 and Table R402.1.3 Footnotes included on Page 2.
Date
Each dwelling unit in a residential building shall comply with sufficient options from Table R406.2 so as to achieve
the following minimum number of credits:
1. Small Dwelling Unit: 1.5 credits
Ll Dwelling units less than 1500 square feet in conditioned floor area with less than 300 square feet of fenestration
area. Additions to existing building that are greater than 500 square feet of heated floor area but less than 1500
square feet.
[]2. Medium Dwelling Unit: 3.5 credits
All dwelling units that are not included in #1 or #3. Exception: Dwelling units serving R-2 occupancies shall
require 2.5 credits.
LJ3. Large Dwelling Unit: 4.5 credits
Dwelling units exceeding 5000 square feet of conditioned floor area.
Additions less than 500 square feet: .5 credits
Table R406.2 Summary
Option Description
Credit(s)
I a
Efficient Building Envelope 1 a
0.5
1 b
Efficient Building Envelope 1 b
1.0
1 c
Efficient Building Envelope 1c
2.0
1 d
Efficient Building Envelope ld
0.5
2a
Air Leakage Control and Efficient Ventilation 2a
0.5
2b
Air Leakage Control and Efficient Ventilation 2b
1.0
2c
Air Leakage Control and Efficient Ventilation 2c
1.5
3a
High Efficiency HVAC 3a
1.0
3b
High Efficiency HVAC 3b
1.0
3c
High Efficiency HVAC 3c
1.5
3d
High Efficiency HVAC 3d
1.0
4
High Efficiency HVAC Distribution System
1.0
5a
Efficient Water Heating 5a
0.5
5b
Efficient Water Heating 5b
1.0
5c
Efficient Water Heating 5c
1.5
5d
Efficient Water Heating 5d
0.5
6
Renewable Electric Energy
0.5
Total Credits
*Please refer to Table R406.2 for complete option descriptions
1-1
El
0
Ll
El
F-1
L1
Ll
L1
0
L1
Q 1.5
'0'.0
12 0 0 kw h
2-fta
MAY 14 ZM8
BtALDING DEPARTMENT
CITY OF EDMONDS
Table R402.1.1 Footnotes
For SI: I foot.= 304.8 mm, ci .= continuous insulation, int.= intermediate framing.
a R-values are minimums. U-factors and SHGC are maximums. When insulation is installed in a cavity which is
less than the label or design thickness of the insulation, the compressed R-value of the insulation from
Appendix Table A101.4 shall not be less than the R-value specified in the table.
b The fenestration U-factor column excludes skylights. The SHGC column applies to all glazed fenestration.
C 1110/15/21.+T13" means R-10 continuous insulation on the exterior of the wall, or R-15 on the continuous
insulation on the interior of the wall, or R-21 cavity insulation plus a thermal break between the slab and the
basement wall at the interior of the basement wall. "10/15/21.+TB" shall be permitted to be met with R-13
cavity insulation on the interior of the basement wall plus R-5 continuous insulation on the interior or exterior
of the wall. "10/13" means R-10 continuous insulation on the interior or exterior of the home or R-13 cavity
insulation at the interior of the basement wall. '713" means thermal break between floor slab and basement
wall.
R-10 continuous insulation is required under heated slab on grade floors. See R402.2.9.1.
There are no SHGC requirements in the Marine Zone.
Reserved.
Reserved.
Reserved.
The second R-value applies when more than half the insulation is on the interior of the mass wall.
Reserved.
For single rafter- or joist -vaulted ceilings, the insulation may be reduced to R-38.
Reserved.
,n Int. (intermediate framing) denotes standard framing 16 inches on center with headers insulated with a
minimum of R-10 insulation.
Nonfenestration U-factors shall be obtained from measurement, calculation or an approved source or as
specified in Section R402.1.3.
..........
IDE WAY
5. 5
ENGINEERING
20305 87th Ave. W.
Edmonds, WA 98026
(425) 673-4160
April 13, 2018
Douglas Beck, PE, SE
Beck & Associates, PLLC
16425 S.E. 66th Street
Bellevue, WA 98006
Subject: Permit #BLD17-1835, Structural Comment Response
Project: Edmonds Multi -Unit, 20904 72nd Avenue W., Edmonds
Douglas,
Itemized below are responses to the structural review comments provided in your review dated January 14th, 2018.
1. 3/4" gyperete topping has been added on the upper floor as detailed in the architectural drawings. The
calculation package has been updated in its' entirety to account for this additional weight.
2. The beams adjacent to the stairwell are called out at the cantilevered end. Please refer to S2.2.
3. Refer to architectural drawings and details for siding and deck weatherproofing system.
4. Detail 11 on Sheet S4.2 has been added for clarification at the deck/beam condition.
5. Detail 7 on Sheet S4.3 has been added for clarification at the roof step condition.
Please feel free to contact me if there are any additional questions or concerns.
Sincerely,
Chris Bernards, PE, SE, LEED AP
Principal
A_114�?Iff
P"11
MAY 14 2018
R1 oil rl'Na QFRARTA
.. 4-h[T
Edmonds Multi -Unit Correction Notice
Sidesway Project No. 17071.01
e
Site Improvement Bond Quantity Worksheet Web date: 11/21/2005
King County SCANNED
RCTJ9 2#18
Department of Development & Environmental Services
900 Oakesdale Avenue Southwest
Renton, Washington 98055-1219 For alternate formats, call 206-296-6600.
206-296-6600 TTY 206-296-7217
Project Name: Cummings Development - 4 Unit Apartment Date: 4/30/2018
Location: 20904 72nd Ave. W. Edmonds, WA Project No.: BLD20171835
Activity No.:
Clearing greater than or equal to 5,000 board feet of timber?
yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
?009MAOM 90WO
PW f 105C = ib45104#44P
1W5KCTffM AW - 4-4363-01
Copy of Bond Qty_l 81026
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from IRS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
APPHOVEU AS NOTELI
BY E e
qEERING
1001^10%ld W If'I
-4-91 d= E it I -Z ---& &
Date: � :
GINITY GORY
Unit prices updated: 02/12/02
Version: 04/22/02
Report Date: 10/29/2018
Site Improvement Bond Quantity Worksheet Web date: 11/21/2005
Reference #
Unit
Price
Unit
Quantity
# of
Applications
Cost
EROSION/SEDIMENT CONTROL
Number
Backfill & compaction -embankment
ESCA
$ 5.62
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 67.51
Each
Crushed surfacing 1 1/4" minus
ESC-3
WSIDOT 9-03.9(3)
$ 85.45
CY
Ditching
ESC-4
$ 8.08
CY
Excavation -bulk
ESC-5
$ 1.50
CY
Fence, silt
ESC-6
SWIDM 5.4.3.1
$ 1.38
LF
400
1
552
Fence, Temporary (NGPE)
ESC-7
$ 1.38
LF
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.59
SY
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 1.45
SY
Mulch, by hand, straw, 3" deep
ESCA 0
SWDM 5.4.2.1
$ Z01
SY
Mulch, by machine, straw, 2" deep
ESCA 1
SWIDM 5.4.2.1
$ 0.53
SY
900
1
47
Piping, temporary, CPP, 6"
ESCA 2
$ 10.70
LF
Piping, temporary, CPP, 8"
ESC-13
$ 16.10
LF
Piping, temporary, CPP, 12"
ESC-14
$ 20.70
LF
Plastic covering, 6mm thick, sandbagged
ESCA 5
SWIDM 5,4.2.3
$ 2.30
SY
Rip Rap, machine placed; slopes
ESC-16
WSIDOT 9-13.1(2)
$ 39.08
CY
Rock Construction Entrance, 50'xl5'xl'
ESCA 7
SWIDM 5.4.4.1
$ 1,464.34
Each
1
1464
Rock Construction Entrance, 1 00'xl 5'xl'
ESC-18
SWIDM 5.4.4.1
$ 2,928.68
Each
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 1,949.38
Each
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 17.91
LF
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWIDM 5.4.5.1
$ 68.54
LF
Seeding, by hand
Sodding, 1" deep, level ground
ESC-22
SWIDM 5.4.2.4
$ 0.51
SY
ESC-23
SWDM 5.4.2.5
$ 6.03
Sy
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 7.45
SY
TESC Supervisor
ESC-25
$ 74.75
HR
Water truck, dust control JESC-26
SWIDM 5.4.7
$ 97.75
HR
WRITE -IN -ITEMS **** (seepg_qe_91
Inlet Protection
$ 100.00
Each
3
1
300
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
Copy of Bond Qty_181026
$ 2,793.34
$ 838.00
$ 3,631.34
A
Unit prices updated: 02/12/02
Version: 04/22/02
Report Date: 10/29/2018
Site Improvement Bond Quantity Worksheet
Web date: 11/21/2005
Existing
Right -of -Way
Future Public
Road Improvements
& Drainage Facilities
Private
Improvements
Quantity Completed
(Bond Reduction)*
Unit rice
Unit
Quant.
Cost
Quant.
Cost
QuantT
Cost
EQuant.
Com lqete
Cost
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1
$ 5.62
CY
Backfill & Compaction- trench
GI - 2
$ 8.53
CY
Clear/Remove Brush, by hand
GI - 3
$ 0.36
SY
Clearing/Grubbing/Tree Removal
GI - 4
$ 8.876-16
Acre
0.17
1,508.95
Excavation - bulk
G1 - 5
$ 1.50
CY
Excavation - Trench
GI - 6
$ 4.06
CY
Fencing, cedar, 6' high
GI - 7
$ 18.55
LF
Fencing, chain link, vinyl coated, 6' high
GI - 8
$ 13.44
LF
Fencing, chain link, gate, vinyl coated, 2
GI - 9
$ 1,271.81
Each
Fencing, split rail, 3' high
GI - 10
$ 12.12
LF
Fill & compact - common barrow
GI - 11
$ 22.57
CY
Fill & compact - gravel base
GI - 12
$ 25.48
CY
Fill & compact - screened topsoil
G1 - 13
$ 37.85
CY
Gabion, 12" deep, stone filled mesh
Gi - 14
$ 54.31
SY
Gabion, 18" deep, stone filled mesh
GI - 15
$ 74.85
SY
Gabion, 36" deep, stone filled mesh
GI - 16
$ 132.48
SY
Grading, fine, by hand
GI - 17
$ 2.02
SY
Grading, fine, with grader
GI - 18
$ 0.95
SY
Monuments, TIong
GI - 19
$ 135.13
Each
Sensitive Areas Sign
GI - 20
$ 2.88
Each
Sodding, 1 "deep, sloped ground
GI - 21
$ 7.46
SY
Surveying, line & grade
GI - 22
$ 788.26
Day
Surveying, lot location/lines
GI - 23
$ 1,556.64
Acre
Traffic control crew ( 2 flaggers;
GI - 24
$ 85.18
HR
20
1,703.60
Trail, 4" chipped wood
GI - 25
$ 7.59
SY
Trail, 4" crushed cinder
GI - 26
$ 8-33
SY
Trail, 4" top course
GI - 27
$ 8.19
SY
Wall, retaining, concrete
GI - 28
$ 44.16
SF
Iwall, rockery
GI - 29
$ 9.49
SF
Page 3 of 9
SUBTOTAL
1,703.60
1,508.95
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 4/22/02
Copy of Bond Qty_l 81026 Report Date: 10/29/2018
Site Improvement Bond Quantity Worksheet
Web date: 11/21/2005
Existing
Right-of-way
Future Public
Road Improvements
& Drainage Facilities
Private
Improvements
Bond Reductl
Quant.
Unit Price
Unit
Cost
Quant. Cost
Quant. Cost
Completel
Cost
ROADIMPROVEMENT
No.
AC Grinding, 4'wide machine < I 000sy
RI - 1
$ 23.00
SY
AC Grinding, 4'wide machine 1000-200C
Rl - 2
$ 5.75
SY
AC Grinding, 4'wide machine > 2000sy
RI - 3
$ 1.38
SY
AC Removal/Disposal/Repair
RI - 4
$ 41.14
SY
Barricade, type I
RI - 5
$ 30.03
LF
Barricade, type III ( Permanent
Rl -6
$ 45.05
LF
Curb & Gutter. rolled
RI - 7
$ 13.27
LF
Curb & Gutter, vertical
RI -8
$ 9.69
LF
75
726.75
Curb and Gutter, demolition and disposal
RI - 9
$ 13.58
LF
Curb, extruded asphalt
R1 - 10
$ 2.44
LF
Curb, extruded concrete
RI - 11
$ 2.56
LF
188
481.28
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
200
370.00
Sawcut, concrete. per 1 " depth
RI - 13
$ 1.69
LF
Sealant, asphalt
RI - 14
$ 0.99
LF
200
198.00
Shoulder, AC, ( see AC road unit price
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 7.53
SY
Sidewalk, 4" thick
RI - 17
$ 30.52
SY
36
1,098.72
Sidewalk, 4" thick, demolition and dispos
RI - 18
$ 27.73
SY
Sidewalk, 5" thick
RI - 19
$ 34.94
SY
18.7
653.38
Sidewalk, 5" thick, demolition and dispos
Rl - 20
$ 34.65
SY
Sign, handicap
RI - 21 1
$ 85.28
Each
1
85.28
Striping, per stall
RI - 22
$ 5.82
Each
8
46.56
Striping, thermoplastic for crosswalk
RI - 23
$ 2.38
SF
100
238.00
Striping, 4" reflectorized line
Rl - 24
$ 0.25
LF
Page 4 of 9
SUBTOTAL
3,046.85
851-12
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 4/22/02
Copy of Bond Qty_l 81026 Report Date: 10/29/2018
Site Improvement Bond Quantity Worksheet
Web date: 11/21/2005
Existing
Right-of-way
Future Public
Road Improvements
& Drainage Facilities
Private
Improvements
Bond Reduction*
Quant.
Cost
Unit Price
Unit
Quant. Cost
Quant. I Cost
Quant, Cost
_22m2letel
ROAD SURFACING (4" Rock= 2.5 base& 1.5" top course) For'93 KCRS 6.5" Rock= 5" base& 1.5" top course)
For KCRS'93, (additional 2.5" base) add
IRS - 1
$ 3.60
SY
AC Overlay, 1.5" AC
IRS - 2
$ 7.39
SY
AC Overlay, 2" AC
RS - 3
$ 8.75
SY
AC Road, 2", 4" rock, First 2500 SY
RS - 4
$ 17.24
SY
AC Road, 2", 4" rock, Qty. over 2500SY
RS - 5
$ 13.36
SY
AC Road, 3", 4" rock, First 2500 SY
RS-6
$ 19.69
SY
64
1,260.16
278
5,469.44
AC Road, 3", 4" rock, Qty. over 2500 SY
RS - 7
$ 15.81
SY
AC Road, 5", First 2500 SY
RS - 8
$ 14.57
SY
AC Road, 5", Oty. Over 2500 SY
RS-9
$ 13.94
SY
AC Road, 6", First 2500 SY
RS- 10
$ 16.76
SY
AC Road, 6", Qty. Over 2500 SY
RS - 11
$ 16.12
SY
Asphalt Treated Base, 4" thick
RS - 12
$ 9.21
SY
Gravel Road, 4" rock, First 2500 SY
RS - 13
$ 11.41
SY
Gravel Road, 4" rock, Qty. over 2500 SY
IRS - 14
$ 7.53
SY
PCC Road, 5", no base, over 2500 SY
RS - 15
$ 21.51
SY
PCC Road, 6", no base, over 2500 SY
RS - 16
$ 21.87 1
SY
Thickened Edge I
RS - 171
$ 6.89 1
LF I
I
Page 5 of 9
SUBTOTAL
1.260.16
5,469.44
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 4/22/02
Copy of Bond Qty_181026 Report Date: 10/29/2018
Site Improvement Bond Quantity Worksheet
Webdate: 11/21/2005
Existing
Right-of-way
Future Public
& Drainage Fac,litles
Road Improvements]:
Private
Improvements
Bond Reduction*
Quant
lete
Cost
T--Unit
Price
Unit
Quant. T Cost
Quant. I C ost
Q uant. Cost
.9=
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4'cover was assumed. Assume perforated PVC is same price as solid pipe.
Access Road, R/D
D - 1
$ 16.74
SY
T
Bollards - fixed
D - 2
$ 240.74
Each
Bollards - removable
D - 3
$ 452.34
Each
* (CBs include frame and lid)
CB Type I
D-4
$ 1,257.64
Each
2
2,515.28
CB Type IL
D - 5
$ 1,433.59
Each
CB Type 11, 48" diameter
D-6
$ 2,033.57
Each
2
4,067.14
1
2,033.57
for additional depth over 4'
D - 7
$ 436.52
FT
10
4,365.20
2
873.04
CB Type 11, 54" diameter
D - 8
$ 2,192.54
Each
for additional depth over 4'
D - 9
$ 486.53
FT
CB Type 11, 60" diameter
D - 10
$ 2,351.52
Each
for additional depth over 4'
D - 11
$ 536.54
FT
CB Type 11, 72" diameter
D - 12
$ 3,212.64
Each
for additional depth over 4'
D - 13
$ 692.21
FT
Through -curb Inlet Framework (Add)
D - 14
$ 366.09
Each
Cleanout, PVC, 4"
D - 15
$ 130.55
Each
Cleanout, PVC, 6"
D - 16
$ 174.90
Each
Cleanout, PVC, 8"
D - 17
$ 224.19
Each
Culvert, PVC, 4"
D - 18
$ 8.64
LF
Culvert, PVC, 6"
D - 19
$ 12.60
LF
95
Culvert, PVC, 8"
D - 20
$ 13.33
LF
41
.1,197.00
546.53
Culvert, PVC, 12"
D - 21
$ 21.77
LF
48
1,044.96
21
457.17
Culvert, DI, 12"
D - 22
$ 35.00
LF
5
175.00
Culvert, CMP, 12"
D - 23
$ 26.45
LF
Culvert, CMP, 15"
D - 24
$ 32.73
LF
Culvert, CMP, 18"
D-25
$ 37.74
LF
Culvert, CMP, 24"
D - 26
$ 53.33
LF
Culvert, CMP, 30"
D - 27
$ 71.45
LF
Culvert, CMP, 36"
D - 28
$ 112.11
LF
Culvert, CMP, 48"
D - 29
$ 140.83
LF
Culvert, CMP, 60"
D - 30
$ 235.45
LF
Culvert, CMP, 72"
D - 31
$ 302.58
LF
Page 6 of 9
*KCC 27A authorizes only one bond reduction,
Copy of Bond Qty_1 81026
SUBTOTAL
9,652.30
7,622.59
Unit prices updated: 02/12/02
Version: 4/22/02
Report Date: 10/29/2018
Site Improvement Bond Quantity Worksheet
Web date: 11/21/2005
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Road Improvements
& Drainage Facilities
Private
Improvements
Bond Reduction*
Quant.
Completel
Cost
No.
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
Culvert, Concrete, 8"
D-32
$ 21.02
LF
Culvert, Concrete, 12"
D - 33
$ 30.05
LF
Culvert, Concrete, 15"
D - 34
$ 37.34
LF
Culvert, Concrete, 18"
D - 35
$ 44.51
LF
Culvert, Concrete, 24"
D - 36
$ 61.07
LF
Culvert, Concrete, 30"
D - 37
$ 104.18
LF
Culvert, Concrete, 36"
D - 38
$ 137.63
LF
Culvert, Concrete, 42"
D - 39
$ 158.42
LF
Culvert, Concrete, 48"
D - 40
$ 175.94
LF
Culvert, CPP, 6"
D - 41
$ 10.70
LF
Culvert, CPP, 8"
D - 42
$ 16.10
LF
Culvert, CPP, 12"
D-43
$ 20.70
LF
Culvert, CPP, 15"
D - 44
$ 23.00
LF
Culvert, CPP, 18"
D-45
$ 27.60
LF
Culvert, CPP, 24"
D - 46
$ 36.80
LF
Culvert, CPP, 30"
D - 47
$ 48.30
LF
Culvert, CPP, 36"
D - 48
$ 55.20
LF
Ditching
D - 49
$ 8.08
CY
Flow Dispersal Trench (1,436 base+)
D - 50
$ 25.99
LF
French Drain (3'depth)
D - 51
$ 22.60
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 2.40
SY
Infiltration pond testing
D - 53
$ 74.75
HR
10
747.5
Mid -tank Access Riser, 48" dia, 6'deep
D - 54
$ 1,605.40
Each
Pond Overflow Spillway
D - 55
$ 14.01
SY
Restrictor/Cil Separator, 12"
D - 56
$ 1,045.19
Each
Restrictor/Oil Separator, 15"
D - 57
$ 1,095.56
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1,146.16
Each
Riprap, placed
D - 59
$ 39.08
CY
Tank End Reducer (36" diameter)
D-60
$ 1,000.50
Each
Trash Rack, 12"
D - 61
$ 211.97
Each
Trash Rack, 15"
D - 62
$ 237.27
Each
Trash Rack, 18"
D - 63
_D
$ 268.89
Each
ITrash Rack, 21"
- 64-F$
306.84
Each
Page 7 of 9
6011-11101 "T,
747.5
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 4/22/02
Copy of Bond Qty_1 81026 Report Date: 10/29/2018
Site Improvement Bond Quantity Worksheet
Web date: 11/21/2005
Existing
Right-of-way
Future Public
Road Improvements
& Drainage Facilities
Private
Improvements
Bond Reduction*
Quant
CoMnIp
t
Unit Price
Unit
Quant. Price
Quant. Cost
Quant. Cost
PARKING LOT SURFACING
No.
2" AC, 2" top course rock & 4" borrow
PL- 1
$ 15,84
SY
2" AC, 1.5" top course & 2.5" base cour
PL - 2
$ 17.24
SY
4" select borrow
PL - 3
$ 4.55
SY
1.5" top course rock & 2.5" base course
PL - 4
$ 11.41
SY
WRITE -IN -ITEMS
(Such as detention/water quality vaults.)
No.
Stormtech SC740 CHAMBER
WI - 1
$ 35,000.00
Lump
35,000.00
Combination Inlet (R3165)
W1 - 2
$ 500.00
Each
1
500
500-00
Turn Down Elbow
WI - 3
$ 250-00
Each
2
500.00
Drywell
WI - 4
$ 1,500�00
Each
1
1,500.00
8" Yard Drain
Wl - 5
$ 750.00
Each
1
750.00
DCDA Vault 2-in
WA-1
$ 9,000.00
Each
1
9,000.00
FIDC facility
WA-2
$ 1,000.00
Each
1
1,000.00
Fire Service pipe 2"PE
Wa-3
$ 20.00
LF
16
109
2 , 180.00
Traffic Control
WA-5
$ 1,000.00
Each
2
2000
4,000.00
FIRE HYDRANT ASSEMBLY
WA-6
$ 6,000.00
Each
WOO
1.
6,000-ft
WATER SERVICE LINE, V
WA-7
$ 10.00
LF
110
1,100.00
WATER VALVE, 2" GV
WA-8
$ 1,000.00
Each
FTS:H: ENCLOSURE
$ 2,000.00
Each
2,000.00
I
SUBTOTAL
SUBTOTAL (SUM ALL PAGES):
30% CONTINGENCY & MOBILIZATION:
GRANDTOTAL:
COLUMN:
Page 8 of 9
q!�-I(P-00
2-,&464)G—
ZY1110.91
484,78-%l
55'34 ] -5-45-3-6;7
B
i�7* 530'
XA-,&a@4&
13,7zi-too
-SO-.729-66-
2, 21 // 1�.
1r, 049.4&04�9413-4-8—
C D
Unit prices updated: 02/12/02
*KCC 27A authorizes only one bond reduction. Version: 4/22/02
Copy of Bond Qty_ 181026 Report Date: 10/29/2018
Site Improvement Bond Quantity Worksheet
Original bond computations prepared by:
Name: Dean A. Furr
PE Registration Number:
46937
Web date: 11/21/2005
Date: 1 -May-1 8
Tel. #: 425.744.0916
Firm Name: JC McDonnell Engineering
Address: 6608 216th St. SW, Ste. 306, Mountlake Terrace, WA 98043 Project No: BLD20171835
ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS
Stabilization/Erosion Sediment Control (ESC)
Existing Right -of -Way Improvements
Future Public Road Improvements & Drainage F
Private Improvements
Calculated Quantity Completed
Total Right -of Way and/or Site Restoration Bond*'**
(First $7,500 of bond* s, hall be cash.)
Performance Bond* Amount (A+B+C+D) = TOTAL
Reduced Performance Bond* Total ***
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND* REDUCTION:
PERFORMANCE BOND*
AMOUNT
(A) $ 3,631.3
(B) $ 31-1131.Q5- �,15_
(C) $
(D) $ q54-040-404-04-,94875—
(A+B) $ %1,3&3.094w-_'4&-9-
M $ 132,212.4 ,
_gi—nimum bond* amount is $1000.
BOND*AMOUNT
REQUIRED AT RECORDING OR
TEMPORARY OCCUPANCY —
(E) $
T x 0.30 $ 39,663.7 OR
(T-E) $ 132,212.4
Use larger of Tx30% or (T--ET—
Date:
PUBLIC ROAD & DRAINAGE
MAINTENANCE/DEFECT BOND*
so 400 4 3 16 34 A? (:e
----------
ImsegaloW ft:
X �-30/0 V 4,06-01
(B+C) x
0.25 = $ 5,908.1
NOTE: The word "bond" as used in this document means any financial guarantee acceptable to King County.
NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
SURETY BOND RIDER NOTE: If a bond rider is used, minimum additional performance bond shall be F$_ 104,948--5-1(C+D)-E
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY DDES
Page 9 of 9 Unit prices updated: 02/12/02
Check out the DDES Web site at www.metrokc-govIddes Version: 4/22/02
Copy of Bond Qty_181026 Report Date: 10/29/2018
po
C!TY COPY
APPENDIX A
Page I of 2 1
Transportation Impact Analysis
Worksheet
'1i('. 1VMV
PERMITTING & DEVELOPMENT
ENGINEERING
D I V I S 10 N
121 5th Avenue N
P: 425.771.0220
www.edmondswa.gov
Name of Proposed Project: EDMONDS MULTI -UNIT
Owner/Applicant
Cummings Dev. LLC
Name
9718 Slater Ave NE
Street/Mailing Address
Kirkland WA 98033
City
Telephone: (425)890-3397
Applicant Contact Person:
J3 Architects LLC I Neil Jorgensen
Name
11702 98th Ave NE, Suite 105
Street/Mailing Address
Kirkland WA 98034
State Zip City
Telephone: (425)242-0369
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name
Telephone:
1. PROJECT DESCRIPTION
Contact Name
E-mail:
State Zip
a. Location - Street address: 20904 72ND AVE WEST, EDMONDS, WA 98026-7205
(A Hach a vicinity map and site plan.)
b. Specify existing land use: EXISTING LAND USE IS SINGLE FAMILY RESIDENTIAL. ZONING RM-1.5
PERMITS MULTIFAMILY LAND USE.
c. Specify proposed type and size of development: APARTMENT BUILDING
4 UNITS — (# of residential units andlor squarefootage of building)
d. Date construction will begin and be completed: ESTIMATED 3/2018 & 10/2018
e. Define proposed access locations: SINGLE ACCESS FROM 72ND AVE WEST PER SITE PLAN
SCARNED
OCT 0 � 2018
APPENDIX A
Page 2 of 2
f. Define proposed sight distance at site egress locations:
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used.
Units in
ITE Land Use Category Per Unit square feet, Fee
Fee Rate of dwelling,
vft). etc.
New Use
220 - APARTMENT
$
2987.09
X 4
Prior Use
210 - SINGLE FAMILY
$
840.72
X 1
7� _ I I
NewUseFee: $ 11�948.36 Prior Use Fee: S 840.727 = I $ 11, 107.64
11 NEW DEVELOPMENT
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use $ X
0 OTHER
Fee
MITIGATION FEE RECOMMENDATION:
S
INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee)_
S
ITOTAL TRANSPORTATION IMPACT FEE
S
/0
City -5—f Editionds, Engineering Division Approval
Date
' No impact.fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
Divirm-ft-apes CITY Co SOA N N E D
17005 424th Dr SE OCT43 2918
Py
Page 1 of 1 Page(s)
Goldbar, WA 98251 PRELIMINARY ESTIMATE
206 290-8643
PROPOSAL SUBMITTED TO,
cell:
ORIGINAL PROPOSAL DATE:
DATE LAST REVISION:
5/9/2018
7=
7/12/2018
jOB1TM7E-.
Email
Edmonds Townhomes
L;IIY,bIAIt,ZIP:
Address:
Estimator.
20904 72nd Ave W, Edmonds
-cramer2/ GCA
We propose hereby to furnish material and labor - complete in accordance with the following specifications, for the sum listed below:
All material is guaranteed to be as specifiec. All work to De completed in a workmanlike manner according to standard practices.
F;�� (�
Warranty work will not be performed until installation is paid in full.
-,
U
Any alteration or deviation from specifications telow involving extra costs will be executed ONLY upon receiving a $200 change order
initiation fee (per change) plus any additional expenses over and above the estimate. All agreements contingent upon strikes, accidents or delays
JUL 13 2018
beyond our control. Owner to carry fire, tomado and other necessary insurance. Our workers are fully covered by Workman's Compensation
Insurance. Proposal must be signed & returned at least 10 days prior to start of installation. This proposal may be withdrawn by us if not accepted within 30 days.
MATERIAL LIST
CrrYOFEDMONLAr�
Qty
Material
Area (sq
Price Installed
Total Price
5
cy
Arborist Chips 3" depth
530
$
75.00
$
375.00
34
cy
Bed Soils 4" depth
2725
$
65.00
$
2,210.00
17
cy
Ferti Mulch 2"depth
2725
$
65.00
$
1,105.00
1
Cy
Cobble 1-3" depth
209
$
65.00
$
65.00
15
ea
Tree Stakes
0
$
10.00
$
150.00
16
ea
2'x2' pavers
$
25.00
$
400.00
108
If
Permalock edging between wood chips and cobble
$
7.00
$
756.00
1
ea
ARGO fertilizer 4-2-2
$
200.00
$
200.00
2725
sf
Site Prep and Clean-up and rototil
$
955.50
Qty
PLANT MATERIAL
Size
Price Installed
Total Price
4
each
Bowhall Maple
1.5" cal.
$ 180.00
$
720.00
8
each
Incense Cedar
6' ht min
$ 125.00
$
1,000.00
1
each
Katsura
1.5" cal
$ 180.00
$
180.00
2
each
Pyrus calleryana 'Glens Form'/ Glens Form Flowering
3" cal
$ 350.00
$
700.00
SHRUBS
7
each
Columnar Barberry
18" ht
$ 36.00
$
252.00
5
each
Carex Evergold
1gal
$ 12.00
$
60.00
26
each
Compact Oregon Grape
24/30"
$ 46.00
$
1,196.00
17
each
Miscanthus morning light
18" ht
$ 36.00
$
612.00
24
each
Nandina gulf stream
18" min
$ 36.00
$
864.00
6
each
Nandina Sienna Sunrise
24/30"
$ 45.00
$
270.00
12
each
Goshiki Holly Oliver
18" min
$ 36.00
$
432.00
24
each
Lilly of the Valley "cavatine"
21/24"
$ 48.00
$
1,152.00
40
each
Western Sword fern
18" min
$ 32.00
$
1,280.00
6
each
Fastiga Enlish Yew
4-6
$ 65.00
$
390.00
20
each
EG Thuja
4-5'
$ 50.00
$
1,000.00
40
each
Firefly Heather
1 gal
$ 12.00
$
480.00
42
each
Salal
11gal
$ 12.00
$
504.00
34
each
Moss Green Honeysuckle
11gal
$ 12.00
$
408.00
10
each
Hamin Dwarf Fountain Grass
11gal
$ 12.00
$
120.00
381
each
Emerald carpet manzanita
4" pot, 24" oc
$ 6.00
$
2,286.00
211
each
Thymus praecox'Albiflorus'Mhite mother of Thyme
4" pot, 18"oc
$ 6.00
$
1,266.00
82
each
Beach Strawberry
4" pot, 24" oc
$ 6.00
$
492.00
SubTotal
$
21,880.50
Tax at 10.3%
$
2,253.69
Total
$
24,134.19
y , I
"_�)
t
-3, � 2-
CITY Coff
SPECIAL INSPECTION AND TESTINC AGREEMENT
S -4ED
CAW'
OCT 2018
Permit BLD2017-1835
Project: Cummin-es 4 plex -,STRUCTJJR,,kL
Prior to Aiviteince of'o permi4 thisfiorni inust be conipleted in ift entirety an(I returned to the (Y�Yfar
approvA The eonipleled.forin inust ha ve signatures (if acknowledgmettl bil all parties.
DUTIESAND RESPONSIBILITIES
S
:UAW Inspection, Firin and Special Inspeclors:
The Special Inspection firm of
will perform special inspection 11or the following types of work (-separate �torms must b,-
submitted if more than
one firm is to be employed):
_XReinforced Concrete
Bolting in Concrete
—Prestressed Concrete
—Shotcrete
Structural Nlason-y
-Structural Steel/Weld . ing
_11 igh, Strength Bolting
—Spray applied Fireproofing-
-Smo.ke Control Systems
—Lateral Wood
—Structural Observation by design professionjil
_Gradim,/soils
- -Steel Floor and.Roof Decks.
—Other
All individual inspectors to be employed oil this project will be WAJ30 cenified for the ty-P � f work- th v ar to
, co e. e
inspect- If inspectionis for work that is not covered by the \VAB0 categories, or the inspector is not WA'_130
certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the
mispector and the fimi are qualified by education and experience to perform the work and testing. required by the
project design and specifications,
The work shall be inspected for conformance with the plans and specifications approved ky the City. Revisions
and addenda sheets will not be used for inspection, unless they have been approved by the City. inspection
records shall include:
A daily record to be maintained on sircl, itemizing the inspections performed. Anly noneonfbrnl�ijig work -
shall be brought to the immediate attention of the contractor for resolution.
A weekly report.shall be submitted to the City. detailing the irLspections and testing performed, listin
any, nonconforming work and resolution of no 0 g
11confornling items,
A final reportshall be submitted to the building department prior to the Certificate of.Occupancy being
issucd� This report will indicate that inspectionand testing was completed in conformance with tfie
approved plans.. specifications and approved revisions or addenda. Any unresolved discrepancies imist
be detailed in the final report,
I RMC C Umpnings, dou-, � i �210 18
Contractor:
The contractor shall provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must be.made available, at the jobsite for the use of the special
inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
Buildinp_ Department: I
The building department shall review any revisions and addenda, The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and for work to proceed.
Desin Professionals:
The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will
coordinate their revision and addenda process in such a way as to ensure that all required City approvals are
obtained, prior to work shown on die revisions being performed in the field.
.Owner:
The project owner, or the architect or engineer acting as the owners agent shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved
plans and this document, may void this agreement and the Building Official's approval of the special inspector.
In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the
design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconforming items have been resolved.
ACKNOWLEDGMENTS
I have read and agree to comply with the terms and conditions of this agreement,
Owner: —21 —Signature
Contractor:
Signature--,-
Arcli./Eng-
Date �n
Date:
bate:
Special Insp. �udi Rosenau-Payseno —Signature i Date:
Special Insp. Agency
ACCEPTED FOR THE CITY OF EDMONDS BUILDING DIVISION
By: Date: —*&
\XedMsvr-user�!Ciuserprof3lb,iorbuck\Desklop�.qf Struc CunimingsAcK3.1/2019
0 -
J.C. Mc DONNELL ENGINEERING, P.C.
Consulting Civil Engineers
6608 — 216TH ST SW #306
Mountlake Terrace, WA 98043
April 30, 2018
DO 0 T &I-ScA j?
Ms. Jeanie McConnell, Engineering Program Manager #p0tjSE
N. a 0 -S To P, [_
21 5th Ave N KETAEOF-D,
Edmonds, WA 98020
ZR
PROJECT: BLD 20171835 - Cummings Development %it apartment
RE: Resubmittal of the revised civil construction plans and reports for development and right-of-way
permits
Dear Ms. McConnell,
On behalf of Mark Cummings, Slater Homes, Corp, we are resubmitting the revised civil construction plans
for the above referenced project in accordance with the Review#l.
The following documents are enclosed for your review.
Revised civil and construction plans and TIR dated May 02, 2018
We have addressed your comments and our responses are as follows:
Jeanie McConnell - Civil Plans:
I . Provide an itemized engineer's cost estimate for both on -site and off -site (right-of-way)
improvements, including traffic control and all utility installations. Use the King County
Bond Quantity Worksheet (available on the county website) and utilize "write-in"
sections where appropriate.
a. The amount of the bond will be based on 120% of the City approved estimate for
the offsite improvements.
b. A 3.3% inspection fee is calculated for the project based on 120% of the City
approved estimate for the entire project improvements.
The Itemized Engineers cost estimate is attached.
2. Please add a note to plans stating "A separate right-of-way construction pennit is
required for all work within the city right-of-way." Please note, a ROW permit
application with contractor's signature shall be provided to the city prior to issuance of
civil construction plans.
The note has been placed on the plans.
3. Please note that City standard details are currently under revision and new details are due
to published at any point here. Please check the City website for most current details prior
to resubmitting plans for this project. L
At time of submittal - the associated details were not updated on the ci y S-website.
A note has been placed on the detail sheet to direct the contractor to obta' *e
HP
latest detail. k-,� L.
MAY 14 20%
BUILDING D�E
n
CITY OF EV=K;1F
BLD 20171835 — Cummings Development 4 unit apartment
4/30/2018
4. A Stormwater Covenant is required to be recorded against the property based on the
proposed stormwater facilities for the project. Please complete the covenant, including
notarization and any required exhibits and submit to the city. The document must be
complete, but will not be recorded prior to pen -nit issuance. Prior to construction final
location of facilities are to be verified (by field inspection and asbuilt) and then the
covenant will be recorded.
A covenant will be provided for review.
5. Please note, additional comments not included in this review may be produced after
reviewing the next submittal.
Noted.
Site Plan
I Remove proposed utility information and utility notes.
The utilities and notes have been deleted.
2. Add note on site plan that references civil construction plan set for civil site construction
and utility information.
The note has been added.
Sheet Ll — Landscape Plan
I Please remove utilities from the landscape plan.
The utilities have been removed.
2. Add note on landscape plan that references civil construction plan set for civil site
construction and utility information.
A note has been added.
3. Wheel stops have been shown on this plan sheet; however, extruded curb has been shown
on the civil plans. Please make consistent.
Noted.
Sheet I of 7 — Cover Sheet
Please provide a cover sheet and include the following:
a. Include Project Owner/Contact Information
b. Provide Utility Purveyor information
c. Provide civil plan sheet index
d. Construction sequence
e. General Construction Notes.
A Cover Sheet will be provided.
Page 2
BLD 20171835 — Cummings Development 4 unit apartment
4/30/2018
Sheet I of 5 — TESC Plan (Renumbered to C2 of 7)
1. Revise TESC Legend, Construction entrance note to remove "If required".
Noted.
2. For all TESC measures, reference City standard details and note location of detail within
plan set.
City standards are referenced.
3. Move Sheet Index to Cover Sheet.
Noted.
4. Move construction sequence notes to Cover Sheet.
Noted.
5. Indicate how "No Compaction Area" will be protected. Fencing?
The "No Compaction Area" is delineated by construction fencing.
6. Add note: Refer to Separate demolition plan and permit — BLD20171836.
Noted.
7. Show existing water meter as "to be removed".
Noted.
8. Show mailboxes as "to be relocated".
The mailboxes for the apartment will be located under the stairs on the building.
9. Please clarify contractors note "See soils recommendation per soils report by Cobalt
Geosciences, dated September 25, 2017". What recommendation is important to the
TESC plan? Or is this a note that should be found on the cover sheet and more generally
referencing that there is an associated soils report?
The note has been retained for the latter reason. Contractor referred to associated
soils report.
Sheet 2 of 5 — Grading Plan (Renumbered to C3 of 7)
I . Revise sheet title to include "Frontage Improvement Plan"
Revised.
2. Remove utilities from plan sheet that were removed with demolition.
Removed.
3. Revise plans and standard detail reference for driveway approach to be consistent with
City standard detail E2.26. With this change, standard concrete sidewalk, curb and gutter
will carry through the driveway approach. Please note that the cross slope along any
portion of the pedestrian path of travel shall not exceed 2%.
The plan has been revised with the required driveway.
Page 3
BLD 20171835 — Cummings Development 4 unit apartment
4/30/2018
4. Revise Construction Note 9 to also state "match into existing driveway".
Note 9 has been revised.
5. Show existing road pavement markers on the plan and indicate requirement to remove
markers:
According to a site visit and the survey, these RPMs don't exist.
6. Fire hydrant will need to be moved to the back side of the sidewalk. See comments under
Sheet C3.
The fire hydrant has been relocated.
7. Show proposed mailbox location as approved by Post Office and installation consistent
with City standard details.
The mailboxes for the apartment will be located under the stairs on the building.
8. A keystone wall has been shown within the ROW at the SE comer of the property.
Blocks shall not be located within the ROW. Please remove and adjust grades with
landscaping.
The keystone wall has been removed. What is the "approved" retaining wall
method within R[W.
9. Please add the following note regarding pavement restoration:
Utility patches with less than 20-feet of separation shall be combined and full width or
half width overlay will be required depending on the extent of disturbance. Where utility
patches fall entirely within one travel lane, the overlay shall extend to the centerline of
roadway. Where utility patches extend into both travel lanes then a full width overlay is
required.
The note has been added to the plan.
10. Callout parking stall dimensions as "typ" (typical) and adjust to meet City minimum
standard of 8.5'xl6.5'.
The architect has been working with city staff for allowable reduction in parking
stall width on the order of 50% of stalls provided. The plan has been dimensioned
to reflect those changes.
11. Trash enclosure shall have drop pin holes and open and closed positions. Show
requirement on plans.
Drop pins are shown in a detail on the plans.
12. Extruded curb has been shown around the entire perimeter of the parking lot. Please
address the following:
a. It is unclear what will be provided in the space between the parking lot and the
building. Please clarify this surface material.
The plans have been revised to illustrate the intended use. Also, see landscape
plan.
Page 4
BLD 20171835 — Cummings Development 4 unit apartment
4/30/2018
b. Please clarify the pedestrian transition from the parking lot to the building entry.
The plans have been revised to illustrate the pedestrian transition.
c. A minimum 5-foot turnaround space should be provided on the west edge of the
parking lot drive aisle to allow vehicles to negotiate into and out of the parking stalls
on the west end of the parking lot.
The 5-foot turnaround space has been incorporated into the pedestrian access
to the apartments.
Sheet 3 of 5 — Drainage and Utility Plan (Renumbered to C4 of 7)
10-feet of separation shall be provided between water and sewer.
Noted — but this should refer to mains and not services, correct?
2. Add note to plans that existing water service shall be cut and capped at the main.
Noted.
Show water service line from meters to structure and call out pipe material and size.
These are not typically shown on civil plans.
4. Callout water meter size.
Shown.
5. Fire hydrant to be relocated to the back of the sidewalk. Please refer to City standard
detail for fire hydrant and include pipe extension. A new tap on the main will not be
required.
FH has been relocated. Thanks!
6. A 4" storz adapter will be required on the fire hydrant.
Noted. A Storz adapter is shown on the City standard detail. Isn't this a required
action that the inspector will require from the contractor?
7. Show blue reflective pavement marker in the street right-of-way per City standards to
identify location of the fire hydrant.
Shown.
8. The existing sanitary side sewer has been shown to remain; however, a new connection to
the City's sewer main has also been shown. Please clarify why two points of connection
have been shown. The property should have only one sanitary sewer lateral within the
City ROW.
Noted, the plan has been revised.
9. If development will reuse existing side sewer and lateral, instead of installing a new
lateral to the manhole, add the following notes:
Page 5
BLD 20171835 — Cummings Development 4 unit apartment
4/30/2018
a. Provide a 6" cleanout with 12" CI lamphole cover on the ROW side of the property
line.
b. Existing side sewer from the point at which it is capped on private property, to the
property line, shall be TV'd by the property owner. TV record shall be provided to
the City to determine if it is acceptable to reuse. If the existing side sewer is 4" it
will need to be removed and replaced with a 6" line regardless of condition.
c. Existing lateral, from the property line to the main, shall be TV'd/inspected by the
City Sewer Division to determine if it is in acceptable condition for reuse. If not, a
new 6" lateral from the main to the property line will be required.
d. If existing sewer lateral is not proposed for reuse, it shall be cut and capped at the
property line.
It is proposed to use the existing 6" side sewer lateral. The appropriate notes have
been placed on the plan.
10. If the development will install a new lateral to the manhole in 72nd, instead of reusing the
existing lateral, respond to the following:
a. Refer to City standard detail for sewer manhole and required channeling.
b. Refer to City standard details for sanitary sewer lateral and side sewer.
c. Provide a 6" cleanout with 12" CI lamphole cover on the ROW side of the property
line.
See above.
11, Provide invert elevations on existing and proposed sanitary sewer at all cleanouts and at
the property line/main line.
Invert elevations have been provided.
12. Will footing drains be installed around the perimeter of the building? If so, indicate
where they will discharge.
The footing drains have very little if any subsurface drainage. The footing drains
will be connected to an onsite drywell.
13. Show location of dry utilities and required utility separation (5-feet from City utilities
within the ROW and 3-feet from water/sewer/storm utilities on private property).
Shown.
14. Underground Wiring Requirements of ECDC 18.05 shall be followed. All utility services
shall be installed underground.
This is a note that should be on the electrical plan.
15. Show location of pad mounted transformer, if proposed; to be located on private
property.
It is unclear where or if a pad mounted transformer will be located. A pole
mounted transformer might be used.
16. Include Hard Surface Area chart on the plans. Provide a breakdown for hard surfaces and
roof tops and the type of stormwater management system being installed to manage each.
Page 6
BLD 20171835 — Cummings Development 4 unit apartment
4/30/2018
The hard surface area chart has been placed on the plans.
17. A new catch basin has been shown to be installed in the new curb/gutter flow line, which
appears to be directly over the City water main and very near a gas main. Based on this
information, it appears as though the proposed alignment of curb, gutter and sidewalk
will need to shift further to the west. In addition, a curb inlet may need to be considered.
Please review and re -design.
A re -design has been proposed, please see the plans.
Sheet 4 of 5 — DETAILS (Renumbered to C5 of 7)
1 . Revise accessible parking detail to show standard parking stall dimensions at 8.5' x 16.5'.
Revised ADA parking stall.
2. Remove driveway entrance section as this style driveway approach will no longer be
constructed.
The driveway entrance has been updated
3. Insert City standard detail XX instead of the pavement detail currently provided on the
plans.
We don't know what standard detail XX is. Please provide it.
Sheet 5 of 5 — NOTES (Renumbered to C6 of 7)
I . Place Erosion Control Notes on TESC Plan.
Done.
2. Place General Notes on Cover Sheet.
Done.
Sheet 7 of 7 — TRAFFIC CONTROL
I . Include a traffic control plan. Refer to City handout E81 for sample plans.
A traffic plan has been created.
STORMWATER ENGINEER REVIEW
City Stormwater Engineer, Zachary Richardson
I General: Geotechnical report recommends that the geotechnical engineer review
proposed plans for consistency with their recommendations; provide evidence of
geotechnical approval of the plans prior to permit issuance.
A set of the plans have been sent to the geotechnical engineer for approval.
2. Geotechnical report: It is not clear that the recommended infiltration rate has been
determined as require per Edmonds Checklists #4; update report as needed to show that
the field -measured infiltration rate is subjected to the prescribed correction factors for the
Page 7
BLD 20171835 — Cummings Development 4 unit apartment
4/30/2018
long-term design infiltration rate. Update drainage report and plan as needed to match
revised infiltration rate.
The geotechnical report has been updated and the drainage report has be revised to
match the geotechnical recommended infiltration rate.
3. C I: Provide construction fencing or other delineator around the infiltration area to
identify and discourage access into the area.
Construction fence is shown around the infiltration area.
4. C2: It appears the entrance will require revisions to a typical driveway standard; but
should the current configuration remain, the reviewer has concerns about the control of
runoff from the right-of-way. Engineer shall verify adequate capacity of the 1/2" lip
proposed on the ribbon gutter and provide additional curb return elevation information as
needed to verify that right-of-way runoff will remain within the right-of-way.
This has been addressed in an earlier comment.
5. C2: It appears that portions of the infiltration chambers will have less than the minimum
2' cover required for traffic rated surfaces; update plans to achieve 2' of cover or submit
manufacturer specification demonstrating that less than 2' of cover is sufficient to
achieve traffic loading requirements.
Manufacturers minimum cover is 1811 from the top of the chamber to the bottom of
the flexible pavement. The design complies with the minimum standard. �Sv�f F11
C2: It appears that a free-standing extruded curb (ie. surface around the curbing does not
step up to top of curb elevation) is proposed around the structure front. While this area is
generally covered, it appears that this area could be subject to blown -in or run-on runoff
or other sources of water (landscaping water, etc) which would then be trapped between
the building and extruded curb. Update plans to address concern, or provide written
response of engineer's opinion as to why this is not a concern.
This seems like an unwarranted heightened awareness of "Blow In" assessment of
the rain. We have no plans to address, because in our Professional opinion is that it
will not cause harm or endanger the public, therefore, is not addressed. -
Furthermore, the grades slope away from the building along the front. So any blow-
in or speculated run-on will drain away from the building to the catch basin (low
point) in the parking lot.
7. C2: Update this sheet and/or landscaping plan to clarify what material is proposed around
the building (assumed to be lawn); between the building and extruded curb and out to the
screening landscape limits.
The proposed soil management plan is to amend all soil per BMP T5.13
8. C2: Update this sheet and/or landscaping to provide an amended soil detail or
specification sufficient enough for the contractor to provide a product that meets the
amended soils requirement.
The plan has been updated, shown on sheet C4.
Page 8
BLD 20171835 — Cummings Development 4 unit apartment
4/30/2018 ,
9. C3: Provide unique identifiers (numbers or letters) for each proposed and altered storm
drain catch basin/manhole and specify lid types (solid/standard) for each.
Unique identifiers have been added.
10. C3: Add a floatable separator (down -turned elbow or vertical/FROP tee) to the CB in the
parking lot; provide details as needed for construction.
The turndown elbow has been added with a detail.
11. C3: It appears that the 8" invert in the CB south-west of the infiltration facility is too low
for functional drainage; revise as needed.
The invert has been revised.
12. C3: Update plans to show or note where footing drains are discharging to.
The footing drains have been addressed in a previous comment by Ms. McConnell.
13. C3: It appears that the CB to the south-east of the infiltration facility is greater than 5'
from rim to invert and will require a Type 2; revise plan or inverts as needed.
The plan has been revised.
14. C3: Update the symbology of the west roadway CB to reflect the type 2 designation
correctly noted in the callout.
The symbol has been revised.
15. C3/C4: It appears that the isolator row requires at least one maintenance portal and a
sediment trap; show location in plan view and provide details as needed for construction
of these items. Or provide written response why these are not needed (may require
additional backup from manufacturer).
The catch basins upstream of the infiltrator have turndown elbows (floatables) and
2ft deep sumps "catch" for sediment. So we believe this is adequate upstream
protection of the Isolator Row.
Fire Department Review
Karl Fitterer
Sheet C3:
a. Call out vaults. All vaults need to be rated to support a GVW of 75,000 lbs and a
point load of 45,000 lbs (24"x24" jack pad) Front axle = 23,000 lbs, Rear dual axles
48,000 lbs.
A note has been placed on the plan, but can we get a cad drawing of the proposed
fire vehicle with outrigger locations and dimensions.
b. Call out fire lane marking per Edmonds Fire Prevention Standard in attachments.
Fire markings have been called out.
c. Call out Fire Department Connection in the landscaping east of the dumpster.
Units will be sprinklered from the meters.
Page 9
BLD 20171835 — Cummings Development 4 unit apartment
4/30/2018
2. Sheet CT
a. East Elevation Call out premis ID 12 inch on contrasting background.
Not sure what this is referencing?
3. On all further submissions call out code reference for compliance.
Noted.
4. Deferred Fire Alarm, Fire Sprinkler and Fire Connection.
Is this an action or a statement?
We believe these responses address all of your comments. Please review and approve at your
earliest convenience. If you have further questions or concerns, feel free to contact me.
Sincerely,
Dean A. Furi, RE, CESCL
Project Manager
\\Pgsnetivork2\vgs—data2VCMcDonneIALand Projects 2016\06043-3JArchitects—Edinonds 4 uniAEdmonds ReviewV80312\06043—IST
Review_Responses_ I 80430.docx
Page 10
After Recording return to:
City of Edmonds
Building Division
121 5th Avenue North - 2nd Floor RECEIVED
Edmonds, WA 98020
I DEC 10 2018
BUILDir,�o
SCANNACD
DEC 10 2010
Document Title(s)
Sale Prohibition Covenant of Multiunit Residential Building
Reference Number(s) of Related Documents
N/A
Gj M t—N I N C-7 S t%4
Grantor(s) (Last, First and Middle Initial)
Grantee(s) (Last, First and Middle Initial)
State of Washington
- Legal Description (abbreviated form; i.e., lot, plat or section,. township, range, quarteF/quarter)
H-C-- dol-T4 '?,�, Fl�-ET or- Tt4A,F Po�Z-TtoN CIF L-6-1 �3. BL-00V--Z-,
t+ (--j c-705 Pivi�ij,&( 4, t-�(H(-7 vif-r4it'l -11fG -50u7-14 4ALP OP 5,A(D
-5F A-T-TLf:- 1+1=16714TI; biviStoP4 �. Ae-c-o"INC-7 T-o rifet pt-A-r -T-(ft�-jLr-- oV�
9_r N -tr- I , PAQ-7k I I 9-r:i P
,LO(LD r
?D 1v V01-Ul z. OF PLAT L-U�-
(Full legal description on Exhibit A) -5 /,rofttij50 Coo.-J-rj 1 wAS 4 INO
Assessor's Property Tax Parcel/Account Number at the Time of Recording:
OoS(n�-�002-00302-
The Auditor/Recorder will rely on the information provided on this form. The staff will not read the document to verity the accuracy or
completeness of the indexing information provided herein.
(13FP624253.D0C;1/00006-900000/)
Sale Prohibition Covenant of Multiunit Residential Building
Pursuant to Chapter 64.55 RCW
This covenant has been recorded in the real property records of Snohomish County, Washington,
in satisfaction of the requirements of RCW 64.55.010 through RCW 64.55.090. The
undersigned grantor is the owner of the property described on Exhibit A (the "Property"), which
is addressed in the records of the City of Edmonds Building Division as 2-09 ()!A "-? ?�,f -
ph'i a V,1 F- api Gptns W N 9 b61-6 . The owner of the Property
irrevocably covenants and agrees that until termination of this covenant, no dwelling unit in or
on the Property may be sold as a condominium unit except for dispositions listed in RCW
64.34.400(2).
This covenant terminates on the earlier of either: (a) Compliance with the requirements of RCW
64.55.090, as certified by the owner of the Property in a recorded supplement hereto; or (b) the
fifth anniversary of the date of first occupancy of a dwelling unit as certified by the owner of the
property in a recorded supplement hereto.
This covenant shall run with the land and shall bind the grantor and the grantor's heirs, personal
representatives, successors in interest and assigns.
DATED: I-Lilcll lb
GrOR,�S
Its:
STATE OF WASHINGTON)
COUNTY OF SNOHOMISH)
On this day appeared before me Af,*,e4 C4,M/,V/"V&,0 the
of &"MIA16:5 1*5Wra6 , and stated that he/she is
authorized to execute this document on behalf of said corporation for the uses and purposed
herein mentioned.
D Xf
!%NN;NTR%jJj,j11 I - �
201 M
16 6%cl
/111, OP
NOTARY PUBLI�
Printed Name:
My Commission expires:
(BFP62426 LDOC; 1 /00006.900000/1
OV ED&10 41,
"'A��_
. IS90
PROJECT NAME:
ROW PERMIT NO.: ENGZ01'R - 04LI3
ISSUE DATE:
RIGHT-OF-WAY CONSTRUCTION
PERMIT APPLICATION
V_Qmzlll� i-t 1PG5y_
CONTRACTOR: SLATIETZ-ftACS:.,
MailingAddress: W-10(
wA 9?�03':;'
State License #: 5 L Arl-15- 14 (-A 00 0kn
City Business License #:
ADDRESS OR INTERSECTION OF CONSTRUCTION:
CONTACT: P4,AR-le- C_uAAMW6,5
Phone#: 4-2-5 6110 '3-,Irl*
Fax #:
Email #:
[&Liability Insurance M Bonded
ROW WORK ASSOCIATED WITH THE FOLLOWING TYPE OF PROJECT:
F] Commercial El Subdivision El City Project E:1 Traffic Control (Only)
N Multi -Family [:1 Single Family
F] EUC (PUD, VERIZON, PSE,
COMCAST, OVWSD):
Is this permit part of a blanket permit?
F Other
R Yes R No
I ANY ASSOCIATED PERMITS? I BLD# 7-o ri k 6 5 5 ENG# ZVI 9 . 04(4 T
DESCRIPTION OF PROPOSED WORK (Be Specific):
�J te-_� &tP-,.ArD 4+er— 6f— '-C�-T-o V_M C
4
I WAS STREET OVERLAYED WITHIN THE LAST FIVE (5) YEARS? YES EN NO 0 Year:
PAVEMENT CUT: 2 Yes F1 No
CONCRETE CUT: 0 Yes El No
L--
If yes, indicate size of cut: L"J �x
If yes, indicate size of cut: x
RIGHT-OF-WAY
AREA
CLOSURE
TOTAL
DURATION
(NUMBER OF MONTHS)
Sidewalk 48 Hrs + LF
X
75—LF
SF
Alley 72 Hrs + LF
X
LF
SF
Parking 72 Hrs + LF
X
LF
SF
APPLICANT TO READ AND SIGN
*Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by (WAC) 296-155-305 and must have certification
verifying completion of the required training in their possession.
*Restoration is to be in accordance with City codes and Standards. All street -cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday — NO EXCEPTIONS.
Indemnity: The Applicant has signed an application which states helshe hold the City of
Edmonds harmless from injuries, damages or claims of any kind or description
whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or
any of its departments or employees, including defense costs and attorney fees by reason
of granting this permit.
I have read the above statements and understand the permit requirements and acknowledge that I must
follow all requireme&ts in order for the permit to be valid.
SIGNATURE DATE
Contractgr or Agent
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
0 A10 �v
ql,vc wiw-
CONTRACTOR INFORMATION:
SIDE SEWER
PERMIT APPLICATION
Company Name: Site Contact: M-NU—
Company Address: A�
Phone
kl-(rL�&NQ VVA- � b05�
City: Zip: Email M
StateLicense# eL_pT-U:-=��(Cafoo
Expiration Date: !A I I (b 1-2-0 Z-0
PROPERTY INFORMATION:
City Business License #
Address:
Owner's Name:
C,jAA1�&1NfG?C> t9ev L-1-6—
Phone#: 4 2-5 60:�o
54-FULL LINE REPLACEMENT [:1 SPOT REPAIR [] PIPE BURST RELINE (PERMALINE ONLY)
DESCRIPTION OF PROPOSED WORK (Be Specific):
i-ltvv s(or, rzweg- cotveurc-7
ISSUANCE OF THIS PERMIT DOES NOT CONSTITUTE PERMISSION TO WORK ON ANY PROPERTY OTHER
THAN THAT OWNED BY THE SUBJECT PROPERTY OWNER.
CERTIFICATIONS NECESSARY FOR INSTALLATION METHODS ARE THE RESPONSIBILITY OF THE
CONTRACTOR PERFORMING SAID WORK.
I REPRESENT AND WARRANT TO THE CITY OF EDMONDS, IF REPAIR OF EXISTING SEWER EXTENDS TO AN
ADJACENT PROPERTY, I HAVE OWNERS EXPRESS PERMISSION TO PERFORM WORK ON THAT ADJACENT
PROPERTY.
SIGNATURE DATE !�j hA05
Contractor or A i ffr 4
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
JUNE 2017 APPENDIX A - ON -SITE STORMWATER MANAGEMENT BMP INFEASIgaIMITK
a Mwn %W WERIVED
Appendix A - On -Site Stormwater DEC 28 2017
DEVELOPMENT SEFMCES
Management BMP Infeasibility CriteriSOUNTER
The following tables summarize infeasibility criteria that can be used to justify not using various on -site
stormwater management l3MPs for consideration in the List No. I or List No. 2 option of Minimum
Requirement No. 5. Much of this information is also included under the detailed descriptions of each
BMP in the SWMMWW, but is summarized here in this Addendum appendix for additional clarity and
efficiency. However, note that this appendix also includes several City -specific infeasibility criteria that
are not included in the SWMMWW. Therefore, where any inconsistencies or lack of clarity exists
between the SWMMWW and this appendix, the requirements of this appendix shall apply, and project
proponents should consult with the City for any clarifications.
If a project is limited by one or more of the infeasibility criteria specified below, but still wishes to use the
given BMP, they may propose a functionally equivalent design to the City for review and approval.
Lawn and Landscaped Areas
BMP Infeasibility Criteria — This BMP is INFEASIBLE under the following
conditions:
Posi-Construction Lawn and landscape area is on till slopes greater than 33 percent.
Soil Quality and
Depth
Roofs
BMP Infeasibility Criteria — This BW is INFEASIBLE under the following
onditions:
Full Dispersion 0 Where the dispersion area is within the North Edmonds Earth Subsidence
and Landslide Hazard Area (ESLHA).
* The flowpath or dispersal area is within the buffer of the ESLHA (minimum
buffer equal to the height of the steep slope or 50 feet, whichever is greater)
unless a geotechnical assessment and soils report is prepared addressing the
potential impact of the proposed system.
0 The slope of the flowpath or dispersal area is steeper than 15 percent for any
20-foot reach of the flowpath, or steeper than 33 percent if a level spreader
is used upstrearn and vegetation is established.
0 The flowpath or dispersal area is within 50 feet of the top of slopes greater
than 15 percent (unless a geotechnical assessment and soils report is
prepared addressing the potential impact of the proposed system).
* A 65 to 10 ratio of forested or native vegetation area to impervious area
cannot be achieved.
0 A minimum forested or native vegetation flowpath length of 100 feet
(25 feet for sheet flow from a nonnative pervious surface) cannot be
achieved.
A. ON -SITE STORMWATER MANAGEMENT BMP INFEASIBILITY CPJTEFUA 1
APPENDIX A - ON -SITE STORMWATER MANAGEMENT BMP INFEASIBILITY CRrTERIA JUNE 2017
Roofs (continued)
BMT
Infeasibility Criteria — This BMP is INFEASIBLE under the following
conditions:
Full Dispersion
The flow path cannot be located on site or in a reserved offsite tract or
(continued)
casement area.
The flowpath cannot be located between the dispersion device and any
t.�
downstream drainage feature such as a pipe, ditch, stream, river, pond, lake,
or wetland.
• Flowpaths for adjacent dispersion devices cannot be sufficiently spaced to
prevent overlap of flows in the flowpatb areas.
• For sites with onsite or adjacent septic systems, the discharge point must be
at least 30 feet upgradlient, or 10 feet downgradient, of the drainfield primary
and reserve areas (per WAC 246-272A-0210). This requirement can be
modified by the City if site topography will clearly prohibit flows from
intersecting the drainfield or where site conditions (soil penneability,
distance between systems, etc.) indicate that this is unnecessary.
• The dispersion area is within the buffer of a Category I or Category 2
wctland.
• The dispersion area is within the buffer of a Category 3 or Category 4
wetland, except for the outer 25 percent of the buffer.
• The dispersion of runoff would create flooding or erosion impacts.
Downspout Full
* 'Where the ififiltration system is within the North Edmonds Earth Subsidence
Infiltration Systems
and Landslide Hazard Area (ESLHA).
act-
• Within the buffer of the ESLHA (minimum buffer equal to the height of the
steep slope or 50 feet, whichever is greater) unless a geotechnical
assessment and soils report is prepared addressing the potential impact of
the proposed system.
• Within 50 feet of the top of slopes greater than 15 percent (unless a
geotechnical assessment and soils report is prepared addressing the potential
impact of the proposed systern).
• The lot(s) or site does not have outwash or loani soils.
• There is not at least 3 feet or more of pen-neable soil from the proposed final
grade to the seasonal high groundwater table or other impermeable layer.
• There is not at least I foot or more of permeable soil from the proposed
bottom of the infiltration system to the seasonal high groundwater table or
other impermeable layer.
• Within 5 feet from any property lines and easements.
• If the contributing area is less than 5,000 square feet, within 5 feet from a
structure without a basement and 10 feet for a structure with a basement.
• If the contributing area is greater than or equal to 5,000 square feet, within a
I Horizontal: I Vertical slope line from the bottom edge of the facility to a
structure. (Minimum clearance 5 feet from a structure with a basement and
10 feet for a structure with a basement.)
2 A. ON-SfTE STORMWATER MANAGEMENT BMP INFEASIBILITY CRJTERIA
JUNE 2017 APPENDIX A - ON -SITE STORMWATER MANAGEMENT BMP INFEASIBIUTY CRITERIA
Roofs (continued)
BMP Infeasibility Criteria — This BMIP is INFEASIBLE under the following
conditions:
Downspout Full For sites with onsite or adjacent septic systems, the discharge point must be
Infiltration Systems at least 30 feet upgradient, or 10 feet downgradient, of the drainfield primary
(continued) and reserve areas (per WAC 246-2 72A-02 10). This requirement can be
modified by the City if site topography will clearly prohibit flows from
intersecting the drainfield or where site conditions (soil permeability,
distance between systems, etc.) indicate that this is unnecessary.
• If placed in fill material, the measured infiltration rate is less than 8 inches
per hour.
• If placed under pavement, overflow cannot be sited at least I foot below the
pavement (i.e., to prevent saturation of the pavement if system fails).
• Within the buffer of a Category I or Category 2 wetland.
• Within the buffer of a Category 3 or Category 4 wetland, except for the
outer 25 percent of the buffer.
Bioretention or Note: Criteria with setback distances are as measured from the bottom edge of
Rain Gardens the bioretention soil mix.
Citation of any of the following infeasibility criteria must be based on an
evaluation of site -specific conditions and a written recommendation ftom an
appropriate licensed professional (e.g., engineer, geologist, hydrogeologist):
Where professional geotechnical evaluation recommends infiltration not be
used due to reasonable concerns about erosion, slope failure, or
downgradient flooding.
• Where the only area available for siting would threaten the safety or
reliability of pre-existing underground utilities, pre-existing underground
storage tanks.
, pre-existing structures, or pre-existing road or parking lot
surfaces.
• Where the only area available for siting does not allow for a safe overflow
pathway to stormwater drainage system or private storm sewer system.
• Where there is a lack of usable space for bioretention/rain garden areas at
development sites, or where there is insufficient space within the existing
public right-of-way on public road projects.
• Where infiltrating water would threaten shoreline structures such as
bulkheads.
The following criteria can be cited as reasons for infeasibility without further
justification (though some require professional services to make the
observation):
• Where the system is within the North Edmonds Eartli Subsidence and
Landslide Hazard Area (ESLHA).
• Within the buffer of the ESLHA (minimum buffer equal to the height of the
steep slope or 50 feet, whichever is greater) unless a geotechnical
assessment and soils report is prepared addressing the potential impact of
the pro osed system.
A. ON -SITE STORMWATER MANAGEMENT BMP INFEASIBILrry CRJTERJA 3
APPENDIX A - ON -SITE STORMWATER MANAGEMENT BMP INFEASIBILITY CRITERIA JUNE 2017
Roofs (continued)
BMIP Infeasibility Criteria — This BMP is INTEASIBLE under the following
conditions:
Bioretention or Within 50 feet of the top of slopes greater than 15 percent (unless a
Rain Gardens geotechnical assessment and soils report is prepared addressing the potential
(continued) impact of the proposed system).
0 Where they are not compatible with surrounding drainage system as
determined by the City (e.g., project drains to an existing stormwater
collection system whose elevation or location precludes connection to a
properly functioning bioretention/rain garden area),
0 Where the site cannot be reasonably designed to locate bioretention/rain
garden areas on slopes less than 8 percent.
0 Properties with known soil or groundwater contamination (typically federal
Superfund sites or state cleanup sites under the Model Toxics Control Act
[MTCA]):
• Within 100 feet of an area known to have deep soil contamination.
• Where groundwater modeling indicates infiltration will likely increase
or change the direction of the migration of pollutants in the
groundwater.
• Wherever surface soils have been found to be contaminated unless those
soils are removed within 10 horizontal feet from the infiltration area.
• Any area where these facilities are prohibited by an approved cleanup
plan under the state Model Toxics Control Act or Federal Superftind
Law, or an environmental covenant under Chapter 64.70 RCW.
• For sites with onsite or adjacent septic systems, the discharge point must be
at least 30 feet upgradient, or 10 feet downgradient, of the drainfield primary
and reserve areas (per WAC 246-272A-02 10), This requirement can be
modified by the City if site topography will clearly prohibit flows from
intersecting the drainfield or where site conditions (soil permeability,
distance between systems, etc.) indicate that this is unnecessary.
• Within 10 feet of an underground storage tank and connecting underground
pipes when the capacity of the tank and pipe system is ],100 gal Ions or less.
As used in these criteria, an underground storage tank means any tank used
to store petroleum products, chemicals, or liquid hazardous wastes of which
10 percent or more of the storage volume (including volume in the
connecting piping system) is beneath the ground surface.
• Within 100 feet of an underground storage tank and connecting underground
pipes when the capacity of the tank and pipe system is greater than
I I 100 gallons.
4 A. ON -SITE STORMWATER MANAGEMENT BMP INFEASIBILITY CRITEPJA
JUNE 2017 APPENDIX A - CIN-SITE STORMWATER MANAGEMENT BMP INFEASIBIUTY CRITERIA
Roofs (continued)
BMP Infeasibility Criteria — This BMF is INFEASIBLE under the following
conditions:
Bioretention or Where field testing indicates potential bioretention/rain garden sites have a
Rain Gardens measured (a.k.a., initial) native soil saturated hydraulic conductivity less
(continued) than 0.30 inches per hour. A small-scale or large-scale PIT in accordance
with Appendix B shall be used to demonstrate infeasibility. If the measured
native soil infiltration rate is less than 0.30 in/hour, bioretention/rain garden
13MPs are not required to be evaluated as an option in List No. I or
List No. 2. In these slow draining soils, a blioretention area with an
underdrain may be used to treat pol I uti on -generating surfaces to help meet
Minimum Requirement No. 6. If the underdrain is elevated within a base
course of gravel, it will also provide some modest flow reduction benefit
that will help achieve Minimum Requirement No. 7.
Where the minimum vertical separation of 3 feet to the seasonal high
groundwater elevation or other impermeable layer would not be achieved
below bioretention that would serve a drainage area that exceeds the
following thresholds (and cannot reasonably be broken down into amounts
smaller than indicated):
o 5,000 square feet of pollution -generating impervious surface (PGIS)
c, 10,000 square feet of impervious area
o 0.75 acres of lawn and landscape.
• Where the minimum vertical separation of I foot to the seasonal high
groundwater or other impermeable layer would not be achieved below
bioretention that would serve a drainage area less than the above thresholds.
• If the contributing area is less than 5,000 square feet, within 5 feet from a
structure without a basement and 10 feet for a structure with a basement.
• If the contributing area is greater than or equal to 5,000 square feet, within a
I Horizontal: I Vertical slope line from the bottom edge of the facility to a
structure. (Minimum clearance 5 feet from a structure with a basement and
10 feet for a structure with a basement.)
• Within 5 feet from any property lines and easements.
• Within the buffer of a Category I or Category 2 welland.
• Within the buffer of a Category 3 or Category 4,.vetland, except for the
outer 25 percent of the buffer.
Downspout * Where dispersion area is within the North Edmonds Earth Subsidence and
Dispersion Systems Landslide Hazard Area (ESLHA).
* Within the buffer of the ESLHA (minimum buffer equal to the height of the
steep slope or 50 feet, whichever is greater) unless a geotechnical
assessment and soils report is prepared addressing the potential impact of the
proposed systern.
For splasliblocks, a vegetated flowpath at least 50 feet in length from the
downspout to the downstream property line, structure, Stream, wetland,
slope over 15 percent (unless a geolechnical assessment and soils report is
prepared addressing the potential impact of the proposed system), or other
impervious Surface is not feasible.
A. ON -SITE STORMWATER MANAGEMENT BMP INFEASIBILITY CRITERIA 5
APPENDIX A - ON -SITE STORMWATER MANAGEMENT BMP INFEASIBIUTY CRITERIA JUNE 2017
Roofs (continued)
BMP Infeasibility Criteria — This BMP is INFEASMILE under the following
conditions:
Downspout For trenches, a vegetated flowpath of at least 25 feet in between the outlet of
Dispersion Systems the trench and any property line, structure, stream, wetland, or impervious
(continued) surface is not feasible. A minimum vegetated flowpath of at least 50 feet
between the outlet of the trench and any slope steeper than 15 percent is not
feasible (unless a geotechnical assessment and soils report is prepared
addressing the potential impact of the proposed system).
For trenches, a trench width of at least 10 feet is not feasible.
• Flow-patbs for adjacent dispersion devices cannot be sufficiently spaced to
prevent overlap of flows in the flowpath areas.
• For trenches within 5 feet from any property lines and easements.
• For sites with onsite or adjacent septic systems, the discharge point must be
at least 30 feet upgradient, or 10 feet downgradient, of the drainfield primary
and reserve areas (per WAC 246-272A-02 10). This requirement can be
modified by the City if site topography will clearly prohibit flows from
intersecting the drainfield or where site conditions (soil permeability,
distance between systems, etc.) indicate that this is unnecessary.
0 Within tile buffer of a Category I or Category 2 welland.
Within the buffer of a Category 3 or Category 4 wetland, except for the
outer 25 percent of the buffer.
Perforated Stub- Where the system is within the North Edmonds Earth Subsidence and
Out Connections Landslide Hazard Area (ESLHA).
• Within the buffer of the ESLHA (minimum buffer equal to the height of the
steep slope or 50 feet, whichever is greater) unless a geotechnical
assessment and soils report is prepared addressing the potential impact of
the proposed system.
• Within 50 feet of the top of slopes greater than 15 percent (unless a
geotechnical assessment and soils report is prepared addressing tile potential
impact of the proposed system).
• There is not at least I foot of perrneable soil from the proposed bottom of
the perforated stub -out connection trench to the highest estimated
groundwater table or other impermeable layer.
• The only location available for the perforated stub -out connection is under
impervious or heavily compacted soils.
• For sites with onsite or adjacent septic systems, the discharge point must be
at least 30 feet upgradient, or 10 feet downgradient, of the drainfield primary
and reserve areas (per WAC 246-272A-02 10). This requirement can be
modified by the City if site topography will clearly prohibit flows from
intersecting the drainfield or where site conditions (soil permeability,
distance between systems, etc.) indicate that this is unnecessary.
• Within the buffer of a Category I or Category 2 wetland.
• Within the buffer of a Category 3 or Category 4 welland, except for the
outer 25 percent of the buffer.
6 A. ON-SFTE STORMWATER MANAGEMENT BMP INFEASIBILITY CRITERIA
JUNE 2017 APPENDIX A - ON -SITE STORMWATER MANAGEMENT BMP INFEASIBILITY CRITERIA
Roofs (contin
BMF Infeasibility Criteria — This BMP is INFEASIBLE under the following
conditions:
Detention Vaults Subject to review and approval by the City; infeasibility may be determined
and Pipes when a project meets any of the following infeasibility criteiia:
• Where the downstream analysis in Minimum Requirement No. 4, or
available City data, indicate that peak flow control from the site is not
beneficial.
• Where there is less than 1,000 square feet of contributing site impervious
surfaces that are not proposed to be managed by other On -Site Stormwater
Management BMPs. (This includes combining of areas froin multiple types
of surfaces listed under the list options for Minimum Requirement No. 5.
e.g., roofs and other hard surfaces.)
• Where there is not a downstream drainage system that allows for connection
to the City storm system or an appropriate dispersion and overflow path.
Other Hard Surfaces
BMP
Infeasibility Criteria — This BMP is INFEASIBLE under the following
conditions:
Full Dispersion
0 See Full Dispersion under "Roofs"' section above. I tA f 6M Ilk Lr-
Permeable
Citation of any of the following infeasibility criteria must be based on an
Pavement
evaluation of site -specific conditions and a written recommendation from an
appropriate licensed professional (e.g., engineer, geologist, hydrogeologist):
Where professional geotechnical evaluation recommends infiltration not be
used due to reasonable concerns about erosion, slope failure, or
IFL:—
downgradient flooding.
Where infiltrating and ponded water below the new ermeable pavement
p
area would compromise adjacent impervious pavements.
Where infiltrating water below a new permeable pavement area would
threaten existing below grade basements.
Where infiltrating water would threaten shoreline structures such as
bulkheads.
Down slope of steep, erosion prone areas that are likely to deliver sediment.
• Where fill soils are used that can become unstable when saturated.
• Excessively steep slopes where water within the aggregate base layer or at
the subgrade surface cannot be controlled by detenfion structures and may
cause erosion and structural failure, or where surface runoff velocities may
preclude adequate infiltration at the pavernent surface.
• Where pen-neable pavements cannot provide sufficient strength to support
heavy loads at industrial facilities such as ports.
• Where installation of permeable pavement would threaten the safety or
reliability of pre-existing underground utilities, pre-existing underground
storage tanks, or pre-existing road subgrades.
A. ON -SITE STORMWATER MANAGEMENT BMP INFEASIBILITY CRITERIA 7
APPENDIX A - ON -SITE STORMWATER MANAGEMENT BMP INFEASIBILITY CPJTERJA JUNE 2017
I Other Hard Surfaces (continued) I
BMF Infeasibility Criteria — This BMP is INFEASIBLE under the following
conditions:
Permeable The following criteria can be cited as reasons for infeasibility without further
Pavement justification (though some require professional services to make the
(continued) observation):
• Where the permeable pavement is within the North Edmonds Earth
Subsidence and Landslide Hazard Area (ESLHA).
• Within the buffer of the ESLHA (minimum buffer equal to the height of the
steep slope or 50 feet, whichever is greater) unless a geotechnical
assessment and soils report is prepared addressing the potential impact of
the proposed system.
• Within 50 feet of the top of slopes greater than 15 percent (unless a
geotechnical assessment and soils report is prepared addressing the potential
impact of the proposed system).
• For sites with onsite or adjacent septic systems, the discharge point must be
at least 30 feet upgradient, or 10 feet downgradient, of the drainfield primary
and reserve areas (per WAC 246-272A-02 10). This requirement can be
modified by the City if site topography will clearly prohibit flows from
intersecting the drainfield or where site conditions (soil permeability,
distance between systems, etc.) indicate that this is UnDecessary.
• Within 10 feet of any underground storage lank and connecting underground
pipes, regardless of tank size. As used in these criteria, an underground
storage tank means any tank used to store petroleum products, chemicals, or
liquid hazardous wastes of which 10 percent or more of the storage volume
(including volume in the connecting piping system) is beneath the ground
surface.
• At multi -level parking garages, and over culverts and bridges.
• Where the site design cannot avoid putting pavement in areas likely to have
long-term excessive sediment deposition after construction (e.g.,
construction and landscaping material yards).
• Where the site cannot reasonably be designed to have a porous asphalt
surface at less than 5 percent slope, or a pervious concrete surface at less
than 10 percent slope, or a permcabIc interlocking concrete pavement
surface (where appropriate) at less than 12 percent slope. Grid systems
upper slope limit can range from 6 to 12 percent; check with manufacturer
and local supplier.
• Where the subgrade soi Is below a pollution -generating permeable pavement
(e.g., road or parking lot) do not meet the soil suitability criteria for
providing treatment. See soil suitability criteria for treatment in
SWMMWW, Volume 111, Section 3.3.7. Note: In these instances, the City
may approve installation of a 6-inch sand filter layer meeting City
specifications for treatment as a condition of construction.
• Where underlying soils are unsuitable for supporting traffic loads when
saturated. Soils meeting a California Bearing Ratio of 5 percent are
considered suitable for residential access roads.
8 A. ON -SITE STORMWATER MANAGEMENT BMP INFEASIBILITY CRITERIA
JUNE 2017 APPENDIX A - ON -SITE STORMWATER MANAGEMENT BMP INFEASIBILITY CRITERIA
Other Hard Surfaces (continued)
BMP
Infeasibility Criteria — This BMP is INFEASIBLE under the following
conditions:
Permeable
Where appropriate field testing indicates soils have a measured (a.k.a.,
Pavement
initial) subgrade soil saturated hydraulic conductivity less than 0.3 inches
(continued)
per hour. A small-scale or large-scale PIT in accordance with Appendix B
shall be used to demonstrate infeasibility. (Note: In these instances, unless
other infeasibility restrictions apply, roads and parking lots may be built
with an underdrain, preferably elevated within the base course, if flow
control benefits are desired.)
Roads that receive more than very low traffic volumes, and areas having
more than very low truck traffic. Roads with a projected average daily
traffic volume of 400 vehicles or less are very low volume roads (AASHTO
2001) (U.S. Department of Transportation 2013). Areas with very low truck
traffic volurnes are roads and other areas not subject to through truck traffic
but may receive up to weekly use by utility trucks (e.g., garbage, recycling),
daily school bus use, and multiple daily use by pick-up trucks, mail/parcel
delivery trucks, and maintenance vehicles. Note: This infeasibility criterion
does not extend to sidewalks and other non -traffic beaning surfaces
associated with the collector or arterial.
0 Where replacing existing impervious surfaces unless the existing surface is a
non -pollution generating surface over an outwash soil with a saturated
hydraulic conductivity of 4 inches per hour or greater.
0 At sites defined as "high -use sites." For more information on higb-use sites,
refer to the Glossary in SWMMWW, Volume 1.
0 In areas with "industrial activity" as identified in 40 CFR 122.26(b)(14).
0 Where the risk of concentrated pollutant spills is more likely such as gas
stations, truck stops, and industrial chemical storage sites.
* Where routine, heavy applications of sand occur in frequent snow zones to
maintain traction during weeks of snow and ice accumulation.
0 Where the seasonal high groundwater or an underlying impermeable/low
permeable layer would create saturated conditions within I foot of the
bottom of the lowest gravel base course.
0 Within the buffer of a Category I or Category 2 wetland.
0 Within the buffer of a Category 3 or Category 4 wetland, except for the
outer 25 percent of the buffer.
Bioretention or
0 See Bioretention or Rain Gardens under "Roofs" section above.
Rain Gardens
Sheet Flow
* Where the dispersion area is within the North Edmonds Earth Subsidence
Dispersion
and Landslide Hazard Area (ESLHA).
* Within the buffer of the ESLHA (minimum buffer equal to the height of the
steep slope Or 50 feet, whichever is greater) unless a geotechnical
assessment and soils report is prepared addressing the potential impact of
the proposed system.
A. ON -SITE STORMWATER MANAGEMENT BMP INFEASIBILITY CRITERIA 9
APPENDIX A - ON -SITE STORMWATER MANAGEMENT BMP INFEASIBILITY CRITERIA JUNE 2017
Other Hard Surfaces (continued)
BMP
Infeasibility Criteria — This BMP is INFEASIBLE under the following
conditions:
Sheet Flow
0 Where the dispersion area is within 50 feet of the top of slopes greater than
Dispersion
15 percent (unless a geotechnical assessment and soils report is prepared
(continued)
addressing the potential impact of the proposed system).
• Positive drainage for sheet flow runoff cannot be achieved.
• Area to be dispersed (e.g., driveway.
. patio) cannot be graded to have less
than a 15 percent slope.
• For flat to moderately sloped areas, at least a I 0-foot-wide vegetation buffer
for dispersion of the adjacent 20 feet of contributing surface cannot be
achieved. For variably sloped areas, at least a 25-foot vegetated flowpath
between berins cannot be achieved.
• The dispersion of runoff would create flooding or erosion impacts.
• For sites with onsite or adjacent septic systems, the discharge point must be
at least 30 feet upgradient, or 10 feet downgradient, of the drainfield primary
and reserve areas (per WAC 246-272A-02 10). This requirement can be
modified by the City if site topography will clearly prohibit flows from
intersecting the drainfield or where site conditions (soil permeability,
distance between systems, etc.) indicate that this is unnecessary.
0 The dispersion area is within the buffer of a Category I or Category 2
wetland.
0 The dispersion area is within the buffer of a Category 3 or Category 4
wetland, except for the outer 25 percent of the buffer.
Concentrated Flow
9 Where the dispersion area is within the North Edmonds Earth Subsidence
Dispersion
and Landslide Hazard Area (ESLHA).
0 Within the buffer of the ESLHA (minimum buffer equal to the height of the
steep slope or 50 feet, whichever is greater) unless a geotechnical
assessment and soils report is prepared addressing the potential impact of
the proposed system.
0 A minimum vegetated flowpath of 50 feet between the discharge point and
the top of slopes greater than 15 percent is not feasible (unless a
geotechnical assessment and soils report is prepared addressing the potential
impact of the proposed system).
0 A minimum 3-foot length of rock pad and 50-fool flowpath OR a dispersion
trench and 25-foot flowpath for every 700 sq. fl. of drainage area (within
applicable setbacks) cannot be achieved.
0 More than 700 square feet drainage area drains to any dispersion device.
0 The dispersion of runoff would create flooding or erosion impacts.
0 A minimum vegetated flowpath of 50 feet (if using rock pads) or 25 feet (if
using dispersion trenches) between the discharge point and any property
line, structure, stream, lake, weland, or other impervious surface is not
feasible.
10 A. ON -SITE STORMWATER MANAGEMENT BMP INFEASIBILITY CRITERIA
JUNE 2017 APPENDIX A - ON -SITE STORMWATER MANAGEMENT BMP INFEASIBIM CRITERIA
Other Hard Surfaces (continued)
BMP
Infeasibility Criteria — This BMP is INFEASIBLE under the Mowing
conditions:
Concentrated Flow
For sites with onsite or adjacent septic systems, the discharge point inust be
Dispersion
at least 30 feet upgradient, or 10 feet downgradient, of the drainfield primary
(continued)
and reserve areas (per WAC 246-2 72A-02 10). This requirement can be
modified by the City if site topography will clearly prohibit flows from
intersecting the drainfield or where site conditions (soil permeability,
distance between systems, etc.) indicate that this is unnecessary.
• The dispersion area is within the buffer of a Category I or Category 2
wetland.
• The dispersion area is within the buffer of a Category 3 or Category 4
wetland, except for the outer 25 percent of the buffer.
Detention Vaults
0 See Detention Vaults and Pipes under "Roofs" section above.
and Pipes
A.ON-SITESTORMWATER MANAGEMENT BMPINFEASIBILITYCRITEMA 11
Ab
City of Edmonds
Public Works Department, Engineering Division
121 5di Ave N
Edmonds, WA 98020
Checklist 1:
Category 1 Stormwater Site Plans
DEC 2 8 2017
DEVELOPMENT SERVICES
COUNTIER
Per ECDC 18.30, Category I projects must comply with Minimum Requirements No. I through No. 5
and include projects that:
i. Result in 2,000 square feet, or greater, of new plus replaced hard surface area, or
ii. Have land disturbing activity of 7,000 square feet or greater,
Stormwater Site Plans shall be prepared in accordance with Chapter 3 of Volume I of the Department of
Ecology's Stormwater Management Manual for Western Washington (SWMMWW), ECDC 18.30, and
the requirements in the Edmonds Stormwater Addendum (Addendum). Because the SWMMWW does not
include clear itemization of project submittal requirements, the City of Edmonds developed the following
checklist to aid project proponents and plan reviewers in complying with the applicable SWMMWW
requirements. In addition, City -specific requirements (i.e., requirements presented in ECDC 18.30 and the
Addendum that are not included in the SWMMWW) are also included in the checklist. For clarity, the
checklist headings and subheadings are generally organized according to the SWMMWW structure,
though some requirements specific to ECDC 18.30 and the Addendum are included under the
SWMMWW headings.
This checklist reflects most, but not necessarily all of the items that will be reviewed by the Engineering
Division. It is intended to be used as an aid for developers and plan reviewers by providing a foundation
for clear and consistent review of development work in the City of Edmonds. However, all items may not
be applicable to every project, and all items of concern to this office may not be covered on this checklist.
Last, the structure and organization of project submittals can vary depending on the project. The headings
outlined below represent the City's preferred organization of submittal information, though variations are
acceptable as long as all of the required information is provided in a clear submittal package.
Applicant:
Application #:
ADDENDUM CHECKUST I
2
3
4
U
12
1 4
14
I';
V
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
Incomplete
DRAWING REQUIREMENTS
(SWA4MWW Volume 1, Chapter 3)
General
Lines are drawn with a straight edge (with the exception of curved lines).
Drawings are sufficiently clear to see footprints of structures and other features described
above, and are on I I x 17-inch paper or plan -size sheets (24 x 36-inch).
All drawings to scale, preferably at I inch = 20 feet, minimum font size 8 point.
All sheets have a north arrow, scale, a benchmark reference, datum, the section, township,
and range. North arrow points to the top or to the left of the sheet.
Each set of drawings has a legend to define map symbols and line types.
Site Development Drawings
(SWMMWW Volume 1, Section 3. 1.1 [survey requirements),
3.1.5 and 3.1.7)
(all of the following should be included where applicable)
Property lines, parcel numbers, and ownership.
Property dimensions and area.
Contour lines from the best available source (datum used is specified).
Adjoining street names,
Outlines of all drainage basins and basin areas.
Existing and proposed structures and other hard surfaces such as driveways, patios, etc.
t1A
Existing and proposed easements.
0 -
Established buffers, significant trees, and natural vegetation easements.
AIN
Natural drainage channels, wetlands, canyons, gullies, water bodies, etc.
Location of known wells, and underground storage tanks, and septic tanks.
Location and type of on -site stormwater management BMPs, discharge location and
pathway, and areas served.
Location of stormwater conveyance systems for runoff from structures.
Notes, specifications, and details related to selected BMPs.
Locations of soil surveys, soil test pits, and soil borings conducted as part of the required
§oils report (see Soils Report Requirements below).
V
01 If a geotechnical evaluation is required, any recommendations contained in the report are
incorporated into the site development drawings.
Existing public and private development, including utility infrastructure on and adjacent to
the site, if publicly available.
/�/A
Minor hydrologic features, including seeps, springs, closed depression areas, and drainage.
Major hydrologic features including streams, wetlands, and water bodies, as well as wetland
and buffer boundaries and classifications.
Flood hazard areas on or adjacent to the site.
2
ADDENDUM CHECKLIST 1
28
29
14
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
= Incomplete
Geologic hazard areas and associated buffer requirements on or adjacent to the site.
Aquifer and wellhead protection areas on or adjacent to the site.
Topographic features that may act as natural stormwater storage, infiltration, or
conveyance.
Construction SWPPP Drawings
(SWMMWW Volume 1, Section 3.1.6 and Volume 11, Chapter 3)
Refer to Addendum Checklist 3: Construction SWPPP Drawings and Report.
STORMWATER SITE PLAN REPORT
(SWMMWW Volume 1, Section 3.1.5 and 3.1.7)
Project Overview
(SWMMWW Volume 1, Section 3.1.7)
General description of the project, predleveloped, and developed site conditions.
C,
Site area and size of improvements.
fA
Indicates whether there are existing umnanaged hard surfaces that will remain after project
completion.
Pre- and post- developed stormwater runoff conditions, including downstream receiving
system (see Addendum Chapter 4).
Summarizes site parameters, natural drainage systems, drainage to and from adjacent
properties, and bypass flows.
Existing Conditions Summary
(SWMMWW Volume 1, Section 3. 1.1 and Section 3.1.7)
Summarizes existing site topography (see Site Development Drawing requirements).
Summarizes existing site soils (see Soil Report requirements).
Developed Site Hydrology
(SWMMWW Volume 1, Section 3.1.5; ECDC 18.30.060, Addendum)
C,
Scale drawing of lot or lots (see Site Development Drawing requirements).
Provides written summary of the proposed project and how it complies with the applicable
stormwater management requirements.
Includes all calculations and/or analyses necessary to demonstrate compliance with
applicable minimum requirements,
Provides a detailed descripdon of how Minimum Requirement No. 5 is met.
CIncludes
justification for any on -site stormwater management BMPs that were determined
"infeasible."
(o be
Documents that at least 25 percent of any existing hard surfaces that do not drain to an
stormwater management facility and that will remain after the project use on -site
1Aapproved
stormwater management BMPs to manage those existing hard surfaces. (If the 25 percent
minimum is met, projects are not required to evaluate BMPs in priority order or document
infeasibility for these existing surfaces.)
ADDENDUM CHECKUST 1
42
43
44
4 ;
46
41
I �.
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
= Incomplete
Description/tabulation of managed and unmanaged surfaces. (Note that per Addendum
Section 5.5, if a project cannot manage 100 percent of a given surface with the first feasible
BMP, a second BMP may be required to manage the remaining unmanaged area. For
example, where a roof surface drains to multiple downspouts around the perimeter of the
structure, it is generally insufficient to only manage runoff that drains to a single downspout
and to leave the remaining downspouts unmanaged.)
Off -site analysis and documentation in accordance with Addendum Section 6.2:
• Description of where and how stormwater runoff will leave the site.
* Conditions downstrearn of the site including any existing or anticipated future
problem areas (e.g., spot flooding, property damage, erosion issues, capacity -
limited drainage systems, etc.).
• Quantitative analysis (if required by the City).
SOILS REPORT
(SWMMWW Volume 1, Section 3. 1. 1)
In support of the requirements of Minimum Requirement No. 5, includes a Soils Report
prepared by: a professional soil scientist certified by the Soil Science Society of America
(or an equivalent national program); a locally licensed on -site sewage designer; or by other
suitably trained persons working under the supervision of a professional engineer licensed
in the State of Washington in civil engineering, a geologist, a hydrogeologist, or a licensed
engineering geologist registered in the State of Washington.
C/
Soil surveys, soil test pits, soil borings, or soil grain analyses sufficient to identify
underlying soils on the site. Soil testing should occur between December I and April 1.
Results of saturated hydraulic conductivity (Ksat) testing to assess infiltration capability
and the feasibility of rain gardens, bioretention, and permeable pavement if required (see
Addendum Checklist 4: Methods for Determining Infiltration Rates).
Demonstrates compliance with design requirements for all site -specific BMPs (see
Addendum Checklist 5: Field and Design Procedures for Bioretention, Permeable
Pavement, Rain Gardens and Downspout Infiltration Systems).
CONSTRUCTION SWPPP REQUIREMENTS
(SWMMWW Volume 1, Section 3.1.6 and Volume 11, Chapter 3)
Refer to Addendum Checklist 3: Construction SWPPP Drawings and Report.
ESTABLISHMENT OF MAINTENANCE COVENANT
(SWMMWW Volume 1, Section 3.1.5 and 3.1.7)
The maintenance covenant is created on a City -approved form, and all attachments meet the
recording requirements of the Snohomish County Auditor.
Includes maintenance requirements and inspection frequencies for each BMP.
The covenant is recorded at the Snohomish County Auditor's office and is tied to the parcel
numbers that the project is built on.
All covenants are recorded prior to final construction approval for the proposed project.
ADDENDUM CHECKUST I
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
IC = IncornDlete
The covenant includes an 8.5-inch x 11 -inch plan view showing the location of on -site
stonnwater management BMPs relative to structures and property lines, and maintenance
requirements and inspection frequencies for each on -site stormwater management BMP.
A map showing the location of newly planted and retained trees claimed as flow reduction
credits is attached.
Reviewer:
Review Date:
Reviewer Phone #:
Reviewer Comments:
ADDENDUM CHECKLIST 1 5
City of Edmonds
Public Works Department, Engineering Division
121 5th Ave N
Edmonds, WA 98020
Checklist 3:
Construction SWPPP Drawings and Report
Per ECDC 18.30, all Category I and 2 projects must comply with Miniinuin Requirements No. I
Stormwater Site Plans, which includes preparation of a Construction Stormwater Pollution Prevention
Plan (Construction SWPPP) to comply with Minimum Requirement No. 2, Construction Stormwater
Pollution Prevention.
Construction SWPPPs shall be prepared in accordance with Chapter 3 of Volume I of the Department of
Ecology's Stormwater Management Manual for Western Washington (SWMMWW), ECDC 18.30, and
the requirements in the Edmonds Stormwater Addendum (Addendum). Because the SWMMWW does not
include clear itemization of project submittal requirements, the City of Edmonds developed the following
checklist to aid project proponents and plan reviewers in complying with the applicable SWMMWW
requirements. In addition, City -specific requirements (i.e., requirements presented in ECDC 18.30 and the
Addendum that are not included in the SWMMWW) are also included in the checklist. For clarity, the
checklist headings and subheadings are generally organized according to the SWMMWW structure,
though some requirements specific to ECDC 18.30 and the Addendurn are included under the
SWMMWW headings.
This checklist reflects most, but not necessarily all of the items that will be reviewed by the Engineering
Division. It is intended to be used as an aid for developers and plan reviewers by providing a foundation
for clear and consistent review of development work in the City of Edmonds. However, all items may not
be applicable to every project, and all items of concern to this office may not be covered on this checklist.
Last, the structure and organization of project submittals can vary depending on the project. The headings
outlined below represent the City's preferred organization of submittal information, though variations are
acceptable as long as all of the required information is provided in a clear submittal package.
Applicant:
Application #:
ADDENDUM CHECKLIST 3
1
2
3
4
5
6
7
12
Ei
14
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
IC = Incomplete
CONSTRUCTION SWPPP NARRATIVE REPORT
(SWMNIWW Volume 11, Section 3.2.1)
Cover Sheet
Project name.
Applicant's name, address, telephone number, and e-mail address.
Project engineer's name (if applicable), address telephone number, and e-mail address.
Date of submittal.
Contact's name, address telephone number, and e-mail address.
Contractor's name, address telephone number, and e-mail address, if known.
Project Engineer's Certification
For Category 2 Stormwater Site Plans and Category I Stormwater Site Plans with
engineered elements, the Construction SWPPP is stamped by a professional engineer
licensed in the State of Washington in civil engineering.
If required, the SWPPP Report contains a page with the project engineer"s seal with the
following statement:
"I hereby state that this Construction Storinivater Pollution Prevention Plan.for
(name ofproject) has been prepared �v me or under my
supeii,ision and meets the standard ofcare and expertise "" ' usual and customary in
this coniniunity.forprofessional engineers. I understand #14 >untv does not and
'Construction
ivill not assume liabilityfor the sufficiency, suitabilit),, or pe,75rmaince Of
SJfPFP BMPs prepared by me. "
Table of Contents
Shows the page number for each section of the report and the appendices.
Certifled Erosion and Sediment Control Lead
For project sites that will disturb I acre or more and that discharge stormwater to surface
waters of the State, a Certified Erosion and Sediment Control Lead (CESCL) is identified
in the Construcfion SWPPP and shall be on site or on -call at all times.
General Information on the Existing Site and Project
Nature and purpose of the construction project.
Total size of the area; any increase in existing impervious area, the total area expected to
b e disturbed by clearing, grading, excavation or other construction activities, including off -
site borrow and fill areas; and the volumes of grading cut -and -fill that are proposed.
Existing topography, vegetation, and drainage.
Any structures or development on the parcel including the area of existing impervious
surfaces.
Adjacent areas, including streams, lakes, wetlands, residential areas, and roads that might
be affected by the construction project.
Describes how upstream drainage areas may affect the site.
Describes downstream drainage leading from the site to the receiving body of wat
2 ADDENDUM CHECKLIST 3
19
20
21
22
23
24
25
26
29
30
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
IC = Incomplete
tq/A
Areas on or adjacent to the site that are classified as critical areas.
Critical areas that receive runoff from the site up to one -quarter mile away.
t;
Special requirements and provisions for working near or within these areas.
Soil on the site, giving such information as soil names, mapping unit, erodibility, ability to
settle, permeability, depth, texture, and soil structure.
Areas on the site that have potential erosion problems.
Thirteen Elements
Describes how the Construction SWPPP addresses each of the 13 required elements.
Z:
Type and location of BMPs used to satisfy the required element.
If an element is not applicable to a project, a written justification for why it is not
necessary.
Includes description of construction -phase BMP protection techniques specific to
categories of LID BM?s (e.g., infiltration and dispersion) as well asspecific LID BMTs
(permeable pavement, bioretention areas/rain gardens, and vegetated roofs per Addendum
Section 6.1 [related to Element No. 13]).
Construction Phasing
C,
Provides intended sequence and timing of construction activities and any proposed
construction phasing (including construction restraints for environmentally sensitive areas).
See also the sequencing requirements in Addendum Section 6. 1.
Includes construction schedule, including the activities that will continue during the wet
season and how the transport of sediment from the construction site to receiving waters
will be prevented.
— Financial/Ownership Responsibilities
Description of ownership and obligations for the project, including financial responsibility
for environmental liabilities associated with construction.
Engineering Calculations
All calculations made for the design of such items as sediment ponds, diversions, and
waterways, as well as calculations for runoff and stormwater detention design are attached
(if applicable).
CONSTRUCTION SWPPP DRAWINGS
(SWMMWW Volume 11, Section 3.2.2)
Refer to the general Drawing Requirements in SWMMWW Volume 1, Chapter 3;
Addendum Checklist 1: Category I Stormwater Site Plans, and Addendum Checklist 2:
Category 2 Stormwater Site Plans.
Vicinity Map
Provides a map with enough detail to identify the location of the construction site, adjacent
roads, and receiving waters.
Site Map
Legal description of the property boundaries or an illustration of property lines (includin 9
distances) on the drawings.
ADDENDUM CHECKUST 3
34
35
36
3",
38
.1 ()
40
41
.42
43
44
45
40
48
49
11 0
51
52
53
54
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A =Not Applicable M Missing (i.e., please include)
= Incomplete
C
North arrow.
Existing structures and roads.
C,
Boundaries and identification of different soil types.
C
Areas of potential erosion problems.
Any on -site and a4jacent surface waters, critical areas, buffers, flood plain boundaries, and
Shoreline Management boundaries.
C
Existing contours and drainage basins and the direction of flow for the different drainage
areas.
Where feasible, contours extend a minirnurn of 25 feet beyond property lines and extend
sufficiently to depict existing conditions.
Final and interim grade contours as appropriate, drainage basins, and the direction of
stormwater flow during and upon completion of construction.
CL
Areas of soil disturbance, including all areas affected by clearing, grading, and excavation.
cLocations
where stormwater will discharge to surface waters during and upon completion
of construction.
C_
Existing unique or valuable vegetation and vegetation to be preserved.
/,/)I\
Cut -and -fill slopes indicating top and bottom of slope catch lines.
Total cut -and -fill quantities and the method of disposal for excess material.
Stockpile. waste storage; and vehicle storage, maintenance, and washdown areas.
Temporary and Permanent Conveyance Systems
C-
Locations for temporary and permanent swales, interceptor trenches, or ditches.
C
Drainage pipes, ditches, or cut-off trenches associated with erosion and sediment control
and storrnwater management.
C_
Temporary and permanent pipe inverts and minimum slopes and cover.
--Grades,
dimensions, and direction of flow in all ditches and swales, culverts, and pipes.
Details for bypassing off -site runoff around disturbed areas.
Locations and outlets of any dewatering systems.
Temporary and Permanent Treatment and Detention BMPs
Locations of temporary and pennanent stonnwater treatment and/or flow control BMPs.
Temporary and Permanent Erosion and Sediment Control BMPs
c
Shows on the site map and includes details for all structural and nonstructural ESC BMPs
(including, but not limited to, silt fences, construction entrances, sedimentation facilities,
etc.).
C_
Shows on maps and includes details for any construction -phase BMPs or techniques used
for LID BMP protection.
4 ADDENDUM CHECKLIST 3
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
IC = Incomplete
Other Pollutant BMPs
CIdentifies
location of BMPs to be used for the control of pollutants other than sediment.
This can include designated concrete washout area, refueling sites, or other BMPs for
pollutant control.
Monitoring Locations
Identifies any required water quality sampling locations (sites greater than I acre).
Sampling stations are located in accordance with applicable permit requirements.
Standard Notes
Notes addressing construction phasing and scheduling are included on the drawings.
(Standard Notes are suggested in SWMMWW Appendix II -A.)
Reviewer:
Review Date:
Reviewer Phone #:
Reviewer Comments:
ADDENDUM CHECKLIST 3
City of Edmonds
Public Works Department, Engineering Di-Osion
121 5 th Ave N
Edmonds, WA 98020
Checklist 4:
Methods for Determining Infiltration Rates
Per ECDC 18.30, all Category I projects must comply with Minimum Requirements No. I through No. 5,
and all Category 2 projects must comply with Minimum Requirements No. I through No. 9. If infiltration
facilities are proposed to meet Minimum Requirement Nos. 5, 6, and/or 7, soil infiltration rates must be
measured using approved soil infiltration testing procedures.
Infiltration facilities shall be prepared in accordance with the Department of Ecology's Stormwater
Management Manual for Western Washington (SWMMWW), ECDC 18.30, and the requirements in the
Edmonds Stormwater Addendum (Addendum). Because the SWMMWW does not always include clear
itemization of project procedural and/or submittal requirements, the City of Edmonds developed
Appendix B of this Addendum (Methods for Determining Design Infiltration Rates) as well as this
accompanying checklist to aid project proponents and plan reviewers in complying with the applicable
SWMMWV requirements. In addition, City -specific requirements (i.e., requirements presented in
ECDC 18.30 and the Addendum that are not included in the SWMMWW) are also included in the
appendix and checklist.
This checklist reflects most, but not necessarily all, of the items that shall be performed by the project
proponent, and documented for review by the Engineering Division. It is intended to be used as an aid for
developers and plan reviewers by providing a foundation for clear and consistent infiltration evaluation
processes in the City of Edmonds. However, all items may not be applicable to every project, and all
items of concern to this office may not be covered on this checklist. Project proponents must review
Appendix B in detail to identify complete infiltration testing requirements. Last, methods and procedures
outlined herein can vary depending on the project, The headings outlined below represent the City's
recommended process, though variations are acceptable as long as all of the required information is
evaluated and documented.
Applicant:
Application #:
ADDENDUM CHECKLIST 4
3
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
Incomplete
APPLICATIONS
(SWMMWW Volume 111, Section 3.3.5)
Method 1 — Field Testing
Large -Scale Pilot Infiltration Test (PIT) applies to infiltrationfacilities with drainage areas
"Detailed
greater than I acre (i.e., projects that are using the Method "- see Addendum
Checklist 6), and inay be used to demonstrate infeasibilio; ofbiorelention, permeable
pavement, orrain gardens in meeting Minimum Requirement No. 5.
Small -Scale Pilot Infiltration Test (PIT) applies to infiltration facilities with drainage areas
less than I acre (i.e., projects that are using the "Simple Method "_ see Addendum
Checklist 6), and may be used to demonstrate infeasibility ofbioretention, permeable
pavement, or rain gardens in meeting Minimum Requirement No. 5.
U - S - EPA Falling Head Percolation Test Procedure (as Modiftedfor the City of Edmonds)
may only be usedfor BMP performance verification testing. May not be usedfor BMP
design or to demonstrate infeasibility ofbioretention, pernleablepavement, or rain gardens
in meeting Minimum Requirement No. 5.
Method 2 — Soil Grain Size Analysis
Soil Grain Size Analysis may only be used at project sites that are underlain by soils not
consolidated by glacial advance (e.g., recessional outivash soils), and may not be used to
demonstrate infeasibility of bioretention, permeable pavement, orrain gardens in meeting
Minimum Requirement No. 5.
PROCEDURES
(SWMMWW Volume 111, Section 3.3.5 and 3.4)
See Addendum Appendix B — Methods for Determining Design Infiltration Rates, as well
as Addendum Checklists 5 and 6.
Correction Factor
(SWMMWW Volume 111, Section 3.3.6)
For application of correction factors for bioretention, permeable pavement, and rain
gardens, refer to SWMMWW Volume 111, Section 3.4; Addendum Appendix B; and
Addendum Checklist 5: Field and Design Procedures for Bioretention, Pernicable
Pavement, Rain Gardens, and Downspout Infiltration Systems for application of correction
factors. (L6R64L--(
ADDENDUM CHECKLIST 4
10
11
12
13
14
15
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
= Incomplete
For all other infiltration facilities, the design saturated hydraulic conductivity is calculated
using the following equation:
Ksatdcsign = Ksatinitial X CFv x CFT x CFm
CR, CF for site variability and number of test locations
0.33 to 1.0
High uncertainty in subsurface conditions = lower CFv
High certainty in subsurface conditions = higher CFv
CF,- CF for test method used
For the large-scale PIT method, CFT= 0.75;
• For the small-scale PIT method, CFr = 0.50
• For other small-scale infiltration tests (e.g., EPA falling head), CFT 0.40
• For grain size analysis, CFT = 0.40.
CF,\, = CF for influent control to prevent siltation and bio-build up = 0.9.
Method I — Field Testing
(SWMMWW Volume 111, Section 3.3.6)
Large -Scale Pilot Infiltration Test (PIT)
Preparation of Test Hole
Excavate the test pit to the depth of the bottom of The proposed infiltration facility.
Lay back the slopes sufficiently to avoid caving and erosion during the test, or consider
shoring the sides of the test pit.
The horizontal surface area of the bottorn of the test pit should be approximately 100 square
feet.
Accurately document the size, location, and geometry of the test pit.
Install a vertical measuring rod (minimum 5 feet long) marked in 0.5-inch increments in the
center of the pit bottom.
Convey water to the pit using a rigid 6-inch diameter pipe with a splash plate on the bottom
to convey water to the pit.
Soaking Period
Pre-soak: Add water to the pit at a rate that wil I maintain a water level between 6 inches and
12 inches above the bottom of the pit.
Note: For in Itrationfacilities sepiling large drainage areas, designs with multiplefeei of
f,
standing water can have infiltration tests with greater than I foot of standing water. The
depth niust not exceed the proposed maximum depth of water expected in the completed
facility.
Every 15 to 30 minutes, record the cumulative volume and instantaneous flow rate (in
gallons per minute) necessary to maintain the water level at the same point on the
measuring rod.
ADDENDUM CHECKLIST 4
18
19
20
21
22
23
24
2 5
26
27
28
29
30
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
= Incomplete
Add water to the pit until I hour after the flow rate into the pit has stabilized while
maintaining the same pond water level (usually 6 hours). The total of the pre-soak time plus
I hour after the flow rate has stabilized should be no less than 6 hours.
Measurement of the Infiltration Rate
After the flow rate has stabilized for at least I hour, turn off the water and record the rate of
infiltration (the drop rate of the standing water) in inches per hour from the measuring rod
data, until the pit is empty. Use 30-minute or 1 -hour increments.
Calculate the Design Infiltration Rate
Calculate and record the infiltration rate in inches per hour. Use the lowest hourly rate
determined in row 17 above.
To compute the design infiltration rate (Ksatde,ip), adjust the final measured infiltration
rates by the appropriate correction factors outlined above,
Groundwater Mounding
Over -excavate the pit to see if the test water is mounded on shallow restrictive layers or if it
has continued to flow deep into the subsurface. The depth of excavation varies depending
on soil type and depth to hydraulic restricting layer, and is determined by the design
professional engineer or certified soils professional. Mounding is an indication that a
mounding analysis is necessary.
Smail-Scale Pflot Infiltration Test
Preparation of Test Hole
Excavate the test pit to the estimated surface elevation of the proposed infiltration facility.
For bioretention, excavate to the estimated elevation at which the imported soil mix will lie
on top of the underlying native soil.
For permeable pavements, excavate to the elevation at which the imported subgrade
materials, or the pavement itself, will contact the underlying native soil.
Lay back the slopes sufficiently to avoid caving and erosion during the test, or consider
shoring the sides of the test pit.
The horizontal surface area of the bottom of the test pit should be 12 to 32 square feet.
Accurately document the size, location, and geometry of the test pit.
Install a vertical measuring rod that is marked in 0.5-incb increments in the center of the pit
bottom.
Convey water to the pit using a rigid pipe with a splash plate on the bottom to Convey water
to the pit. Use a 3-inch-diameter pipe for pits or) the smaller end of the recommended
surface area, and a 4-inch pipe for pits on the larger end of the recommended surface area.
Soaking Period
Pre-soak: Add water to the pit so that there is standing water for at least 6 hours. Maintain
the water level at least 12 inches above the bottom of the pit.
Add water to the pit at a rate that will maintain a fixed 6- to 12-inch water level above the
bottom of the pit over a full hour, The depth should not exceed the proposed maximum
depth of water expected in the completed facility.
4 ADDENDUM CHECKLIST 4
31
32
33
34
35
36
37
38
39
40
41
42
43
44
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
= Incomplete
Every 15 minutes, record the cumulative volume and instantaneous flow rate in gallons per
minute necessary to maintain the water level at the same point (between 6 to 12 inches) on
the measuring rod. The specific depth should be the same as the maximum designed
ponding depth (usually 6 to 12 inches).
Measurement of the Infiltration Rate
After the flow rate has stabilized for I hour, turn off the water and record the rate of
infiltration (the drop rate of the standing water) in inches per hour from the measuring rod
data, until the pit is empty. Use 15-minute increments if feasible.
Calculate the Design Infiltration Rate
Calculate and record the infiltration rate in inches per hour. Use the lowest hourly rate
determined in row 32 above.
To cornpute the design infiltrafion rate (Ksat&,ign), adjust the final measured infiltration
rates by the appropriate correction factors outlined above.
Groundwater Mounding
Over -excavate the pit to see if the test water is mounded on shallow restrictive layers or if it
has continued to flow deep into the subsurface. The soils professional should judge whether
a mounding analysis is necessary.
Falling Head Percolation Test Procedure
(as Modified for the City of Edmonds; for performance verification only)
+Space
tests uniformly throughout the area. If soil conditions are highly variable, more tests
may be required.
Preparation of Test Hole
The diameter of each test hole is 8 inches.
The depth of each test is to the proposed depths of the absorption systems or to the most
limiting soil horizon.
To expose a natural soil surface, scratch the bottom of the hole with a sharp pointed
instrument and remove the loose material from the test hole.
Set a PVC pipe (6 inch -inner -diameter, 4 foot long) into the hole and press into the soil
6 inches.
Place 2 inches of 0.5- to 0.75-inch rock in the pipe to protect the bottom from scouring
when water is added.
Soaking Period
In sandy soils with little or no clay, soaking is not necessary (proceed to Measurement of
the Percolation Rate).
Carefully fill the pipe with at least 12 inches of clear water. Maintain the depth of water for
at least 4 hours (and preferably overnight if clay soils are present).
If, after filling the pipe twice with 12 inches of water, the water seeps completely away in
less than 10 minutes, the test can proceed immediately (proceed to Measurement of the
Percolation Rate).
ADDENDUM CHECKUST 4 5
45
46
47
48
49
50
51
52
53
54
55
56
57
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
IC = Incomplete
Measurement of the Percolation Rate
Except for sandy soils, make percolation rate measurements 15 hours but no more than
30 hours after the soaking period began.
Adjust the water level to 6 inches above the gravel (or 8 inches above the bottom of the
hole). At no time during the test is the water level allowed to rise more than 6 inches above
the gravel.
Immediately after adjustment, measure the water level from a fixed reference point to the
nearest I/ I 6th inch at 3 0-minute intervals. Continue the test until two successive water level
drops do not vary by more than 1/ 16 inch within a 90-minute period. At least three
measurements are to be made.
After each measurement, readjust the water level to the 6-inch level.
Use the last water level drop to calculate the percolation rate.
In sandy soils or soils in which the first 6 inches of water added after the soaking period
seeps away in less than 30 minutes, make water level measurements at 10-minute intervals
for a I -hour period. Use the last water level drop to calculate the percolation rate.
Calculate the Design Infiltration Rate
Calculate the percolation rate for each test site by dividing the time interval used between
measurements by the magnitude of the last water level drop. This calculation results in a
percolation rate in minutes/inch. To determine the percolation rate for the area, average the
rates obtained from each hole. (If tests in the area vary by more than 20 minutes/inch,
variations in soil type are indicated. Under these circumstances, percolation rates should not
I
be averaged.)
To compute the design infiltration rate (Ksatd,,i,:n),. adjust the final percolation rates by the
appropriate correction factors outlined above.
Method 3 — Soil Grain Analysis
(SWMMWW Volurrie III, Section 3.3.6)
For infiltration basins and trenches, perform the grain size analysis for each defined layer
below the infiltration facility to a depth below the facility bottom of 2.5 times the maximum
depth of water in the pond, but not less than 10 feet.
For large infiltration facilities serving drainage areas of 10 acres or more, soil grain size
analyses are performed on layers up to 50 feet deep (or no more than 10 feet below the
water table).
For bioretention areas, each defined layer is analyzed below the top of the final bioretention
area subgrade to a depth of at least 3 times the maximum ponding depth, but not less than
3 feet (I meter).
For permeable pavement, each defined layer is analyzed below the top of the final subgrade
to a depth of at least 3 times the maximum ponding depth within the base (reservoir) course,
but not less than 3 feet (I meter).
If the licensed professional conducting the investigation determines that deeper layers will
influence the rate of infiltration for the facility, soil layers at greater depths may be
considered when assessing the site's hydraulic conductivity characteristics.
6 ADDENDUM CHECKLIST 4
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A � Not Applicable M Missing (i.e., please include)
IC = IncomDlete
59 1 J
Reviewer:
Use the following relationship to determine the initial hydraulic conductivity:
1og,�(K,.)=-1.57+1.90DIO +0.015D60 -0.0 1 3D90 - 2.08ffi,,,S
Where, Dto, DO, and Dqo are the grain sizes in mm for which 10 percent, 60 percent, and
90 percent of the sample is more fine and ff.,., is the fraction of the soil (by weight) that
passes the US #200 sieve (Ksat is in cm/s).
Compaction effects must be taken into account when estimating hydraulic conductivity
where applicable.
Review Date:
Reviewer Phone #:
Reviewer Comments:
ADDENDUM CHECKLIST 4 7
. ir
,, IM City of Edmonds
Public Works Departmcn� Engineering DhAsion
121 5th Ave N
Edmonds, WA 98020
Checklist 5:
Field and Design Procedures for Bioretention, Permeable Pavement,
Rain Gardens, and Downspout Infiltration Systems
Per ECDC 18.30, all Category I projects must comply with Minimum Requirements No. I through No. 5,
and all Category 2 projects must comply with Minimum Requirements No. I through No. 9. If
bioretention, rain gardens, permeable pavernent, and/or downspout infiltration systems are proposed to
meet Minimum Requirement Nos. 5, 6, and/or 7, soil infiltration rates must be measured using approved
so]] infiltration testing procedures. See the Edmonds Stormwater Addendum (Addendum) Appendix B
and Checklist 4.
Bioretention, rain gardens, permeable pavement, and downspout infiltration systems shall be designed in
accordance with the Department of Ecology's Stormwater Management Manual for Western Washington
(SWMMWW), ECDC 18.30, and the requirements in the Addendum. Because the SWMMWW does not
always include clear itemization of project procedural and/or submittal requirements, the City of
Edmonds developed the following checklist to aid project proponents and plan reviewers in complying
with the applicable SWMMWW requirements. In addition, City -specific requirements (i.e., requirements
presented in ECDC 18.30 and the Addendum that are not included in the SWMMWW) are also included
in the checklist. For clarity, the checklist headings and subheadings are generally organized according to
the SWMMWW structure, though some requirements specific to ECDC 18.30 and the Addendum are
included under the SWMMWW headings.
This checklist reflects most, but not necessarily all, of the items that shall be performed by the project
proponent, and documented for review by the Engineering Division. It is intended to be used as an aid for
developers and plan reviewers by providing a foundation for clear and consistent field and design
procedures in the City of Edmonds. However, all items may not be applicable to every project, and all
items of concern to this office may not be covered on this checklist. Last, the methods and procedures
outlined herein can vary depending on the project. The headings outlined below represent the City's
recommended process, though variations are acceptable as long as all of the required infori-nation is
evaluated and documented.
Applicant:
Application #:
ADDENDUM CHECKLIST 5
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
Incomplete
BIORETENTION
FIELD AND DESIGN PROCEDURES
Soils Report meeting the requirements described in the "Soils Report" section of this
checklist. The Soils Report shall be included as part of the required Category I or 2
IN/A
Stormwater Site Plan (see also Addendum Checklists I and 2).
Infiltration Rate
(SWMMWW Volume III, Section 3.4; Volume V, BMP T7.30;
and Addendum Appendix B)
Test hole or test pit explorations should be conducted during mid to late in the wet season
(December I through April 1).
Infiltration testing is performed at the anticipated elevation of the top of the native soil
beneath the bioretention area (i.e., at the bottom of the excavated area).
Small bioretention cells (bioretention areas receiving water from one or two individual
lots or <0.25 acre of pavement or other impervious surface): A single small-scale PIT (or
soil grain size analysis, if permitted per Addendum Appendix B and Addendum
Checklist 41) is performed at each potential bioretention site.
Large bioretention cells (bioretention areas receiving water from three or more lots or
0.25 acre or more of pavement or other impervious surface): A single small-scale PIT (or
soil grain size analysis, if permitted per Addendum Appendix B and Addendum
I
Checklist 41) is performed every 5,000 square feet of bioretention area. If soil
characteristics across the site are consistent, a geotechnical professional may recommend a
reduction in the number of tests.
Bioretention swales or long, narrow bioretention areas (i.e., one following the road
rigbt-of-way): A single small-scale PIT (or soil grain size analysis, if permitted per
Addendum Appendix B and Addendum Checklist 41) is performed every 200 linear feet
and within each length of road with varying subsurface characteriStiCS.2
A correction factor is applied to the measured Ksat of the subgrade soils (not the imported
bioretention soil mix) to estimate its design (long-term) infiltration rate. Correction factors
range from 0.33 — I (no correction) and are based on the site variability and number of
locations tested (CF,). See also Addendum Appendix B and Addendum Checklist 4.
Depth to Groundwater
(SWMMWW Volume 111, Section 3.4)
A soil log or over -excavation of the PIT reveals that there is at least 3 feet of vertical
clearance from the lowest elevation of the bioretention soil (or any underlying gravel layer)
to the seasonal high groundwater elevation or other impermeable layer if the area tributary
to the facility meets or exceeds any of the following thresholds:
0 5,000 square feet of pollution -generating impervious surface (PGIS)
0 10,000 square feet of impervious area
0 0.75 acres of lawn and landscape
A soil log or over -excavation of the PIT reveals that there is at least I foot of vertical
clearance from the seasonal high groundwater or other impermeable layer for bioretention
systems with a contributing area less than the above threshold.
ADDENDUM CHECKLIST 5
12
13
14
15
E
I "
I �
lu
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
Incomplete
Groundwater Mounding Analysis
(SWMMWW Volume III, Section 3.4.2)
Applies to biorctenfion areas with drainage areas exceeding I acre.
If a single bioretention area serves a drainage area exceeding I acre, and has less than
15 feet depth to seasonal high ground water or other low permeability stratum (as measured
A
from the bottom of the infiltration basin or trench), a groundwater mounding analysis is
performed. (See also SWMMWW Volume 111, Section 3.3.8, Step 10.)
Final design infiltration rate determined using an analytical ground water model to
investigate the effects of the local hydrologic conditions on facility performance. (Use
MODRET or an equivalent subject to approval by the City.)
RAIN GARDEN
FIELD AND DESIGN PROCEDURES
(SWMMWW Volume III, Section 3.4)
Soils Report meeting the Category I Stormwater Site Plan Soils Report requirements
described in the "Soils Report" section of this checklist.
Infiltration Rate
Test bole or test pit explorations should be conducted during mid to late in the wet season
(December I through April 1).
A single small-scale PIT (or soil grain size analysis, if permitted per Addendum
Appendix B and Addendum Checklist 41) is performed at each potential rain garden site.
Infiltration testing is performed at the anticipated elevation of the top of the native soil
beneath the rain garden area (i.e., at the bottom of the excavated area).
Depth to Groundwater
A soil log or over -excavation of the PIT reveals that there is at least I foot between the
bottom of the lowest elevation of the rain garden soil (or any underlying gravel layer) and
the seasonal high groundwater or an underlying impermeable/low permeable layer.
PERMEABLE PAVEMENT
FIELD AND DESIGN PROCEDURES
(SWMMWW Volume III, Section 3.4)
Soils Report meeting the requirements described in the "Soils Report"' section of this
checklist. The Soils Report shall be included as part of the required Category I or 2
Stormwater Site Plan (see also Addendum Checklists I and 2).
Infiltration Rate
Test bole or test pit explorations should be conducted during mid to late in the wet season
(December I through April 1).
Infiltration testing is performed in the soil profile at the estimated bottom elevation of base
materials for the permeable pavement. If no base materials (e.g., a pervious concrete
sidewalk), the testing is performed at the estimated bottom elevation of the pavement.
ADDENDUM CHECKLIST 5
20
21
22
23
24
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
= Incomplete
Projects subject to Minimum Requirements No. I through No. 5:
A single small-scale PIT (or soil grain size analysis, if permitted per Addendum
Appendix B and Addendum Checklist 41) is performed for every 5,000 square feet of
permeable pavement, but not less than one test per site.
Projects subject to Minimum Requirements No. 1 through No. 9:
• On commercial property: a single small-scale PIT (or soil grain size analysis, if
permitted per Addendurn Appendix B and Addendum Checklist 41) is performed
for every 5,000 square feet of permeable pavement, but not less than one test per
site.
• On residential developments: a single small-scale PIT (or soil grain size analysis, if
permitted per Addendum Appendix B and Addendum Checklist 41) is performed at
every proposed lot, every 200 feet of roadway, and within each length of road with
significant differences in subsurface characteristics?
A correction factor is applied to the measured Ksat of the subgrade soils to estimate its
design (long-term) infiltration rate. Two correction factors may be applied, based on site
variability and number of test locations (CF,), and quality of aggregate base material
(CF.):
• CF� = 0.33 — I
• CF,= 0.9 — I
See also Addendum Appendix B and Addendum Checklist 4.
Where permeable pavements are used for pollution -generating hard surfaces (primarily
roads, driveways, and parking lots) and Minimum Requirement No. 6 is triggered, the
subgrade meets the soil suitability criteria for treatment (refer to SWMMWW Volume 111,
Section 3.3.7), or a treatment layer is provided.
Depth to Groundwater
A soil log or over -excavation of the PIT reveals that there is at least I foot between the
bottom of the lowest gravel base course or treatment layer and the seasonal high
groundwater or an underlying impertneable/low permeable layer.
DOWNSPOUT FULL INFILTRATION SYSTEMS
FIELD AND DESIGN PROCEDURES
(SWMMWW Volume 111, Section 3. 1. 1)
Soils Report meeting the requirements described in the "Soils Report" section of this
checklist. The Soils Report shall be included as part of the required Category I or 2
Stormwater Site Plan (see also Addendum Checklists I and 2).
Individual lot or site tests consist of at least one soil log at the location of the infiltration
system.
Soil logs extend a minimum of 4 feet in depth (from proposed grade), and at least 1 foot
below the expected bottom elevation of the facility.
C/
Soils in the location of the proposed infiltration system are outwash or loam soils.
ADDENDUM CHECKLIST 5
29
30
31
32
33
34
35
I
3h
I -
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
Incomplete
Depth to Groundwater
Site -specific test indicates there is 12 inches or more of permeable soil from the proposed
C,/
bottom (final grade) of the infiltration system to the seasonal high groundwater table or
other impermeable layer.
CATEGORY 1 STORMWATER SITE PLAN SOILS REPORT
(SWM Volume 1, Section 3. 1. 1; Addendum Chapter 7 and Checklist 1)
In support of the requirements of Minimum Requirement No. 5, includes a Soils Report
prepared by: a professional soil scientist certified by the Soil Science Society of America
C'/
(or an equivalent national program); a locally licensed on -site sewage designer; or by other
suitably trained persons working under the supervision of a professional engineer,
geologist, hydrogeologist, or engineering geologist registered in the State of Washington.
Soil surveys, soil test pits, soil borings, or soil grain analyses sufficient to identify
underlying soils on the site. Soil testing should occur between December I and April 1.
Includes the results of saturated hydraulic conductivity (Ksat) testing to assess infiltration
capability and the feasibility of rain gardens, bioretention, and permeable pavement.
Includes the results of saturated hydraulic conductivity (Ksat) testing to assess infiltration
capability and the feasibility of rain gardens, bioretention, and permeable pavement (see
Addendum Appendix B and Addendum Checklist 4: Methods for Determining Infiltration
Rates).
Includes the results of testing for a hydraulic restriction layer (groundwater, soil layer with
less than 0.3 in/hr Ksat, bedrock, etc.) under possible sites for a rain garden, bioretention
area, or permeable pavement. Testing with a monitoring well or an excavated pit must
extend to a depth at least I foot below the estimated bottom elevation of a rain
garden/bioretention excavation and at least I foot below the subgrade surface of a
permeable pavement. This analysis should be performed in the winter season (December 21
through March 21). Site historical information and evidence of high groundwater in the
soils can also be used.
For downspout infiltration systems, identifies the limits of any outwash type soils (i.e.,
those meeting USDA soil texture classes ranging from coarse sand and cobbles to medium
sand) versus other soil types and include an inventory of topsoil depth. Any evidence of
high groundwater level, such as mottling, is noted.
CATEGORY 2 STORMWATER SITE PLAN SOILS REPORT
(SWMMWW Volume 1, 3. 1. 1; Addendum Chapter 7 and Checklist 2)
The Soils Report is prepared and stamped by a professional soil scientist certified by the
Soil Science Society of America (or equivalent program), professional engineer, a licensed
geologist, an engineefing geologist, or a hydrogeologist registered in the State of
Washington.
[NTA
Soils Report prepared meeting the requirements outlined in Addendum Checklist 2, and
including BMP-specific information listed below where applicable.
ADDENDUM CHECKUST 5
0
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
IC = Incomplete
Includes the results of testing for a hydraulic restriction layer (groundwater, soil layer with
less than 0.3 in/hr Ksat, bedrock, etc.) under possible sites for a bioretention area or
permeable pavement. Testing with a monitoring well or an excavated pit must extend to a
Adepth
at least 3 feet below the estimated bottom elevation of a bioretention excavation and
at least I foot below the subgrade surface of a permeable pavement. This analysis should be
performed in the winter season (December 21 through March 2 1). Site historical
information and evidence of high groundwater in the soils can also be used.
For downspout infiltration systems, identifies the limits of any outwash type soils (i.e.,
those meeting USDA soil texture classes ranging from coarse sand and cobbles to medium
sand) versus other soil types and include an inventory of topsoil depth.
Where required for bioretention (see above), documents of the results of groundwater
mounding analyses and the impacts of mounding on the design infiltration rate.
Small-scale and large-scale PITs are required to determine feasibility of bioretention,
permeable pavement, and rain gardens. The Soil Grain Size Analysis methods outlined in
SWMMWW Volume 111, Section 3.3.6; Addendum Appendix B; and Addendum Checklist 4
may be used to determine infiltration rate of underlying soils (for outwash soils only), but may
not be used to determine infeasibility.
2 If the site subsurface characterization, including soil borings across the development site,
indicates consistent soil characteristics and depths to seasonal high groundwater conditions, the
number of test locations may be reduced to a frequency recommended by a geotechnical
professional.
Reviewer:
Review Date:
Reviewer Phone #:
Reviewer Comments:
ADDENDUM CHECKUST 5
City of Edmonds
Public Works Department, Engineering Division
121 51h Ave N
Ednionds, WA 98020
Checklist 7:
Post -Construction Soil Quality and Depth BMP
Per ECDC 18.30, all Category I projects must comply with Minimum Requirements No. I through No. 5,
and all Category 2 projects must comply with Minimum Requirements No. I through No. 9. Post -
construction soil quality and depth is required to be established on all disturbed lawn and landscaped
areas subject to Minimum Requirement No. 5. See also Addendum Checklists I through 3 for submittal
requirements.
Post -construction soil quality and depth shall be established in accordance with the Department of
Ecology's Stormwater Management Manual for Western Washington (SWMMWW), ECDC 18.30, and
the requirements in the Addendum. The City of Edmonds developed the following checklist to aid project
proponents and plan reviewers in complying with the applicable SWMMWW requirements for this BMP.
In addition, City -specific requirements (i.e., requirements presented in ECDC 18.30, the Addendum, or
other City requirements that are not included in the SWMMWW) are also included in the checklist. Note
also that much of the post -construction soil quality and depth design content in the SWMMWW refers to
the Soils for Salmon, Building Soil guidebook (available at <vrw%,.soilsforsalmon.orgLhow>. To simplify
the design and review process, the requirements from the Building Soil guidebook are also included in
this checklist
This checklist reflects most, but not necessarily all, of the items that shall be documented by the project
proponent, for review by the Engineering Division. It is intended to be used as an aid for developers and
plan reviewers by providing a foundation for clear and consistent BMP design in the City of Edmonds.
However, all items may not be applicable to every project, and all items of concern to this office may not
be covered on this checklist.
Applicant:
Application #:
ADDENDUM CHECKUST 7 1
2'k
31.
4'�
5i
0,
7,
81
10,
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
Incomplete
MODELING AND SIZING
(SVIMMWW Volume V, Section 5.3. 1, BMP T5. 13)
Lawn and landscape areas that meet the requirements of this BMP are modeled as
"Pasture" "lawn"
rather than surface over the underlying soil (till or outwash).
SETBACKS
(Addendum, Appendix A)
Lawn and landscape area is not within the North Edmonds Earth Subsidence and Landslide
Hazard Area (ESLHA).
DESIGN CRITERIA
(SWMMWW Volume V, Section 5.3.1, BMP T5.13; Building Soil Manual, 2016;
City of Edmonds Standard Detail for Post -Construction Soil Quality and Depth)
Compost Specifications
Compost meets organic content requirements either by using "preapproved" amendment
rates (see compost specifications in BMP T7.30 and Addendum Checklist 10) or calculated
amendment rates (see below).
If using "preapproved" amendment rates, the compost meets the compost specifications in
BMP T7.30 and Addendum Checklist 10, with the following exceptions:
0 Compost may have up to 35 percent biosolids; or manure.
0 Compost must have organic matter content of 40 percent to 65 percent.
* Carbon to nitrogen ratio may be up to 35:1 for plantings entirely composed of
plants native to the Puget Sound Lowlands region.
If using calculated amendment rates, compost meets compost specifications for
preapproved rates, or other organic materials amended to meet carbon to nitrogen
requirements and contaminant standards for "composted materials" in WAC 173-350-220.
Soil Retention
Existing vegetation and soils are left undisturbed and are protected from compaction during
construction.
Soils to be retained are not stripped, logged, graded or driven on during construction
(Building Soil Manual, 2016).
Soil Amendment
Soil organic matter is deten-nined using the most current version of ASTM D2974 "Test
Methods for Moisture, Ash, and Organic Matter of Peat and Other Organic Soils"' and
TMECC 05.07A "Loss -On -Ignition Organic Matter Method." Results of soil analysis are
submitted to the City along with proposed soil mix to meet soil requirements.
Topsoil PH is 6.0 to 8.0, or matches the PH of the original undisturbed soil.
Subsoils are scarified to at least 8 inches depth (or to depth needed to achieve a total depth
of 12 inches of uncompacted soil after calculated amount of amendment is added).
Leave plant debris or its equivalent on the soil surface to replenish organic matter.
ADDENDUM CHECKLIST 7
12
131
14,
15,
16,
171�,
18 'A
19'.
20*
21,
22'
23*
24'-
25'
20,
2-1 '
2XI
-)9�
3 0',
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
C = Incomplete
Turf Installations
JA
Topsoil layer in turf areas achieves a minimum organic matter content of 5 percent.
If using the preapproved amendment rate, 1.75 inches of composted material is rototilled
into 6.25 inches of soil for a total settled depth of 8 inches (Building Soil Manual, 2016).
If using the calculated amendment rate, the calculated amount of composted material or
approved organic material is rototilled into depth of soil needed to achieve 8 inches of
settled soil at 5 percent organic content (Building Soil Manual, 2016).
Soil is compacted to 85 percent of maximum dry density, modified proctor ASTM D 15 57
(Building Soil Manual, 2016).
Surface is level and no woody debris or rocks over I-incb diameter remain (Building Soil
Manual, 2016).
Planting Beds
Cl
Topsoil layer in planting beds achieves a minimum organic matter content of 10 percent.
If using the preapproved amendment rated, 3 inches of composted material is rototilled into
5 inches of soil for a total settled depth of 8 inches (Building Soil Manual, 2016).
If using a calculated amendment rate, calculated amount of composted material Or
approved organic material rototilled into depth of soil needed to achieve 8 inches of settled
soil at 10 percent organic content (Building Soil Manual, 2016).
Surface is smooth and no rocks over 2 inches in diameter remain (Building Soil Manual,
2016).
2 inches of organic mulch is provided.
Stockpile Soil
Areas requiring cuts have removed the upper native topsoil and stockpiled for replacement
on site.
The depth of upper native soils that is stockpiled is the entire depth of the native topsoil
horizon, but no more than 3 feet.
Stockpiled soils are amended as needed and applied as described in Soil Amendment above
(Building Soil Manual, 2016).
Stockpiled soils are reapplied in layers no greater than I foot.
Importing Soil
Topsoil pH is 6.0 to 8.0. or matches the pH of the original undisturbed soil.
C/
Subsoils are scarified to at least 6 inches below the topsoil layer.
Turf Installations
tJ(s4
For turf installations, an imported topsoil mix that contains 5 percent organic matter
(typically around 25 percent compost) is used (Building Soil Manual, 2016).
Soil portion is sand or sandy loarn per the USDA (Building Soil Manual, 2016).
3 inches of imported topsoil mix is tilled into 2 inches of soil (Building Soil Manual,
2016).
ADDENDUM CHECKLIST 7 3
1 .6
31
32'
33'
34,
35,
36'
37'
38'
3 9 -'
MI
41 �-
42,
43,
44
45
46
4-
48
49
54,
Within each blank cell, enter comment codes as folloii,s:
C = Complete R Revise (i.e., make corrections)
N/A =Not Applicable M Missing (i.e., please include)
= Incomplete
p0AA
3 more inches of topsoil inix are placed on surface (Building Soil Manual, 2016).
Soil is compacted to 85 percent of maximum dry density, modified proctor ASTM D1557
(Building Soil Manual, 2016).
Surface is level, and no woody debris or rocks over I -inch diameter remain (Building Soil
Manual, 2016).
Planting Beds
YJ
For planting beds, an imported mix that contains 10 percent organic matter (typically
around 25 percent compost) is used (Building Soil Manual, 2016).
Soil portion is sand or sandy loam per the USDA (Building Soil Manual, 2016).
3 inches of imported topsoil rr�ix is tilled into 2 inches of soil (Building Soil Manual,
2016).
3 more inches of topsoil mix are placed on surface (Building Soil Manual, 2016).
Surface is smooth and no rocks over 2 inches in diameter remain (Building Soil Manual,
2016).
%1
2 inches of organic mulch is provided.
CONSTRUCTION CRITERIA INCLUDED IN THE SWPPP
(Addendum, Section 6. 1 )
Root zones where tree roots limit the depth of incorporation of amendments are exempted
from soil preservation and amendment requirements. Root zones are fenced and protected
from stripping of soil, grading, or compaction to the maximum extent practical.
Materials are stockpiled in areas designated for clearing and grading (such as parking areas
and future impervious roadways) and away from infiltration and other stormwater
facilities.
Small stockpiles are covered with weed barrier material that sheds moisture yet allows air
transmission. Large stockpiles are seeded and/or mulched.
Topsoil or other materials are not relocated to areas where they can cover critical root
zones, suffocate vegetation, or erode into adjacent streams.
The soil preservation area is clearly identified (e.g., using flagging or high visibility
fencing) and protected prior to construction.
A soil and vegetation management plan is provided showing areas to be protected and
restoration methods for disturbed areas.
Construction SWPPP sheets outline construction sequencing that will protect the soil
—Cl
preservation area during construction.
General (i.e., non-BMP-specific) construction SWPPP BMPs and protection techniques are
implemented as applicab1c. The upslope of construction areas are stabilized and overland
flow distances are minimized.
Machinery is operated outside of the soil preservation area during construction.
Placement of topsoils does not occur during wet or saturated conditions.
Establish soil quality and depth toward the end of construction, and once established,
protect from compaction and erosion.
4 ADDENDUM CHECKUST 7
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
NI/A = Not Applicable M Missing (i.e., please include)
IC = Incom2lete
I INSPECTION CRITERIA
The soil preservation and amendment BMP meets applicable sifing, design, and
construction criteria (see * notations in applicable rows).
Reviewer:
Review Date:
Reviewer Phone #:
Reviewer Comments:
ADDENDUM CHECKLIST 7
City of Edmonds
Public Works Department, Engineering Dhision
121 Sth Ave N
Edmonds, WA 98020
Checklist 13:
Downspout Full Infiltration Systems
Per ECDC 18.30, all Category I projects must comply with Minimum Requirements No. I through No. 5,
and all Category 2 projects must comply with Minimum Requirements No. I through No. 9. Downspout
full infiltration may be used to help meet Minimum Requirement Nos. 5 and 7, provided that the
following requirements are met. See also Addendum Checklists I through 3 for submittal requirements,
and Addendum Appendix A for infeasibility criteria that apply to Minimum Requirement No. 5
specifically.
Downspout ftill infiltration shall be designed in accordance with the Department of Ecology's Stormwater
Management Manual for Western Washington (SWMMWW), ECDC 18.30, and the requirements in the
Addendum. The City of Edmonds developed the following checklist to aid project proponents and plan
reviewers in complying with the applicable SWMM1*VW requirements for this BMP, In addition, City -
specific requirements (i.e., requirements presented in ECDC 18.30, the Addendum, or other City
requirements that are not included in the SWMMWW) are also included in the checklist.
This checklist reflects most, but not necessarily all, of the items that shall be documented by the project
proponent, for review by the Engineering Division. It is intended to be used as an aid for developers and
plan reviewers by providing a foundation for clear and consistent BMP design in the City of Edmonds.
However, all items may not be applicable to every project, and all items of concern to this office may not
be covered on this checklist.
Applicant:
Application #:
ADDENDUM CHECKLIST 13
2'
3'
51
(11
91
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
I = Incomplete
MODELING AND SIZING
(SWA4MWW Volume III, Section 3.1.1)
If roof runoff is infiltrated according to the requirements of this BMP, tile roof area is
discounted from the project area used for sizing stormwater facilities.
Infiltration trench length is sized based on underlying soil type as follows:
• Coarse sand and cobbles: 20 linear feet of trench per 1,000 square feet
contributing roof area
• Mediurn sand: 30 linear feet Of trench per 1,000 square feet of contributing roof
area
• Fine or loamy sand: 75 linear feet of trench per 1,000 square feet of contributing
roof area
• Sandy loam: 125 linear feet of trench per 1,000 square feet of contributing roof
area
• Loam: 190 linear feet of trench per 1,000 square feet of contributing roof area
• Fill: 60 linear feet of trench per 1,000 square feet of contributing roof area
Infiltration drywell is sized based on underlying soil type as follows;
• Coarse sand and cobble: 60 cubic feet of gravel per 1,000 square. feet of
contributing impervious surface
• Medium sand: 90 cubic feet of gravel per 1,000 square feet of contributing
impervious surface
SETBACKS
(Addendum, Appendix A)
Cl
The downspout infiltration system is not within the North Edmonds Earth Subsidence and
Landslide Hazard Area (ESLHA).
The downspout infiltration system is not within the buffer of the ESLHA (minimum
Cgeotechnical
buffer equal to the height of the steep slope or 50 feet, whichever is greater) unless a
assessment and soils report is prepared addressing the potential impact of
the proposed system.
The downspout infiltration system is not within 50 feet of the top of slopes greater than
15 percent (unless a geotechnical assessment and soils report is prepared addressing the
potential impact of the proposed system).
There is at least 3 fcct or more of permeable soil from the proposed final grade (i.e.,
C/
ground elevation at the facility location) to the seasonal high groundwater table or other
impermeable layer, AND there is at least I foot or more of permeable soil from the
proposed bottom of the infiltration system to the seasonal high groundwater table or other
impermeable layer.
Cl
The downspout infiltration system is not within 5 feet from any property lines and
easements.
If the contributing area is less than 5,000 square feet, the downspout infiltration system is
C,
not within 5 feet from a structure without a basement and 10 feet for a structure with a
basement.
ADDENDUM CHECKUST 13
t5j�
16 .
171_
18-
19*
20*
2 1 `-
2P--
23'-
24*
25i-
26*
27"
28*
29'
30,
Within each blank cell, enter comment codes as follows:
C = complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e- please include)
IC = Incomplete
If the contributing area is greater than or equal to 5,000 square feet, the downspout
infiltration system is not within a I H: I V slope line from the bottom edge of the facility to
a structure. (Minimum clearance 5 feet from a structure with a basement and 10 feet for a
structure with a basement.)
For sites with on -site or adjacent septic systems, the discharge point is at least 30 feet
or 10 feet dox%mgradient, of the drainfield primary and reserve areas (per
(upgradient,
A
WAC 246-272A-02 10). This requirement can be modified by the City if site topography
will clearly prohibit flows from intersecting the drainfield or where site conditions (soil
permeability, distance between systems, etc.) indicate that this is unnecessary.
If placed under pavement. overflow (small yard drain or catch basin with grate cover) is
greater than I foot below'the pavement.
The downspout infiltration system is not within the buffer of a Category I or Category 2
wetland.
The downspout infiltration system is not within the buffer of a Category 3 or Category 4
wetland, except for the outer 25 percent of the buffer.
DESIGN CRITERIA
Volume 111, Section 3.1.1)
'rhe lot or site hat outwas4 loam soils. se�A-' t44�� lr.�-
.,Wj�r
If placed in fill mat -en -a �,the measured infiltration rate is at least 8 inches per hour.
lnrdtration Trench
*JjA
Trench is no greater than 100 feet in length.
I
Spacing between trench centerlines is at least 6 feet.
Aggregate material consists of washed drain rock conforming to WSDOT
Spec. 9-03.12(5) Gravel Backfill for Dry Wells.
Filter fabric is installed around the tops and sides of trench drain rock prior to backfilling.
A structure with sump is located upstream of the trench.
Trench is sized according to the sizing requirements above in Modeling and Sizing.
Downspout full infiltration trench is designed as shown in City of Edmonds Standard
Detail.
Inflitration Drywell
Drywell is at least 48 inches in diameter.
Drywell is deep enough to contain gravel amounts specified above in Modeling and
Sizing.
Filter fabric is installed around the tops and sides of trench drain rock prior to backfilling.
Aggregate material consists of washed drain rock conforming to WSDOT
Spec. 9-03.12(5) Gravel Backfill for Dry Wells.
Spacing between drywells is a minimum of 10 feet (minimum 4 feet between edges of
drywells).
Drywell is sized according to the sizing requirements above in Modeling and Sizing.
Downspout full -infiltration drywell is designed as shown in City of Edmonds Standard
Detail.
ADDENDUM CHECKUST 13 3
I
T
3-1,
331
3 J ".
3
Within each blank cell, enter comment codes as follows:
C = Complete R Revise (i.e., make corrections)
N/A = Not Applicable M Missing (i.e., please include)
I = Incorn2lete
CONSTRUCTION CRITERIA INCLUDED IN THE SWPPP
(Addendum, Section 6.1)
The infiltration area is clearly identified (e.g., using flagging or high -visibility fencing)
and protected prior to construction.
A soil and vegetation management plan is provided showing areas to be protected and
restoration methods for disturbed areas.
Construction SWPPP sheets outline construction sequencing that will protect the
infiltration area during construction.
General (i.e., non-BMP-specific) construction SWPPP BMPs and protection techniques
are implemented as applicable. The upslope of construction areas is stabilized, and
overland flow distances are minimized.
Machinery is operated outside of the infiltration areas during construction.
Infiltration area is excavated to final grade only after all disturbed areas in the upgradient
project drainage area have been permanently stabilized. If infiltration areas must be
excavated before permanent site stabilization, initial excavation is conducted to no less
than 6 inches of the final elevation of the facility floor.
C—
Excavation of infiltration areas does not occur during wet or saturated conditions.
The bottom of the infiltration facility excavation is raked or scarified to a minimum depth
of 3 inches after final excavation to restore infiltration rates.
Downspout illfiltration facilities are not used as sediment control facilities during
construction, and all drainage is directed away from the facility after initial rough
grading.
C-
Clogging and over -compaction of the subgrade, native soil, rain garden soils, or amended
soils is prevented during construction.
If placed in fill material, fill is compacted under supervision of professional civil engineer
with geotechnical expertise.
INSPECTION CRITERIA
The infiltration system meets applicable siting, design, and construction criteria
(see * notations in applicable rows).
Reviewer:
Review Date:
Reviewer Phone #:
Reviewer Comments:
4 ADDENDUM CHECKLIST 13
J-C. Mc DONNELL ENGINEERING., P.C.
Consulting Civil Engineers
6608 — 216TH ST SW #306
Mountlake Terrace, WA 98043
STORM DRAINAGE STUDY
.For
4-UNIT APARTMENT BUILDING
Site Located at
20904 — 72nd Ave. W,
Edmonds, WA. 98020
TAX ID.: 00566900200302
COMPLIES WITH APPLICABLE
CITY STO WATER CODIE
'y
Vate, 7, �-3
LEGAL DESCRIPTION: SEATTLE 14EIGHTS DIV 4 BLK 002 D-02 - N 75FT OF TI-I PTN LOT 3
BLK 2LY WHN TI4ES/2OF BLK 2.
DEVELOPER:
Mr. Mark Cummings
Slater.Homes Corp.
9718 Slater Ave. NE.
Kifkland, WA. 98033
425 330-7440
REPORT PREPARED BY:
Dean A. Furr, P.E.
Project #06043
Issue bate- 10/19/2017
Revised: 04/24/18
44
1 0 1 -2,
Z—U
w""T7
RESUB
MAy 14 2018
BUILDING DEPARTMENT
CITY OF EDMONDS
2090472 d Ave. W
4-Unit Apartments
TABLE OF CONTENTS
STORMWATERANALYSIS ........................................................................................................ 2
EXISTING CONDITIONS 2
DEVELOPED CONDITIONS ........... .............................. ...... ............. 3
MINIMUM TECHINAL REQUIREMENTS: _ ........... ............................................................ 4
Minimum Requirement #I: Prepare Stonnwater Site Plans ................................................... 4
Minimum Requirement #2: Construct Stormwater Prevention Plan ...................................... 4
Minimum Requirement #3: Source Control of Pollution ....................................................... 4
Minimum Requirement #4: Preservation of Natural Drainage Systems & Outfalls .............. 4
Minimum Requirement #5: On -site Stormwater Management .............................................. 4
WATER QUALITY AND TESC METHODS PROPOSED ...................................................... 6
SPECIALREPORTS ............................. - ..................................................................................... 27
OPERATION AND MAINTENANCE ........................................................................................ 28
Page i
2090472 nd AVe_ W
4-Unit Apartments
Lynt,
Wq 51 5w :ef"m st swzi—
5w
%
SITE
......... . .............
-,pv! sis
7
51 sw
.1
k
ZZ.. K! SA
IE
-4 -
A.
515.4
Figure 1: VICINITY MAP - not to scale
Page I
20904 72na Ave. W
4-Unit Apartments
STORMWATER ANALYSIS
The City of Edmonds has adopted the 2014 SWMMWW and the City Stormwater Management
Code Ch. 18.30 with the June 2017 Edmonds Stormwater Addendum. Hydrologic analysis was
performed using WWHM 2012 a continuous hydrologic modeler, version 4.2.13, 4/4/2017, by
Clear Creek Solutions. The city requires that the model utilize the "Puget East 36" precipitation
time series, available in the WSDOT data set In WWHM. 0
The city has five paths of review for ston-nwater site plans to determine applicability of MR#5
The project site is required to comply with the Category I path, because the new plus replace
impervious area is between 2,000sf < 5,000sf and the land disturbing activity is more than
7,000sf See the Existing Conditions and Developed Conditions Exhibits in the back of this
section.
EXISTING CONDITIONS
Tile proposed site is a developed, 7,798 sf, residential lot located at 20904 — 72N11 Ave. W.,
Edmonds, WA. The site is bound to the north by the Turnberry Lane Condominiums, 72"d Ave.
W. to the east, residential house to the south and an undeveloped "vacant land" to the west.
Currently, the site has a single-family house, concrete patio and gravel driveway approximately
2,500sf impervious surface. The site vegetation is mostly grass and typical urban landscaping.
The site slopes at 3.9% downgradient in a southwest direction.
A geotechnical investigation of the site was performed by Cobalt Geosciences dated September
25, 2017. The subsurface investigation consisted of two test pits on the east side of the parcel (TP-
I and TP-2 respectively) and two hand dug pits in the west side of the parcel (HB- I and H13-2).
TP- I and TP-2 encountered 6-10 inches of topsoil, underlain by 3 to 4.5 feet of loose to medium
grained sand with organic debris and silt. This layer is underlain by medium dense to dense, fine
medium grained sand with trace gravel and silt (Outwash component), which continued to the
termination depth of the test pits.
Hand borings, HB-1 and H13-2, encountered 8 inches of grass and topsoil underlain by 2 feet of
loose, silty -fine to medium grained sand with gravel underlain by medium to dense, silty -fine to
medium grained sand with gravel (Glacial Till),which continuedto thcten-nination depth of4 feet.
Overall, the site consists of Vashon Glacial Till and Vashon Advance Outwash.
A small-scale pilot infiltration test was perfon-ned in TP-1 at a depth of 5-feet below grade.
Following an 8-hour pre-soak- period, the observed in -situ infiltration rate was observed to be
approximately 2.8 inches per hour. After application of correction factors for small-scale PIT
(0.50), site variability (L), and influent control (0.9), the design infiltration rate is 1.26 inches per
.hour. The Geotech also recommends that infiltration facilities be in the southeast portion of the
property where these soils are more favorable to infiltration. The soil in this area has a CEC (cation
Exchange Capacity) of 6.7meq.
See the following table of the existing land use table
Page 2
20904 72"d Ave. W
4-Unit Apartments
Parcelarea
7,798
0.18
EXISTING
Sf
ac
IMP TOTAL
2,449
MOW
Gravel driveway
336
0.008
HSE/PATIO/SHED
2,164
0.050
PERVIOUS
5,298
0.122
Table 1: Existing Land -Use
The modeled existing runoff flow for the site is
Flow Frequency
Flow(CFS)
2 Year =
0.0031
5 Year =
0.0051
10 Year =
0.0062
25 Year =
0.0074
50 Year =
0.0082
100 Year =
0,0088
DEVELOPED CONDITIONS
32% Coverage
The project proposes to construct a 4-unit apartment building, asphalt driveway/parking, trash
enclosure, stornawater infiltration facility and drainage, underground utilities and landscaping.
Additionally, the city requires that the project provide frontage improvements that consist of
curb/gutter/sidewalk along the parcels 72 d Ave. W. right-of-way line. A dropdo'%rn driveway will
be constructed at the proposed driveway entrance. The gutter lip along tile flow line will intercept
stormwater from the roadway and convey it to a downstream catch basin near the southeast
property comer.
Seethe following table of the developed land use.
DEVELOPED
DIST. AREA
7,414.20
0.17
1 M P TOTAL
4,779.5
0.110
APT.BLDG
2,277
0.052
DRIVE/PRKG
2,502
0.057
LAND CAPING
2,635
0.060
Table 2: Developed Land -Use
Page 3
2090472 d Ave. W
4-Unit Apartments
The project site results in less than 5,000sf of new plus replaced impervious area and disturbs
7,414sf of area. The project is subject to Category I review and must comply with MR's I through
5.
Surface
Sf
ac
REPL Hard
Surface
2,111
0.048
New Hard
Surface
2,669
I
0.061
R + N
4,779.50
<<5,000
<<5,000
PGHS
2,502.10
MINIMUM TECHINAL REQUIREMENTS:
Minimum Requirement #1: Prepare Stormwater Site Plans
See Plans Submitted with Project Application and this Report
Minimum Requirement 4#2: Construct Stormwater Prevention Plan
See TESC Plans and SVVTPP are provided with this submittal.
Minimum Requirement #3: Source Control of Pollution
Generally, pollution control is not required for a project of this size, but there are pollution
generating activities/sources that are associated with this type of residential development. Usually,
these are vehicle maintenance and repair and washing and landscaping and lawn/vegetation
management, as well as, spilling of waste in and around the trash enclosure, Reduction and
elimination of stormwater pollutants can be achieved by implementing "'operational source control
BMP's" including good housekeeping, spill prevention and cleanup. The trash enclosure will have
separate bins with lids for storing garbage waste and recyclables, as well as, yard waste bins.
Generally, most pollutants and floating material exposed to stormwater will be contained within
the catch basins or the isolation row of the infiltration galley. A routine maintenance schedule
should be established to clean out the catch basins and isolator row. Furthermore, the underlaying
soil of the infiltration gallery has a CEC of 6.7meq, which will help mitigate pollution attributed
to soluble metals.
Minimum Requirement #4: Preservation of Natural Drainage Systems & Outfalls
The natural slope of the project site is from east to west from 72 nd Ave W. The project proposes
to infiltrate 100% of the stormwater on -site — complying with MR#5. However, in the event
there is an emergency overflow event stormwater will be conveyed to the storm drainage system
within 72"d Ave W. All natural drainage systems and outfalls are prescrved.
Minimum Requirement #5: On -site Stormwater Management
The city has five paths of review for stormwater site plans to determine applicability of MR#5.
The project site is required to comply with the Category I path, because the new plus replace
impervious area is between 2,000sf < 5,000sf and the land disturbing activity is more than
7,000sf. See the Existing Conditions and Developed Conditions Exhibits in the back of this
section.
Page 4
20904 72nd Ave. W
4-Unit Apartments
For projects that elect to use List No. I to comply with ECDC 18.30.060.D.b (11), for each
surface, consider the BMPs in the order listed for that type of surface. Use the first BMP that is
considered feasible. No other On -site Stormwater Management BMP isnecessary for that
surface. Feasibility shall be determined by evaluation against design criteria, limitations, and
infeasibility criteria identified for each BMP in the SWMMWW and the Edi-nonds Stormwater
Addendum; and Competing Needs Criteria listed in Chapter 5 of Volume V of the SWMMWW.
Lawn and landscaped areas:
Post -Construction Soil Quality and Depth in accordance with BMP T5.13 in Chapter
5 of Volume V of the SWMMWW.
All pervious/landscape areas will be treated to comply with this BMP.
Roofs-
i. Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the
SWMMWW, or Downspout Full Infiltration Systems in accordance with BMP
T5. I OA in Section 3- 1.1 of Volume III of the SWMMWW.
A geotechnical report was prepared for this project as stated on the previous
page. Issues of infiltration were addressed. Site is acceptable for infiltration of
runoff. Percolation tests in the- southeast corner of the site support a factored
infiltration rate of 1.26 in/hi. As a result, all Roof runoff will be conveyed to an
underground infiltration facility to provide 100% infiltration.
ii. Rain Gardens in accordance with BMP TS. 14A in Chapter 5 of Volume V, or
Bioretention in accordance with Chapter 7 of Volume V of the SWMMWW. The rain
garden or bioretention facility must have a minimum horizontal projected surface area
below the overflow which is at least 5 percent of the area draining to it.
Not Evaluated
iii. Downspout Dispersion Systems in accordancew ith BMP T5. I OB in Section 3.1.2 of
Volume III of the SWMMWW.
Not Evaluated
iv. Perforated Stub -out Connections in accordance with BMP T5.1 OC in Section 3.1.3 of
Volume III of the SVIMMWW,
Not Evaluated
V. Detention vaults or pipes in accordance with the Edmonds Stormwater Addendum.
The City may waive the requirement to install a detention vault if the downstream
analysis in Minimum Requirement #4., or available City data, indicate that peak flow
controlis not beneficial.
Not Evaluated
Other Hard Surfaces:
Full Dispersion in accordance with BMP T5.30 in Chapter 5 of Volume V of the
SWMMWW.
Not Evaluated, but a geotechnical report was prepared for this project as stated
on the previous page. Issues of infiltration were addressed and the site is
Page 5
20904 72n'Ave. W
4-Unit Apartments
acceptable for infiltration of runoff. Percolation tests in the southeast corner of
the site support a factored infiltration rate of 1.26 in/hr. As a resul4 all Other
Hard Surfaces runoff will be conveyed to an underground infiltration facility to
provide 100% infiltration.
Permeable Pavement in accordance with BMP T5.15 in Chapter 5 of Volume V of the
SWMMWW, or Rain Gardens in accordance with BMP T5.14A in Chapter 5 of
Volume V, or Bioretention in accordance with Chapter 7 of Volume V of the
SWMMWW. The rain garden or bioretention facility must have a minimum
hoiizontal projected surface area below the overflow which is at least 5 percent of the
area draining to it.
Not Evaluated
iii. Sheet Flow Dispersion in accordance with BMP T5.12, or Concentrated Flow
Dispersion in accordance with BMP T5.11 in Chapter 5 of Volume V of the
SWMMWW.
Not Evaluated
iv. Detention vaults or pipes in accordance with the Edmonds Storrnwater Addendum.
The City may waive the requirement to install a detention vaultif the downstream
analysis in Minimum Requirement #4, or available City data, indicate that peak flow
control is not beneficial.
Not Evaluated
Onsite ston-nwater from roof downspouts, the parking lot and a portion of the landscaping runoff
will be conveyed to a Stormtech@, chambered infiltration gallery, under the southeast portion of
the parking lot and in the southeast portion of the parcel. The Stormtech SC-740 (10) chamber
infiltration system was sized using WWHM 2012 using the SSD element. The SSD printout is at
the end of this section. The bottom 6" of stone was modeled with a 35% porosity input into
WV,iHM as 0.35 (stormchamber recommends 40%). The upper 6" of stone was not included in
the analysis, but die additional I ft perimeter was included in the analysis. The bottom area of the
infiltration system is 431.8sf and was modeled with a 1.26 in/hr. infiltration rate per
geotechnical engineer recommendations. The 6in, of top stone over die chambers was not
included in the model, but will provide an additional 75ef of storage at 35% porosity. The
infiltration facility will have an overflow pipe set at the top of the chamber that will discharge
into the storm drainage system in the event of an emergency. See the WWHM printouts in the
back of this section.
The bottom of the infiltration facility is set at elev. 92.50. This elevafion was established by
using the TP#1 ground surface elevation of 97.5 with an 8ft BGS boring depth to an assumed
barrier layer elevation of 89.5. The infiltration bottom is set 3ft (separation) above the 89.5
elevation.
WATER QUALITY AND TESC METHODS PROPOSED
Type of water quality measure(s) proposed:
Page 6
20904 72'd Ave. W
4-Unit Apartments
I DOE Standard erosion control BMPs will be designed at the detailed construction plan
stage such as mulch, silt fence, sediment traps, and plastic sheeting and TESC entrances
to control construction runoff, as required.
2. Mulching and other winter soil management techniques will be specified in the
construction plan.
3, Full infiltration will provide water quality — see the WWHM printout at the end of this
section.
EXISTING CONDITIONS
Page 7
EXISTING CONDITIONS EXHIBIT
SCALE: 1' = 20'
*Or W-4.%W)
A
4' NOE
LANDWAPF cw-M.7
Cos fammo
DISIURBED AREA . ............
7,414.2 SF
pew
x
WAS:
2ft
APARTMENTS ROOF
Z277.4 SF T At IOPkRWU-�:
7.
ic etw) COW-4&07
Z. p
4*RS 12'
10,
N la;BXE 10� S9 2
INFILTRATION FAot�ny-/
R.-
T4- PEW. FWTINC DRAIN SMRW7E0i = ....
-E (N.S.W)
12 -82.56
ROW
BGTT0M AREA-3515F CRILTYPE 2
801TOM EL-92-50
IKmTRAWf0-2 IN/HOUR 1271E (E�N*)-ft,w
COMBINA7M
C1304, TYPE I CB9,r*fPE 2 INLET FRAME
8'IE (N)-9125
fi-IE (W)-0&42 12'IE
Cal K ?2'(AIAS) Cv;'-ftiP
DEVELOPED CONDITIONS -
SCALE: I' = 20'
ow
,M,.9aw
c irm av*(M" Nor Acwv)
1.9.1
OW01
sw
FAwcaw
fn
cc
T
SO
L,,-Sam
MM
OM04191
W-97.74
ca x IM&S) 040.8101
NEW AND REPLACED IMPERVIOUS
SCALE l' = 20'
20904 72"0 Ave. W
4-Unit Apartinents
I'd drity Dimensions
T,
h
-�Cngth
Trench Bott Width (ft)
Effectiye Total th (ft)
Top and bottom \slopeN)
Left Side Slope (HN) 0
bp NOft)N)
Right Side Slope (H I
Material Layers for Trenc
Layer 1 Thickness (ft) F(I —5
Layer 1 porosity (0-1)
Layer 2 Thickness (it)
Layer 2 porosity f0-1 1 =07
Layer 3 Thickness (ft) Ed --7
Layer 3 porosity (0-1) K--
Infiltration FY—es —H,
Measuted Infiltration Rate (Whr)
Reduction Factor (infift'factor)
Use Wetted Stxfwe Airea [sidewalls)
Total Volume Irgiltrated (ac-ft)
Total Volume Through Riser (ac-ft)
Size Infiltration Trench
Target%: F 5-0.
1w-
Outlet Structure Data I
Riser Height (ft) F3—
Riser Di"ter (in) fj —2 J1
Riser Type Flat
Notch Type
Orifice DiameterHeight
Number (in)
1 1-0— ro— -=.A
2 fo----,,, Fc- -.!I
3 ro— o
Trench Volu t Riser Head (ac-ft) .019
R H 'ad 'ac*"' 01
-' e
rl 276 m t is" 7 ----
ShowTrench FOpen TabIe
rN —0 Initial Stage (it)
52-13S6 Total Volume Through F I I ac. t;� 5Z696
0 Percent Infiltrated 100-1
Page 10
2090472 d Ave. W
4-Unit Apartiments
Project: J3 EDMONDS 4-UNIT
6
Chamber Model - SC-740 06% M . A
Units Z51ormTerch-
ImDeriall DeLyew - remxr - V111MY OUA,
qf 2M.
Number of chambers
10
Voids in the stone (porosity) - 35 %
Base of Stone
Elevation - 92.50 ft
Amount of Stone Above Chambers - 6 in
Amount of Stone Below Chambers - 6 in
Area of system - 432 sf Min. Area - 338 sf min. area
StormTech SC-740 Cumulative Storaae Volumes
Incremental
Incremental
Height of
Single
Total
Incremental
Incremental Ch
Cumulative
System
Chamber
Chamber
Stone
& St
Chamber
Elevation
(Obic feet) ,
(cubic feet)
(cubic feet)
(cubic feet)
(qubic feeQ ,
(feet)
42
41
40
39
38
37
0.100
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.59
12459
12.59
12.59
12.59
112�59
12.59
12.59
12.59
12.59
12.59
12.59
827.60
815.01
802.42
789.82
777.23
764.64
96.00
95.92
95.83
95.75
95.67
95.58
36
0.05
0.55
12.40
12.95
752.04
95,50
35
0.16
1.63
12.02
13Z5
739.09
95.42
34
0.28
2.82
11.61
14,43
725.44
95.33
33
0.60
6.04
10.48
16.52
711.01
95.25
32
0.80
8.02
9.79
17.80
694.50
95.17
31
0.95
9.51
9,27
18.77
676.69
95.08
30
1.07
10.75
8.83
19.58
657.92
95.00
29
1.18
11.80
8.46
20.27
638.34
94.92
28
1.27
12.66
8,16
20.82
618,07
94.83
27
1.36
13.55
7.85
21.40
597.25
94.75
26
1.45
14.54
7.50
22.05
575.85
94.67
25
1.52
15.25
7.26
22.50
553.81
94.58
24
1.58
15.82
7.06
22.88
531.30
94.50
23
1.64
16.42
6.85
23.27
508.42
94.42
22
130
17.00
6.65
23.64
485.16
94.33
21
1.75
17.53
6.46
23-99
461.52
94.25
20
1,80
18.03
6.28
24,31
437.53
94,17
19
1.85
18.55
6.10
24.65
413.22
94.08
18
1.89
18.93
5.97
24.90
388.57
94.00
Page I I
20904 72n' Ave. W
4-Unit Apartments
17
1.93
19.34
5.82
25.16
363.67
93.92
16
1.97
19,75
5.68
25.43
338.50
93.83
15
2.01
20.10
5.56
25.66
313.07
93.75
14
2.04
20.45
5.44
25.89
287.41
93.67
13
2.07
20.75
5.33
26.08
261.53
93.58
12
2,10
21.05
5.23
26.28
235.45
93-50
11
2.13
21 M
5.13
26.45
209.17
93,42
10
2.15
21.54
5.05
26.59
18232
9333
9
2.18
21.77
4.97
26.74
156.13
93.25
8
2.20
21.98
4.90
26.88
129.38
93.17
7
2.21
22,07
4.87
26.94
102.50
93.08
6
0,00
0.00
12.69
12.59
75.56
93.00
5
0.00
0.00
12.59
12.59
62,97
92.92
4
0.00
OM
12.59
12.59
50.37
92.83
3
0.00
OM
12.59
12.59
37.78
92.75
2
0.00
0.00
12.59
12.59
25.19
9M7
1
0.00
0.00
12.59
12.59
12.59
92.58
Page 12
2090472 d Ave. W
4-Unit Apannents
STORMTECH SC-740 CHAMBER
Desigined to meet the most stringBrit Industry performance standards for
supenrior structural integrity while providing designers With a Cost-effective
method tosave valuable land and protect water resources The StormTeCh
system Is designed primarily to be used tinder 0 rking lots, thus maximizing
land usage for private (commercial) and public applications
erl hancing the perfo,mance and extending the service life of these practices
STORMTECH SC-740 CHAMBER
(nottoscale)
Monninal Chamber Speclillicaftits
SIza(LxWxH)
85.4"x5l'00*
2,170 mm x 1,295 mm x 762 mm
CbernberStump
45.9 fits (110 ml
Min. Installed St*rW
743 ft(2.12 m')
Weight
74.0 1 bs (33.6 kj)
Shlppfng
30chambers/pallet
60eadcaps/pallet
12 pallets/truck
-SWeabo",belmand
btbww thanAws and 40% stone parvilty-
�mo— BEA "e-
-E Of �7— 8�-M . n
MPH -1WFnWW[W.Ts lop
90.7'(23D4 mm)
ACTUAL LENGTH
2,r (SOD
OAX
112X
DO "Wn)
W4* (2160 rTwr,)
INSTALLM L04GTH
5te,
MMM)
cx-a"s D�L RE 5E M�—ED � ACCCRD�LE �TH AMU t."'
V N.
---------------
�MPWX (CM14 T0107TOM C6 ALEAULLOA.— ��AVRQ P.vALLATQ�t�tu wnt P,- few vsx-.--wR --w cm-rA.'*2"m."
Page 13
rid
20904 72 Ave. W
4-Unit Apartments
SC-740 CUMULATIVE STORAGE VOLUMES PER CHAMBER
ASSUMeS 4 0% Stone Porosity. Gaicuiations are Based Upon
a 6 (15,j mm) Stone se Under Charn rs.
409101
Slane 4520 (13001
72,644 (R2.057
*(9-9
45.90 (I-sool
38M
,M-i
4,5-90,i ' -
7 .39(11193)
0
�97-010)
A�-�RLI-An �
Lg:Ld
301!141
_15,00(L
L 14 Mal
J __ _ _
L5 P-m-
11
66.08 !Ag7)
- --( -
5.69(12mv),
1
6575(IAM
517(l.70
30(7q
W.80
jjVj1 63j9_
27015
39,54(QM
64.17
-_29 2M
Ln-LL85i
zom
R
-L2 EDR6R))
21.31 p We)
IRA? (qm)
R-P (U�P)
jq� "54
0.74 (D247
1�.51 e4"
221
o(o)
07afo.191i
-q3
fo
SM6 oto)�
4.51(V28)
100)
1)
Note: Add 10 ff"(0.032 ml)of storage for each Ddiftbonal inch a5 mm) of stone
foundation.
STORAGEVOLUME PER CHAMBER FV (M3)
I i"IF AM ... fi)
Ic"P,
Note: Assumas 6' (150 mm) vlone stove 0 ambers, V(i50 nim) row
spacing and 40% stone porosity.
AMOUNTOFSTONE PER CHAM BER
SC-740 3.11(a) 4,0J13) 1 5.5(19)
SC-740 4.IM(2s) 1 -.4qo(301
No* Aawmas 6'(150 man)*1 stant aboya and betwan chembers.
VOLUME EXCAVATION PERCHAMBERYD' (M3
�411,11'ammul., I � ".9
55(4A 1 9214.71 ! aA (5.2)
Note: Assumes 6'(150 mm) of tow separation and 13'(450 mm) of covet. The
volume at excirvattar, will vary as depth of cam Inas"es-
Working on a project?
DESIGIIIJ VISKUSStWKIA
and utilize the StorrinTech Design Tool
lRormonsfirformatforionthe $to imiTech $0-740 Ckarober and olherADS products, pkass contact am Cirsterne f So twice ReDtnetrtattves at 1-800 .821-si to
Page 14
20904 72'd Ave. W
4-Unit Apartrnents
WWHM2012
PROJECT REPORT
Project Name: Site Infiltration-SSD
Site Name: 4-unit Apt
Site Address: .20904 72nd Ave W
city : Edmonds
Report Date: 4/27/2018
MGS Regoin : Puget East
Data Start : 1901/10/1
Data End : 2058/09/30
DOT Data Number: 03
Version Date: 2017/07/05
Version : 4.2.13
Low Flow Threshold for POC 1 : 50 Percent of the 2 Year
High Flow Threshold for POC 1: 50 year
PREDEVELOPED LAM USE
Name : Basin I
Bypass: No
GroundWater: No
Pervious Land Use
acre
C, Forest, Mod
.17
Pervious Total
0.17
Impervious Land Use
acre
Impervious Total
0
Basin Total
0.17
Element Flows To:
Surface Interflow
MITIGATED LAND USE
Name : Basin I
Bypass: No
GroundWater: No
Groundwater
Page 15
2090472 d Ave. W
4-Unit Apartments
Pervious Land Use acre
C, Lawn, Mod .06
Pervious Total 0.06
Impervious Land Use acre
ROOF TOPS FLAT 0.052
DRIVEWAYS MOD 0.057
Impervious Total 0.109
Basin Total 0.169
Element Flows To:
Surface Interflow
S8D Table I SSD Table I
Name SSD Table I
Depth: 3.B ft.
Element Flows To:
Outlet I Outlet 2
Groundwater
SSD Table
Hydraulic Table
Stage
Area
Volume
(feet)
(ac-)
(ac-ft.) Manual Manual NotUsed NotUsed NotUsed
0.000
0.010
0.000
0.000
0.012
0.000
O.ODO
0-000
0.083
0.010
0.000
0.000
0.012
6.000
0.000
0,000
0.167
0.010
0.001
0.000
0.012
0-000
0.000
0,000
0.250
0.010
0,001
�0.000
0.012
0.000
0.000
0.000
0.333
0.010
0.001
0.000
0.012
0-000
0.000
0.000
0.417
0.010
0.001
0.000
0.012
0�000
O.DOO
0-000
0,500
0.010
0.002
0.000
0.012
0.000
0.000
0.000
0.583
0.010
0.002
0.000
0.012
0.000
0.000
0.000
0.667
0.010
0.003
0.000
0.012
0.000
0.000
0.000
0.750
0.010
0,004
0.000
0.012
0.000
0.000
0.000
0.833
0.010
0.004
0.000
0.012
01000
0.000
0.000
0.917
0.010
0,005
01000
0.012
0.000
01000
0.000
1.000
0.010
0.005
0.000
0.012
0.000
0.000
0.000
1.083
0-010
0.006
0.000
0.012
0.000
0.000
0.000
1.167
0.010
0.007
0.000
0,012
0.000
0.000
0.000
1.250
0.010
0.007
0.000
0.012
0.000
0.000
0.000
1.333
0.010
0.008
0.000
0,012
0.000
01000
0.000
1.417
0.010
0.008
0.000
0.012
0.000
0.000
0.000
1.500
0.010
0.009
0.000
0.012
0.000
0.000
0.000
1.583
0.010
0.009
0.000
0.012
0.000
0.000
0.000
1.667
0.010
0.010
0�000
0.012
0.000
0.000
0.000
Page 16
2090472 nd Ave. W
4-Unit Apartments
1.750
0.010
0.011
0.000
0.012
0.000
0.000
0.000
1.833
0.010
0.011
0.000
0.012
0.000
0.000
0.000
1,917
0.010
0.012
0.000
0.012
0.600
0.000
0.000
2.000
0.010
0.012
0.000
0.012
0.000
0.000
0.000
2.083
0.010
0.013
0.000
0.012
0.000
0.000
0.000
2.167
0.010
0.013
O.-GOO
0,012
0.000
0.000
0.000
2.250
0.010
0.014
0.000
0.012
0.000
0.000
0.000
2.333
0.010
0.014
0.000
0.012
0.000
0.000
0.000
2.417
0.010
0.015
0.000
0.012
0.000
0.000
0.000
2.500
0.010
0.015
0.000
0.012
0.000
0.000
0.000
2.583
0.010
0.016
0.000
0.012
0.000
0.000
0.000
2.667
0.010
0.016
0.000
0.012
0.000
0.00.0
0,0 00
2.750
0.010
0.016
0.000
0.012
0.000
0.000
0.000
2.833
0.010
0.017
0.000
0.012
0.000
0.000
0.000
2.917
0.010
0.017
0.000
0.012
0.000
0.000
0.000
3.000
0-010
0.017
0.000
0.012
0.000
O.ODO
01000
3�083
0.010
0.018
0.000
0.012
0.000
0.000
0.000
3.167
0,010
0.018
0.000
0.012
0.000
0.000
0.000
3.250
0.010
0.016
0.000
0.012
0.000
0.000
0.000
3.333
0.010
0.018
0.000
0.012
0,000
0.000
0.000
3.417
0.010
0.019
0.000
0.012
0.000
0.000
0.000
3.500
0.010
0.019
0.000
0.012
0.000
0.000
0.000
ANALYSIS RESULTS
Stream Protection Duration
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.17
Total Impervious Area:O
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.06
Total Impervious Area;0.109
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period
Flow(cfs)
2 year
OaOO29
5 year
0.004815
10 year
0.005902
25 year
0,007035
50 year
0.00772
100 year
0.00829
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0
5 year 0
10 year 0
25 year 0
Page 17
20904 72nd Ave. W
4-Unit Apartments
SO year 0
IOD year 0
stream Protection ]Duration
Annual Peaks for Predeveloped and Mitigated. POC #1
Year
Predevelo2ed
Mitigated
1902
0.004
0.000
1903
0.001
0.000
1904
0.004
0.000
1905
0.002
0.000
1906
0.001
0.000
1907
0.005
0.000
1908
0.003
0.000
1909
0.003
0.000
1910
0.005
0.000
1911
0.003
0.000
1912
0.011
0.000
1913
0.004
0.000
1914
0.001
0.000
1915
0.001
0.000
1916
0.002
0.000
1917
0.001
0.000
1918
0.003
0.000
1919
0.002
0.000
1920
0.003
0.000
1921
0.003
0.000
1922
0.003
01000
1923
0.003
0.000
1924
0.001
0.000
1925
0,001
0.000
1926
0.002
0.000
192*7
0.003
0.000
1928
0,002
0.000
1929
0.005
0.000
1930
0.003
0.000
1931
0.003
0.000
1932
0.002
01000
1933
0.002
0.000
1934
0.007
0.000
1935
0.002
0.000
1936
0.004
0.000
1937
0.003
0.000
1938
0.003
0.000
1939
0.000
0.000
1940
0.002
01000
1941
0.002
0.000
1942
0.004
0.000
1943
0.001
0.000
1944
0.004
0.000
1945
0.003
0.000
1946
0.003
0.000
1947
0.002
0.000
1948
0.006
0.000
1949
0.005
0.0100
1950
0.003
0.000
1951
0.003
0.000
Page 18
20904 72,d Ave, W
4-Unit Apartments
1952
0.010
0.000
1953
0.008
0.000
1954
0.002
01000
1955
0,002
0.000
1956
0.001
0.000
1957
0,003
0.000
1958
0,008
0.000
19S9
0,005
0.000
1960
0.002
0.000
1961
0.005
0.000
1962
0.002
0.000
1963
0.001
0.000
1964
0.002
0.000
1965
0.006
0.000
1966
0.001
0.000
1967
0.002
0.000
1968
0.003
0.000
1969
0.002
0.000
1970
0.004
cl000
1971
0.006
0.000
1972
0.004
0.000
1973
0.005
0.000
1974
0.003
0.000
1975
0.007
0.000
1976
0.003
0.000
1977
0.002
0.000
1978
0.006
0.000
1979
0.001
0.000
1980
0.003
0.000
1981
0,003
0.000
1982
0.002
0.000
1983
0.005
0.000
1984
0.001
0.000
1985
0.003
0.000
1986
0.002
0.000
1987
0.005
0.000
1988
0.003
0.000
1989
0.003
0.000
1990
0.003
0.000
1991
0.003
0.000
1992
0,004
0.000
1993
0.003
0.000
1994
0.006
0.000
.1995
0,001
0.000
1996
0.007
0.000
1997
0.003
0.000
1998
0.003
0.000
1999
0.000
0.000
2000
01002
0.000
2001
0.001
0.000
2002
0.006
0.000
2003
0.003
0.000
2004
0.003
0.000
2005
0.005
0.000
2006
0.002
0.000
2007
0.002
0.000
2008
0.003
0.000
Page 19
2090472 ,d Ave. W
4-Unit Apartments
2009
0.002
0.000
2010
0.001
0.000
2011
0.002
0.000
2012
Oa003
0.000
2013
0,002
01000
2014
0.0.01
0.000
2015
0.006
0.000
2016
0.001
0.000
2017
0.005
o.obo
2018
01009
0.000
2019
01010
0.000
2020
0.003
0,000
2021
0.004
0.000
2022
0.001
0.000
2023
0.003
0.000
2024
0.012
0.000
2025
0.002
0.000
2026
0.004
0.000
2027
0.002
0.000
2028
0.001
0.000
2029
0.003
0.000
2030
0.007
0.000
2031
0.002
0.000
2.032
0.001
Ow000
2033
0.001
0.000
2034
0.002
0�000
2035
0.00?
0.000
2036
0.004
0.000
2037
0.001
0.000
2038
0.004
0.000
2039
0.000
0.000
2040
0.001
0.000
2041
0.002
0.000
2042
0.008
0.000
2043
0.003
0.000
2044
0.004
0.000
2045
0,003
0.000
2046
0.003
0.000
2047
0.002
0.000
2048
0,003
0�000
2049
0.003
0.000
2050
01002
0-000
2051
0.003
0.000
2052
0.002
0.000
2053
0.003
0.000
2054
0.005
2055
0.001
0.000
2056
0.001
0.000
2057
0.002
0.000
205B
0,002
0.000
Stream
Protection Duration
Ranked
Annual Peaks for
Predeveloped and Mitigated. POC #1
Rank
Predeveloped
Mitigated
1
0.0122
0.0000
2
0.0109
0.0000
Page 20
20904 72' Ave. W
4-Unit Apadments
3
0.0100
0,0000
4
0.0097
0.0000
5
0.0091
0.0000
6
0.0081
0.0000
7
0.0080
0.0000
8
0.0075
0.0000
9
0.0072
0.0000
10
0.0070
0.0000
11
0.0069
0.0000
12
0.0068
0.0000
13
0.0066
0.0000
14
0.0064
0.0000
15
0.0061
0.0000
16
0.0058
0.0000
17
0.0058
0.0000
is
0.0058
0.0000
19
0.0055
0.0000
20
0.0055
0.0000
21
0.0054
0.0000
22
0.0053
010000
23
0.0051
0.0000
24
0-0050
0.0000
25
0.0050
0.0000
26
OA049
0.0000
27
0.004a
0.0000
28
0,0048
0.0000
29
0.0047
0.0000
30
0.0046
0.0000
31
0.0046
0.0000
32
0.0045
0.0000
33
0.0044
0.0000
34
0.0044
0.0000
35
0.0043
0.0000
36
0.0042
0.0000
37
0.0040
0.0000
38
0.0040
0,0000
39
0.0039
0.0000
40
0.0038
0.0000
41
0.0038
0.0000
42
0.0038
0.0000
43
0.0037
0.0000
44
0.0037
0.0000
45
0.0037
().O000
46
0.0035
0.0000
4*7
0.0035
0.0000
48
0.0034
0.0000
49
0.0034
0.0000
50
0.0034
0.0000
51
0.0031
0.0000
52
0.0033
0.0000
53
0-0033
0.0000
54
0.0032
0.0000
55
0.0032
0.0000
56
0.0031
0.0000
57
0.0031
0.0000
58
0.0031
0.0000
59
0-0031
0.0000
Page 21
20904 72" Ave. W
4-Unit Apartments
60
0,0031
0.0000
61
0.0030
0.0000
62
0.0030
010000
63
0.0030
0.0000
64
0.0030
0.0000
65
OA030
0-0000
66
0.0029
0.0000
67
0.0029
0.0000
68
0.0029
0.0000
69
0.0028
0.0000
70
0.0028
0.0000
71
0.0028
0.0000
72
0.0028
0�0000
73
0.0028
0.0000
74
0.0028
0.0000
75
0,0028
0.0000
76
0.0027
0.0000
77
0.0027
0.0000
78
0.0027
0.0000
79
0.0027
0.0000
80
0.0027
0.0000
81
0.0027
0.0000
82
0.0026
0.0000
83
0.0026
0.0000,
84
0.0026
0.0000
85
0.0026
0.0000
86
0.0026
0.0000
87
0.0026
O.DOOO
88
0.0025
0.0000
89
0.0025
0,0000
90
0.0025
0.0000
91
0-0025
0.0000
92
0.0025
0.0000
93
0.0025
0.0000
94
0.0024
0.0000
95
0.0024
0.0000
.96
0.0024
0.0000
97
0.0023
0.0000
98
0.0023
0.0600
99
0.0023
0.0000
100
0.0022
0.0000
101
0.0022
0.0000
102
0.0022
0.0000
103
0.0022
0,0000
104
0.0022
0.0000
105
0.0021
0.0000
106
0.0021
0.0000
107
0.0021
0.0000
108
0.0021
0.0000
109
0.0020
0.0000
110
0.0020
0.0000
ill
0,0020
0.0000
112
0.0020
0.0000
113
0.0019
0.0000
114
0.0019
0.0000
115
0.0019
0.0000
116
0.0019
0.00010
Page 22
20904 72"' Ave. W
4-Unit Apartments
117
0.0019
0.0000
118
0.0018
0.0000
119
0,0018
0.0000
120
0.0018
0.0000
121
0.0017
0.0000
122
0.0017
0,0000
123
0.0017
0.0000
124
0,0017
0.0000
125
0.0017
0.0000
126
0.0016
0.0000
127
0.0016
0,0000
128
0.0015
0.0000
129
0.0015
010000
130
0.0015
0.0000
131
0.0014
0.0000
132
0.0014
0.0000
133
0.0014
0.0000
134
0.0014
0.0000
13S
0.0014
0.0000
136
0.0014
0.0000
137
0.0013
010000
138
0.0013
0.0000
139
0.0013
0.0000
140
0.0013
0.0000
141
0.0013
0.0000
142
0.0012
0.0000
143
0.0012
0.0000
144
0.0012
0.0000
145
0.0011
0.0000
146
0.0011
0.0000
147
0.0011
0.0000
148
0.0011
0.0000
149
0.0010
0.0000
150
0.0010
0.0000
151
0.0009
0.0000
152
0.0008
0.0000
153
0.0006
0.0000
154
0.0006
0.0000
155
0.0002
0.0000
156
0-0001
0.0000
157
0.0000
0.0000
Stream Protection Duration
POC #1
The Facility PASSED
The Facility PASSED.
Flow(cfs) Predev Mit Percentage Pass/Fail
0.0015
12741
0
0
Pass
0.0015
11578
0
0
Pass
0.0016
10534
0
0
Pass
0.0016
9594
0
0
Pass
0.0017
8785
0
0
Pass
0.0018
8070
0
Pass
0.0018
7428
0
0
Pass
Page 23
2090472 nd Ave. W
4-Unit Apartments
0.0019
6847
0
0
Pass
0.0020
6299
0
0
Pass
0.001,10
5809
0
0
Pass
0.0021
5329
0
0
Pass
0,0021
4904
0
0
Pass
0,0022
4509
0
0
Pass
0.0023
4169
0
0
Pass
0.0023
3847
0
0
Pass
0.0024
3544
0
0
Pass
0.0025
3274
0
0
Pass
0.0025
3029
0
0
Pass
0.0026
2803
0
0
Pass
0.0027
2615
0
0
Pass
0.0027
2443
0
0
Pass
0.0028
2290
0
0
Pass
0,0028
21ae
0
0
Pass
0.0029
1985
0
0
Pass
0.0030
1866
0
0
Pass
0.0030
1762
0
0
Pass
0.0031
1652
0
0
Pass
0.0032
1562
0
0
Pass
0.0032
1478
0
0
Pass
0.0033
1393
0
0
Pass
0.0034
1324
0
0
Pass
0.0034
1243
0
0
Pass
0.0035
1172
0
0
Pass
0.0035
1119
0
0
Pass
0.0036
1053
0
0
Pass
0.0037
1000
0
0
Pass
0-0037
953
0
0
Pass
0.003B
901
0
0
Pass
0.0039
868
0
0
Pass
0.0039
833
0
0
Pass
0,0040
800
0
0
Pass
OA040
774
0
0
Pass
0.0041
740
0
0
Pass
0.0042
717
0
0
Pass
0.0042
688
0
0
Pass
0.0043
6SS
0
0
Pass
0.0044
630
0
0
Pass
0.0044
598
0
0
Pass
0.0045
563
0
0
Pass
0.0046
538
0
0
Pass
0.0046
511
0
0
Pass
0.0047
487
0
0
Pass
0.0047
464
0
0
Pass
0.0048
447
0
0
Pass
0,0049
434
0
0
Pass
0.0049
412
0
0
Pass
0.0050
399
0
0
Pass
0,0051
375
0
0
Pass
0,0051
360
0
0
Pass
0.0052
343
0
0
Pass
0.0053
326
0
0
Pass
0.0053
309
0
0
Pass
0.0054
292
0
0
Pass
0.0054
279
0
0
Pass
Page 24
20904 72"' Ave. W
4-Unit Apartments
0.0055
264
0
0
Pass
0.0056
254
0
0
Pass
0.0056
237
0
0
Pass
0.0057
225
0
0
Pass
0-0058
214
0
0
Pass
0.0058
203
0
0
Pass
0.0059
185
0
0
Pass
0.0059
176
0
0
Pass
0.0060
166
0
0
Pass
0.0061
156
0
0
Pass
0.0061
139
0
0
Pass
0.0062
128
0
0
Pass
0.0063
120
0
0
Pass
0.0063
112
0
0
Pass
0.0064
99
0
0
Pass
0.0065
93
0
0
Pass
0.0065
84
0
0
pass
0.0066
79
0
0
Pass
0.0066
78
0
0
Pass
0.0067
73
0
0
Pass
0.0068
66
0
0
Pass
0.0068
61
0
0
Pass
0.0069
53
0
0
Pass
0.0070
47
0
0
Pas s
0.0070
43
0
0
Pass
0.0071
39
0
0
Pass
0.0072
16
0
0
Pass
0.0072
34
0
0
Pass
0.0073
31
0
0
Pass
0,0073
29
0
0
Pass
0.0074
27
0
0
Pass
0,0075
27
0
0
Pass
0.0075
25
C
0
Pass
0.0076
21
0
0
Pass
0.0077
21
0
0
Pass
0.0077
19
0
0
Pass
Water Quality BKP Flow and Volume for Poc #1
On-line facility volume: 0.0112 acre-feet
On-line facility target flow: 0.0143 cfa.
Adjusted for 15 min: G.01Ss cfe.
Off-2ine facility target flow: 0.008 efg.
Adjusted for 15 min: 0.0087 cfa.
LID Report
LID Technique Used for Total Volume
Percent Water Quality Percent Comment
Treatment? Needs
Volume Water Quality
Volume Infiltration Cumulative
Through volume Volume
Facility (ac-ft.) Infiltrai-in-n
Infiltrated Treated
(ac-ft) �ac-ft) Credit
SSD Table 1 POC Y 46.46 51.05 51.05 Y
100.00 51.05 100.00 Treat. Credit
Total Volume Infiltrated 46.46 51�05 51-05
Page 25
2090472 nd Ave. W
4-Unit Apartments
100,00 51.05 51 / 51 = .100%Treat. Credit = 100%
qompliance with LID Standard 8
Duration Analysis Result = Passed
Page 26
2090472 nd Ave. W
4-Unit Apartments
SPECIAL REPORTS
Geotechnical Investigation Proposed Townhouse Structure — 20904 72 "d Avenue West, Edmonds,
Washington, by Cobalt Geosciences, dated September 25, 2017, Updated April 11, 2018
Page 27
Cobalt
Geosciences
Geotechnical Investigation
Proposed Townhouse Structure
20904 — 72nd Avenue West
Edmonds, Washington
April 11, 2018
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
Table of Contents
1.0 INTRODUCTION ................................ I ............................................................................ I
2.o PROJECT DESCRIPTION ............................................................................................... 1
3.0 SITE DESCRIPTION ..... i- ............................................................................................... I
4.o FIELD INVESTIGATION ............................................................................................... 2
4.1.1 Site Investigation Program ...................................................................... ............ 2
5.o SOIL AND GROUNDWATER CONDITIONS .............................................................. 2
5-1-1 Area Geology ........................................................................................................ 2
5.1.2 Groundwater ........................................................................................................ 3
6.o GEOLOGIC HAZARDS ................................................................................................... 3
6.1 Erosion Hazard .......................................................................... ............ -- ...... — 3
6.2 Seismic Hazard .................................................................... ............ - ........... -- 4
7,o DISCUSSION .................................................................................................................... 4
7.1.1 General ........ ............. i .......................................................................................... 4
8.o RECOMMENDATIONS .................................................................................................. 5
8.1.1
Site Preparation ............... .......................................................... ........................ 5
8.1,2
Temporary Excavations .............. -- ................... ....................... ............................ 5
8.1.3
Erosion and Sediment Control .............................................................................. 6
8,14
Foundation Design ................................................... ......... ............................... 6
8.1.5
Infiltration Recommendations ............................................................................. 7
8.1.6
Slab -on -Grade ...................................................................................................... 8
8.1.7
Utilities ... ............................................................................................ ............... 9
8ii.8
Groundwater Influence on Construction ................................................ ............. 9
9.o CONSTRUCTION FIELD REVIEWS ........................................................................... 11
:to. o CLOSURE .......................................................... ....................................................... 11
LIST OF APPENDICES
Appendix A — Statement of General Conditions
Appendix B — Figures
Appendix C — Exploration Logs
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 11. 2018
1.o Introduction
In accordance with your authorization, Cobalt Geosciences, LLC (Cobalt) has completed a geotechnical
investigation for the proposed four -unit townhouse structure located at 20904 — 72nd Avenue West in
Edmonds, Washington (Figure i).
The purpose of the geotechnical investigation was to identify subsurface conditions and to provide
preliminary geotechnical recommendations for foundation design, earthwork, soil compaction, utilities,
general pavement guidelines, infiltration rates, and suitability of the on -site soils for use as fill.
The scope of work forth e geotechnical investigation consisted of a site investigation followed by
engineering analyses to prepare this report. Recommendations presented herein pertain to various
geotechnical aspects of the proposed development, including foundation design, drainage, and earthwork.
2.0 P *ect Description
r0i
The project includes construction of a new two-story wood -framed townhouse structure. The building
wdl be located in the western portion of the property with asphalt parking areas extending east of the new
building.
We anticipate that the structure ,�rill be supported on a shallow. foundation system and site grading will.
include cuts and fills on the order Of 3 feet or less. Stormxvater runoff may be directed into shallow
infiltration trenches or drywells within the property.
3.0 Site Description
The site is located at 20904 — 72nd Avenue West in Edmonds, Washington (Figure 1). The property
consists of one rectangular parcel (No. 00566900200302) with a total area of o.18 acres.
The property is currently developed with a single-family residence and asphalt driveway. The site is
vegetated,Aith grasses, bushes, and sparse evergreen and deciduous trees.
The property slopes gently downward toward the west. The topographic relief across the property is
about 6 feet.
The site is bordered to the north by multi -unit residential buildings, to the south by a single-family
residence, to the south by SE 22nd Street, to the west by undeveloped land, and to the east by 72nd Avenue
West.
I
P-0- BOX 92243, Kenmore, NVA 98o26
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 11, 2018
4.o Field Investigation
4. 1 .1 Site Investigation Program
The geotechnical field investigation program was completed on August 29, 2017 and included excavating
and sampling two test pits and two hand borings within the property, where accessible.
The soils encountered were logged in the field and are described in accordance with the Unified Soil
Classification System (USCS).
A Cobalt Geosciences field representative conducted the explorations, classified the encountered soils,
kept a detailed log of each test pit and hand boring, and observed and recorded pertinent site features.
The results of the test pit and hand boring explorations are presented in Appendix C.
5.0 Soil and Groundwater Conditions
5.1.1 Area Geology
The site lieswithin the Puget Lowland. The lowland is part of a regional north -south trending trough that
extends from southwestern British Columbia to near Eugene, Oregon. North of 01yrnpia,'W"ashington,
this lowland is glacially carved, with a depositional and erosional history including at least four separate
glacial advances/retreats, The Puget Lowland is bounded to the west by the Olympic Mountains and to
the east by the Cascade Range. The lowland is filled with glacial and non -glacial sediments consisting of
interbedded gravel, sand, silt, till, and peat lenses.
The Geologic Map of the Edmonds East Quadrg",Ie indicates that the site is located near the contacts of
Vashon Glacial Till and Vashon Advance Outwash.
Vashon Glacial Till is typically characterized by an unsorted, non -stratified mixture of clay, silt, sand,
gravel, cobbles and boulders in variable quantities. These materials are typically dense and relatively
impermeable. The poor sorting reflects the mixing of the materials as these sediments were overridden
and incorporated by the glacial ice.
Vashon Advance Outwasb consists of fine to medium grained sand with variable amounts of silt and
gravel deposited during the Vasbon glacial advance. These deposits are relatively permeable and are
commonly overlain by Vashon Glacial Till.
Test Pits TP-1 and TP-2
The test pits encountered approximately 6 to io inches of topsoil and vegetation underlain by
approximatelY 3 to 4.5 feetof loose to medium dense, fine to medium grained sand with organic debris
and silt (Fill). This layer was underlain by medium dense to dense, fine to medium grained sand with,
trace gravel and trace silt (Advance Outwash), which continued to the termination depth of the test pits.
2
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 11, 2018
Hand Borings
Both hand borings encountered approximately 8 inches of grass and topsoil underlain by approximately 2
feet of loose, silty -fine to medium grained sand with gravel underlain by medium dense to dense, silty -fine
to medium grained sand with gravel (Glacial Till?), which continued to the termination depth of the hand
borings.
Overall Soil Conditions
Based on the explorations conducted, the site is underlain by variable thicknesses of fill material and at
depth by Vashon Advance Outwasb. Glacial till was observed in hand borings in the west portion of the
property -
The geologic maps indicate that the site is located near the contacts of Vasbon Glacial Till and Vashon
Advance Outwash. These two geologic units often inter -finger near the margins of till -planes. In other
words, near the contact between these two units, there can be areas underlain by glacial till or advance
outwash. Therefore, the location of any infiltration system (if proposed), may need to be modified during
construction if glacial till is encountered. Glacial till is not suitable for infiltration. While this possibility
is fairly low in likelihood, we mention it so that pro -visions in stormwater system location can be
considered. Preliminarily, we suggest locating the infiltration system in the southeast portion of the
property. We can be contacted during house demolition to observe additional explorations in that area to
verify/determine additional areas suitable for infiltration.
5-1.2 Groundwater
At the time of our investigation, groundwater was not encountered in any of the explorations, We
anticipate that light amounts of perched groundwater may develop during the wet season in areas
underlain by fill and/or glacial till materials (if present).
Water table elevations often fluctuate over time. The groundwater level will depend on a variety of factors
that may include seasonal precipitation, irrigation, land use, climatic conditions and soil permeability.
Vftter levels at the time of the field investigation may be different from those encountered during the
construction phase of the project.
6.o Geologic Hazards
6.1 Erosion Hazard
The Natural Resources Conservation Services (NRCS) maps for Snohomish Count), indicate that the site is
underlain by Alderwood-Urban Land Complex. We anticipate the soils to consist of sandy loams with a
"Moderate" erosion potential in a disturbed state.
It is our opinion that soil erosion potential at this project site can be reduced through landscaping and
surface water runoff control. I)rpically erosion of exposed soils will be most noticeable during periods of
rainfall and may be controlled by the use of normal temporary erosion control measures, such as silt
fences, hay bales, mulching, control ditches and diversion trenches. The typical wet weather season, with
regard to site grading, is from October 31s' to April is'. Erosion control measures should be in place before
the onset of wet weather.
3
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 11, 2018
6.2 Seismic Hazard
The overall subsurface profile corresponds to a Site Class D as defined by Table 1613.5.2 of the 2015
International Building Code (2015 IBC). A Site Class D applies to an overall profile consisting of dense to
very dense soils within the upper loo feet,
We referenced the U.S. Geological Survey (USGS) Earthquake Hazards Program 'Arebsite to obtain values
for Ss, S,, F., and F.. The USGS website includes the most updated published data on seismic conditions.
The site specific seismic design parameters and adjusted maximum spectral response acceleration
parameters are as follows:
PGA (Peak Ground Acceleration, in percent of g)
S5 127.6o% of g
S, 49-90% Of 9
FA 1.00
Fir 1.501
Additional seismic considerations include liquefaction potential and amplification of ground motions by
soft/loose soil deposits. The liquefaction potential is highest for loose sand with a high groundwater table.
The relatively dense soil deposits that underlie the site have a low potential for liquefaction.
7-o DISCUSSION
7.1.1 General
It is our opinion that the proposed townhouse structure may be supported on a shal.low foundation system
bearing on medium dense or firmer native soils, re -compacted native soils, or on structural fill placed on
native soils per the recommendations in Section 8.1.1 and 8.1.4 of this report.
The near surface soils include loose to medium dense sand N�rith gravel, medium dense silty -sand with
gravel, and local areas of loose -undocumented fill. The sod conditions throughout the site vary somewhat
and we recommend that a qualified geotechnical engineer or geologist monitor footing excavation work
and provide area -specific recommendations for footing subgrade preparation,
All excavations within the building footprint should be backfilled and compacted according to the
recommendations in this report. Any filled areas beneath foundation elements should extend a lateral
distance equal to the depth of the overexcavation in all directions from the faces of the footings. Soils
belovv foundation elements should be compacted to at least 95 percent of the modified proctor or consist
of medium dense to very dense native soils.
Infiltration of stormwater is feasiblewithin Advance Outwash soils. These systems should not be located
in fill. or glacial till materials. Therefore, the final depth and location of the system(s) should be allowed to
be finalized in the field. Based on our explorations, the most feasible location is in the southeast portion
of the property.
4
GE07ECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 11, 2018
8.o Recommendations
8.1.1 Site Preparation
Trees, shrubs and other vegetation should be removed prior to stripping of surficial organic -rich soil.
Based on observations from the site investigation program, it is anticipated that the stripping depth 'Ail]
range from 6 to 18 inches. Deeper excavations wil.1 be necessary to remove unsuitable fill materials from
the site, FiH up to 4.5 feet was observed in the east half of the property.
The excavated material is not suitable as fill material within the proposed building envelope but could be
used as fill material in non -settlement sensitive areas such as landscaping regions. Ih these non -
settlement sensitive areas, the fill should be placed in Maximum 12 inch thick lifts that should be
compacted to at least go percent of the modified proctor (ASTM D 1557 Test Method) maximum dry
density.
All existing foundation elements and any undocumented fill should be removed and backfilled with
suitable structural fill compacted to at least 95 percent of the modified proctor up to planned subgrade
elevations.
The native soils below the vegetation and topsoil generally consist of outwasb sands. These materials are
generally considered suitable for use as structural fill provided they are %rithin 3 percent of the optimum
moisture content. If soils with higher silt contents are encountered, they should be considered moisture
sensitive and suitable for use as structural fill only during the summer months.
Imported structural fill should consist of a sand and gravel mixture with a maximum grain size of 3 inches
and less than 5 percent fines (material passing the U.S. Standard No. 200 Sieve). Structural fill should be
placed in maximum lift thicknesses of 12 inches and should be compacted to a minimum Of 95 Percent of
the modified proctor maximum dry density, as determined by the ASTM D 1557 test method.
8.1.2 Temporary Excavations
Based on our understanding of the project, we anticipate that the grading could include local cuts on the
order of approximately 4 feet or less for foundation placement. These excavations should be sloped no
steeper than iH:iV (Horizonta]:Vertical) in native sofls. If an excavation is subject to heavy vibration or
surcharge loads, we recommend that the excavations be sloped no steeper than 1.511: N, where room
permits.
Temporary cuts should be in accordance with the Washington Administrative Code (WAC) Part N,
Excavation, Trenching, and Shoring. Temporary slopes should be visually inspected daily by a qualified
person during construction activities and the inspections should be documented in daily reports. The
contractor is responsible for maintaining the stability of the temporary cut slopes and reducing slope
erosion during construction.
Temporary cut slopes should be covered with visqueen to help reduce erosion during wet weather, and the
slopes should be closely monitored until the permanent retaining systems or slope configurations are
complete. Materials should not be stored or equipment operated within io feet of the top of any
temporary cut slope.
5
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 11, 2018
Soil conditions may not be completely known from the geotechnical investigation. In the case of
temporary cuts, the existing soil conditions may not be completely revealed until the excavation work
exposes the soil. I)Tically, as excavation work progresses the maximum inclination of temporary slopes
will need to be re-evaluated by the geotechnical engineer so that supplemental recommendations can be
made. Soil and groundwater conditions can be highly variable. Scheduling for soil work will need to be
adjustable, to deal with unanticipated conditions, so that the project can proceed and required deadlines
can be met.
If any variations or undesirable conditions are encountered during construction, we should be notified so
that supplemental recommendations can be made. if room constraints or groundwater conditions do not
pennit temporary slopes to be cut to the maximum angles allowed by the WAC, temporary shoring
systems may be required. The contractor should be responsible for developing temporary shoring
systems, if needed. We recommend that Cobalt Geosciences and the project structural engineer review
temporary shoring designs prior to installation, to verif�, the suitability of the proposed systems.
8-1-3 Erosion and Sediment Control
Erosion and sediment control (ESC) is used to reduce the transportation of eroded sediment to wetlands,
streams, lakes, drainage systems, and adjacent properties. Erosion and sediment control measures
should be implemented and these measures should be in general accordance %Ath local regulations. At a
minimum, the following basic recommendations should be incorporated into the design of the erosion
and sediment control features for the site:
• Schedule the soil, foundation, utility, and other work requiring excavation or the disturbance of the
site soils, to take place during the dry season (generally May through September). However, provided
precautions are taken using Best Management Practices (BMP's), grading activities can be completed
during the wet season (generally October through April).
• All site work should be completed and stabilized as quickly as possible.
• Additional perimeter erosion and sediment control features may be required to reduce the possibility
of sediment entering the surface water. This may include additional silt fences, silt fences with a
higher Apparent Opening Size (AOS), construction of a berm, or other filtration systems,
• Any runoff generated by dewatering discharge should be treated through construction of a sediment
trap if there is sufficient space. if space is limited other filtration methods mill need to be
incorporated.
8.1.4 Foundation Design
Ilie proposed townhouse structure may be supported on a shallow spread footing foundation system
bearing on undisturbed medium dense or firmer native soils, re -compacted native soils, or on properly
compacted structural fill placed on the suitableriative soils. If structural fill is used to support
foundations, then the zone of structural fill should extend beyond the faces of the footing a lateral distance
at least equal to the thickness of the structural fill.
We anticipate that re -compaction or over -excavation and replacement of the upper 2 to 3 feet below
proposed footing elevations could be necessary due to loose native soil conditions as well as presence of
areas of fill material. If undocumented fill is encountered below foundation elements, it should be fully
M
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
Ap6l 11, 2018
removed and replaced with suitable native soils or imported structural fill. As noted above,
overexcavations should extend laterally from the footing edges a distance equal to the depth of the
overexcavation.
For shallow foundation support, we recommend widths of at least 18 and 24 inches, respectively, for
continuous wall and isolated column footings supporting the proposed structure. Provided that the
footings are supported as recommended above, a net allowable bearing pressure Of 2,500 pounds per
square foot (psf) may be used for design.
A 1/3 increase in the above value may be used for short duration loads, such as those imposed by wind
and seismic events. Structural fill placed on bearing, native subgrade should be compacted to at least 95
percent of the maximum dry density based on ASTM Test Method Di5.57. Footing excavations should be
inspected to ver%- that the foundations will bear on suitable material.
Exterior footings should have a minimum depth of 18 inches belaw pad subgrade (soil grade) or adjacent
exterior grade, whichever is lower. Interior footings should have- a minimum depth of 12 inches below pad
subgrade (soil grade) or adjacent exterior grade, whichever is lower.
If constructed as recommended, the total foundation settlement is not expected to exceed 1 inch.
Differential settlement, along a 25-foot exterior wall footing, or between adjoining column footings,
should be less than 1/2 inch. This translates to an angular distortion Of 0.002. Most settlement is
expected to occur during construction, as the loads are applied. However, additional post -construction
settlement may occur if the foundation soils are flooded or saturated. All footing excavations should be
observed by a qualified geoteclinical cowsultant.
Resistance to lateral footing displacement can be determined using an allowable friction factor Of �0-35
acting between the base of foundations and the supporting subgrades. Lateral resistance for footings can
also be developed using an allowable equivalent fluid passive pressure of 275 pounds per cubic foot (pcf)
acting against the appropriate vertical footing faces (neglect the upper 12 inches below grade in exterior
areas). The allomable friction factor and allowable equivalent fluid passive pressure values include a
factor of safety Of 1.5. The frictional and passive resistance of the soil may be combined,%ithout reduction
in determining the total lateral resistance. A 1/3 increase in the above values may be used for short
duration transient loads.
Care should be taken to prevent wetting or drying of the bearing materials during construction. Any
extremely wet or dry materials, or any loose or disturbed materials at the bottom of the footing
excavations, should be removed prior to placing concrete. The potential for wetting or drying of the
bearing materials can be reduced by pouring concrete as soon as possible after completing the footing
excavation and evaluating the bearing surface by the geotechnical engineer or his representative.
8-1-5 Infiltration Reconunendations
We understand that some portion of stormwater runoff may flow into infiltration trenches or other
shallow systems. We should be provided with the final system designs in order to determine if they are
consistent with our recommendations.
7
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 1), 2018
The following table provides relevant soil characteristics typically used for water quality system design:
Test/Sample
Organic
Cation
Exploration
Elevation
Content
Exchange
Soil Classification
Number
(Feet Below
Capacity
(USDA/USCS)
Grade)
TP-1
5
3.5%
6.7 meq
Medium Sand/SP
We also performed a small-scale pilot infiltration test in test pit TP-i at a depth of 5 feet below grade.
Following an approximate 8-hour pre-soak period, the observed in-sifti infiltration rate was observed to
be approximately 2.8 inches per hour. After application of correction factors for small-scale PIT (0.50),
site variability (1.o), and influent control (o.o), the design infiltration rate is 1.26 incbes per hour.
Since the site is situated in an area that may have interlayered glacial till and outwash, it may be necessary
to adjust final system locations and depths in the field during construction. Alternatively,,we could be on -
site during initial grading or house demolition to observe additional test pit excavations in the area of any
proposed infiltration system.
8.1.6 Slab -on -Grade
We recommend that the upper 24 inches of the native soils within any proposed slab areas be re -
compacted to at least 95 percent of the modified proctor (ASTM D1557 Test Method). Any remaining
organic debris or fill should be removed prior to fill placement and compaction.
Often, a vapor barrier is considered below concrete slab areas. However, the usage of a vapor barrier could
result in curling of the concrete slab at joints. Floor covers sensitive to moisture typically requires the
usage of a vapor barrier. A materials or structural engineer should be consulted regarding the detailing of
the vapor barrier below concrete slabs. Exterior slabs typically do not utilize vapor barriers.
The American Concrete Institutes ACI 36oR-o6 Design of Slabs on Grade and ACI 302. iR-04 Guide for
Concrete Floor and Slab Construction are recommended references for vapor barrier selection and floor
slab detailing.
Slabs on grade may be designed using a coefficient of subgrade reaction Of 210 pounds per cubic inch (pci)
assuming the slab -on -grade base course is underlain by structural fill placed and compacted as outlined in
Section 8.1.
A perimeter drainage system is recommended unless interior slab areas are elevated a minimum of 12
inches above adjacent exterior grades. If installed, a perimeter drainage system should consist of a 4 inch
diameter perforated drain pipe surrounded by a minimum 6 inches of drain rock wrapped in a non -woven
geosynthetic filter fabric to reduce migration of soil particles into the drainage system. The perimeter
drainage system should discharge by gravity flow to a suitable stormwater system.
Exterior grades surrounding buildings should be sloped at a minimum of one percent to facilitate surface
water flow away from these buildings and preferably with a relatively impermeable surface cover
immediately adjacent to the buildings.
R
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
APO 11, 20)8
8.1.7 Utilities
Utility trenches should be excavated according to accepted engineering practices follo."ring OSHA
(Occupational Safety and Health Administration) standards, by a contractor experienced in such work.
The contractor is responsible for the safety of open trenches. Traffic and vibration adjacent to trench
walls should be reduced; cyclic wetting and drying of excavation side slopes should be avoided.
Depending upon the location and depth of some utility trenches, groundwater flow into open excavations
could be experienced, especially during or shortly following periods of precipitation,
rn general, sandy soils were encountered at shallow depths in the explorations at this site. These soils
have low cohesion and have a tendency to cave orslough in excavations. Shoring or sloping back trench
sidewalls is required within these soils.
All utility trench backfill should consist of imported structural fill or suitable on site soils. Utflity trench
backfdl placed in or adjacent to buildings and exterior slabs.should be compacted to at least 95 percent of
the maximum dn, density based on ASTM Test Method D1557. The upper 5 feet of utility trench backfill
placed in pavement areas should be compacted to at least 95 percent of the maximum dry density based
on ASTM Test Method D1557. Below 5 feet, utility trench back -fill in pavement areas should be compacted
to at least go percent of the maximum dry density based on ASTM Test Method D1557. Pipe bedding
should be in accordance with the pipe manufacturer's recommendations.
The contractor is responsible for removing all water -sensitive soils from the trenches regardless of the
backfill location and compaction requirements. Depending on the depth and location of the proposed
utilities, we anticipate the need to re -compact existing fill soils below the utility structures and pipes. The
contractor should use appropriate equipment and methods to avoid damage to the utilities and/or
structures during fill placement and compaction procedures.
8.1.8 Groundwater Influence on Construction
At the time of our investigation, groundwater was not encountered in any of the explorations. Based on
the sod conditions and area geology, we do not expect groundwater to be encountered during construction
atthissite. Light amounts of perched water could be encountered in areas underlain by fill and/or glacial
till (if present).
8.1.9 Pavement Recommendations
The near surface subgrade soils generAlly consist of silq, sand with gravel and poorly graded sand'vNith
variable amounts of gravel. These soils are rated as fair to good for pavement subgrade material
(depending on silt content and moisture conditions). We estimate that the subgrade iNrill have a California
Bearing Ratio (CBR) value Of 12 and a modulus of subgrade reaction value of k � 2io pci, provided the
subgrade is prepared in general accordance with our recommendations.
We recommend that, at a minimum, 18 inches of the existing subgrade material be moisture conditioned
(as necessary) and re -compacted to prepare for the construction of pavement sections. Deeper levels of
recompaction or overexcavation and replacement may be necessary in areas where fill and/or loose soils
are present.
GEOTECHNICAL INVI!STIGATION
EDMONDS, WASHINGTON
Apdl 1], 2018
The subgrade should be compacted to at least 95 percent of the maximum dry density as determined by
ASTM Test Method D1557. In place density tests should be performed to verify proper moisture content
and adequate compaction. However, if the subgrade soil consists of firm and unyielding native glacial
soils a proof roll of the pavement subgrade soil may be performed in lieu of compaction tests.
The recommended flexible and rigid pavement sections are based on design CBR and modulus of
subgrade reaction (k) values that are achieved, only following proper subgrade preparation. It should be
noted that subgrade soils that have relatively high silt contents -Mll likely be highly sensitive to moisture
conditions. The subgrade strength and performance characteristics of a silty subgrade material maybe
dramatically reduced if this material becomes wet.
Based on out knowledge of the proposed project, Nve expect the traffic to range ftom light duty (passenger
automobiles) to heavy duty (delivery trucks). The following tables show the recommended pavement
sections for light duty and heavy duty use,
ASPHALTIC CONCRETE (FLEXIBLE) PAVEMENT
LIGHT DUTY
Asphaltic Concrete
Aggregate Base*
Compacted Subgrade*
2.0 in.
6.o in.
18.0 in,
* 95% compaction based on AS7M Test Method D1.5,57
**A proof roll may be performed in lieu of in place density tests
HEAVY DLTff
Asphaltic Concrete
Aggregate Base*
Compacted Suhgrade*
3.0 in.
6.o in.
i8.o in.
* 95% compaction based on AS7M Test Method Dj5,57
"Aproof roll may beperformed in lieu of inplace density tests
PORTLAND CEMENT CONCRETE (RIGID) PAVEMENT
Min. PCC Depth
Aggregate Base*
Compacted Subgrade*
6.o in,
6.o in.
12.0 in.
* 95% compaction based on ASTM Test Method D1,557
A p roof roll may be performed in lieu of in place density tests
Ice
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
Ap6l 11, 2018
The asphaltic concrete depth in the flexible pavement tables should be a surface course type asphalt, such
as Washington Department of Transportation (WSDOT) 1/2 inch HMA- The rigid pavement design is
based on a Portland Cement Concrete (PCQ mix that has a 28 day compressive strength Of 4,000 pounds
per square inch (psi). The design is also based on a concrete flexural strength or modulus of rupture of
550 Psi -
9.0 Construction Field Reviews
Cobalt Geosciences should be retained to provide parttime field review during construction in order to
verify that the soil conditions encountered are consistent with our design assumptions and that the intent
of our recommendations is being met. This will require field and engineering review to:
• Monitor and test structural fill placement and soil compaction
• Verify the soil bearing at foundation locations for the building
• Verify slab subgrade and capillary break material below slab -on -grade
• Observe footing drainage placement
10 Verify infiltration rates at system locations
N Observe proof rolls of roadway subgrade prior to asphalt placement
Geotechnical design services should also be anticipated during the subsequent final design phase to
support the structural design and address specific issues arising during this phase. Field and engineering
review services will also be required during the construction phase in order to provide a Final Letter for
the project.
io.o Closure
This report was prepared for the exclusive use of Mark Cummings and his appointed consultants. Any use
of this report or the material contained herein by third parties, or for other than the intended purpose,
should first be approved in writing by Cobalt Geosciences, LLC.
The recommendations contained in this report are based on assumed continuity of soilsArith those of our
test holes, and assumed structural loads. Cobalt Geosciences should be provided with final architectural
and civil drawings when they become available in order that we may review our design recommendations
and advise of any revisions, if necessary.
Use of this report is subject to the Statement of General Conditions provided in Appendix A. It is the
responsibility of Mark Cummings who is identified as "the Client" within the Statement of General
Conditions, and its agents to review the conditions and to notify Cobalt Geosciences should any of these
not be satisfied.
11
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
Ap6l 11, 2018
Respectful�v submitted,
Cobalt Geosciences, LLC
Oiiginal signed by.-
"ONY
i�)5 WAsl
CL
A
NAL
Phil Haberman, PE, LG, LEG
Principal
PH/sc
E
PHVLUP HAS`RMAN
12
Statement of General Conditions
Statement of General Conditions
USE OF THIS REPORT: This report has been prepared for the sole benefit of the Client or its agent and
may not be used by any third party without the express written consent of Cobalt Geosciences and the
Client. Any use which a third party makes of this report is the responsibility of such third party.
BASIS OF THE REPORT: The information, opinions, and/or recommendations made in this report are
in accordance %ith Cobalt Geosciences present understanding of the site specific project as described by
the Client. The applicability of these is restricted to the site conditions encountered at the time of the
investigation or study. If the proposed site specific project differs or is modified from what is described in
this report or if the site conditions are altered, this report is no longer valid unless Cobalt Geosciences is
requested by the Client to review and rexise the report to reflect the differing or modified project specifics
and/or the altered site conditions.
STANDARD OF CARE: Preparation of this report, and all associated work, was carried out in
accordance with the normally accepted standard of care in the state of execution for the s ecific
p
professional service pro-.1ded to the Client. No other warranty is made.
INTERPRETATION OF SITE CONDITIONS: Soil, rock, or other material descriptions, and
statements regarding their condition, made in this report are based on site conditions encountered by
Cobalt Geosciences at the time of the work and at the specific testing and/or sampling locations.
Classifications and statements of condition have been made in accordance with normally accepted
practices which are judgmental in nature; no specific description should be considered exact, but rather
reflective of the anticipated material beba%ior. Extrapolation of in situ conditions can only be made to
some limited extent beyond the sampling or test points. The extent depends on variability of the soil, rock
and groundwater conditions as influenced bygeological processes, construction activity, and site use.
VARYING OR UNEXPECTED CONDITIONS: Should any site or subsurface conditions be
encountered that are different from those described in this report or encountered at the test locations,
Cobalt Geosciences must be notified immediately to assess if the varying or unexpected conditions are
substantial and if reassessments of the report conclusions or recommendations are required. Cobalt
Geosciences will not be responsible to any pat, for damages incurred as a result of failing to notify Cobalt
Geosciences that differing site or sub -surface conditions are present upon becoming aware of such
conditions.
PLANNING, DESIGN, OR CONSTRUCTION: Development or design plans and specifications
should be reviewed by Cobalt Geosciences, sufficiently ahead of initiating the next project stage (property
acquisition, tender, construction, etc), to confirm that this report completely addresses the elaborated
project specifics and that the contents of this report have been properly interpreted. Specialty quality
assurance senices (field observations and testing) during construction are a necessary part of the
evaluation of sub -subsurface conditions and site preparation works. Site work relating to the
recommendations included in this report should only be carried out in the presence of a qualified
geotechnical engineer; Cobalt Geosciences cannot be responsible for site work carried out without being
present.
Figures: Vicinity Map, Site Plan
im
122022,000' W 122021,000'W 122c20.000'W Mc19,000' W WGS84 122.018.000- W
76t t' 1k, 'r,
WASHRqGTON
Q4
Y&h P1
VISA
99
Edmonds
2ng st%svv P�Svv St PC swj
b
Project na
Ln 0
"tion In
5M
th
jli
Ln
r Aiiny P"
S
vird rH
L
4
"T
-A
z z
b
0
0
C" W01 '9
IN Vail
q
'IS
2nA
-'J Z
z WVW z
0
L 4
(0
P,
[Piz
S
S S
--U—d t S
1A
z J., 2 �S'K.
23 StjSW
b b
.T.
0 Lake.�
0 3?th Pl' 6
23i6 . h PC S I r,
S
Balli IV
gel,
211 SJS
7,11 f Ns X
Mni
T eie X2007
Ve -
122*22.000'W 122*21 .000' W 122o2O.00O'W i 22� 19.000' W WGS84 122018. 0 n D'
TN MN
Mtn
IS
NATIONAL ;ON 9 in oft �p
GEOGRAPHIC I aawffss 1, —1
10M 0 WDIRS low 7
VICINITYMAP P.O. BOX 82243
Proposed Townhouse Structure Kenmore, WA 98028
20904 72nd Avenue West Cobalt (2o6) 331-1097
Edmonds, Washington FIGURE i Geosciences
dr4m%E
4rAj.
T
i
T.Pa2-
HB-1
LOT 3, SLOCK 2,
SEATrU HEFQHTS
DIVIWON 4
VOLUME 9, �A6E 1 f
TAX PARCEL 00066MWUCW.�
tG'
2004 7PAM AVFNUC WFSr
EUA#GM& WA P8nf-?M
O*WP, CIAOAWSDEV UZ L n�',
TP-jL
t
X
HB-2
t' wim MVM
j J Ir.")
TAX PAFX�- 00OW90020030
z0g12 nNo AvENLE wEs r.
TP-1
Approxhnate Test Pit or
Hand Boring Location
Proposed Townhouse Structure
20904 72nd Avenue West
Edmonds, Washington
S11TE, PLAN
FIGURE 2.
NY
-F _7
4�
Rv.
Cobalt
Geosciences
N
A
P.O. BOX $2243
Kenmore, WA 98028
(206) 331-1097
cobaltPeuk2unail co ill
APPENDIX C
Exploration Logs
PROJECT: Edmonds Townhouse Structure
Hand Boring No:
LOCATION: 20904 72nd Avenue West, Edmonds, WA
PROJECT NUMBER:
HB-1 PAGE 1 OF I
DRILLING Y INSTALLATION:
NORTHING (ft): EASTING (ft):
STARTED 8/29117 COMPLETED: 8129/17
LAT: LONG:
DRILLING comPANY� Cobalt
GROUND ELEV (ft): TOC ELEV (fl):
INITIAL DTW (fty Not EncounteredWELL DEPTH (ft): —
DRILLING EQUIPMENT:
STATIC oTw (fty Not EncounteredBOREHOLE DEPTH (ft):4.0
DRILLING METHOD:
WELL CASING DIA. (in): — BOREHOLE DIA, (in): 3
SAMPLING -EQUIPMENT: Hand Auger
LOGGED BY: PH CHECKED BY: SC
t.
OL 0
Description
E
Sample 10
Z
E
_j
0
D
Time
av
Fo
2
Topsoil/grass
----------------------------------
SM; Loose to medium dense, silty -fine to medium grained sand some
gravel, areas of organic debris, dark yellowish brown to yellowish brown,
dry to moist. (Weathered Glacial Till?)
Borehole terminated at 4 feet.
5—
PROJECT: Edmonds Townhouse Structure
Hand Boring No:
LOCATION: 20904 72nd Avenue West, Edmonds, WA
PROJECT NUMBER*
HB-2 PAGE 1 OF I
DRILLING / INSTALLATION:
NORTHING (ft EASTING (ft):
STARTED 8129117 COMPLETED: 8129/17
LAT: LONG:
DRILLING COMPANY: Cobalt
GROUND ELEV (fl): TOO ELEV (ft):
INITIAL DTW (fty Not EncounteredWELL DEPTH (ft): —
DRILLING EQUIPMENT:
STATIC DTW (fty Not EncounteredBOREHOLE DEPTH (fty 4.0
DRILLING METHOD:
WELL CASING DIA. (in), — BOREHOLE DIA. (in): 3
SAMPLING EQUIPMENT: Hand Au_qer
LOGGED BY: PH CHECKED BY: SC
'a 0
.2
CL 0
Description
E
Sample ID
>
8
M
0
M
to
Time
6-0
x —
0
0
a.
Topsail/grass
to —me—dium—q—rai—nad s—an—d—so—me—
gravel, areas of organic debris, dark yetlowish brown to yellowish brown,
dry to moist. (Weathered Glacial Tifl?)
Borehole terminated at 4 feet.
5.0—
5—
PROJECT, Edmonds Townhouse Structure
Test Pit No:
LOCATION: 20904 72nd Avenue West, Edmonds, WA
TP-1
PROJECT NUMBER:
PAGE I OF 1
DRILLING I INSTALLATION:
NORTHING (ft): EASTING (ft):
STARTED 8/29117 COMPLETED: 8129il 7
LAT: LONG:
EXCAVATION COMPANY: Steffen
GROUND ELEV MY TOC ELEV (ft):
INITIAL DTW (fty Not EncounteredWELL DEPTH (fl): —
DRILLING EQUIPMENT: Excavator
STATIC DTVV (ft): Not EncounteredBOREHOLE DEPTH (ft): 8.0
DRILLING METHOD:
WELL CASING DIA. (in): — BOREHOLE DIA, (in):
SAMPLING EQUIPMENT. Hand Au-qer
LOGGED BY: PH CHECKED BY: SC
CL 0
Description
CL
F
Sample ID
"112
-j
D
Time
Topsoil/grass
SP-
----- --------------------------
SP-SM; Loose to medium dense, silty -fine to medium grained sand
SM
some gravel, areas of organic debris, dark yellowish brown to yellowish
K
brown, dry -to moist. (Fill)
SP-
- - - - - - - - - - - - - - - - - - - -
W1TeTkTm- dense to dense, fine to medium grained sand tii;ii-silt,
yellowish brown to grayish brown. moist. (Advance Outwash)
Test pit terminated at 8 feet.
PROJECT: Edmonds Townhouse Structure
Test Pit No:
LOCATION: 20904 72nd Avenue West, Edmonds, WA
PROJECT NUMBER:
TP-2 PAGE I OF I
DRILLING I INSTALLATION:
NORTHING (ft): EASTING (fl):
STARTED 8129117 COMPLETED: 8129/17
LAT: LONG:
EXCAVATION COMPANY: Steffen
GROUND ELEV (11): TOC ELEV (ft):
INITIAL DTW (fty Not EncounteredWELL DEPTH (it): --
DRILLING EQUIPMENT: Excavator
STATIC DTW (fty Not EncounteredsOREHOLE DEPTH (11): 8.0
DRILLING METHOD:
WELL CASING DIA. (in): — BOREHOLE DIA. (in):
SAMPLING EQUIPMENT: Hand Auger
LOGGED BY: PH CHECKED BY: SC
9L
Description
91
E
Sample ID
8 --6
0
to
Time
L)
Topsoil/grass
gravel, areas of organic debris, dark yellowish brown to yellowish brown,
�4 - *.
j.'
dry to moist. (Fill)
rpit
W--$M;—NFe Ti u m— je n—se—t—od—e n—s e—, fi—n e—t o—m—e d—i u—m —g r—ai n—ed—s —an —d t —ra c—e —to
SM
some silt, yellowish brown to grayish brown, moist. (Advance Outwash?)
5.0-"
'41
Test pit terminated at 8 feet.
2090472 "d Ave. W
4-Unit Apartments
OPERATION AND MAINTENANCE
A site -specific operations and maintenance section will be provided as a condition of final
approval of the TIR.
The objective of this manual is to ensure that the storm drainage facilities located on this site are
adequately maintained and operating properly.
Inspection Schedule:
Facilities should be routinely inspected every 120 days during the dry season months (April I
thru September 30) and every 60 days during the wet season months (October I - March 3 1).
Facilities shall also be inspected following major rainfall events (0.5 inches of rain or more).
Catch Basins and Yard Drains
Maintenance
Defect
Condition When Maintenance
Results Expected When
Component
is Needed
Maintenance is Performed
General
Trash & Debris
Trash or debris which is located
immediately in front of the
No Trash or debris located
immediately in front of catch
catch basin opening or is
basin or on grate opening.
blocking inletting capacity of
the basin by more than 10%.
Trash or debris (in the basin)
No trash or debris in the catch
that exceeds 60 percent of the
basin.
sump depth as measured from
the bottom of basin to invert of
the lowest pipe into or out of
the basin, but in no case less
than a minimum of six inches
clearance from the debris
surface to the invert of the
lowest pipe.
Trash or debris in any inlet or
Inlet and outlet pipes free of
outlet pipe blocking more than
trash or debris.
-1/3 of its height.
Dead animals or vegetation that
No dead animals or vegetation
could generate odors that could
present within the catch basin.
cause complaints or dangerous
gases (e.g., methane).
Sediment
Sediment (in the basin) that
exceeds 60 percent of the sump
No sediment in the catch basin
depth as measured from the
bottom of basin to invert of the
lowest pipe into or out of the
basin, but in no case less than a
L
minimum of 6 inches clearance
Page 28
2090472 nd Ave. W
4-Umt Apartments
from the sediment surface to
the invert of the lowestpipe.
Structure
Top slab has holes larger than 2
Top slab is free of holes and
Damage to
square inches or cracks wider
cracks.
Frame and/or
than 1/4 inch
Top Slab
(Intent is to make sure no
material is running into basin).
Frame not sitting flush on top
Frame is sitting flush on the riser
slab, i.e., separation of more
rings or top slab and firmly
than 3/4 inch of the frame from
attached.
the top slab. Frame not securely
attached
Fractures or
Maintenance person judges that
Basin replaced or repaired to
Cracks in Basin
structure is unsound.
design standards.
Grout fillet has separated or
Pipe is re -grouted and secure at
Walls / Bottom
cracked wider than 1/2 inch
basin wall.
and longer than 1 foot at the
joint of any inlet/outlet pipe or
any evidence of soil particles
entering catch basin through
cracks.
Settlement
If failure of basin has created a
Basin replaced or repaired to
Misalignment
safety, function, or design
design standards.
problem.
Vegetation
Vegetation growing across and
No vegetation blocking opening
blocking more than 10% of the
to basin.
basin opening.
Vegetation growing in
No vegetation or root growth
inlet/outlet pipe joints that is
present.
more than six inches tall and
less than six inches apart.
Contaminants
Any evidence of oil, gasoline,
Removal of oil, gasoline,
and Pollution
Contaminants or other
contaminants or other
pollutants
pollutants. Restoration of facility
(Coordinate removal/cleanup
to pre -contaminated condition.
with local water quality
response agency).
Catch Basin
Cover Not in
Cover is missing or only
Catch basin cover is closed
Cover
Place
partially in place. Any open
catch basin requires
maintenance.
Lock Mechanism
Mechanism cannot be opened
Mechanism opens with proper
not Working
by one maintenance person
tools.
with proper tools. Bolts into
frame have lessthan 1/2 inch of
thread.
Cover Difficult
One maintenance person
Cover can be removed by one
to Remove
cannot remove lid after
maintenance person..
Page 29
nd
20904 72 Ave. W
4-Unit Apartments
applying normal lifting
pressure.
(Intent is keep cover from
sealing off access to
maintenance.)_
Metal Grates
Grate Opening
Grate with opening wider than
Grate opening meets design
7/8 inch.
standards.
Trash and
Trash and debris that is
Grate free of trash and debris.
Debris
blocking more than 20% of
gr te surface inletting capaci!y.
Damaged or
Grate missing or broken
Grate is in place and meets
Missing
member(s) of the grate.
design standards.
Dispersion
Pipe Plugged
Accumulated sediment that
Pipe cleaned/flushed so that it
Trench
with Sediment
exceeds 20% of the design
matches design.
depth.
Not
Visual evidence of water
Trench redesigned or rebuilt to
Discharging
disebargq'ng at concentrated
standards.
Water Properly
points along trench (normal
condition is a "sheet flow" of
water along trench). Intent is
to prevent erosion damage.
Perforations
Overl/2 of perforations in pipe
Perforated pipe cleaned or
Plugged.
are plugged with debris and
replaced.
sediment.
Water Flows
Maintenance person observes
Facility rebuilt or redesigned to
Out Top of
or receives credible report of
standards
"Distributor"
water flowing out during any
Catch Basin.
storm less than the design
storm or its causing or appears
likelX to cause damage.
Page30
C1
StonnTebh-
Isolator" Row
O&M Manual
</
Mr-4500
THE MOST ADVANCED NAME W WATER MANAGEMENTSOLURONS-
-7-7-
2090472 nd AVe. W
4-Unit Apartments
T*M ISOLATOR* ROW
INTRODUCTION
An ImportaM component of any Stormwater Polkidw Prevention
Mn fe Inspection and maintormnoo. The Stonnbch Woof Raw is
a technkpm to Inwwwolvd1y.enhance Total Suspended Solids M
removal Wid provide SW access for Inspection and maint-anance.
THE ISOLATORPOW
IM IxoWor Flow Is a roW of SkmmTech chambwa ' Wflmr SO4 ISOM
W-310, SC-3104, W,740, DC-7W. MCVM or MC-4SM models,
that 18, surrounded with MW fabric avid connected to a ckmely kx�fted
manhola for easy access. The IiWowrapped chumbers provide for
swirg and ottration of sommd as Mom w4wrism In tho Wgubor
Raw and ultimately pass" through 0* filter fabdr- The open �boftom
clambers wA pwfordtad sidmalls M-310. SP- 310-3 and SC-740
modeWallowatDin watwto Now bat vertically wW twizontaltry out of
ft charrbom &dmerft am captured In to Isolator Row protecting
tia *Who aton of V* adjacent Mom and chambers ftm sediment
a0cunnkfion.
Two dMarent fabrice am used for the Nolator Row. A wom geoUxtile
fabrie Is p� baN~ I% stona mul ft Isoleor Row dmmberz.
The tough gootextile provides a awm9a for storm waW fthratim wW
provides a durable surface for maintenance operations. R Is also
ned te
"gh
to
dwnbm
The Wokdor Row Is tp** deeVoed to capture the 'Knot flueW aM
ofters the versardy to te sb*d m a volume baws or Now me basis,
An upebtam manhole M only provides soms to On Isokior Flow but
typicalbr Includes a hk& Now weir such that swrm water fowrobes or
volumes thM exceed the capselty outhe r Row overtV the over
flow weir and disciwgo through a nmnftW to the ottw chambers.
The Isolator Row may also be part of a b eat , ent bWn. By treating
stury waterptiorto enby into the chambetvistem, the servks Meow
be attended and polutarft such an hydrocarbons can be captimmad.
Pro -treatment beat management practices can be as simple as
deep sump rnkl basirak bfl-� or can be rvxywugw
StOFM water treattnent devicee- The d"Igh of the treatment Vain and
selection of pretreatment devices by the design engineer is often
driven by regulatory requinwroaffl& Whether prvtre�ect is used or not
the Isolator Row is recommarxied by Storniftch as an efliecthm mews
to rhin1mize maintenance requiremerft and maliftwinon cost&
Note: See ft MoapTech Deso Mmusf lbr deftied kdonnotbn on
dssq*jg v*ft for a $ftmTbM qaftm, bdudng the IwAgor Row
StormTech Isolator Row wlth
Overflow Splaway(notto ftwe)
Alow4r"
,N%ATtA wM
Page32
2,0904 72 d Ave. W
4-Unit Apartments
V, !7-1, P,
INSPECTION
The frequency of inspection and maintenance varies by k=tion. A
routine inspection schedule needs to be established for each individual
location ha upon Me specific vwiab6& The type of land use (Le,
industrial. commercial, residenW, anticipated pollutant load, percent
imperviousness, climate, atc. all play a critical role in determining the
actuisl frequency of Inspection and maintenance practices.
At a minirnum, Stornfrech recommends annual Inspections, lnftty�
the Isolatair Raw should be inspected every 6 months forthe firtrt year
of operafion. For subsequent years, the Inapoctilon shoWd be i4usted
based upon previous observabon of sediment deposition.
The Isolator Row incorporates a combination of stanclard manhole(s) and strategically located inspection ports
(as neadeM. The Inspection Pons allow for easy access to the system from the surface, eliminating the need to
perform a confined space entry for Inspection purposes.
If upon visual Inspection it Is found that sediment has accumulated, a stadia rod should be Inserted to
determine the depth of 6ediment. When the average depth of sediment exceeds 3 Inches throughout the iength
of the Isolator Rom cloan-oLrt should be performed.
MAINTENANCE
The Isolater Row was designed to reduce the cost at periodic maintenance. By 'isolaft* sediments to just
one row, costs are dramatically reduced by eliminafing the need to clean out each row at the entire storage
bed. If inspection indicates the potential need for maintenamx� access is provided via a manIxAe(s) located on
the eM(s) of &(a tow for cleanourt. If entry Into the manhole Is required, please follow local and OSHA rules for a
confined spew entriw.
Maintenance is accomplished with the JetVac proom. The JetVac ptocess utilizes a high premre water
nozzle to propel itself down the Isolator How while scourbrig and empending sediments. As the nozzle is
retrieved, the captLued pollutants are flushed back kft the manhole for vacuumiing. Most sewer and pipe
maintenance companies have vacuumliatVac combination vehicle& Selection of an appropriate JelVao rozzle
will Improve maintenance efifliclency. Fb(ed nozzles designed for culverts or large diameter pipe cleaning are
preferabia. Rear foxing jets with an effective spread of at least 45" are bwL Most JaWac: reals have 400 feet
of hose allowing maintenance of an lsoWw Row up to 50 chambers long. The JotVac process shall only
be performed on StorrnTech llsoleuw Rows that harve AASHTO clam I woven geotextile (as specif led by
StormTeoh) over their angular base stone.
StormTech Isolator flow (not to scale)
Note,Nw-wwm Wric is anll�requkW overMinfelApe co-w0w oft ft end cap fbrSC-18%P. DC-M WC-3500arVW-4500 chamber
uxxJEWs and Is not nmIL&vd erm Um saft 130ftfof R&w.
O—W all
r#
Page 33
2090472 nd Ave. W
4-Unit Apartments
ROV� STEP BY IST811
STEP 1
Inspec:4 Isolator Raw for sediment.
A) Inspection ports (if present)
i. Remove lid from floor box frame
li. Remove cap from Inspection riser
III. Using a flashlight and stadia rod,rneawre depth of sediment and record resuft on maintenance log.
iv. If sediment is at or above 3 inch depth, proceed to Stop 2- If not proceed to Stop 3.
B) All Isolator Rom
I. Remove cover from manhole at upstream end of Isolator Raw
ii. Using a flashfigh� inspect down Isolator Row through outlet pipe
1. Mirrors on poles or cameras may be used to avoid a confirwd space entry
2. Follow OSHA regulations for confined space entry If entering manhole
iii. If sodirnerd is at or above the lower row of sidewall holes (approximately 3 inches), proceed to Step 2.
If nut, proceed to Stop 3.
STEP 2
Clean out Isolator Row using the JetVac process.
A) A fixed floor cleaning nozzle with rear facing nozzle spread of 45 inches or more is preferable
B) Apply multiple passes of JelVac unhl backRush water is clean
C) Vacuum manhole sump as required
STEP 3
Repleice all caps. (ids and covers, record observations and actions.
STEP 4
Inspect & clean catch basins and manholes upstrearn of the ftrnnTech system.
SAMPLE MAINTENANCE LOG
3/15/21 KOK, W" UoWL.H.'.. FhmA " Es CJ fra� t:1#4
qr&A r.
9/14-AL1 'SO" W qr* fau
6/26/1S
0.6 ft )Ack� ftal, Ae"' w�jtbtq Lk emmkoLe 9,vwt Lk 14V
ISOUtor Rok, "w1kt-&-ce A"t
7/711.2 &-A A
;-XI.A —4
Page34
Cobalt
Geosciences
Geotechnical Investigation
Proposed Townhouse Structure
20904 — 72nd Avenue West
Edmonds, Washington
BLD201-1 ) 935
April 11, 2018
cIrry C.
RESUB
MAY 14 2018
BUILDING DEPARTMENT
CITY OF EDMONDS
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
Table of Contents
i.o INTRODUCTION ............................................................................................................. I
2.o PROJECT DESCRIPTION .............................................................................................. 1
3-0 SITE DESCRIPTION ....................................................................................................... I
4.o FIELD INVESTIGATION ...............................................................................................
2
4.1.1 Site Investigation Program ...................................................................................
2
5.0 SOIL AND GROUNDWATER CONDITIONS ..............................................................
2
5.1.1 Area Geology ........................................................................................................
2
5.1.2 Groundwater ........................................................................................................
3
6.o GEOLOGIC HAZARDS ...................................................................................................
3
6.1 Erosion Hazard ....................................................................................................
3
6.2 Seismic Hazard ....................................................................................................
4
7.o DISCUSSION ...................................................................................................................
4
7.1.1 General .................................................................................................................
4
8.o RECOMMENDATIONS ..................................................................................................
5
8.1.1 Site Preparation ...................................................................................................
5
8.1.2 Temporary Excavations ........................................................................................
5
8.1.3 Erosion and Sediment Control ..............................................................................
6
8.1.4 Foundation Design ...............................................................................................
6
8.1.5 Infiltration Recommendations .............................................................................
7
8.1.6 Slab -on -Grade ......................................................................................................
8
8.1.7 Utilities ................................................................................................................
9
8.1.8 Groundwater Influence on Construction ............................................................ -
9
9.o CONSTRUCTION FIELD REVIEWS ........................................................................... 11
lo.o CLOSURF . ................................................................................................................... 11
LIST OF APPENDICES
Appendix A — Statement of General Conditions
Appendix B — Figures
Appendix C — Exploration Logs
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 11, 2018
1.o Introduction
in accordance with your authorization, Cobalt Geosciences, LLC (Cobalt) has completed a geotechnical
investigation for the proposed four -unit townhouse structure located at 20904 — 72nd Avenue West in
Edmonds, Washington (Figure 1).
The purpose of the geotechnical investigation was to identify subsurface conditions and to provide
preliminary geotechnical recommendations for foundation design, earthwork, soil compaction, utilities,
general pavement guidelines, infiltration rates, and suitability of the on -site soils for use as fill.
The scope of work for the geotechnical investigation consisted of a site investigation followed by
engineering analyses to prepare this report. Recommendations presented herein pertain to various
geotechnical aspects of the proposed development, including foundation design, drainage, and earthwork.
2.o Project Description
The project includes construction of a new two-story wood -framed townhouse structure. The building
will be located in the western portion of the property with asphalt parking areas extending east of the new
building.
We anticipate that the structure will be supported on a shallow foundation system and site grading will
include cuts and fills on the order Of 3 feet or less. Stormwater runoff may be directed into shallow
infiltration trenches or drywells within the property.
3.0 Site Description
The site is located at 20904 — *72nd Avenue West in Edmonds, Washington (Figure 1). The property
consists of one rectangular parcel (No. 00566qoO2003O2) with a total area of o.18 acres.
The property is currently developed with a single-family residence and asphalt driveway. The site is
vegetated with grasses, bushes, and sparse evergreen and deciduous trees.
The property slopes gently downward toward the west. The topographic relief across the property is
about 6 feet.
The site is bordered to the north by multi -unit residential buildings, to the south by a single-family
residence, to the south by SE 22nd Street, to the west by undeveloped land, and to the east by 72nd Avenue
West.
I
P.O. BOX 82243, Kemnore, WA 98028
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 11, 2018
4.o Field Investigation
4.1.1 Site investigation Program
The geotechnical field investigation program was completed on August 29, 2017 and included excavating
and sampling two test pits and two hand borings within the property, where accessible.
The soils encountered were logged in the field and are described in accordance with the Unified Soil
Classification System (USCS).
A Cobalt Geosciences field representative conducted the explorations, classified the encountered soils,
kept a detailed log of each test pit and hand boring, and observed and recorded pertinent site features.
The results of the test pit and hand boring explorations are presented in Appendix C.
5-0 Soil and Groundwater Conditions
5-1.1 Area Geology
The site lies within the Puget Lowland. The lowland is part of a regional north -south trending trough that
extends from southwestern British Columbia to near Eugene, Oregon. North of Olympia, Washington,
this lowland is glacially carved, with a depositional and erosional history including at least four separate
glacial advances/retreats. The Puget Lowland is bounded to the west by the Olympic Mountains and to
the east by the Cascade Range. The lowland is filled with glacial and non-gjacial sediments consisting of
interbedded gravel, sand, silt, till, and peat lenses.
The Geologic Map of the Edmonds East Quadrangle, indicates that the site is located near the contacts of
Vashon Glacial Till and Vashon Advance Outwash.
Vashon Glacial Till is typically characterized by an unsorted, non -stratified mixture of clay, silt, sand,
gravel, cobbles and boulders in variable quantities. These materials are typically dense and relatively
impermeable. The poor sorting reflects the mixing of the materials as these sediments were overridden
and incorporated by the glacial ice.
Vashon Advance Outwash consists of fine to medium grained sand with variable amounts of silt and
gravel deposited during the Vashon glacial advance. These deposits are relatively permeable and are
commonly overlain by Vashon Glacial Till.
Test Pits TP-i and TP-2
The test pits encountered approximately 6 to io inches of topsoil and vegetation underlain by
approximately 3 to 4.5 feet of loose to medium dense, fine to medium grained sand with organic debris
and silt (Fill). This layer was underlain by medium dense to dense, fine to medium grained sand with
trace gravel and trace silt (Advance Outwash), which continued to the termination depth of the test pits.
2
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 11, 2018
Hand Borings
Both hand borings encountered approximately 8 inches of grass and topsoil underlain by approximately 2
feet of loose, silty -fine to medium grained sand with gravel underlain by medium dense to dense, silty -fine
to medium grained sand with gravel (Glacial Till?), which continued to the termination depth of the hand
borings.
Overall Soil Conditions
Based on the explorations conducted, the site is underlain by variable thicknesses of fill material and at
depth by Vashon Advance Outwash. Glacial till was observed in hand borings in the west portion of the
property.
The geologic maps indicate that the site is located near the contacts of Vashon Glacial Till and Vashon
Advance Outwash. These two geologic units often inter -finger near the margins of till -planes. In other
words, near the contact between these two units, there can be areas underlain by glacial till or advance
outwash. Therefore, the location of any infiltration system (if proposed), may need to be modified during
construction if glacial till is encountered. Glacial till is not suitable for infiltration. While this possibility
is fairly low in likelihood, we mention it so that provisions in stormwater system location can be
considered. Preliminarily, we suggest locating the infiltration system in the southeast portion of the
property. We can be contacted during house demolition to observe additional explorations in that area to
verify/determine additional areas suitable for infiltration.
5.1.2 Groundwater
At the time of our investigation, groundwater was not encountered in any of the explorations. We
anticipate that light amounts of perched groundwater may develop during the wet season in areas
underlain by fill and/or glacial till materials (if present).
Water table elevations often fluctuate over time. The groundwater level will depend on a variety of factors
that may include seasonal precipitation, irrigation, land use, climatic conditions and soil permeability.
Water levels at the time of the field investigation may be different from those encountered during the
construction phase of the project.
6.o Geologic Hazards
6.1 Erosion Hazard
The Natural Resources Conservation Services (NRCS) maps for Snohomish County indicate that the site is
underlain by Alderwood-Urban Land Complex. We anticipate the soils to consist of sandy loams with a
"Moderate" erosion potential in a disturbed state.
It is our opinion that soil erosion potential at this project site can be reduced through landscaping and
surface water runoff control. Typically erosion of exposed soils will be most noticeable during periods of
rainfall and may be controlled by the use of normal temporary erosion control measures, such as silt
fences, hay bales, mulching, control ditches and diversion trenches. The typical wet weather season, with
regard to site grading, is from October 31st to April ist. Erosion control measures should be in place before
the onset of wet weather.
3
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 11, 2018
6.2 Seismic Hazard
The overall subsurface profile corresponds to a Site Class D as defined by Table 1613-5.2 of the 2015
International Building Code (2015 IBC). A Site Class D applies to an overall profile consisting of dense to
very dense soils within the upper loo feet.
We referenced the U.S. Geological Survey (USGS) Earthquake Hazards Program Website to obtain values
for Ss, S,, F,,, and F,. The USGS website includes the most updated published data on seismic conditions.
The site specific seismic design parameters and adjusted maximum spectral response acceleration
parameters are as follows:
PGA (Peak Ground Acceleration, in percent of g)
SS 127.6o% of g
S, 49-90% Of 9
FA 1.00
Fv 1.501
Additional seismic considerations include liquefaction potential and amplification of ground motions by
soft/loose soil deposits. The liquefaction potential is highest for loose sand with a high groundwater table.
The relatively dense soil deposits that underlie the site have a low potential for liquefaction.
7-o DISCUSSION
7.:t.i General
It is our opinion that the proposed townhouse structure may be supported on a shallow foundation system
bearing on medium dense or firmer native soils, re -compacted native soils, or on structural fill placed on
native soils per the recommendations in Section 8.1.1 and 8.1.4 Of this report.
The near surface soils include loose to medium dense sand with gravel, medium dense silty -sand with
gravel, and local areas of loose undocumented fill. The soil conditions throughout the site vary somewhat
and we recommend that a qualified geotechnical engineer or geologist monitor footing excavation work
and provide area -specific recommendations for footing subgrade preparation.
All excavations within the building footprint should be backfilled and compacted according to the
recommendations in this report. Any filled areas beneath foundation elements should extend a lateral
distance equal to the depth of the overexcavation in all directions from the faces of the footings. Soils
below foundation elements should be compacted to at least 95 percent of the modified proctor or consist
of medium dense to very dense native soils.
Infiltration of stormwater is feasible within Advance Outwash soils. These systems should not be located
in fill or glacial till materials. Therefore, the final depth and location of the system(s) should be allowed to
be finalized in the field. Based on our explorations, the most feasible location is in the southeast portion
of the property.
4
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 11, 2018
8.o Recommendations
8.1.1 Site Preparation
Trees, shrubs and other vegetation should be removed prior to stripping of surficial organic -rich soil.
Based on observations from the site investigation program, it is anticipated that the stripping depth will
range from 6 to 18 inches. Deeper excavations will be necessary to remove unsuitable fill materials from
the site. Fill up to 4.5 feet was observed in the east half of the property.
The excavated material is not suitable as fill material within the proposed building envelope but could be
used as fill material in non -settlement sensitive areas such as landscaping regions. In these non -
settlement sensitive areas, the fill should be placed in maximum 12 inch thick lifts that should be
compacted to at least go percent of the modified proctor (ASTM D 1557 Test Method) maximum dry
density.
All existing foundation elements and any undocumented fill should be removed and backfilled with
suitable structural fill compacted to at least 95 percent of the modified proctor up to planned subgrade
elevations.
The native soils below the vegetation and topsoil generally consist of outwash sands. These materials are
generally considered suitable for use as structural fill provided they are within 3 percent of the optimum
moisture content. If soils with higher silt contents are encountered, they should be considered moisture
sensitive and suitable for use as structural fill only during the summer months.
Imported structural fill should consist of a sand and gravel mixture with a maximum grain size Of 3 inches
and less than 5 percent fines (material passing the U.S. Standard No. 200 Sieve). Structural fill should be
placed in maximum lift thicknesses Of 12 inches and should be compacted to a minimum Of 95 percent of
the modified proctor maximum dry density, as determined by the ASTM D 1557 test method.
8.1.2 Temporary Excavations
Based on our understanding of the project, we anticipate that the grading could include local cuts on the
order of approximately 4 feet or less for foundation placement. These excavations should be sloped no
steeper than iH:iV (Horizontal:Vertical) in native soils. If an excavation is subject to heavy vibration or
surcharge loads, we recommend that the excavations be sloped no steeper than 1-5H: 1V, where room
permits.
Temporary cuts should be in accordance with the Washington Administrative Code (WAQ Part N,
Excavation, Trenching, and Shoring. Temporary slopes should be visually inspected daily by a qualified
person during construction activities and the inspections should be documented in daily reports. The
contractor is responsible for maintaining the stability of the temporary cut slopes and reducing slope
erosion during construction.
Temporary cut slopes should be covered with visqueen to help reduce erosion during wet weather, and the
slopes should be closely monitored until the permanent retaining systems or slope configurations are
complete. Materials should not be stored or equipment operated within JLo feet of the top of any
temporary cut slope.
5
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 11, 2018
Soil conditions may not be completely known from the geotechnical investigation. In the case of
temporary cuts, the existing soil conditions may not be completely revealed until the excavation work
exposes the soil. Typically, as excavation work progresses the maximum inclination of temporary slopes
will need to be re-evaluated by the geotechnical engineer so that supplemental recommendations can be
made. Soil and groundwater conditions can be highly variable. Scheduling for soil work will need to be
adjustable, to deal with unanticipated conditions, so that the project can proceed and required deadlines
can be met.
If any variations or undesirable conditions are encountered during construction, we should be notified so
that supplemental recommendations can be made. If room constraints or groundwater conditions do not
permit temporary slopes to be cut to the maximum angles allowed by the WAC, temporary shoring
systems may be required. The contractor should be responsible for developing temporary shoring
systems, if needed. We recommend that Cobalt Geosciences and the project structural engineer review
temporary shoring designs prior to installation, to verify the suitability of the proposed systems.
8-1-3 Erosion and Sediment Control
Erosion and sediment control (ESC) is used to reduce the transportation of eroded sediment to wetlands,
streams, lakes, drainage systems, and adjacent properties. Erosion and sediment control measures
should be implemented and these measures should be in general accordance with local regulations. At a
minimum, the following basic recommendations should be incorporated into the design of the erosion
and sediment control features for the site:
• Schedule the soil, foundation, utility, and other work requiring excavation or the disturbance of the
site soils, to take place during the dry season (generally May through September). However, provided
precautions are taken using Best Management Practices (BMP's), grading activities can be completed
during the wet season (generally October through April).
• All site work should be completed and stabilized as quickly as possible.
• Additional perimeter erosion and sediment control features may be required to reduce the possibility
of sediment entering the surface water. This may include additional silt fences, silt fences with a
higher Apparent Opening Size (AOS), construction of a berm, or other filtration systems.
• Any runoff generated by dewatering discharge should be treated through construction of a sediment
trap if there is sufficient space. If space is limited other filtration methods will need to be
incorporated.
8-IL-4 Foundation Design
The proposed townhouse structure may be supported on a shallow spread footing foundation system
bearing on undisturbed medium dense or firmer native soils, re -compacted native soils, or on properly
compacted structural fill placed on the suitable native soils. If structural fill is used to support
foundations, then the zone of structural fill should extend beyond the faces of the footing a lateral distance
at least equal to the thickness of the structural fill.
We anticipate that re -compaction or over -excavation and replacement of the upper 2 to 3 feet below
proposed footing elevations could be necessary due to loose native soil conditions as well as presence of
areas of fill material. If undocumented fill is encountered below foundation elements, it should be fully
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 11, 2018
removed and replaced with suitable native soils or imported structural fill. As noted above,
overexcavations should extend laterally from the footing edges a distance equal to the depth of the
overexcavation.
For shallow foundation support, we recommend widths of at least 18 and 24 inches, respectively, for
continuous wall and isolated column footings supporting the proposed structure. Provided that the
footings are supported as recommended above, a net allowable bearing pressure Of 2,500 pounds per
square foot (psf) maybe used for design.
A 1/3 increase in the above value may be used for short duration loads, such as those imposed by wind
and seismic events. Structural fill placed on bearing, native subgrade should be compacted to at least 95
percent of the maximum dry density based on ASTM Test Method D1557. Footing excavations should be
inspected to verify that the foundations will bear on suitable material.
Exterior footings should have a minimum depth of 18 inches below pad subgrade (soil grade) or adjacent
exterior grade, whichever is lower. Interior footings should have a minimum depth Of 12 inches below pad
subgrade (soil grade) or adjacent exterior grade, whichever is lower.
If constructed as recommended, the total foundation settlement is not expected to exceed IL inch.
Differential settlement, along a 25-foot exterior wall footing, or between adjoining column footings,
should be less than 1/2 inch. This translates to an angular distortion Of 0.002. Most settlement is
expected to occur during construction, as the loads are applied. However, additional post -construction
settlement may occur if the foundation soils are flooded or saturated. All footing excavations should be
observed by a qualified geotechnical consultant.
Resistance to lateral footing displacement can be determined using an allowable friction factor Of 0.35
acting between the base of foundations and the supporting subgrades. Lateral resistance for footings can
also be developed using an allowable equivalent fluid passive pressure Of 275 pounds per cubic foot (pcf)
acting against the appropriate vertical footing faces (neglect the upper 12 inches below grade in exterior
areas). The allowable friction factor and allowable equivalent fluid passive pressure values include a
factor of safety Of 1.5. The frictional and passive resistance of the soil may be combined without reduction
in determining the total lateral resistance. A 1/3 increase in the above values may be used for short
duration transient loads.
Care should be taken to prevent wetting or drying of the bearing materials during construction. Any
extremely wet or dry materials, or any loose or disturbed materials at the bottom of the footing
excavations, should be removed prior to placing concrete. The potential for wetting or drying of the
bearing materials can be reduced by pouring concrete as soon as possible after completing the footing
excavation and evaluating the bearing surface by the geotechnical engineer or his representative.
8.1-5 Infiltration Recornntendations
We understand that some portion of stormwater runoff may flow into infiltration trenches or other
shallow systems. We should be provided with the final system designs in order to determine if they are
consistent with our recommendations.
7
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 11, 2018
The following table provides relevant soil characteristics typically used for water quality system design:
Test/Sample
Organic
Cation
Exploration
Elevation
Content
Exchange
Soil Classification
Number
(Feet Below
Capacity
(USDA/USCS)
Grade)
TP-1
5
1 3.5%
1 6.7 meq
Medium Sand/SP
We also performed a small-scale pilot infiltration test in test pit TP-i at a depth Of 5 feet below grade.
Following an approximate 8-hour pre-soak period, the observed in -situ infiltration rate was observed to
be approximately 2.8 inches per hour. After application of correction factors for small-scale PIT (0-50),
site variability (i.o), and influent control (o.9), the design infiltration rate is 1.26 inches per hour.
Since the site is situated in an area that may have interlayered glacial till and outwash, it may be necessary*�,
to adjust final system locations and depths in the field during construction. Alternatively, we could be on- IS
site during initial grading or house demolition to observe additional test pit excavations in the area of any
proposed infiltration system.
8.1.6 Slab -on -Grade
We recommend that the upper 24 inches of the native soils within any proposed slab areas be re -
compacted to at least 95 percent of the modified proctor (ASTM D1557 Test Method). Any remaining
organic debris or fill should be removed prior to fill placement and compaction.
Often, a vapor barrier is considered below concrete slab areas. However, the usage of a vapor barrier could
result in curling of the concrete slab at joints. Floor covers sensitive to moisture typically requires the
usage of a vapor barrier. A materials or structural engineer should be consulted regarding the detailing of
the vapor barrier below concrete slabs. Exterior slabs typically do not utilize vapor barriers.
The American Concrete Institutes ACI 36oR-o6 Design of Slabs on Grade and ACI 302.1R-04 Guide for
Concrete Floor and Slab Construction are recommended references for vapor barrier selection and floor
slab detailing.
Slabs on grade may be designed using a coefficient of subgrade reaction Of 210 pounds per cubic inch (pci)
assuming the slab -on -grade base course is underlain by structural fill placed and compacted as outlined in
Section 8.1.
A perimeter drainage system is recommended unless interior slab areas are elevated a minimum Of 12
inches above adjacent exterior grades. If installed, a perimeter drainage system should consist of a 4 inch
diameter perforated drain pipe surrounded by a minimum 6 inches of drain rock wrapped in a non -woven
geosynthetic filter fabric to reduce migration of soil particles into the drainage system. The perimeter
drainage system should discharge by gravity flow to a suitable stormwater system.
Exterior grades surrounding buildings should be sloped at a minimum of one percent to facilitate surface
water flow away from these buildings and preferably with a relatively impermeable surface cover
immediately adjacent to the buildings.
Z�
Ell
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 11, 2018
8.1.7 Utilities
Utility trenches should be excavated according to accepted engineering practices following OSHA
(Occupational Safety and Health Administration) standards, by a contractor experienced in such work.
The contractor is responsible for the safety of open trenches. Traffic and vibration adjacent to trench
walls should be reduced; cyclic wetting and drying of excavation side slopes should be avoided.
Depending upon the location and depth of some utility trenches, groundwater flow into open excavations
could be experienced, especially during or shortly following periods of precipitation.
In general, sandy soils were encountered at shallow depths in the explorations at this site. These soils
have low cohesion and have a tendency to cave or slough in excavations. Shoring or sloping back trench
sidewalls is required within these soils.
All utility trench backfill should consist of imported structural fill or suitable on site soils. Utility trench
backfill placed in or adjacent to buildings and exterior slabs should be compacted to at least 95 percent of
the maximum dry density based on ASTM Test Method D1557. The upper 5 feet of utility trench backfill
placed in pavement areas should be compacted to at least 95 percent of the maximum dry density based
on ASTM Test Method D1557. Below 5 feet, utility trench backfill in pavement areas should be compacted
to at least go percent of the maximum dry density based on ASTM Test Method D1557. Pipe bedding
should be in accordance with the pipe manufacturer's recommendations.
The contractor is responsible for removing all water -sensitive soils from the trenches regardless of the
backfill location and compaction requirements. Depending on the depth and location of the proposed
utilities, we anticipate the need to re -compact existing fill soils below the utility structures and pipes. The
contractor should use appropriate equipment and methods to avoid damage to the utilities and/or
structures during fill placement and compaction procedures.
8.1.8 Groundwater Influence on Construction
At the time of our investigation, groundwater was not encountered in any of the explorations. Based on
the soil conditions and area geology, we do not expect groundwater to be encountered during construction
at this site. Light amounts of perched water could be encountered in areas underlain by fill and/or glacial
till (if present).
8.1.9 Pavement Recommendations
The near surface subgrade soils generally consist of silty sand with gravel and poorly graded sand with
variable amounts of gravel. These soils are rated as fair to good for pavement subgrade material
(depending on silt content and moisture conditions). We estimate that the subgrade will have a California
Bearing Ratio (CBR) value Of 12 and a modulus of subgrade reaction value of k = 210 pCi, provided the
subgrade is prepared in general accordance with our recommendations.
We recommend that, at a minimum, 18 inches of the existing subgrade material be moisture conditioned
(as necessary) and re -compacted to prepare for the construction of pavement sections. Deeper levels of
recompaction or overexcavation and replacement may be necessary in areas where fill and/or loose soils
are present.
9
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 11, 2018
The subgrade should be compacted to at least 95 percent of the maximum dry density as determined by
ASTM Test Method D1557- in place density tests should be performed to verify proper moisture content
and adequate compaction. However, if the subgrade soil consists of firm and unyielding native glacial
soils a proof roll of the pavement subgrade soil maybe performed in lieu of compaction tests.
The recommended flexible and rigid pavement sections are based on design CBR and modulus of
subgrade reaction (k) values that are achieved, only following proper subgrade preparation. It should be
noted that subgrade soils that have relatively high silt contents will likely be highly sensitive to moisture
conditions. The subgrade strength and performance characteristics of a silty subgrade material may be
dramatically reduced if this material becomes wet.
Based on our knowledge of the proposed project, we expect the traffic to range from light duty (passenger
automobiles) to heavy duty (delivery trucks). The following tables show the recommended pavement
sections for light duty and heavy duty use.
ASPHALTIC CONCRETE (FLEXIBLE) PAVEMENT
LIGHT DUTY
Asphaltic Concrete
Aggregate Base*
Compacted Suhgrade*
2.0 in.
6.o in.
18.o in.
* 95% compaction based on ASTM Test Method Di557
**A Proof roll may be performed in lieu of in place density tests
HEAVYDUTY
Asphaltic Concrete
Aggregate Base*
Compacted Subgrade*
3.0 in.
6.o in.
i8.o in.
* 95% compaction based on ASTM Test Method D.1557
**A Proof roll may be performed in lieu of in place density tests
PORTLAND CEMENT CONCRETE (RIGID) PAVEMENT
Min. PCC Depth
Aggregate Base*
Compacted Subgrade*
6.o in.
6.o in.
12.0 in.
* 95% compaction based on ASTM Test Method D1557
**A proof roll may be performed in lieu of in place density tests
10
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 11, 2018
The asphaltic concrete depth in the flexible pavement tables should be a surface course type asphalt, such
as Washington Department of Transportation (WSDOT) 1/2 inch HMA- The rigid pavement design is
based on a Portland Cement Concrete (PCQ mix that has a 28 day compressive strength Of 4,000 pounds
per square inch (psi). The design is also based on a concrete flexural strength or modulus of rupture of
550 Psi.
9.o 'Construction Field Reviews
Cobalt Geosciences should be retained to provide part time field review during construction in order to
verify that the soil conditions encountered are consistent with our design assumptions and that the intent
of our recommendations is being met. This will require field and engineering review to:
Monitor and test structural fill placement and soil compaction
Verify the soil bearing at foundation locations for the building
Verify slab subgrade and capillary break material below slab -on -grade
Observe footing drainage placement
Verify infiltration rates at system locations
Observe proof rolls of roadway subgrade prior to asphalt placement
Geotechnical design services should also be anticipated during the subsequent final design phase to
support the structural design and address specific issues arising during this phase. Field and engineering
review services will also be required during the construction phase in order to provide a Final Letter for
the project.
mo Closure
This report was prepared for the exclusive use of Mark Cummings and his appointed consultants. Any use
of this report or the material contained herein by third parties, or for other than the intended purpose,
should first be approved in writing by Cobalt Geosciences, LLC.
The recommendations contained in this report are based on assumed continuity of soils with those of our
test holes, and assumed structural loads. Cobalt Geosciences should be provided with final architectural
and civil drawings when they become available in order that we may review our design recommendations
and advise of any revisions, if necessary.
Use of this report is subject to the Statement of General Conditions provided in Appendix A. It is the
responsibility of Mark Cummings who is identified as "the Client" within the Statement of General
Conditions, and its agents to review the conditions and to notify Cobalt Geosciences should any of these
not be satisfied.
11
GEOTECHNICAL INVESTIGATION
EDMONDS, WASHINGTON
April 11, 2018
Respectfully submitted,
Cobalt Geosciences, LLC
Original signed by:
"ONY
c WAA
-0
4896
NA1-
Phil Haberman, PE, LG, LEG
Principal
PH/sc
12
APPENDIX A
Statement of General Conditions
Statement of General Conditions
USE OF THIS REPORT: This report has been prepared for the sole benefit of the Client or its agent and
may not be used by any third party without the express written consent of Cobalt Geosciences and the
Client. Any use which a third party makes of this report is the responsibility of such third party.
BASIS OF THE REPORT: The information, opinions, and/or recommendations made in this report are
in accordance with Cobalt Geosciences present understanding of the site specific project as described by
the Client. The applicability of these is restricted to the site conditions encountered at the time of the
investigation or study. If the proposed site specific project differs or is modified from what is described in
this report or if the site conditions are altered, this report is no longer valid unless Cobalt Geosciences is
requested by the Client to review and revise the report to reflect the differing or modified project specifics
and/or the altered site conditions.
STANDARD OF CARE: Preparation of this report, and all associated work, was carried out in
accordance with the normally accepted standard of care in the state of execution for the specific
professional service provided to the Client. No other warranty is made.
INTERPRETATION OF SITE CONDITIONS: Soil, rock, or other material descriptions, and
statements regarding their condition, made in this report are based on site conditions encountered by
Cobalt Geosciences at the time of the work and at the specific testing and/or sampling locations.
Classifications and statements of condition have been made in accordance with normally accepted
practices which are judgmental in nature; no specific description should be considered exact, but rather
reflective of the anticipated material behavior. Extrapolation of in situ conditions can only be made to
some limited extent beyond the sampling or test points. The extent depends on variability of the soil, rock
and groundwater conditions as influenced by geological processes, construction activity, and site use.
VARYING OR UNEXPECTED CONDITIONS: Should any site or subsurface conditions be
encountered that are different from those described in this report or encountered at the test locations
Cobalt Geosciences must be notified immediately to assess if the varying or unexpected conditions are
substantial and if reassessments of the report conclusions or recommendations are required. Cobalt
Geosciences will not be responsible to any party for damages incurred as a result of failing to notify Cobalt
Geosciences that differing site or sub -surface conditions are present upon becoming aware of such
conditions.
PLANNING, DESIGN, OR CONSTRUCTION: Development or design plans and specifications
should be reviewed by Cobalt Geosciences, sufficiently ahead of initiating the next project stage (property
acquisition, tender, construction, etc), to confirm that this report completely addresses the elaborated
project specifics and that the contents of this report have been properly interpreted. Specialty quality
assurance services (field observations and testing) during construction are a necessary part of the
evaluation of sub -subsurface conditions and site preparation works. Site work relating to the
recommendations included in this report should only be carried out in the presence of a qualified
geotechnical engineer; Cobalt Geosciences cannot be responsible for site work carried out without being
present.
Figures: Vicinity Map, Site Plan
10.2
IZ4-44.VVV VV
14Z—Z1.UUU VV
1ZZ-ZU.UUU' W
IZZI19.UUU W
W6584 122'lB.000"W
6 St IS
WASHINGTON
'
t' W,
.1 1wh pl�
-'J
Edmonds
18
.12n a
All
P1 SW
P1 SWI
Project
A!
nd hlAv
Location
L
17�z
71 170
W t' —
all
L SION
P
'ZI bw
I 2nd
2
sard S
rHf iE
I h 93" 1 St
3C V�
195Rd P1 all,
00
W
-200th St S I i
;a—':
lie
;X ,.awe
14 V,
>
e M K
> ')12�nd.
1A -.11i
11 SW
66
AS
ciAl
>
I, q1'
H
�le Ln
r'L -SIA
1'2 �a.gt- '5
Od 9 n,
�A Lake -37th P1
Rif,
38f
A &4Q WS S— W,
Ba inge". at S
Q.&S12-S 11 s:
na
fdp
122022.000' W 122021.000'W 122'20.000'W 122'19.000'W WGS84 122'18.000'W
F,
0
0
C?
U
Lf)
0
z
0
0
0
z
0
0
P
M
0
0
0
o
9 — I TN MN
'NATIONAL Tom 0 1000 0 40M MILES 15,h.A
FEET
i GEOGRAPHIC t 0 KkOMETERS I
IODD 0 METERS 1000 .7
Proposed Townhouse Structure VICIN= M" P.O. Box 82243
Kenmore, WA 98028
2090472nd Avenue West Cobalt (2o6) 331-1097
Edmonds, Washington FIGURE 1 Geosciences cobaltgeoRgmail.com
APPENDIX C
Exploration Logs
PROJECT: Edmonds Townhouse Structure
Hand Boring No:
LOCATION: 20904 72nd Avenue West, Edmonds, WA
HB-1
PROJECT NUMBER:
PAGE 1 OF 1
DRILLING / INSTALLATION:
NORTHING (ft): EASTING (ft):
STARTED 8/29117 COMPLETED: 8/29/17
LAT: LONG:
DRILLING COMPANY: Cobalt
GROUND ELEV (ft): TOC ELEV (ft):
INITIAL DTW (fty Not EncounteredWELL DEPTH (ft): ---
DRILLING EQUIPMENT:
STATIC D-rw (fty Not EncounteredBOREHOLE DEPTH (ft): 4.0
DRILLING METHOD:
WELL CASING DIA. (in): --- BOREHOLE DIA. (in): 3
SAMPLING EQUIPMENT: Hand Auger
I LOGGED BY: PH CHECKED BY: SC
Q)
.2
ao
(n
Description
E
Sample ID
0—
U a)
0
E
a) _Q)
2 -j
to
Time
0)
Fa 0
M
Topsoil/grass
���Coo—s(�-to—m—ejiTm-jj-n-s—e,—silt—y-f—in—e t—o —me—di—um—g—rai—ne—d s—and—so—me— — —
gravel, areas of organic debris, dark yellowish brown to yellowish brown,
dry to moist. (Weathered Glacial Till?)
Borehole terminated at 4 feet.
5.0—
5—
PROJECT: Edmonds Townhouse Structure
Hand Boring No:
LOCATION: 20904 72nd Avenue West, Edmonds, WA
PROJECT NUMBER:
HB-2 PAGE 1 OF I
DRILLING / INSTALLATION:
NORTHING (ft): EASTING (ft):
STARTED 8129/17 COMPLETED: 8/29/17
LAT: LONG:
DRILLING COMPANY: Cobalt
GROUND ELEV (ft): TOC ELEV (ft):
INITIAL DTW (fty Not EncounteredWELL DEPTH (ft): ---
DRILLING EQUIPMENT:
STATIC DTW (ft): Not EncounteredBOREHOLE DEPTH (ft): 4.0
DRILLING METHOD:
WELL CASING DIA. (in): --- BOREHOLE DIA. (in): 3
SAMPLING EQUIPMENT: Hand Au_qer
LOGGED BY: PH CHECKED BY: SC
a)
CL 0
0
Description
CL
E
Sample ID
>
o
() a)
=3
Y) E
a
Q
2-1
U)
Z)
M
U)
Time
-2 0
0
-0 a:
CU
Topsoil/grass
----------------------------------
SM; Loose to medium dense, silty -fine to medium grained sand some
gravel, areas of organic debris, dark yellowish brown to yellowish brown,
dry to moist. (Weathered Glacial Till?)
Borehole terminated at 4 feet.
5.0—
5—
PROJECT: Edmonds Townhouse Structure
Test Pit No:
LOCATION: 20904 72nd Avenue West, Edmonds, WA
PROJECT NUMBER:
TP-1 PAGE 1 OF 1
DRILLING / INSTALLATION:
NORTHING (ft): EASTING (ft):
STARTED 8/29/17 COMPLETED: 8/29/17
LAT: LONG:
EXCAVATION COMPANY: Steffen
GROUND ELEV (ft): TOC ELEV (ft):
INITIAL DTW (fty Not EncounteredWELL DEPTH (ft): ---
DRILLING EQUIPMENT: Excavator
STATIC DTW (fty Not EncounteredBOREHOLE DEPTH (ft): 8.0
DRILLING METHOD:
WELL CASING DIA. (in): --- BOREHOLE DIA. (in):
SAMPLING EQUIPMENT: Hand Auger
LOGGED BY: PH CHECKED BY: SC
0.0
Description
12
CL
E
Sample 10
o
0
an E
Time
0
F5
*0
cc
Topsoil/grass
----------------------------------
S -
SP-SM; Loose to medium dense, silty -fine to medium grained sand
SM
some gravel, areas of organic debris, dark yellowish brown to yellowish
brown, dry to moist. (Fill)
5.0-1
P
F:;, ge kFm nse ra
_T -'Uj'--FoTe7n�eTir�e-fo—Rj,7n7g—Fn�d—s—aTdTricVsiFt,---ff
5—
yellowish brown to grayish brown, moist. (Advance Outwash)
Test pit terminated at 8 feet.
PROJECT: Edmonds Townhouse Structure
Test Pit No:
LOCATION: 20904 72nd Avenue West, Edmonds, WA
PROJECT NUMBER:
TP-2 PAGE 1 OF 1
DRILLING / INSTALLATION:
NORTHING (ft): EASTING (ft):
STARTED 8/29117 COMPLETED: 8/29/17
LAT: LONG:
EXCAVATION COMPANY: Steffen
GROUND ELEV (ft): TOC ELEV (ft):
INITIAL DTW (fty Not EncounteredWELL DEPTH (ft): ---
DRILLING EQUIPMENT: Excavator
STATIC DTW (fty Not EncounteredBOREHOLE DEPTH (ft). 8.0
DRILLING METHOD:
WELL CASING DIA. (in): --- BOREHOLE DIA. (in):
SAMPLING EQUIPMENT: Hand Au_qer
LOGGED BY: PH CHECKED BY: SC
7�;
L)
CO
Description
CL
E
Sample ID
>
b:�::�
a 0)
-2 =3
0
(D
0-c E
Cn
:D
Time
T
M 0
- L
C
co
(D
Topsoil/grass
----------------------------------
SM; Loose to medium dense, silty -fine to medium grained sand some
gravel, areas of organic debris, dark yellowish brown to yellowish brown,
dry to moist. (Fill)
-- - -
SP-
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
SP-SM; Medium dense to dense, fine to medium grained sand trace to
SM
some silt, yellowish brown to grayish brown, moist. (Advance Outwash?)
5.0-:'*-'
T�
5-
Test pit terminated at 8 feet.
vie 09eC Jr IRC VE!NTILATION TADLe Fwvw
CLIMATE ZONE
MARINr- 4
(R-VALUM L.) OR
U-FACTOR)
FENESTRATION U-FACTOR 0)
aeo
SKYLIGHT cw U-FACTOP
&LAZeP PENr9TARTION 611CO (b.)
N/A
CEILING R-VAJUe 0
WOOP FRAME WALL C..ko R-VALUM
MASS WALL R-VALUM (Q
FLOOR R�VALUF
�Z�W-P:g) WALL R_VALUM
FOR el: 1 0 CONTINUOUS 114SULATION..A.- INTMMEMATE FRAMING
L') AuI. ARE . .- .� ANO . ANE �. - -TION II INDT-157 IN A -1 MIOH
, THE � OR MENIN TI-ME- Or - N-N, TM -- R.- Or THE r.N FROM A-..
AN�4 i!lAA1.I_ NOT M LE" THAN THE R-V�ff OFECIMEP
(t,) THE rENEDrRAT. .��T.. -M. _ DHT�. THI, DH&C -M __ TO M-TRATI.M.
-ON, ��Tl My De �V rROM - I`EME�TRATION Elf� M.INRENENT� IN I THR"M 6
WHERE THE Ol� FM �H lI POrr NOT - ADO
L.)JOA01ZIM
INTERIM or Ve WAU,. OR R-21 � N�LAIION -D A 71-11- DETWEEN THE - ANO THE OADEMENT WAUL AT
n,e - Or THE DA5EMENT � 1� gE -jTTIE, I De MET TH RAD ffY INEtLA7IOM ON THe
N=IOR Of THE M91EMENT W� � Rlil WNT- N�ITION ON TH� INTERIOR OR �- Or THE W� TE MEAMI
THERMA EMAR OE�N � OLAD ANO DADEMENT -
Cd) R41 WNVUM5 INEt-TON 10 R IINPER MEATEO - ON EM R4..VA
(I) THEM AM NO .� REO-ENT- IN THE MARINE -NE
CO D"EMENT WAU� E, NOT REQUIMO IN -WHIP I-ATION AD �W DY FNNIM RDOLI ANO T� RDAM
(g RDDER�
n- V". � -1 I-E-T,ON, -P . _ IN_TN`N OR I.- op., - 'E,.v MEAND R�I.
IN—— M� R4 W U" 1�710N OR H�TtE, �Na r 5rRX� DHEAIMINS - 41 FEROENT OR
I— or ,e V=RRR ,DHTMOlD I�JON R.Wj DIIAU. M reEN� 0 INE REPtAEE7 OY NO NOM THAN R-0 IN THE
9�THNOIS�TOONTARA�S�WNTT�&�M�NO�CKNE-
to THE DEOOHO R-e ArrILIED "EN MORE THAN HAL.r THIE -TION 10 ON 7HE InERIOR Or THE NAD5 WA�
0) THE 9I`E RAPIER. OR �6T_v Mw�. THE III-AT,ON MY III, MOJ,OEP TO RDb
C,) INT. MNOTIE0 D-ARO rRAMI 0 INOHE,D ON OENTEN WITH HEAMS INDI-TEP WITH HIM"
jw�.
� AMP 9MP �MDER -D MTH A MINI" - THIQOI� Or " N� AM ItNEMrT rROM THIS I-TION
R_x_
TAXE UD rDOTNOTE,
(A) N-NEDTIR N u.,AOTM5 � IN, MTA;NEv MOM MEADuREMENT, CAL-71ON OR AN �W - OR
NE, 1. -ON "IUD
11A
GENrR.6L NOTES,
eMOKe ALARMS (1% 907.0.Z, 1507.Z.111�
/04
THESE GENERAL NOTES ARE TO M U5EP AS A SUPPLEMENT TO THE PRAYAN&S�
ALL SMOKE ALARMS SHALL De LISTeP IN ACCORPANCE WITH UL217 ANP INSTAULEP IN
ACCORPANCe WITH THE rRoAsNoNS Or THE 115C AMP THE FPOVIGONe Or MFPA 72.
ANY PISCRePANCIES rOUNP AMONG THE PRAWINGe, GENERAL NOTES AMP SITE
CONCITION5 9HALj De RerORTeP TO THE ARCHITECT, WHO SHALL CORRECT SUCH
SMOKE ALARMS SHALL Me IIOV IMTeRCONNeCTeP WITH EATTERY 15ACK-Ur.
P19CRMrAW.Y IN WRMNG. ANY WORK PONE 95Y THE CONTRACTOR AFTER THE
PISCOVERY OF A PI%RMrANCY SMLL De PONE AT THE CONTRACTORS OWN RIM
EXHAUST HOOP MAKEUP AIR 14109�5.4): KITCHEN EXHAUST HOOPS EXHAUSTING OVER
I HIGH U&HT DOLLAFP
T iT AWAY
T
400CFM SHALL DE 5QUIrMP WITH MAKEUP AIR AT A RATE APPROXIMATELY e0UAL TO
IR =1.'r1OreRTveS,
ALL MeTHOPS AMP MATeRLA Le TO CONFORM TO THE FOLLOWING DUILPING COPES AS
THE EXHAUST RATE SUCH MAKE UP SYSTEMS SHALL 15E I5GtUIrrMP WITH A MPA149 OF
START ANP OPERATE
'I 'Can"r 100.vo
NeV Tyr.
AS AMeNPW AMP APOMP 15Y THE CITY Or rPMON06, WA
CL09URP AMP SHALL EE AUTOMATICALLY CONTROLLeP TO
SIMULTANEOUSLY WITH THE EXHAUST SYSTEM
-------
9010 INTERNATIONAL 15UWN& rOPI5 WITH STATE AMeNPHeNTe
Z010 INTERNATIONALMECHANICAL COPP fINCLUPING, INTERNATIONAL FUEL COPP) WITH
z
-w -Arr ?TR
4_0 LANoi� fr
CITY OF EDMONDS
BUILDING DEPARTMENT
=K--LA T7S
RESS 26004
OWNER UUMMIN
APPROVEDPATE..
BLDG. OFFICIA
STATE AMEMPMENT9
s,jr NTERNATIONAL FIRE COPE WITH STATE AMENPMENTO
I I
rIRe5LOCrINC, SHALL M FROVIPrP TO CUT Orr ALL COW -MVP PRArT OreNIN&9 AMP TO
__W_E_rTZnVM MRr 15ARRIER PET"VEEN STORIES AMP 15rTweeN Tor STORY ANP
FORM A
's
i7.
PERMIT NUMBER
ZOO UNIFORM FLUM15ING COPE WITH STATE AMENPIAeNTe
I WAS IN&TON eTA OPI5 (WAC V-11)
%01� TM ENERGY C
ROOF SPACE INSTAL.L reR IV- 7101
PA 0
',> [ - --
E�
rPMONPS'C1;OMMUNITY PeVELOrMENT CORE - CURRENT ePIT[OM
WATeR-Re5I*TANT GYPSUM DACKIN& 150ARP CIEC 200191), GYPSUM 150ARP U5ep AS A
ISACKER DOARP FOR CERAMIC TILE SHALL CONFORM TO AOTM C1170, WATER-RE616TANT
9(, LLLL��
-------- =--
T
GYPSUM MOARP SHALL NOT = 1149TAU�W OVER A VAPOR ReTARPrR IN A SHOWER OR
_xroeMp TPGES. INCLUPING THOSE AT WALL. INTERSECTIONS.
TUE5 COMPARTMENT CUT OR r
\\x0\\
'TRASlH
ENCLOSURE
L
SHALL DE 912ALeP AS RMCOMMeNPeP EY THE MANUFACTURER.
'a.
aIEM SVIESHMITT 7
City of Edmoifids Bufldigg Depiftent
rAoTENcRG IN rRrOrRVATIVE TREATeP WOOP (115C "04-10-0), FASTENERS. INCLUPIM&
NUTS ANP WASHERS. FOR PRESERVATIVE TRrATrP WOOP SHALL 15? HOT PirreP
ZIMC-COATEP, GALVANIZrP STEEL, STAINLESS STEEL, SILICON 15RONZIT OR COrreX
SPRINKLER
RISER ROOM
APPROVED
PerFeReP PERMIT 91.115MITTALSs
THE FOLLOWING ITEMS WILL Er 505MITTEP A PMFeRReP 51.15MITTALe 09 SEPARATE
PRr ePc-e (05c 1007.2,94,)1 A PRr CPGe SHALL ONE PROVIPEP AT EAVES ANP rAvLce OF
ASHFALT SHINGLE ROOFS ANP SHALL rXTeNP Z* INCHES DrLOW SHEATHING ANP Z' UP
ROOF Pecr
I OVIERHANG
i
I i
VAN
TRI
n � '44
FILAR
MCANITY MAP�
PERMITS FOR REVIEW 0
Z0107 WlNi5HI Nr:%TON 15TATF- ENMR&Y COPM RMUICEP WIPTH M HOP
R Or TRU69 PC5*N AMP LAYOUT - 151CIPPR PESIrNEP ENERGY CREPIT9 PER W515C TA15LE 496?,t (4) SrACZ9 e L3'-( W fe'A - �Ilt
MO # G1,14'eve - SMALL PWELJNG UNIT - 1,1, CRMPI1S ReQUIRZP
WHA ICAL SYSTEM Pff5ICN -151PPER PFV&NeP H MrTHOP
PWMN'N' GO?
ELECT C SYSTEM PeOIGN - �IPPE.R.R2.6,19NEME, 1-CREPIT 19. - 0.0 POINTS, EFFICIENT WATER HEATING Os, I
r �'r"RIA14LKL"'ryR'9�TEYM5T'rEM6I P&FN 151P _SI& %
SIGN- eIPMR PEOICNrP ALL SHOWER HEAP A14P KITCHEN OVIK, FAUCETS INSTALL" IN THE! HOUSE SHALL LAMPSCAFIM9 I Irv' -a'
MIZE 5M RATEP AT 1,70 GrM OP LESS ,LL. OTHER LAVATORY FAUCETS SHALL 15M
RATEP AT LO GrM,OR LESS �p
ALARM SYSTEM PffVGN- 151PPER PP*1914151?
WATER METER PERM T
ftKIEVIT 9. LID FOII4T6,_rrF_rAr:�T WAT�,R VMA,1149 1- (4) SrACr9 e.( ' FA
SIRE 5FWER PERMIT �ULL WIPT
PT
-Wte K40% wxep wIPTH MrTHOP
CROUP R OCCUPANCIES UP TO AMP IMCJUPIM& FOUR STORIES IN HEIGHT IN 5UILP114" 0 It Vjd Ole It+ L4V 41 4- io-zed d &vr5
AUTOMATIC FIRE SPRINKLER SYSTEM QCR) PER IEC VO�.?,b k 15C CHAPTER GAS. PROFANE OR 01 L WATER HEATER WITH A MINIMUM EF OF O-OL
NOT eXCEMINN& ( 0 FEET IN HEIGHT A15OVe GRAPE SHALL i5e rERMITTrP TO DM
1146TALLIEP THROUGHOUT IN ACCORPAMOM WITH NFFA �R -VEN nLA11149 SYSTEM LrMP, INTeRMrrTMMT WHOLE HOUSE! USING rXHAUST FANG (JMC
4"L3.( I. CHAPTER V-02
WAQ
INO 14PATIO149: WHOLr HOUSE FAN SHALL OPERATE 114TERMIMN11-Y AMP CONTINUOUSLY
SHALL 5M PeGGNMP IN AOCOFWAMCM WITH 115C CHAPTER 10 _AUTOMATI
C '0 OR Z4-HR CLOCK SeT TO OFeRATM FRACTIONAL'ON'TIMP IN 001,a.0.1 l, NFING
C2NC_11MTrE U PROPOSE!
NAPIAAT 10 -6. b LAMp5C,, p MAiL V�Ox
AMP AO ed,') AS rNP4E`P 114 SECTION 10057 OF THE Z010 IV, -OUTPOOR`AIR WILL 5e PRAWN FRCM AIR INLETS INSTAUL12P IN W14POWO (40.e.,AO -R TO
j�rolST MAOTF
=kO ArrFovr- ACTUAL
ALL EXTERIOR WALL5 ARM RrQUIRrP TO 151! GUPF0RTrP ON CONTINUOUS FOOTING, :FeRAX - CT) or z4 HR TiMvR To Dr SET 15Y MV-HA141CAL
rXTr TIME WCATION)
0 POOTINGr SHALL 5IM FLACEP AT LEAST Ib INCHF615EI-OW THE r, AM , OrM @,79114 WC) WILL ISM USEP ANP GET TO A 4-HOUR
ALL. R P
UNP15TURaVP GR LIMP SURFACE A14P AL60 MUST eXTENP DIELOW THE FROST LINE. CYCLr_ THE ONTIME MINUTES 15A6EP ON TABLE 409,0.1 ANP ASHRMA &21-2010:
FOLINPATI
L114 ANP SHALL NOT DF 6UI5JeCTMP TO MORE THAN �61 PCF EQUIVALENT IZO MINUTES Felt 4-HR CYCLE IF PATE (TA" 141007,"0))3 fl*? FAT19
rWIP PRESSURE (WELL PRAIMeP SOL), NOR TO A SURCHARGE. iv,6, MINUTES reR 4-HR CYCLE IF RATE 70 CTANZ f-.( r,
r RATE C-10
07 MINUTES PER 4-HR CYCLE OP (TAI5LM MIP
REFER TO STRUCTURAL eHeffe FOR APPITONAL INFORMATION Rr&ARPIM& 20 MINUTES rER 4OHR CYCLE IF RATE 109 CTAMLE MIlDO7-e,-M)j 4-.01 ell HIGH U9HT I
CONCRETE! FOUNPATION16 LA 5OLLARP � SHIeLP
LIGHT AWAY FROM
PERMA rNT CERTIFICATE SHALL 15E rOSTEP WITHIN 6, rrMT OFTHV ELECTRICAL PANEL . i. I
N,;"N,
P=N& (15C 1009); OR ON'THE PANEL ITSELF THE CERMrICATE SHALL W_ COKrLLTrP 15Y THE DUCLIPIER OR
WALLS THAT RETAJN EARTH AMP ENCLOSE INTMOR SPACES ANP FLOORS Rr&ISTER15P PE610M PROFESSIONAL AMP LIST THE FOLLOWING, INSULATION R-VALUeO Tyr.
MOW GRAPE SHALL EiE PAMrrROOrrP FROM THE TOP OF THE FOOTING TO THE FINKHVP FOR ALL DULANC FRAMING ANP roUmPATioN/6LAi5 comroMel,[Te, PUCT INSULATION
GRAPM CONCRETE WALLS SHALL 5F PAMPFROOFEP ?5Y APFLYING ANY ONE OF THE OUTSIPE CONPITONMP AREAS, &.A4F* U VALUES AMP/OR 5HCC VALUES, TYrM ANP
MATERIALS LGTrP IN Or, DO1, EFFICIENCY OF HEATINS/COOLING SYSTEM ANP HEATING EQUIPMENT, PUCT LEAKAGE
�WSMC 40%�. RATES INCLUPINO TEST CONPITION5 ANP AIR LEAKAGE RESULTS (WOEC 4OL-31
1��CONTROLO,�Np VA
FOUNPATON OINTS AR NPOW AMP POOR FRAME9, oreNNGS 15ETWeeN WALLe ANP HIGH EFFICACY ILL)MINARIre (WSW 404A 70% Or ALL LUMINARIES SHALL 5M HIGH
5,15ETWEEN WAU-9 ANP ROOF ANP METWEEN WALL PANEL) OPENINGS AT ICACY,
FENETIZA110H Or UTILITY GeRVICeS, THROUGH WALLS, FLOOR AMP ROOM�ANV A- 01 HIEK
OPEN
W�C!NING IN THE DULPIN9 VNVELOre SHALL ME flE&rR CAULKMP AMP GASKffTeP OR TESTING (WSffC 4M410. ReQUIREP FOR ALL DUILPINCIS AMP 6HAU OCCUR ANYTIME
ATHITR9TR TO LIMIT AJR LEAKAGE. OTHER FXTTRIOR JOINT* AMP 5 HALL AFTER ROUGHAN AMP AFTER INSTALLATION Or rrNrTRATONe Or THE IWILPINC
SIM
rrep r
HOUr ILARLY TRrATITP, OR TAPER 09 COVeRVP WITH MOISTURE! VAPOR rMRMMAELZ ENVELOPE ACCEFTA51Le AIR LEAKAGE TO 159 LESS THAN ro AIR CHANGES PER HOUR
'EWRAP WITH A 15LOWeR POOR AT A PRESSURE Or.2 INCH W.& CIDO PASCALS) -SDi �,S, GBar&L16A,
7. ALL EXTERIOR POOR6 OR POOR* SERVING AS ACCESS TO AN rNOLOSrP UNHVATEP
AREA SHALL ISM WeATHER9TRIFFEP TO LIMIT LEAKAGE AROUNP THEIR reRIMFTFR WHrM eMAUNC, (WSW PUCTO SHALL DE LEM TrSTMP IN ACCORPANCZ WITH WSU 0
114 A CLO51212 POSITION RO-" U6IN& THE MAXIMUM PUCT LEAKAGE RATES SIMMER
5. RMCM90 'P LIGHTING FIXTURES (402.4.4)� WHEN INGTALLrP IN THE NILPIN& ENVELOPE -INs TOTAL LEAKAGE TO ESE LESS THAN OR rQUAL TO
-POST CONSTRUCTION )� ROUGH
SHALL V, 4CPM PCR 100 Gr, Or CONPITIONrP FLOOR AREA AT 0.1 114CHM W&. FOR ENTIRE! SYSTEM.
�TYPE 10 RATMP ANP CMRTIrIrP UNPrR ASTM rZL)� To HAVE NO MORe THAN " CFM AIR INCLUPING AIR HANPLeR ENCLOSURE ALL RWI�TER 150OT9 9HALI. ME TArMP OR
MOVEME14T OTHeRWI9M 5MALM PURING T126T. LeAKNOE TO OUTPOOR5 SHALL DE LESS THAN OR
-THE L19HTINO MIXTURE SHALL D5 TeSTeP AT 7& PA*CA1_e OR L@7 L5G/Sr PRESSURE EQUAL TO 4CFM reR 100 SQUARE FEET OF COMPITIONrP FLOOR AREA A-60VED 13�' gin- ComerLF1
.5HALL [SEE ITH A GASKET OR CAULK AT THE CEILING TO PREVENT AIR NNNING ,.e
PIFFERENC ANPLADeLEPSHOWIM&COMFWAMCM
LMNKAGM "IeTAL""' W PUCT* SHALL W INSULATFP Setback Required Actual
TO A MINIMUM R-& rXCErT IF _OCATrP COMPLETELY WITHIN THE NILPfNG THrRMAL
ENVELOPE. 5ULPING FRAMING CAVITIES -,HALL NOT ME U9EP AS PUCTS OR PLENUMS. Front I-S --5-3
vArop t5ARRjeRS/&R "DOC: INSTALLATION IF PUcTe SHALL 140T PISPLACe ReQUIREP VMVFLOFr 114eULATIOR
Ir
2UNP COVE= NGTALLEP 014 THE WARM GPM (IN WINTER)
AN ArrROVFP VAPOR RMTARPeR Sides
OF INSULATION HOT WATER Pre INSULATION (W620 R405.0.5,): INSULATION FOR HOT WATER FIFE, 150TH Rear
-FVA (VAPOR RMTARPrR) FAINT WITH A PRY CUP PERM RATING Or I MAX SHALL Be U5ep WI I MIN AMP OU I � I HE WRIPMONW75FACE7_�HALL. HAVE A MINIMUM THERMAL
AS THE VAPOR RETARPVR FOR ALL EXTERIOR WALLS ANP ALL CEILINGS WITHOUT HEATeP RESISTANCE (R-V&UE) Or R-�,. Oflier
SPACE A50VM 51TE rLAN- EPMONP5 MULTI -UNIT Hei*
- CROUNP rOVeR: & MIL 5LACK POI.YeTHYLIENIT OR APPROVEP EQUAL SHALL 15r LAIP sULPING ENVELOPE Sa-Le, 1'.10W
OVER, THM 7ROUNP WITHIN CRAM EIPAC�e AMP SHALL ENE ovIERLArrEp 10'MINIMUM AT TFrCIRPER5URffP`HAe FROVPCP 15UILPINIG ENCLOSURE POCUMENT6 THAT IN MY
C
THE JOINTI5 AN SHALL rXTCNP TO THE FOUNPATION WALL- rROMES610MAL JUPCIAENT ARE APPROPRIATE TO SATISFY THE REQUIREMENTS OF RCW FROrERTY INFORMATION. IDLIILPINC� ANALY�6: LOT COVERASEs IMPERVIOUS SURFACE COVERAGE: HEIGHT rALCULATIO* LEGAL PESCRIrTION,
64.*000-� THROUGH -
PARCEL ON 00% 1( OCCUPANCY, R-Z 15ULPtNc rooTrRiNT rRoroeep ROOF - z.;C77 AVERAGE! EXISTING '51 THE NORTH 70 FEET or THAT rorTON OF
DUILPINC IworecI]ON Z,Z77 Sr. rROMOEIEP PAVM& - 2,-077 MAX HEIGHT ALLO,�EP, LOT" 15LOCK %, GTAT`rU' HEIGHTS PIVISION
MUST !$M IH9r5CTM? EW AU OUILPINS ENCLOSURE APPRI299; CONSTRUCTION TYPE.- V-M COVERAGE, TOTAL, 4.770 fl', FROFO5MP HEIGH I it LYING WITHIN THE SOUTH HALF Or GAIP
20,904 7ZW AVE W 2,271/7,70e- ?,0% *17V/7,71lb- 61% HIGHEST rOINTI Itae,4' 5LOCKZ, SEATTLE HM]GHTf, PIVIS;OM 4,
INSPECTOR PORING THE COURSE Or CONSTRUCTION THIS INSPECTION 15 TO eC IM,
COMFLETrP 15Y A THIRP PARTY INPM'rNPrMT IMOr TOR. 0Le_6%JyZ IJ�5peC,11;,As EPMONP6, WAOSOZ( , ALLOW EI&H 2,Z �IEMC ACCORPING, TO THE FLAT THEREOF RIECORPEP
r OPO=H1
eIr
,HTT
EXTERIOR WALL RAT1149 ANALYSIS ZONING, RM-1.0 R SCOPE Or WORK. IN VOLUME 0 Or FLATS. PAGE 11. REC�RPG Or
RMER'l " 9MPFRA I QN PISTANCZ, go'-Z' LOT AREA, 7,70b ar. ALLOWADLE 0 STORIES (MFPAI�R) e, STORMS (TA15Le 0044) EUILPIN& FOOTPRINT 7 15 C0140TRUCT NEW *,046 Or 6NOHOM19H COUNTY. WAeHINGT ON
SOUTH rROFERTY FIRM SEPARATION P15TANCZ: 0-11" rROPO6rP STORIES: Z u 4 NIT APARTMENT 15UILPIM& WITH
btain Electrical Permit from FMR 115C TAELr (OZ, OCC GROUP R, TYPE V0. FIRE! RATING - 0 5PT15PCK51 LOT AREA 77,96 rAVIN9 90OZ
FPO, ; 10 AU-OWAELF FLOOR AREA WFAIM: 7,000 9r (TAVILM 006.2.) COVERAGE TOTAL 477_71P SURFACE PARKING LOT
Fsot'ate Labor & Industries REAR, W rROPO5ffP OR AREA. MAYCOVERAGE `4� 0402 LOT AREA 77*5
oily COPY
AREA CALCU 0
UNIT I NEW
UNIT 01411
UNIT OIOZ
UNIT #Z#I
UNIT 0202
TOTAL, =N060
9HEET INPEX
c
OVER-affNER& NOTE!S,
IVIL eITE FLAN
OVER 9HEF-T
Sl III
C11
Cz
9C MAN
CeI
RAPIN& PLAN
C4
RAINAaF- AMP UTILITY MAN
cry
ETAILe
C/o
RAINA&M PETAIL-9
C7
FTRIMN& ANP TRArFIC CONTROL FLAN
TC1
TRAMIC CONTROL FLAN
Ll
-ANPI55AFE MAN
LZ
-ANPSCAf'F- PETAIL9
I
"OUNPATION rLAN
5,
AAIN rLOOR MAN
4
ff 15 UNIT6/ CON9T. A99EW15.
.7
0
ER M-OOR PLAN
60
F MAN
7
ION6
7A
VATION9
ION9
HITaCTURAL PF-TAIL9
5111111
UCTURAL NOT55
6Z.1
OUNPATION FLAN
%1Z
OOR rRAMIN& rLAN
SIZ.51
OOr FRAMIN9 MAN
9NI
OUNPATION PETAILI9
e4-11
OOP rRAMINro PF-TAIL9
941
OOP FRAMIN& PETAILI5
54.�
OOP 1"RAMING Pr-TAILI5
:E 9V
2
M� E
U
0 9
z 'R. U
L JU t�)
M/ :z
>
<
lu M
<
:.,z
±j Uj
Z
Q, a
ju
qi Rb
%
V t4 a
14 111
F_
LIJ
Lij
T_
U)
cj�
LU
0
0
J03 1�
17-06ry
PATF�
SIPEYARP: 10' FIRST FLOOR, 1,71 Gr
eWOMP rLOOR, 2%1*0 6F MAX COVERAGE OF !�Oav IMPERVIOUS GOVERfiC-E
ALLOWADLe 5ULPIN& AREA (NPPAI5RY. 40' 'AtU'G312018
7 '000 Sr X Z STORIES - 14,4100 Gr
rROrOSeP 15UILPIN9 AREA. 5,0115F aLCILDInD c
C,
11 T11T1 I I I
F
- - - - - - - - -
- -------
FF
------- 6� 0
- - - - - - - - - -
4--
L
L -J1
Tyr.
Tyr.
T'\
\1
Tyr.
9A�
F t -1
F -4::-
Tyr. Tyr.
----D F
1 %
�pll
"
1
L -J
L t -J
L
---------
----
L --------- ---------
r------------------
------------- L
---------------------
7
L
4,�
L
-FL
__I L -J
'L -J1
1
o-v4 FrN
I Q,
L
O-V4'rPN
01W
-I
.
E----F--
............. ?5?Se
_e
orr
D4/*'RAI6CP
9TEM WALL.
L -i
L t -J
F t -1
L t -1
1 m 1
Lt-J
11
1
L
L
-J - - - - - - - - - - - -
-
- - - - -
- - - - -
- - - - -
- - - - - - - - - -
7,
UIZ
- - - - - - - - - -
P922222QPRRM
FOUNPATION MAN p, v a
q.I.. V4, - I' -a,
CRAWL ARMA rA UNIF % 49
Vr.WTILATION KrGLURW CA5
o
VENTILA110M FROVPM
SCREeNEV rOUNPATION VENT* 04.709-7" !A), I r.714ts
VE14TO REQUIRW,
NUME50R OF VENT5 FROVIPM
"oTAL A REA -ROVVEP,
NOT59:
L eme S-OH=5 FOR ALL STRLICTURAL PrTALS ANP
NOTm-,
e 2EE
ANCHOR POLTO, HOLPOW149 rLATE WAOHERS rZR
ENCINIMR Or RITCORP- 9M 9-5HEeTa.
6. ALL WOOP IN PIRWT CONTACT WITH THI! CROUNP OR
GONGR= TO 15M AN ArFROVfl
rRl!5%RI!-FRe9CRVAT" TREATEP WOOP M
X
0
w
J015
RECEIVED
B�C 28 2017
PATE:
IZ47-17
DEVELOPMENT SERVICES
COUNTER
W1
MAIN I=LOOR
fw. V#' - P-d'
0
di
--- PENOTE� IIVV. 5MOKF PETWTOR W1 DATTFRY
CO. 15ACK-Lr ), INTrRCONNWTr.P ALARM5
---- PMNOTE!!� Ilov. 5MOKr PETIXTOR CAR06ON
MONOWE PETWTOR W1 J�ATTeRy
5Arr-UP P INTrRCONNWTFP ALARM�
--- 00 CrM MIN, 15ATH rAN
NOTF-94 z
I. Fe—W-.� PENOTES GMARWALL TYr. �rr �OR < g
ecHEPLXX- PrTAILS), NOT55 r- R E
z . 8
9MURr HOT WATrR HrATE!R TO MAMIN& WITH U) (D r
6M6MIC i5iTRAre. rROVIPa CZ) LAYrF* e�14'r.W@
FLArORM 01
6. HWT/rUR9 IGNITION GOURCr TO M NOT LZ6e THAN ID'
AWE &ARASP rLOOR.
4. I/Z W15Rr:QURVPP�elWeeN&ARA&rANPUVINC�rACZ
IR
,c
ON WAU-0 ANP %FrORTING fiTRUCTURM 0/6' TYrr'X'
RVQL)IRW 014 &ARACE CEILING WHeN HADITA15Le erACI! le
A50ve &ARAW.
0. -MRIOR HMAPr
ml CAVITY AT 4X ft R9 W/ R-10 RISIP
a 6mzmeR R om ROOM,
-=IOR POOR
rROVIPC A R19ER ROOM eICN ON THr M
RPAPIN& *MRe R16ER AMP ALARM ROOM',
FROIAPe AN ArrROVrP KNOX 15OX ON RIGHT 61121! Or
rwEEN 4'ANP (
Poop, LocATep m 'rRom &RAPm
rROVIP! I HR CONOTRLY-71ON WITH 40 MIN. POOR
u-- lu
M �z
JU
>
<
IL fz
-j Ell
Q) Cl v
ju d�
>
<
M Z
:z -t C.,
lz�. Z
C.,
U
CL
0
0
u—
U)
AREA CALCULATIO
1.7-0 doe
UNIT
New
UNIT *1412
bbil
001
PATF-�
U U 11'
NIT �011
PUNIT*101 �!!j
UNIT *%0Z
V4��
TOTAL,
RE
3uB
AUG
1 2018 3/
BU . ILDING I
5=Tm
MAIN I=LOOR I'LAN
LE!CvF-NP
PEMOTI55 II&V SMOKE PeTWTOR W1 DATTERY
INTIERCONNEzOTEP ALARMS
CIO.
PENOTW ilOV. 5MM PETECTOR CAR15014
MON0XIPe PETECTOR W1 15ATTrRY
15ACK-Ur k INTERCONNBCTeP ALARMS
19-- IM CFM MINI. f5ATH FAN
L FSW�.] PoNoTeG SHEARWALL TM SEE 0-9HEETS FOR
5CHEPUM PETAILG k NOTES
2, SECURE HOT WATER HEATER To FRAMING WITH (.2)
SEISMIC- STRAF5. rROVIPe (2) LAYERS �/4- r.W.
MATFORM
HWT/FURN. IGNITION SOURCE TO 15E NOT LESS THAN 10'
A15OVE GARAGE! FLOOR.
4. Ve S" REQUIRFP 15EIWEM GARAGE AMP LIVING SrACE
ON WALLS AMP 5urronw STRUCTURE */L3' TYFE V
REQUIR -P ON GARACe CFJWNG WHEN HA151TA5LE SrACE- 10
r
ADOVE SARACe
0. FILL CAVITY AT 4X EXTERIOR HEAPERe W1 RAO RISIP
INSULATION
6. OrRINKLER R ZER ROOM'
r
FROVIPE A RISER ROOM 619M ON THE EXTERIOR POOR
REAPING ):�
I RISER AMP ALARM ROOM.
rRoVIpr
_ AN ArrROVEP KNOX DOX ON RIGHT SIPE OF'
POOR , LOCATeP 1515TWEEN * AMP &'FROM GRAPE.
rROVIPE I HR CONSTRUCTION WITH 40 MIN. POOK
ENERGY CREPITS PER W55'C TAME 4061,
*CREPIT r- - 9,* rOINTS, EFFICIENT WATER HEATING rj,:
ALL SHOWER HEAP AMP nTCHEN SINK rAUCET� INOTALLEP
IN THE HOUSE SHALL 5e RATEV AT Wry GfM OR LESS.
ALL OTHER LAVATORY FAUCETS SHALL M RATEP AT 1.0
GFM OR LESS.
#CREPIT 0 1.12 FOIMT9,. i!!TIQFNT WATER HEATING r—
&A5, F��;ANE OR OIL WATER HEATER WITH A MINIMUM Er
OF "I.
MINIMUM SIZE.- NET CLEAR OFENIN9 OF 0.7 SF
MINIMUM PIMFN91ON9: NET CLEAR OPENING HEICHT, 24-
14FT CLEAR orrmm wjprTH: za'
MAXIMUM HEIGHT FROM FLOOR. 44' MAX, FROM FINISHEP FLOOR,
OFERATIONAL CON�TRAJNT6-- EMERGENCY E5CAFe AMP RESCUE
OPENINGS SHALL 15e OrERATIONAL FROM THE IN9Pe OF THE
ROOM WITHOUT THE USE OF KEYS OR TOCLO. PARS. GRILLES,
GRATI55 OR 04MLAR PEVICEe ARE rFRMITTeP TO 15E FLACEP
OVER EMERGENCY ESCAPE AMP RESCUE OrrNIN&l, rROVPMP
THE MINIMUM NET CLEAR OFENIN& SIZE COMPLIES WITH SECTION
100-2 AMP SUCH PFVICE5 SHALL 5E RELMAGA151-15 OR
REMOVAME FROM THE IN51PE WITHOUT THE USE OF A
]MY. TOOL OR FORCE GREATER THAN THAT WHICH IS RECtUIREP
FOR NORMAL OrERATION OF THE EMERGENCY M5CAFE AMP
RESCUE OrENING.
REVISED PLAN APPROVED
arry OF EDMONDS BUILDING DIVISION
PLANS EXAMINER
DATE
REVISION
APR 19 2019
CITY COPY
.-ILDING DEPARTMENT
CITY OF EDMONDS
AREA CALCULATION
UNIT
NEW
UNIT 001
U IT
Dal
UN *Z0I
I UNIT WM
*4el
TOTAL,
DOC b
< <
d
u
0
x
o u
JU vk,�
2:
BJ
>
um
<
C�:
ju
z qz�)
3 (5)
>
4e Z
Z
(3 tZ� :z
Q�
JU
lu
z
CL
ry
0
0 -c?
I=
LL
Z
L<U
101)
JoFl
17-0&*
PATF-i
lz-z7-l7
5HFET It
3
CONSTRUCTION ASSEMBLYS
> MIRROR
X. - rROVpI5 51.=11,19
> FUTURE CRAD FRO M 5LOCr4N&
'T'.. DAR LOCATIONe, FOR`FFUTURr GRAD
> MIR TYM 12, DAR I.00ATION91
Tyr.
04,
MAX
> '11, . .... i MIN, x
>
>
>
LOCATION Or
Z4'
DATHTU5 T
T
MIN.
>
CONTROL6 I
42' MAX
rL
USE
USE
FLUeH CONTROLe ARE MOUNTeP FO _ FRO
>
WIPE 91PE Or WATER CLOSET AREA ANP NOT
MORE THA14 46"ADOVE FLOOR VATH FORCE
>
TO ACTIVATE NO GREATER THAN 0 L155.
FAUCET CONTROLe ARE OreRA15LE WITH ONE
>
HANP ANIP PO NOT REQUIRE 'naHT 9RA5rlN&.
ElE, D-OeiNs vAwri5 REMAIN oreN FOR AT
>
-I!A�T 10 SCZONPS rrR OrCRATION
>
it
Iz,
AAY Z4' 1. 4'
MIN.
>
rROVII?tr M=INC,
rROVIVE 5LOCrINS,
FOR rUTVRr GRAD
FOR FUTURE GRAD
>
IM'N]
X11AIL
SAR LCCATIONO,
15AR LOCATIONe,
Tyn
Tyr.
>
>
CA511,11!T� ANP eHMVINC, CAN PC 10TALLEP
UNPeRNEATH COUNTER SrACE OR
>
LAVATORIF� rROVIPFP) THAT IT 6 NOT
rERMANENT ANP ARE MAVL.Y RFMOVeADLr-
>
THE f'INI!5H MOOR EZZ'9 UNPER THE
CANNeTe, ANP THE WAIL-5 DFHINP ANP
5URROUNPIN& CANNETRY ARE I"11,115HEP
15ATHROOM ELEVATION!5
�c'].: 114' = 1'-0"
GA riLE 0 RC-2602
\C/ ROOF/CEILING ASSEMBLY
Y
BASE LA FIR E/5" TYPE 'X" GYPSUM WALLBOARD
I
APPL ED AT RIGHT ANGLES To Woop ROOF
TRUSSrr, WITH 1-114" TYPIR W OR 8 DRYWALL SCREWS
24'. _.. FACE LAYER 5/8" TYPE'X' GYPSUM
I
WALLBOAR; *I APPLIED RIGHT ANGLES TO TRUSSES
WIT14 I-1/S" TYPE W OR 5 DRYWALL -SCREWS 12�
715 §1 1.
JOINTS A INTERMEDIATE TRUSSES 4 1-1/2" TYPE G
2�R!
DRYWALL SCREWS 12" 0- 2" BACK ON EITHER SIDE
:E 9 $2
or. END JOISTS ' JOINTS OFFSET 24" FROM BASE
LAYER JOINTS. WOOD TRUSSES SUPPORTING 1/2"
WOOD STRUCTURAL PANELS APPLIED AT RIGHT
ANGLES TO TRUSSES WITH Sd NAILS. APPROPRIATE
ROOF COVERING
u
2);3
o 'N � r
GA FILE WP 8105
. gqx
EXT. WALL ASSEMBLY
Po
- 1 u
INTMOR 51DE
ONE LAYER 5/8" TYPE "X" GYPSUM WALLBOARD,
WATER-RZSISTANIT GYPSUM BACKING BOARD. OR
GYPSUM VENEER BASE APPLIED PARALLEL OR
RIGHT ANGLES TO STUDS WITH 6d COATED NAILS,
I-ile" LONG aosis SHANK, 114" HEAD, ill D.C.
EXTERIOR SIDE
ONE LAYER 46" WIDE 515" TYPE 5(" GYPSUM
SHEATHING APPLIED OVER STRUCTURAL SHEATHING
PIER PLAN PARALLEL TO 2X6 STUDS
—!k?X4L3 CLEAR
G 0 ROOFING NAILS
7
F�]Aa-
FLOOR erACF
4" AT VERTICAL JOINTS AND I" o- AT
kk)
5INr ANIP eHWR
INTERMEDIATE STUDS AND TOP AND BOTTOM
—4eX06 CLEAR
PLATE$, JOINTS OF GYPSUM SHEATHING MAY BE
LEFT UNTREATED. EXTERIOR CLADDING TO BE
JU
rwoR SrACE
ATTACHED THROUGH SHEATHING TO 5TUD6,
>
<
TOILET
F -1
L --]
F -1L
T !008, CLEAR
L -1 FLOOR 9rACe
Tyr.
L
L[j
L-1 E I I
TYPICAL TYf'F- 1 15 1 UNIT
sa.. V4, - 1W WUNITe 5HALL COMrLY YATH ICC/
I AN91117.1-200V ANP P10, 15C CHAMR 11
, "I z-
GA RLE 0 WP-3310
INT. D5L. WALL ASSEMBLY
STO 50
<
ONE LAYER 5/0" TYPE 'lX" GYPSUM WALLBOARD,
OR GYPSUM VENEER BASE APPLIED PARALLEL.
OR RIGHT ANGLES To FACI4 SIDE OF DOUBLE
ROW OF 2X4 WOOD STUDS IV'-.c ON SIEPERATE
PLATES I" APART WIT14 bd COATED NAILS, 1-1/8'
LONG O�OSM, SHANK, 114'- WpAp, I- O,r.
JOINTS STAGGERED W ON OPPOSITE SIDES.
HORIZONTAL BRACING REQUIRED AT MID HEIGHT,
t �A
>
&A fflLff 0 rC r2107
irpTrl rvrg -
ONE LAYER I/Z' rROrRjrTARy Tyre �e oyrgum
C,
WALLDOAPP OR W!"elUM VENEER EA9e ArrWep
AT R*HT ANICLDF, TO RE�ILIENT CHANNeL9 Z4'
04, WITH I"Wre � PPYWALL 9CREW� 12- 0,C.
&Yrr7UM 50APP eNIP JOINT'Sl LOCATEP MIPWAY
5eTWErI4
C�'
CONTINUOUSl CHANMELe, ANP ATTACHeP
TO APPITIONAL FIECI!6, Or CHANNEL *4' LON&
'MTH �CReft AT IZ' OC, Pe�]LII!NT CHANNeL5
Arr=' AT R*HT ANC-LF5 TO UO WOOP j-
16" Of- WITH 1-1/4' TYre W �CREW�. Woop
iol"!Ii SUFFOFTINC, 1191CIZ, rLywoop %5FLOOR:
ANIP,�,/4`1,000 rElf �ANPEP Cyr%M FLOOR
UNPeRLAYMENT. �
FROrRIFTARY &Ymm DoARP,
�CZRTAINT]EeV &Yr%Mt 1/2' CERTAINTEEP TYre 0
Giyr%M 150ARP - -
CGNT`I�, 1/2' f"IRECHOCK
TYFF C
'GEORGIA rAC rIC &YF6UMs VZ" TOIJCHROCr
I '
FIReCAJARP C &YF55UM DOARP
,NATIONAL &Yreum COmrANY: I/Z' G" DOW
15RANP FIRE-5HIELP C &Yr5UM 150ARP
PADCO GYMUM: I/Z'rLAM CUP15 6UrFR'C'C Tyre
0
r&-c -
-'U5 9YF5UM COMPANYl VZ' 6HEeTizocr 15RANP
uj
rIRECOPF CICORe 0Yr6UM rANEI-5.
cc
06 75
SHEAR WALL PANEL,
Lu
cf)
NAILING 4 CONNECTIONS
c/)
PER PLAN 4 SCHEDULE
ON SHEET 6-1
—J (j)
<
L—<
LLJ Z
00
z C)
) ::)
co
0
17-0(jr72
PATF:i
�HFET
3us
3 U"
MAY
I � 2.0186
BUILDING
EPARTME
MIRROR
4- INS,
FUTURE Gm
"I".
141N. Tm
qiLOCATIONO' F
I% I I
rL LOCATION LOCATION OF
ax i5ATHTO TOLET FAFeR
CONTROLS 910FENOOR -
rL FLLISH CONTROL6 ARE MOUNTEP FOP U51! FROM
WIPE
_ elpe OF WATER CLO9MT AREA AMP 140T
MORE THAN 4 A50VE MOOR WITH FORCE
TO ACTIVATE NO GREATER THAN r, L06.
FAUCET COMTFOL� ARE OrERAME WITH ONE
HANP AMP PO NOT REQUIRE TIGHT &RA�FINO-
ee-r 0-01,IN& VALV15� REMAIN OPEN FOR AT
LFA�T 16, !FMCONP� PER OPERATION
MIN. 'I 7T rRoVpe m4,,Ns
FOR MJTURE ORA5
15AR LOCATIONe,
CA5114eT5 A14P 5HELVINC, CAN1515 11,15TALLEP
UNPERNEATH AOUNTERSFACE OR
LAVATORIM rROIAPEP3 THAT IT 15 NOT
rrzRjAANENT AMP ARE I!A�ILY REMOVEADLF.
THE rlNI!5H FLOOR eXTENP� UNPrR THE
CASINeTe, AMP THE WALLS EFHINP AMP
5URROUNPIN& CA51METRY ARE FIN151-IMP
�>ATHROOM F-I-EVATION5
*..W 1/4 � =
FROVPT 15LO=Nrl
FOR FUTURE GRAE
15AR LOCAlION9,
Tyr.
movipe SLOCUM& I
FOR FUTURE ORAD
TYrlr,AL TYFE I r> I UNIT
O.-W V4' - I-,'"
AN%(71-200* AMP Z01ro IV, CHAF'7EP ]I
I
GA rlLE 0 WP 010r,
ED<T. WALL ASSEME3LY
INTERIOR SIDE
ONE LAYER 5/8" TYPE "X" GYPSUM WALLBOARD,
WATIER-RESISTANT GYPSUM BACKING BOARD. OR
C
.YPSUM VENEER BASE APPLIED PARALLEL OR
RIGHT ANGLES TO STUDS WITH &d COATED NAILS,
1_1/a. LONG O.O'Alb SHANK, 1/4" HEAD, 1" 0.0,
EXTERIOR SIDE
ONE LAYER 46" WIDE 5/6" TYPE "X' GYPSUM
SHEATHING APPLIED OVER STRUCTURAL SHEATHING
PER PLAN PARALLEL TO US, STUDS
16 " WIT14 1-3/4" GALVANIZED R�OFING NAILS
4' o- At VrRTICAL JOINTS AND I o... AT
INTERMEDIATE STUDS AND TOP AND BOTTOM
PLATES" JOINTS OF GYPSUM SWFATWING MAY BE
LEFT UNTREATED. EXI—IOR CLADDING To BE
ATTACHED THROUGH SHEATHING TO STUDS.
(;;Z� GA RLE - WP-3310
INT. 013L. WALL A65EMBLY
STC 58
ONE LAYER 5/9" TYPE "X" GYPSUM UIALLECARD,
OR GYPSUM VENEER EASE APPLIED PARALLEL
OR RIG14T ANGLES TO EACH SIDE OF DOUBLE
POW OF 2x4 WOOD STUDS 16" — ON SEPERATIE
PLATES I" APART WITH 6d COATED NAILS, 1-1/8"
LONG O.O-JI5 SHANK, 1/4" HEAD, I" O.C.
JOINTS STAGGERED 16" ON 01-1-OOITE SIDES,
14ORIZONTAL BRACING RE=IRED AT MID HEIGHT.
&A ME 0 FC *107
rLooR-cr-lwN9!5y!5TF-m5
15TC rvry - 0719
ONE LAYER VZ' rROMIFTARY TYM'X'9Yr!5UM
WALL150ARP OR OYMUM VENEER DA!5ie AFFLIEP
AT FZ19HT AMGLE� TO RF�UENT CHANMEL� %*"
04, WITH I' TYFF- � PPYWALL 15CRFW� le Or-
GYMUM DOARP FNP JOINTI5 LOCATEP MIPWAY
W-TWEEM CONTINUOU5 CHAMNFL� AMP ATTACHW
TO APPITIONAL rIECE5 Or CHANNEL OW LONG
WITH 50PFW!5 AT W 04, RE94LIFNT CHANNa6
ArMIFP AT RI&HT ANCLM TO Z.10 WOOP J016TO
16' 04, WITH 1-1/4' TYrE W %RFW!5. WOOP
JOIET!5!F'UrroRTIMq O/e�z"FLYWOOP �Umwop
AMP �/4' L000 FEI EANPEP &YMUM FLOOR
UNPERLAYMENT.
FROFRIETARY rYrI5UM I5OARP,.
CERTAINTEEP &YF5UM, I/Z'CeRTAINTEEP TYM C
&YrSLIM 150ARP
CONTINENTAL 15UILPiNa rROPLICTI51 VZ' FIRECH=
TYPE C
GEORGIA IACIrIC r7Yr5UM: VZ' TOU&HROCK
rIR59UARP C &Yr6UM 15OARP
NATIONAL C7Yr%M COMrANY-. VZ' &OLP 150HP
151ZANP I`IRE-�Hlel-p 0 &Yr6UM WARP
rAV-0 cyreum: Vz'mm cuRi5 Eurmdc Tyre
r&-rl
U� &YF%M COWANY., I/Z" 6HEETROOK 15RAMP
FIRECMe C CORE aYr%M FAMEL�.
SWEAR WALL PANEL,
NAILING 4 CONNECTIONS
PER FLAN 4 5CPEDULE
ON SPEET 6-1
REVISED PLAN APPROVED
CITY OF EDMONDS BUILDING DIVISION
PLANS EXAMINER :F—
DATE
z;�
r4.
0
Z21 u
L Ul ti�)
DI :z VI-1
C3 UJ
>
<
uj
c�
:z
UJ
Z lz�l
>
<
<
PSI Z -�r
IIA 4�� 'Z�' z
ju
lu
c/)
w
w
U) U)
U)
LLJ Z
o 0
C)
D
UJ c/)
a- Z
0
C)
J05 0
17-0&;�
PATE:
IZ-27-17
REMION 15HI:—
APR 19 2019
BUIMING DEPARTMEN
CITYOFEDMONDS 4
4 �11.
J-4 4-4- 4 z
4 .,z
a)
(1) g 8
u
2);;
on�
T
u
Kul Ru
04 X0 TO 9016 L 404� X0
WRM99
rF __404& 1`10 -in
g-_j I
ZONE 05' Z Z Nr 04 ZONE *5 5
HIGH erMCIVNCY HVAG EQUIPMENT eP-
D. ONE *4� PLJCTLM�9 5rLIT 5Y5TEM HEAT rumre, ZONAL coKTRm, IN L lu
HOME6 WHERE THE FRIMAPY eFACM HEATING eYeTeM 19 :z
ZONAL ELECTRIC HEATING, A Pumeq� HEAT rumr oygTem
0 Q1 Ul
HALL 15E MTALLEO ANP rROMP? HEATIN& TO THE LARSMOT
ZONE OF THE H0.19IN& LIN[T. >
GAWMT CARPPT C-ARMT CARFITT -3 E7MClrNTWATrRHeATlN&13A,
ALL GHOWe HEAD ANP (ITCHEN 6INK IAUCET6 IN5TALLVP IN
lu bj
I
THE HOM �HALL EM RATEP AT i.75� &rm OR Lae�, ALL. OTHER Ju <
LAVATORY FAUCETS 5HALL ISE! RATEP AT 1.0 WM OR U!55
9D. lc�
TANIKLE�5 GA� op, 5,p./ :z
TA (90) *CO ul
"9 <
Z C
r- -A� WATER HeATM 24.
Al"LE
24 ATER �.TVR
2.6 J ROOF %_6
VENT THR� RCOr—\
/a, 0. Vf!-' -ATE'�
Ve T
_NT THRII III
ttt! I I - I I ) Z' , 1 — — "'� -- —
MA HI 69.
H.O. YCR
ep
V
M,
0
L
k3� lu
V
>
CARPET <
z§ . '
7;r
11,111T
A H 15A H_
R5,
I R� ------------------- N
4 TZ-4
..w
t Ju
MICHEN tu
VRIT Zoz
LIVIN& LIVIN9
CARPET I L KiTCHEN I GARfff
H9.
O'H. 9IJARP
9GO PECK- C4
eLore Tj PININ& PININ& W. SALM l,'/rT. TO
T
1 00" He.
(,'0'KA5TIG ATI..
&P-O OR 91K' ZONE 01 &ACO I =H rAN PRAIN
ZONE #I
4%' H. "AU FIV-1 FHv-1
r'0161 0/ #1& 0/
e,64 PIC OL
MULLIMP TO Li VT'o
16' OR '(1 ric
V. 0-
'4
94'-0'
7
Lu
H
u
Lij
UFrF_F, rLOOR fLAN o-
n
6.1.; 1/4� 1',0'
7
AREA CALCU T10 lr7-,9&;2
UNIT NEW
UNIT 41,71 __ftl RATE:
UNIT �102 eol
UNIT.201 04�,
UNIT OZOZ 049,
TOTAL�
eHF-F-T tl,
!F 1/4 -1
MY 14)18
BUILDING
CITyoFl NT
Nffi
Ufpf'ER MOOR MAN
0,-I- V4'- 1�41'
- LF-rzr-NP
PENOTM floV. 5MOKE PETECTOR W1 15ATTFRY
BACK-UP J, INTERCON14MTEP ALARMS
CIO.
?FNOTe9 II,'V. 0140M PeTECTOR CAR50N
MONOXIM PETIECTOR W1 5ATTeRY
15ACK-UP J� INTFROONNIECTEP ALARM6
*0 CFM MIN. 15ATH FAN
WHOLE HOUSE FAN- It( , CrM MIN. - 59E COVER
WHF SHEET
WHOLE HOUSE rAN INTERMITTENT TIMER- 515e
COVER SHE= rOFZ FRACTIONAL ON Time
NOTM:
L EQUIVALENT LENGTH OF PRYER PLACT TO De F0671517 ON A
FERMANENT LA5EL OR TA& WITHIN &I PRYeR
J.LL CAVITY AT 4X EXTERIOR HEAPERS W1 RAP R191P
INSULATION
WA STATE! ENERCY COPE CREWS,
#CREW 0.0 POINTS. EFFM14T WATER HEATINO 0.
ALL SHOWER HEAP ANP KITCHEN OINK FAUCETS INOTALLEP
IN THE HOUSE 5HALL f�!! RATEP AT 1.70 CeM OR LESS.
ALL OTHER LAVATORY IAUCE70 SHALL 15E RATEV AT 1.0
" OR LESS.
A'CREPIT 0. - Ir, rOINTs, EfMeNT WATER HEATING
&AS, rROrANF OR OIL WATER HEATER WITH A MINIMUM EF
OF V&
:E
a)
E)G 2 2
0 2
x
U
:z tN
ul
>
<
10
C�:
Dz :z
:z ;Z�.
:z
:z A- L
:z
uJ 'Z'A C�,
uj
REVISED PLANAPPROVED
z
CrrY OF EDMONDS BUILDING DIVISION
<
PLANS EXAMINER
DATE 6-1"t"q
�9
LU
LL
w
o—
REV�SPURN
n
APR 19 2019
BUILDING DEPARTMENT
CrTYOFEDMONDS
AREA CAWU TIO
1'7-0&r2
UNIT
NEW
UNIT 0101
UNIT Oiaz
PAT5
UNIT 0901
UNIT Ozoz
TOTAL,
ve Til
UAt+Vl V011 i4'pWAf-Ubll& 6.S')(Oel�h LIN WMP A C ANP UNVrNTEP ENCLO�PP RArTrR
A59rMI5Llff5 (FCR 15C 100" WA OWE AMFNPMENT):
6 t2wvlA4, ;4- d,kZc4-
f5PIRAYI!P-ON.AIFZ!PlRMMA5LZ INOULATION
C wi'fk 4Ae upJo�4 o-�- +Ae W/ MIN. R-VALUE OF
t4,9. PIRWTLY 09rHE UNPER51M Or �HEATHNG
I. THE UNVF14TEP ATTIC 9FACE 19 COMPLeTMY WITHIN THE
THERMAL. ENVELOre
Z. NO INTERIOR VArOR RETARPER9 ARE IN5TAUZP 014 THE
OWNS WE CATTIC ILOOR) OF THE UNVeNTEP ATTIC
AeSEMISLY OR ON THE CEUNG WE OF THE UNVENTEP
ENCW�ep Roor FRAMING A59EMIDLY.
AJR-PERMVA" IN6ULATION �HALL E�E ArrLIeP IN PIRECT
W14TACT VATH THE UNPeR9lPr OF THE 5TRXTURAL ROOF
q8r
_ATHING 4) 8
ID
0
API
<=T�y
=> I <= => I <�=
7112
-
L
1_1001 "Or AT,
ftM 1122� AT OF AT ROOF AT ROOP AT
,O_
'OOT rOOT
'COT 'OOT
rr 5W501 OV R rOOT —IrR
:z
/AT
I
�j LA
Ll
c�
—j L WE-- —1 L—
[-1 F-L"
WOOL? Twj�*,, 4� OL., Tyr.
rKe-MANur. ON
t
><
aIRPMR TRL)6�
NH TL
MATCH WACM1 TRLI�� F=
RNMR� TO MAR ON &IRPER TRU55 AT TH19 LOCATION PEFTH rOR CONTINUOIJ6 -AFTFR� TO DEAR ON OIRPER TRI.19i5 AT TH16 LOCATION
Tor Or GIRpr;R: TRugg Lp lo'-p 1/2' X�r, ROOF SLOM TOr Or GIRPER TRU96
c-\
Z
<3
57 Q)
CK
10 -A
5TRUCTURAL. rA�CLA eTRU=RAL. rA9CIA
\� INVERTrp
CONCEALER f�LANGP HANGER INVERTW CONCEALEP
HANGER MANGE HANGER
Tyr. Tyr.
INVERTEP HANGER
ROOr FRAMIN& MAN
z
n
(D -0
z
<
LL V)
LL
0
0
ry
17-0690
R ;SLPE
PATF:
JUL 13 2018
lz-z7-l7
nkj
WKCGF DERQCW
MM ��
0HEET 1�
61
1
12 urraK r—m r� I a
9 UE&v
( Lie 1/2' HF-APER
MAIN IL ELEV, - V.7-b'—
AVERAGE L
-LEVEL ISLENLATION 1 -81—
F-A!5T ELEVATION
tj��AMUM L��WAVZ HEIGHT ff I%I.L0
rwmiw IWILPIN& HEIGHT - Z6.94
VERTICAL METAL 151PINC -----------
Tyr @ 15UILPOUT
15 1 CHANNEL CMAR
�IPIN& WITH CLEAR
7Yr.
4'CHANNEL CEPAP
15AN CHARReP MNI!51-1,
lyr.
rOWPER COATEP
ALUMINUM rRAMe WITH
91PING, WITH eHOU %&I
TrMrrReP CLA!5e
SUARPRAIL. TYr.
L
ivl�7
F115FR CEMENT rANFL!5
WITH VeRTICAL A14P
HORIZONTAL ReVEAL!5�.
Typ-
MAIN rL eLEV- - V7-LD'
AVERAGE LEVEL rLeVATON - Vele"
NORTH ELEVATION
APPRree LrTTMR� TO Dr
12" MIN. 014 CONTRAETING
PAC*ROUNP
CAr M-A�HING, AT CUR15 OF ROOF WGE OVr5R
rANEL WALL, TYI-.
CFPAR rANEL WALL WITH HORIZONTAL 2�5,, 2.4,
Z.6. ANP Z.e� �4!5 �LAT� ATTACHITP TO
WeWEP MrTAL eUrf'ORT FRAME AT LANPING
MITAL �IPING.
L - - - - - - -T
1 ITTTL
-,-' ��—VIEITICAL
TYF. @ 15UILPOUT
CZPAR
----�b"CHANNML
61PING WITH CLeAR
fqNl5H, Tyr,.
C14ANNrLCrPAR
61PING, WITH 6HOU 6U&I
DAN CHARReP MN6H,
Tyf�
FOWPrR COATFP
ALUMINUM rRAMr= WITH
TrMrERr:P GLAe!5
GUARP RAIL. TYr.
VINYL WINPOW W1 PARr
15RONZr rXTERIOP
rIN19H, TyP.
1'115ER CEMENT ANELO
WITH VrzRTrALrAf4p
HORIZONTAL REVeAle,
Tyr.
F —
H�:,( & TUD15 �TEEL
ANP METAL NUMI5eR
APPM99 �*NAC& AT
ENTRY
I m - I ME
Z. rXT WALL, FeR
:E"'
2
EF E
2)92
0
M4).
Z�-. U
L 10
M :z
Q) in
>
JU
f-
<
ju
:z
>
C-\
:z
kA
C�l :z
� :z
I )I, v \I� I
MAN
EXTRUPW ALUMINUM
EXTRUPE17 ALUMINUM
EXTRUPW ALUMINUM
ALLOY VERTICAL JOINT
ALLOY HORIZONTAL
ALLOY OUT51pe CORNER
'Y rRy Reci-ET
TRIM DY FRY RECLET
TRIM 9W rRY RMLET
WIN& MR rLrVAllON
610INr, MR ELEVATION
51PI14a MR ELEVATION
L
WAU- 5HEATHINO MR
5TRUCTURAL.
WALL eHF
-ATH NG MR
W . ALL �HPATH N& . rER
I
2. EXT. WA-L. MR PLAN
�TRUCTURAL
GTRUCTURAL
D 0 �"'
��01�NANZL
ou 9 FRNER TRIM
",
Z. FXT. WALL.
MFI —11
eHF
-ATHIN9 M
5TRUC7URA-
FXTFUPeP ALUMINUM
9PINC, MR
ALLOY IN0112e CORNER
exTRUpep
fJ--CHANNM
ELEVATION
TRIM DY rRy RrcLrT
ALUMINUM —OY
ALUMINUM ALLOY
PW AUJMINUM
5PINC MR ELEVATION
I M
TRI
TRIM
15Y rRY RV&LeT
ALLOY PRIr CAr TRIM
WALL �HEATHIN& MR
EPTRUCTURAL
WINPOW JAMP
WIN"OW J Mp
E�y FRY RECLET
&Ar MIN,
z
01PIN9 MR rl.r�VA2110N
2. EXT. WALL,
, WALL OHrATHING MR
WINPOW rRAME
PER PLAN
9TRUCrURAL
(�)�ItVP NER FIN
V
-C A
6i
w C)
WALL. CHrATHING
—j U)
MR i5lKUCTURAL
uj
91PING FER ELEVATION
EXTRUPrP ALUMINUM
J015 It
ALLOY ISA5E TRIM 15Y
FRY RMrT
-o(or
44 'N
PATrn
IZ47-17
FINI�H GRAPM
�HEFT
u2
RAU EG
7
3s, ,B,
BUILgNoGFDEPAo
\IT
C EDMRTME
ND�
tIAXIMUM A�WADLE HEIGHT = 1211�
rRopoqEp fui-pImc �Lrl&HT = lzv.�4'
N-1 vb* urrm MZOR rLATr-
, FLOOR VUVLOOR
10'4 Vb" UPPER MATE
Ve HEAMR
MIN FL- EUFV - V7,D'_ __
AVERAGE LEVEL ELEVATION - 0&20'
APPRF56 LET=� TO 5ff
M"MIN. ON CONTRA6nN&
F-N�T ELEVATION BAQ*POUNP
5.A.� V** - e-0,
Ld�IMUM 6!L�ADLI! HEIGHT a 174��02
rROFO�W OOLPINC, HEIGHT - MOZ4
VERTICAL 1`115ER CZMeNT
FANEL� - FAINT. -(Yr. @
15UILPOUT
b' I-Ar 1`115ER CEMENT
151PINa - FAINT
4'LAr �15RR CEMENT
eIPING, - FAINT
FOWMR COATep---
ALUMINUM rRAme WITH
TrWEREP &LA!5�5
GUARPRAIL. TYr.
F115ER CX-AENT rANE-!5
WITH VERTICAL ANP
HORIZONTAL REVEAL�,
m
I�E I i I L---j 1/,
luv- im. - — I I
—A&q_-- -E�LATION - -20'
06
NORTH ELEVATION
CAr ILAOHING, AT CURD Or ROOF EPaF OVER
PANEL WALL, TYr.
b,4 CEPAR ILANKe AITACHEP TO WELPEP METAL
eUF'ORT FRAME AT LANPING,
He6&e Tum �TFEL
ANP METAL NU14MR
APPRI56!5 5IGNAGE AT
ENTRY
VERTICAL FIBER CEMENT
rANFLO - FAINT , TYr.
15UILPOUT
_—e LAr rlmiz CEMENT
elPIN& - FAINT. TYr.
rmelz cam -ENT
�IPING, - FAINT, TYr.
rOWPER GOATFP
ALUMINUM rRAMF WITH
lr-WeREP G(A55
GLIARPRAIL, TYF.
-- - -----------------
_—VINYL WINPOW W1WHITI!
— - —IEXTeRIOK-rINI!5HrTYr — - — - — -
��,—FIDER CEMENT FAN151.4r,
WITH VERTICAL ANP
HORIZONTAL RFVEXe.
Tyr.
7 ALLOY VERTICAL JOINT
$Y rRy RESLeT
WING rER ELEVATION
WALL �HeATHING MR
6TRUC71'URAL
12� EXT, WALL. rER rLAN
4071T��VJOINT I@ rANeL
2. EXT WALL, rER
MAN
EXTRUPW ALUMINUM
ALLOY HORIZONTPL
TRI1415Y MY RBCiZT
6VING FER ELEVATION
WALL 6HeATH N& FeR
�TRUCTURN- I
Ewpl-- JOINT I@ PAN L
L�='O'E" M' UM
UT=CORN
Tmm 5Y rRy R:��
9PIN& PER ELFVATIO14
WALL 5flrATHING rER
6TRUCTUFAL
2. EXT, WALL. PER rLAM
2w FPER TRIM
:E 9 �2
2
ci
a)
a)
ZR!
L uj vc)
:z tN
uj
>
<
aj
c�
z
>
:z
:z
lz�, :z
14N (3
lz�.
2. EXT WALL
A Y )0( y Y Y reR
-----5HEATHtl49rER
5TRUCTURAL
EXTRUPEP ALUMINUM SIPING reR
ALLOY 11,15117e CORNER EXTRUprp --�ELI!VATION
TRIM 15Y rRY REGLET ALUMINUM ALLOY EXTRU ALLWINUM
AL TRIM
J-CHANNeL TRIM
SPIN& rER Fi-eVATION ALLOY PRIr CAr TRIM
15Y FRY RI5cLeT 15Y rRY RESLET U)
WALL 6HeATHIN9 rER
POW JAM15
�TRUCTURAL IWIN -LC-ArMIN. z
. SPIN9 rER eLEVA'jn0N 4
2. eXT. WALL, WALL �HEATHIN9 rER WINPOW FRAME
rIER MAN STRUCTURAL
E!R TRIM bi
16". 21pill w 5 —1
Lu <
L)
WALL eHFATHIING
reR �TRUCTURAL ui
SIPiNC, FER ELEVATION
EXTRUMP ALUMINUM
ALLOY 0iA5eTRjM 15Y REVISED PLAN APPROVED— J015 0
FRY R5CLET CffY OF EDMONDS BUILDING DIVISION 17-0&;27
PLANS EXAMINER �A PATE:
DATE
GRAPE
REVISION �HEET
APR 19 2019
JUN 0 6 2019 BUILDING DEPARTME 7
BUILDING DEPARTMENT CITY OF EDVIONDSNT
C � TY C F E CM 0 K D S
T—
Zo-! u
L JU vc�
DZ :z
Q) UJ
13 >
C�:
:z
<
v-
Z tz�.
Z >
L c,
;Z, :z
%N (3
'Zb
lu
tjA)(LMUM ALLOWADLe HMGHT a IZLLr,.L_
7-7
- - - - - - - - - - - - - - - - 7— 1 VERTICAL rIl5eR CEMENT
- - - - - - I-ANE1.6 - FAINT, TYM
- - - - - - - - - - - - PUILPOUT
D I-Ar MEEK CEMENT
e NG, - FAINT. TYr.
#4 Ile' UrreR FLOOR PLATE
U.N'o-
6'40 1/2" HeAPER
LAP f-IMR 66WENT
elPING - FAINT. TYr.
rOWMF COATEP
ALUMINUM rKAMF- WITH
TFIAPEREP 61-AI54,
,E:f CAJARPRAIL. TYF.
iol-i Ve' urreR rLoor eupmoop LATCH ANP LOCK
e-j ve . MAIN rLooR FLATe
---- ---------------- --------- - 014 X 4 5TAINEP *14 X 4 6TAINEP Y)
CEPAR FLANK &ATE5 CEPAR rLANK5 z
( '-I& VZ' HEAPEF ;RIVID fLA11111
0
'9
t
F115ER CEMENT rANELI5 .4
WITH VERTICAL ANP
HORIZONTAL REVEAL-3i,
lyr. <
L)
7b (n
I ui
CoNo VTE
CA.1 111TI WALL REVISED PLAN APPROVED
6VEFZAGI�.LeM ELE�LATION - 061ro' CYTY OF EDMONDS RDlLDtNG DIVISION J015 0
��OUTH ELEVATION TRN5H ENrLO!E7UFF- ELF-VATIONI5 PLANS EXAMINER 17-060
1/4' - 1'-#' DATE PATF,
1247-17
REVISIM REVONON
JUN 0 6 2019 APR 19 2019
BUILDING DEPARTMENT
BUILDING DEPARII-NT Cl
. y OF EDMOND,
CITY OF ED%iOND§
W
M.AXIMUM 660WAMZ Hr*HT
=OOZE 15ulLPING HEIGHT - 120-54
OL 8�'-I VL)" LJFF'FR rLOOR PLATE
U.N.O.
0� &'40 I/Z' HFAMR
Ij - MOOR 6UVLOOR
'1XN MOOR PLATE
(�Is 1/2" HCAPM
MAIN FL ELEV. - *7.0' - - - - --
AVERAGE LEVEL ELEVATION - V&.2W
V&
Wr_�T��ELEVA
�AAMUM ALLOWAE�1.15 HE*HT 0 10110'
M0rO6I!aI5UILPINr,I �rHT-120**'
VERTICAL METAL
TYF. @ 15UILPOUT
&" CHANNEL CIMPAR
eIPIN& WITH CLEAR
I-11,119H, TYr.
b'-I 11b, LJFMR MOOR MATE F1
--4 allANNF.L. CMAR
91PIN& WITH 9HOU 9UGI
--- - -- ----- - 15AN CHARREP rIM19H,
---- ------ Tyr.
=_ rOWPFR COATEP
----------- ALLIIAINUIA MAMr WITH
TemrrREP aLA99
CAJARPRAIL, TYF.
'd-, 10�1 va" UrrrR FLOOR �UWLOOF_
0'-I 119�' MAIN MOOR MATE — - — - — -
--- ------------- -
&'-I$ �/Z" HeAPM
CFMrMT FANIIL�
WITH VERTICAL ANP
HORIZONTAL- RFVEAL�,
Tyr.
MAIN M_ MFV. - 07 LY_
&�MKA&ELLEVFL rLEVATION a 96.20
� u
e TION
0
5.6: V4, f-6,
F] I ;z
<
VERTICAL METAL
U
elPINO,
TM @ 15UILPOUT
0 'V
CEMrMT FANM-9
X
___—I95rR
WITH VERTICAL ANP
HORIZONTAL FFVeALe,
ZRI U,
Tyr.
contractor and observed by the Building Inspector on site.
&lit verification shWl be done by the apapilicant's agend, on d b ed B Idin n on u
I'
si
a
th t of
t
0 own
A
" 7
he I S pectu" 0
t' d the Pain
ui g I spect
' d
th 6 il i sh
"b by uildnig (" a
' - or an 0 d um point' an a
u 1
e ilders level), establish the datum point, and the point of
an i I bu it n as
is i'�
a mq-i'�.. An
y th
Heig
The agent/oontractor shall set up the equipment (transittlau d h. lit a g
e rov d a e rup Dsed height of a building (as shown
'a. - If P I on some i q
t
c" v t -Y . n' e
me to a at with ' pp . p he n c . "
1 must be consistent with the approved plans. If the Prop' quired. An
aver -age grade, Thew items i h i e i an elevati on survey is re
It P conami
Po
0,
I t
t th
a. d P n 'a'
b rm I for a I to n - da
e ad I of a ou" anor e g ' P d u or ror 0
on it e plans) is within 12 inches of the maximum height permitted for the zone,
ey i. I ce c Po be W a 'i.en e - y re diaman
ne raducted by a licensed surveyor. 1) Prior to construction, the
co shaiI, a lis a re, no
t 'oor 0
0,
t
to
ma to d
elevation survey consists of three, components to be oon; 2 1 4 3 a f t
0
oft c
t ct
to
U.
'is v re du . as ce i D 0 ev i dit, fas P. na
estab grade as specified in ECDC 21.40.030, and shail establish a reference datum point that
a ' ) e so eyor 'he e' a, on 0 - oor
surveyor shall establish average on of the first foor print to the
he r � tv a a 'a 'cii of
will be undisturbed and can be freely accessed. 2) The surveyor shall locate the elevati
M f gat co fir, I be mvi upon carria an he a.
t, 0 rmation shall be provided upon completion ofthe structure-
0, a 0. r sa c hei n ,
city under -floor inspection. 3) A faid letter ofheight confl.
"CH U.,
0/4 X * 9TAI ep 0/4 X 4 9TAINEP
CMPAR 'M'14K CATM CEPAR MAMKe
� CANCIOLTS I
TRN5H F_NCL0!5UFF_ ELEVATION�5
:z T��
Q� to 1�1
>
>
:z
(� Z :z
57 %N Q�
(�' lz�. :�:
Uj
U)
z
LD -I'
Uj
W
_j U)
LU
J015 sp
PATM, M47-17
R
�HFMT it
7A
AUG 3 1 2018
0AXIMIJM6!L0WAI5LeHEJ0HT 1?101� —
M0FoRLNLPIN9 HeIGHT x !ZO.!14'
�77
'�F "I,- I MAIN-rL00K-
MA114 FIL 5XV. - Vzb'
�vepcELLevm. mm�AwN - oo'
le.
�IAXDMUH kLI-OWAOLI!, HrJCHT m 0.10'
rROF'O��LWLPII* L—H — I
,i, &'-I vb' urrrR rLooR r
\"F U14 '0.
OL &�Ia 1/?" HeAPER
I - 1�1
wl-i uFfm rwoR
&'-I& I/ZN HFAPM
MAIN rL. MZV. - V1.0'
05—
MVIERAr,k�nVLL MZ)LATION
rOUNPATION5 A14P rAP rOOTWDS, reg 9TRLCTURAL
WIL 15ZAFZINC rRe5!5IJRr rrR CCOTWHMICAL RCrORT
5ECTION A -A
fWIL vcwNa -Re55JRe rER GeOTMCHNICAL RErORT
�5F-ICITION 15-15
a4rEP Tor cHoRp TRu e
W1 FLAT 150TTOM CHORP AT
L46XIMUM ��WAIDLM KeJGHT V11W Nwb' rLATE HEI&HT
LRoi-05ZE 15umwc, HrI*HT 0 120.".
4�'-1 a' UrreR rLooR rLIATr
'0�lZeR R euVILOOR 01�T� frFK 5
l/U7MAlNrLr0U0,0RrLATF
TON
�-IJINTeitLLATION
Tyr. WALL
HeApeR
�AIN FIL qLV - 1)7.5'_ -
LVMl61;jLFVI!L MZ\LA710H 1 V4
�-e,- -
r>pRm PININO
JLJI Ct) =
z 9
R-iw iN5uLA-n 14
T'r. 0 rL
J016TO reR 6TRIXTURAL
CRAWL45rACE
FOUNVATION9 ANP rAP FOO-W5 FER sTFturTuRAL
501L mmm& m5�%Re rrR &eoTecHHr.AL RerORT
OECTION G-C,
�.Ik: J14" = I'-l'
Lu 6
Cl) U)
J05 1�
17 - 0 (a r2
PATE:
1047-17
UIB
JUL 13 2018
�HEET 9
81
F ON
ON
N.r
I
MAXIMUM N4�LWAKZ HEC41T 121,20' — — — — — — — — — — — — — — — — — — — — — —
MOP06EE IsULPINC, ItEAGHT - Izd.�4� — — — — — — — — — — —7 — — — — — — — — — — —
r
Q
b,A-vb, UPrEK ILOOR FLATF-
+
-- — - — --
�r U.N.O.
I/Z' HEAPFR-
iM9ULATIOM - SEE
NOTE ON eHT. 6. Trr.
HALL
15ATH
15ATH
HALL
15PPIM
ve-urmR moox-ouvLooR-- -
— — - — — -
- - — - — - — --
*'-I VW -MAIN rLooK rLAim--
E R41 INSULATION
Tyr. @ wALL
PININCO
LNPRY/ ewR,
Y/ eToR.
MIN&
��N FL ELEV ')7.b'_
T-er.
F—
1\/ v vVY M/\ALV��VL�N�2"ll
VVvVA'vVvV�v-~---Vv-Vv4oVh"
It j
AVERAGE Le\/EL ELEVATION *( SO'
MAXIMUM 64AWA13LE HOOK 121,20'
.-I
Mofo� �PUILPINCI I-!Ejc-1iT- I
4 o'-i Ve urreR rLooR r
�F U.NO.
OL a-10 1/2' HrApeR
I- - - \-F
UrmR rLOOK 6U151'
MAdN M-OOR rLA
6�40 VZ' HWrR
t1IN IL E� �tlldll'
AVERAGELFVEL ELI!N�ATION
rOUNPATION5 AMP PAP FOOTINGS PER STRUCTURAL
50L DEARJNC PRESSURE PER GEOTECHNICAL REPORT
15ECTION A -A
601L 5EARING PRE55URE PER CFOTECHNICAL. REPORT
15ECTION 15-15
2 rN-4
L5
E
a) r . r
u
2);ii 2
U
re
L UJ V('�
UJ
>
uJ DZ
�: UJ
<
_j :z
<
v—
be Q,
� L— 3;:
z
GIRPERTRU55TOF05TAT
RIOFZ WALL OLD AT TOP Or WALL
rOR 5UI-POUT AMP THE
CANTLFVrRrP ROOr
51-orep TOP CHORP TRUS9
R-4* SFRAY-ON
MEWRANe ROOF- INSTALL PER
P`3D 5MRAY414
r
W1 rL,\T DOTTOM HORP AT
INSULATION - SEE
MANLIP. SPECS. /-
INSULATION- SEE
MAXIMUM 8LL2±A%e HEIGHT
&I-ve, PLATE HEIGHT
NOTE ON SHT. 6. TYr.
rRAMINGFER.,
5-1-'RAL _ 4-
—7
NOTE ON 5w. Tyr.
1/2 _
vii-lw�
VFNTeP SOFPIT
ol-i Ve urreR moOK PLATE
A
Tu-
— - — - — --
:�Z u R mom eumooz API �JOJST� PER STRUCTURAL
V,7
MAIN M.00R rLA7e
,WZ1 INOULATION
&,-I& Ile w-weiz TYr. @WALL
MAIN PL MZV. a 07,D'_
AVERAGE LEVEL ELEVATION = 04
PINING
/R40 INSULATION
TYF. @ rLOOFt
GRAV&13FACF
FOUNPATION5 AMP PAP FOOTINGS PER aTIKLICTURAL
SOL 15EARiNG PRESSURE PER GEOTECI-INCAL REPORT
5ECTION 0-0
R-!�V INSULATION
Tyr. @F1LOOR\
- - - - - - - - - - - -
LIVIN
c/)
z
L --- I—
LU
Lij <
REVISED PLANAPPROVED
CITY OFXDMONDS WILDING DIVISION
Jor, 1�
PLANS EXAMINER F3<7
DATE
PATF:
IZ47-17
REYMOIH
APR I 1 1111
BUILDING DEPARTM NT
CITY OF EDMONDS
— &#' mAx rcrT erAm
SM. POST.
FIELD TRIM HEIGHT AS NECESSARY
1-1/2' TYr. CLASO GAr
CUAll �Y5TEM MWelITe AMP
�UrrOR'1`11,19 COMNECTION5
1/4' OR !I/0"
ENP PLATE
VINYL BUT70N CAP
(4 EA)
TO ASSURE LEVEL TOP RAIL.
5 HALL Rae[ A "a rOUNP
i9T
CONCeNTRATEP LOAP ArrWEP AT
TelIMR
VILA55
TRIM BOTTOM ONLY (BEFORE
THE TOr Or TW_ SUARR
Y,-X4"SSLAG
ATTACHING TO BASE PLATE)
OWIDSSOUTrCN
CAPWASHER
(4 EA-)
5'X5'5A$F;FLATE
914 X I YSS
(I EA.)
FLATHEADSCREW
(6 EA.)
NWPHEINEGASKET
(1 EA -OPTIONAL)
4Z'TYrlCALArr.
'I', ZVI
r
ALUMINUM �e &L
I ITI '1
WOOD BLocIqQ
�1:;,I-Al�lllll �Lll
�All
4, SpHrpr HALL
MOT rA5e T`HFOWH
MOUNT TO WOOP
&_��7,T�URrAOE
�0011111!OTION
CORNER TO 15E
MJLLY INVA ATEP,
TYF. —
I
TeRMWATr rRAMEP WAM5
cw5ec, RZOZ),
6TIJP�5 FRAMeP ON I( V OC, WITH
Pou" Tor PLATE A14P 5INCLE
U,OTTOM PLATE COP14MR 0515
TWO STU" OR OTHER MrAN0 OF
FLILLY [NeULATIN& CORNeR5, AMP
EACH OreNINr le FRAME DY TWO
57L,m. HEAP=* 5HALL Dr
INI TO 15e R-10
TYMOAL GORNM
MAT
P .11IR u
TM
PLANS FOR
INS LA
Ly-v
IR-OR P $PAC.
ORAPIST.P.W.O.—
I—A
A.—V
ANUF. ALUM MUM
1
rR PET#JL
AN
SPAC9
_IWON
5TICI
m PRAJN
myow reR RIM �0161
ZrROOr
;OATINIcl
OR 9A
LAYEP �l 11
.1 WATER-
-I.d. .—WiSLISLK.
..MRANK —1"
MAT V4W LONG SLOCKING
ol WALL L�AVE OPEN 1 '.14�
P-1 1�__
RIP - �_
.__ TNAN, Lll�
0MN=t TO RAFTER Wl SL SO —NM
R.I.% RIPP- LIP
MAT1..� TO
BLOCK-
4 TOP PL I &
m.w L'AUS,
-WALL AS. —I
SMOS le —
A. WALLSI
11w _�L $OW0
0. WALLS,
OAW_K AM SOLS PLAM 4
WALL PIPUTTRATI." IOR
--P.PST.
I'm PI
Q) 2�4 TOP PLATO
Is.Tp WALLS)
-.ALL AMIN1.1-1
-U4 S-ol...
JNO 0 WALLIS
_yll RO-01-
1.5VIL ..176 � WA
Z SOL9 PLATR MOTO WALLS)
CAUL< AM �E PLATM 4
WALL PENSTRATIONS TOR
SoW,D ATTISNUATION
MOOR � PER PLAN
INC
WALL
NC rER 5-�HEFTe
WKS DTL US P7R TYP. NOTIM
IZ TO 0,70' HEIGHT
Ly
vAPM ISARRIER
24' or_ ruRRIN&
-AWLSIA.E
PER ELVVATION�
TYMCAL MKE f-ARTITION I5ECTION
�`,161RTIT�10N
10
o
�j
MEM15RANE! ROOFfNr,
ALUMINUM CAr F_A�11114& --------- OVER ryWOOP PER COR
51.011' TOFTO PRAIN
MeMKANE ROOFIMC Z� CRrrrT z. RAFTER* PER rLAN
OVER rLywoop PER rOR FRAIAIN. FLAN W/ R4X 6rRAY-ON
INOUL C 6E
r
MJRRIN9 LIMPER RAFTERS
W/ M15ER CEMENT 59),
2)s
COMTNUou6 6TRr VE14T 0
TRU!"I!5 rER rLAN W1
I E 7 W1
R-41V =eRrAY�ON
TYPICAL EXTERIOR WALL. x
INOULA10M N& rFR PLAN U
z R
1001 VULPINS, FAMR OVER
5HEATHINC, (FrR 6-eHEETe)
Tyrm WALL Z.& qTupq @ 16. or- W/
N
R-21 ISATT INSULATION
VZ'GYreUM WALL 150ARP W1
rVA FAINT (I.I.M.a)
TYPICAL HEADER,
HPAPER rrR rLAM
TYMCAL R001=
R-11 FIS111 IN�IJL
TYMCA
L
L
15CALE. !,14'- f-#'
7
lu
>
CWA� PIMITTO NOT
SHOUIN LER. FOR LARITY
lu
14lr SIMI- PIPS
TYrICAL EX RIOR WAU,
TPLAN
V_
4AN-AlL . WWNT.
4-
51PING rVR
114
ISA UPPM FLOOR LAN!?ING
10*
5UILPIN ' rAreR OVER
C
51W
IF. w
(rr
eHPATHING _R e-OHEeTo)
-
FOR RA14m
Z.6 qTwq @ v,- Oc. W/
4-11V Ml STAIR
(LOS TNAN A 4' SPAA�E
R-21 15ATT INWLA11ON
VZ" &YrOUM WALL ISOARP W1
rVA FAINT
t
ALLOW- zWo
(UN.a)
z
q,) lu
ARD"IL
>
TYPICAL FLOOR r Iwl.
�,/4'Tk ' OUDrw OVER
IRAMIN. FeR rLAN OVER
SAO
f
Z-1
tx
vz' &WE
0 F
Ir HIM
z
qz�. :z
LM
4z,
A.
R"N "I
MAIL TO CONM LAND*
1-11 lAl ll�U_ATION
rrRIMeTeR
lu
RIM reR eNGINrPR
or ReCORP
ON ASS ANGLE TO
SWk STRIMER
IL-0 SIAS 1
011110-10 111-131
FL�00R flvf�AIMIINGY
�TYMC�ALWALL
A.S.STO
1==.4P---'- INTO
ecma 5,14
TYFIGAL OTAIR
TYFICAL FXTCRIOF WAU,
6PIN& FER PLAN
I" MILPINC, rAreR OVER
MC
HEATH] Creg "T�)
Z,& �TUP* O.C. W/
R-01 V�ATT IN5ULAT10N
w
II WALL __ W/
FRAmims PER ENGINEER Or
rVA FAINT CU.N.O.)
In
RECORP- effff �-5H=5
F.T. 9LL rLATE, P45OLT I, rLATV WASHeR reR
_j
MNSIMITM Or RMCORP- 6Ee e-5HrET!�
FRAMING rER PLAN W1
R-�V 15ATT INIULATION
R40 15ATT 114�LLATION
D
SRAP
V.
C-)
uj
4, POWN,3FOUT
..p
.
mc-HI
3:
ML 5LACK VArOR
0ARRIER
LI
UNIP19TURW eOlL
MIL PLACK VAPOR
MLTeR rA15RIC 5ARRIrF CIP A
JOD 0
if,[
TIT M
4"0 rPRrORATEP
m=—Trr�
rre PRAim w/ 4'
rFR rNP. rLAN
MIR &RAVEL COVER
PATI!,
TYMCAL II50LATEP 1`000TINCY
TYMCAL 15TEM WALL
14,
n1-2E`3UR3
77FT $t
JUL 13 2018
8%LF-MaTEMORMOr
-AD-1
Sm. POST.
FIELD TRIM HEIGHT AS NECESSARY
VINYL 13UTTON CAP TO ASSURE LEVEL TOP RAIL.
(4 EA-) TRIM BOTTOM ONLY (BEFORE
Y,-X4-SSLAGSCREVV ATTACHING TO BASE PLATE)
(4 EA-)
O&IDSSSUTTON
CAPWASr FER
(4 EA.) 5"XTBASEPLATE
914X 1 Yss (1 EA4
r
.LAT HEAD SCREW NEOPRENEGASKET
(6 EA-) JI EA-OFrnONAL)
AIOODBIOCKI�G
1110�u"T T�owo�oll 00�11111`0�T,011
WRNER TO 15F
FU.LY tN9LLATeP.
TyF- ----\
In, FRAMEP WALL5
ov�mc Met),
M99 PRAMEP ON II WITH
POU15LE Tor PLATE ANP �INCILM
J'OTTOM PLATE COR14CRO U515
TWO 5TUPr OR OTHrR MEANe OF
'NTERM 'ATE
FULLY IN5ULATIN& CORNMR5. ANP
EACH OMNIN& 15 FRA14F 15Y IWO
9TUP5. HICAPER5 6HALL 15r
11,16LLATEP TO 15e R-IA
TyrirAL roRNr-R
��ALE �-111
—e I- MAX FOCT 5PAN
i-Vz"-ryrcLAse&Ar
SUARP 5Y5TEM ELEMeNT5 ANP
CON
Lfro NaCTIO"
v 4 0
�HALL RMII A 200 POUW
TemreRep
EW PLATE
CONCENTRATEP LOAP APFILIMP AT
C-LA05
THE TOP OF THE! GUARP.
,W TYPM
AFF.
�Z�z
zzz-,�
A�LLLUIIM41.11NNUUM �e OLN5I5 RAIL PETAIL
ALE
ROOFING ANP
PECKING PER PLAN
ROOF FRAMING
PER MAN -
ANUF. ALUMINUM
ER PETAL
Am
--E V .1-E
FLA5TC
H PRAIN
5EYONP PER
4, 6PHERe GRmj
... — rHpOU9H
CONTINUE WALL
AI50EMISLY C TO
Uhipmelpff or
ROOF PECK
-WAU-A6*Eb0LYC
.0.
I'.. —D
W-1- ES
BAM �W W�)
WROOF
;OATIN9
OR 51M)
49 MR
Z To vw HfftGHT
Jill
24'0.r.MJRRING
MR ELEVATION�
TYPICAL FIRE FARTITION!5ECTION
ALUMINUM CAP FLASHING-
SLOFe TOP TO PRAIN
MEM15RANE ROOFINC
OVER MYWOOP PER E!OFZ - IkA /- F`RAM,"N9Er`ER PLAN
TRU�6eo PER PLAN W/
R-419 5RPAY-ON
lNeULATION —
TYPICAL WALL —
MTYMCAL R001=
, C/11 N 1!
TYr[CAL 5TAIR
FRAMING PER ENGINEER OF
REGORV- SPE5 S�-SHEET5
R-5,0 DATT 1M9ULATON
& MIL MACK VAPOR
I'ARRIER
UW10TURDWOOL.
TYMOAL 60LATEP FOOTIN&
SCALE: ?,/4' = 1'-0'
TO
MEM5RANe ROOPINC
OVER rLywoop PER rog
2. RAFTERe PER PLAN
W1 R-W 5FRAY-ON
INOUL
PURR N'S UNPER RAFTERG
W1 MM CEMENT 06P J�
T11411-5 —1 VENT
TYPICAL EXTERIOR WALL,
salls mR PLAN
-77,
10* ERALPING PAPER OVER
HEATHING (MR e-eHEET5)
Z.e. owl7s, @ w 04. W/
R-21 15AI7 IN*UILATION
V?.'&Yr5UM WALL 150ARP W1
rVA FAINT (W10.)
TYrICA- HeAPER,
11LAPER PER MAN
R-10 FJGIP imem
AL '-0,
TYrM EXTERIOR WALL,
61PING MR PLAN
4- 1,,- wlom, rAreR ovmz
5HEATHIN9 (FER 51,HerT6)
Z.& STUP5 @ W or- W/
R-21 15ATT NeULATION
09' GYPeUM WALL WARP W1
rVA PANT (UILO.)
H �� FLOOR FRAMING,
/4. T " G SUN-LOOR OVER
MINC
, MR PLAN OVER
V". C
R-01 15ATT INSULATION
PeRtIAFTER
OPRECORP
-11 — --INIER
(��ICAL WALL rLOOR rRAMIN&
TYF']"�� �LLI�L�00R' 11�;�AIIIIIG
_,_7A
:E
. I V,
C § E
E
tA
z 0
U
t46 44
L ul tc,�
DZ :z
Q1 uj
>
Z IZZ$
tu
>
:,ZA ;3
:z
z
M
TYPICAL EXTERIOR WAU--
01PING PER PLAN
I" 5ULPINC PAPER OVER
<
e1I CrER 9-�H=9)
.
Z�& OTw� @ w or, W/
R-:U E5ATT IN5ULATION
ui
11%'GYMUM WALL "ARP W/
0
rVA FAINT (U.NO.)
rT OLL FLAM A$OLT J, PLATE WA5HER PER
-j
ENGINEER OF R15COV- SM "HeeT5
<
IN
rRAM N& PER PLAN W1
R-" 95ATT INSULATION
REVISED PLAN APPF
OW
CITY OF EDMONDS BUILDING
DPM
PLANS EXAMINER r-t'-7
SALLPI
DATE
MIL 15LACK VArOR
FILTER rABRIC 15ARRIER
4"0 MWORATEP
FT& PRA114 W/ 4' 1'7-0(ory
MIN. GRAVEL COVER
PATE.
TYMCAL!�7TEM WALL IZ-Z7-1'7
SCALE: 5/4'� 1'-0" eil-T
APR 19 2019
BUILDING DEPARTMENT
CITYOFEDMONDS [AD-1
STRUCTURAL NOTES
CODE
ALL MATERIALS, WORKMANSHIP, DESIGN, AND CONSTRUCTION SHALL CONFORM TO THE DRAWINGS,
SPECIFICATIONS, AND THE INTERNATIONAL BUILDING CODE (IBC), AS AMENDED BY THE LOCAL
JURISDICTION, SPECIFICATIONS AND STANDARDS WHERE REFERENCED ON THE DRAWINGS ARE TO BE
THE LATEST EDITION.
DESIGN LOADS
LIVELOADS:
RESIDENTIAL 40 PSF
CORRIDORSIEKII'S 100 PEP
ROOF(SNOK9 25 PSF
EARTHQUAKE LOADS:
SITE CLASS 0
SHORT PERIOD SPECTRAL RESPONSE (SD,) 0.851
ONE SECOND SPECTRAL RESPONSE (S.) 0.499
OCCUPANCY CATEGORY it
SEISMIC IMPOR TANCE FA CTOR 1.00
SEISMIC DESIGN CATEGORY D
BASIC SEISMIC FORCE -RESISTING -SYSTEM WOODSw
RESPONSE MODIFICATION FACTOR, (R) 6.5
SEISMIC RESPONSE COEFFICIENT (C,) 0.131
WIND LOADS:
ULT. BASIC WIND SPEED (S SECOND GUST) 110 MPH
EXPOSURE a
WIND IMPORTANCE FACTOR 1.00
K� 1.00
SPECIAL INSPECTION
SPECIAL INSPECTION SHALL BE PERFORMED PER CHAPTER 17 OF THE IBC FOR THE FOLLOWING ITEMS.
SOILS (SECTIONITABLE 1705.6)
CONCRETE (SECTICAWABLE170.3)
MASONRY (SECTION 1705.4, ACI 530)
STRUCTURAL STEEL (SECTION 1705.2. 1, AISC 360)
MISCELLANEOUS STEEL (SECTION17ABLE 1705.2.2)
WOOD (SECTION 1705.5)
REFER TO IBC SECTION 1705. 10 AND 1705. if FOR ADDITIONAL INSPECTION REQUIREMENTS FOR T74E
STRUCTURAL COMPONENTS OF THE LATERAL FORCE RESISTING SYSTEM.
ALL INSPECTIONS SHALL BE PERFORMED BYA QUALIFIED TESTING AGENCYDESIGNATED By THE
OWNER. THEARCHITECT ENGINEER, AND BUILDING OFFICIAL SHALL BE FURNISHED WITH COPIES OFALL
INSPECTION REPORTS. IFANY INSPECTION FAILS TO MEET THE REQUIREMENTS OF THE CONTRACT
DOCUMENTS, ITSHALL BE IMMEDIATELYBROUGHT TO THEArTENTIONOF THE DESIGN TEAM.
STRUCTURAL OBSERVATION
STRUCTURAL OBSERVATION SHALL BE PERFORMED PER CHAPTER 17 OF THE ISO ONLY WHERE
CONCRETE
ALL CONCRETE WORKSHALL BE PERFORMED INACCORDANCE WITHACI301 "STANDARD
SPECIFICATIONS FOR STRUCTURAL CONCRETE"AND ACI 318, IBUILDING CODE REQUIREMENTS FOR
STRUCTURALCCNCRETE� THE CONCRETE SHALL HAVE A UNIT WEIGHT OFAPPROMMATELY 150 PCF.
CONCRETE STRENGTHS AT28 DAYS (fc) AND MIX CRITERIA SHALL SEAS FOLLOWS. -
SLAB -ON -GRADE.' Fc - 2,500 PSI 0.55 WIC RATIO
FOUNDATION& WALLS: fC . 3,000 PSI 0.55 WIC RATIO
A CONCRETE MIX DESIGN SHALL BE SUBMITTED TO THE ENGINEER FORAPPROVAL IFREQUIRED IN THE
SUBMITTAL SPECIFICATIONS, THE MIX DESIGN SHALL INCLUDE THEAMOUNTS OF CEMENT, FINEAND
COARSEAGGREGATE, WATER, AND ADMIXTURES AS WELL AS THE WATER-CEMENTRATIO, SLUMP,
CONCRETE YIELD, AND SUBSTANTIATING STRENGTH DATA INACCORDANCE WITHACI REQUIREMENTS.
ALL CONCRETE EXPOSED TO WEATHER OR TO FREEZING TEMPERATURES SHALL BEAIR-ENTRAINED IN
ACCORDANCE MTHACI TABLE 4.2.1 FOR MODERATE EXPOSURE CONDITION.
MINIMUM CONCRETE COVER ON REINFORCING STEEL SHALL SEAS FOLLOWS."
CONCRETE CASTArAINSTAND PERMANENTLYEXPosEo TO EARTH. 3'
CONCRETE EXPOSED TO EARTHAND WEATHER.
#6BARSANDLARGER 2"
*5 BARS AND SMALLER I
CONCRETE NOT EXPOSED TO EARTH OR WEATHER:
SLABS, WALLS, AND JOISTS 314'
BEAMICOLUMN TIES AND STIRRUPS 1 112"
REINFORCING STEEL
REINFORCINGS EELSHALLSEDEFOR ED BIL.LETSTEEL CONFORMING TOASTMA615 GRADE 60.
REINFORCING BARS INDICATED ON DRAWINGS TO BE WELDED SHALL CONFORM TOASTMA706. WELDED
WIRE REINFORCING SHALL CONFORM TO ASTM A185. PROVIDE WELDED WIRE FABRIC IN SHEETS WITH
12"LAPS ATSIDES AND ENDS.
REINFORCING STEEL SHALL BE DETAILED TO INCLUDE HOOKS AND BENDS IN ACCORDANCE WITHACI
SP-66 AND ACI 318. DEVELOPMENTLENGTHS AND LAP SPLICES SHALL BE PER THE SCHEDULE.
MECHANICAL SPLICING OF REINFORCING BARS, IFREOUIRED, SHALL BEBYANICROAPPROVED SYSTEM,
AND SHALL DEVELOP 125% OF THE SPECIFIED YIELD STRENGTH OF THE BAR. ALL SPLICE DEVICES
SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.
REINFORCING SHALL BE PLACED AND ADEQUATELYSUPPORTED PRIOR TO PLACING CONCRETE.
WET -SETTING ITEMS IS NOTALLOWED WITHOUTPRIOR ENGINEER APPROVAL. BARS PARTIALLY
EMBEDDED IN HARDENED CONCRETE SHALL NOT BE FIELD BENT UNLESSAPPROVED BY THE ENGINEER
REFER TO ACI FOR PLACING TOLERANCES AND OTHER REINFORCING MEL REQUIREMENTS.
DEVELOPMEAfTLENGTHAND LAP SPLICE
REINFORCINGDEVELOPMENTLENGTHS AND LAP SPLICES SHALL SEAS FOLLOWS. ALL LENGTHS ARE IN
INCHES BASED ON GRADE 60 REINFORCING. CONSULTENGINEER FOR OTHER GRADES OFSTEEL. TOP
BARS ARE HORL70NTAL BARS WITH MORE THAN 12N OF CONCRETE CASTSELOW THE BAR.
REQUIRED BY THE LOCAL JURISDICTION. STRUCTURAL OBSERVA77ON DOES NOT INCLUDE OR WAIVE
THE RESPONSIBIL TY FOR ANYSPECIAL INSPECTIONS REQUIRED. NOTIFY THE ENGINEER A MINIMUM OF
ITY
ONE WEEK PRIOR TO THE OBSERVATION
SHOP DRAWINGSISUBMITTAL DOCUMENTS
PROVIDE SHOP DRAWINGS OR SUBMITTAL DOCUMENTS FOR THE FOLLOWING ITEMS:
CONCRETE MIX
REINFORCING STEEL
STRUCTURAL STEEL
PRE -MANUFACTURED TRUSSES
SHOP DRAWINGS SHALL BE REVIEWED AND REVISED AS REQUIRED FOR FIELD CONDITIONS BY THE
CONTRACTOR PRIOR TO THE ENGINEERS REVIEW FABRICATION SHALL NOTBEGIN UNTIL APPROVED
SHOP DRAWINGS OR SUBMITTALS BEARING THE STAMP AND SIGNATURE OF THEARCHITECT, ENGINEER,
AND CONTRACTOR HAVE BEEN RECEIVED.
ENGINEERS REVIEW IS SOLELY FOR CHECKING GENERAL CONFORMANCE WITH THE PROJECTDESIGN
CONCEPTAND GENERAL CONFORMANCE WITH INFORMATION GIVEN IN THE CGNTR40TDOCUMENTS.
MARKINGS OR COMMENTS SHALL NOT RELIEVE THE CONTRACTOR FROM COMPLIANCE WITH THE
PROJECT PLANS AND SPECIFICATIONS. THE CONTRACTOR REMAINS RESPONSIBLE FOR DETAILS AND
ACCURACY, QUANTITIES AND DIMENSIONS, FABRICATION PROCESSES, AND TECHNIQUES OF ASSEMBLY
REVIEW OF STRUCTURAL COMPONENTS DESIGNED By OTHERS IS FOR LOADS IMPOSED ON THE BASIC
STRUCTURE THE COMPONENT DESIGNER REMAINS RESPONSIBLE FOR CODE CONFORMANCEAND ALL
C RUCTURAL COMPONENTSUBMITIALS SHALL BE STAMPED
'ONNECTIONS To THE BASIC STRUCTURE. S7
BYA PROFESSIONAL ENGINEER REGISTERED IN THE SAME STATE AS THE PROJECT BUILDING OFFICIAL
APPROVAL IS REQUIRED PRIOR TO FABRICATION AND INSTALLA77ON OF STRUCTURAL COMPONENTS
FOUNDATIONS,
THE FOLLOWING SOIL DESIGN PARAMETERS ARE FROM THE COBALT GEOSCIENCES INVESTIGATION
DA TED SEPTEMBER 2017. IF EXCA VA TION SHO WS THA T SOIL CONDITIONS DO NOT MA TCH THE LISTED
DESIGN VALUES, THE GEOTECHNICAL ENGINEER SHALL BE RETA INED TO RE-EVA L UA TE THE SOIL
CONDITIONS. NOTIFY THE ENGINEER FOR POSSIBLE FOUNDATION REDESIGN.
2,500 PSF (ALLOWABLE BEARING PRESSURE)
275 PCF (PASSIVE PRESSURE)
0.35 (COEFFICIENT OF FRICTION)
FOOTINGS SHALL BEAR ON FIRM UNDISTURBED EARTH OR COMPACTED STRUCTURAL FILL AS REQUIRED
BY THE GEOTECHNICAL ENGINEER. FOOTINGS SHALL BE PLACED ATA MINIMUM OF THE FROST DEPTH
REQUIRED BY THE LOCAL JURISDICTION. FOOTING ELEVATIONS SHOWN IN THE DRAWINGS REPRESENT
MINIMUM DEPT14S AND ARE FOR BIDDING ONLY. FINAL FOUNDATION ELEVATIONS ARE SUBJECT TO SITE
CONDITIONS AND SHALL BE ESTABLISHED BY THE CONTRACTOR FOOTINGS SHALL BE CENTERED
BENEA TH THE STRUCTURE ABOVE, UNLESS DIMENSIONED OTHERWISE
IMPORTED STRUCTURAL FILL AND SACKFILL MATERIAL SHOULD CONSIST OF CLEAN, WELL GRADED
GRANULAR MATERIAL FREE OF DEBRIS OR ORGANICS WITH A MAXIMUM PARTICLE DIAMETER OF THREE
INCHES AND NO MORE THAN 10% FINES (PASSING THE #200 SIEVE). FILL AND BACKFILL MATERIAL
SHOULD BE PLACED IN LEVEL LIFTS NOT EXCEEDING TWEL VE INCHES IN LOOSE THICKNESS AND.
COMPACTED TO A MINIMUM OF 95% OF ITS MAXIMUM DRY DENSITYAS DETERMINED BYASTM 0 1557.
RACKFILL BEHIND ALL RET AINING WALLS WITH WELL -DRAINING, GRANULAR FILL AND PROVIDE FOR
SUBSURFACE DRAINAGE. PROVIDE WATER PROOFING SYSTEMATEXTERIOR FACEOFALL FOUNDATION
WALLS EXPOSED TO EARTH PER ARCHITECTURAL SPECIFICATIONS.
rc = 2500 PSI
Fc - 3000 PSI
DEVELOPMENT
LENGTH
LAP SPLICE
DEVELOPMENT
LENGTH
LAP SPLICE
BAR SIZE
TOP
BARS
OTHER
BARS
TOP
BARS
OTHER
BARS
TOP
BARS
OTHER
BARS
TOP
BARS
OTHER
BARS
#3
23
18
30
23
22
17
28
22
#4
31
24
41
31
29
22
37
29
#5
30
51
39
36
28
47
36
36
61
47
43
1 33
56
43
52
89
68
63
1 48
81
63
60
101
78
72
1 65
93
72
CONCRETE GENERAL NOTES
WALL AND COLUMN VERTICAL BARS SHALL START FROM THE TOP OF FOOTING. HORIZONTAL BARS
SHALL START A DISTANCE OF 112 THE NORMAL BAR SPACING FROM TOP OF FOOTING ANEVOR TOP OF
FRAMED SLABS. T74ERE SHALL BE AN ADDITIONAL HORIZONTAL 13AR A TA MAXIMUM OF S"FROM EVERY
TOP OF WALL AND BOTTOM OF FRAMED SLABS.
PROVIDE CORNER BARS TO MATCH AND LAP ALL HORIZONTAL REINFORCING ON EACH SIDE OF THE
CORNER PER SCHEDULE OR SEND ONE SIDE OF HORIZONTAL AROUND CORNER TO PROVIDE LAP SPLICE.
PRO VIDE CONTROL OR CONS TRUC T/ON JOINTS IN SLABS ON GRA DE TO BREAK UP EA CH SLAB INTO
RECTANGULAR AREAS OF NOT MORE THAN 400 SQUARE FEET. AREAS SHALL BE AS SQUARE AS
PRACTICAL AND HA VE NO A CUTE A NGL ES. JOINT L OCA TIONS SHALL BE APPROVED B Y THE ARCHITECT
PRIOR TO PLACEMENT
ALL CONSTRUCTION JOINTS SHALL BE THOROUGHLY CLEANED AND PROPERLY PREPARED IMMEDIATELY
PRIOR To POURING OF CONCRETE. DOWEL STEEL SHALL BE THE SAME SIZEAND SPACING AS MAIN
REINFORCING DETAILED BEYOND JOINT UNLESS NOTED OTHERWISE IN PLAN
SEE ARC141TECTURAL DRA WINGS AND MECHANICAL DRA WINGS FOR EXACT SIZE AND LOCA TION OF
OPENINGS IN CONCRETE WALLS, FLOORS, AND ROOF. UNLESS INDICATED OTHERWISE, REINFORCE
AROUND OPENINGS GRE4TER THAN 12"INANYDIRECTION WITH (1) #5 E4CHSIDEAND (1) #SX4�0"
DIAGONAL AT EACH CORNER. EXTEND BARS 2'-O"BEYOND EDGE OF OPENING. IF2'-O'IS UNAVAILABLE,
EXTEND AS FAR AS POSSIBLE AND HOOK. HOOKALL REINFORCING INTERRUPTED BYOPENINGS-
SEEARCHITECTURAL DRAWINGS FOR ALL GROOVES, NOTCHES, CHAMFERS, STRIPS, TEXTURE, AND
OTHER FINISH DETAILS ATEXPOSED CONCRETE SURFACES. PROVIDE 314"CHAMFER ATALL CORNERS
UNO.
STRUCTURAL STEEL
ALL STRUCTURAL STEEL WORK SHALL BE PERFORMED IN ACCORDANCE WITH AISC "SPECIFICATION FOR
STRUCTURAL STEEL BUILDINGS"AND AWS DI. I "STRUCTURAL WELDING CODE - STEEL". STEEL SHALL BE
FABRICATED AND ERECTED WITHIN THE TOLERANCES DEFINED BYAISC STRUCTURAL STEEL MATERIALS
SHALL SEAS FOLLOWS:
SHAPES SHALL CONFORM TO AS714 A992, Fy - 50 KSL
PLATES, ANGLES, AND RODS SHALL CONFORM TOASTMA36, Fy- 36 KSI.
STRUCTURAL TUBING SHALL CONFORM TO ASTMASOO GRADE B, Fy - 46 KS1.
STRUCTURAL PIPE SHALL CONFORM TO ASTM A53 GRADE B, Fy = 35 KSL
BOLTS SHALL CONFORM TO ASTM A325-N (USE 518-0 MINIMUM UNC)
ANCHOR BOLTS SHALL CONFORM TO ASTM F1554 GRADE 36, Fy - 36 KSL
ALL WELDING SHALL BE PERFORMED B Y DER TIFIED WELDERS IN A CCORDANCE WITH A WS AND WASO
REQUIREMENTS. USE 70 KSI LOW HYDROGEN ELECTRODES APPROPRIA TE FOR THE MATERIALS BEING
WELDED IF NOT SPECIFIED, MINIMUM WELD SIZE SHALL BE PER A WS D 1. 1. WELDING OF REINFORCING
BA RS SHALL NO T BE PERMITTED UNL ESS SPECIFICALL Y CALLED OUT ON DRA WINGS.
ALL STEEL EXPOSED TO WEATHER SHALL BE FABRICATED IN ACCORDANCE WITH ASTM A385 AND HOT
DIP GALVANIZED IN ACCORDANCE WITH ASTM A 123. FASTENERS AND HARDWARE SHALL BE HOT DIP
GAL VANIZED IN A CCORDANCE WITH ASTM A 153. ALL DA A44 GED GAL VANIZED C04 TINGS SHALL BE
REPA IRED IN ACCORDANCE WITH AS TM A 780 WI TH AN APPLIED GOA TING THICKNESS DETERMINED B Y
THE ENGINEER
WOOD FRAMING
ALL WOOD FRAMING SHALL BE PERFORMED WACCORDANCE WITH IBC CHAPTER 23, ANSIIAWC
"NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION", AND AITC"TIMBER CONSTRUC77ON
MANUAL�
SAWNLUMBER SHALL BE IDENTIFIED BY THE GRADE MARKOFAN AGENCYAPPROVED BYAN
ACCREDITATION BODYCOMPLIANT WITH DOC PS20. ALL GRADES SPECIFIED IN THESTRUCTURAL
DRAWINGSARE MINIMUM STANDARDS AND SHALL BEAS FOLLOWS:
STUDS, PLATES, AND BLOCKING HEM -FIR STUD GRADE
JOISTS DOUG-FIR #2
4x OR SMALLER BEAMS AND HEADERS DOUG-FIR #2
6K OR LARGER BEAMS AND HEADERS DOUG-FIR #2
POSTS AND TIMBERS DOUG-FIR #2
WOOD FRAMING SHALL BE KILN -DRIED TO A MAXIMUM MOIS TURE CONTENTOF 19%. ALL WOOD IN
CONTACT WITH CONCRETE OR MASONRY, OR EXPOSED TO EARTH OR WE4THER SHALL BE PRESSURE
TREATED INACCORDANCE WITH AWFA STANDARD Ul AND M4 FOR THE SPECIES, PRODUCT,
PRESERVATIVE, AND END USE REQUIRED.
GLUED LAMINATED TIMBER SHALL BE MANUFACTURED AND IDENTIFIED IN CONFORMANCE WITH
ANS11AITC A 190.1 AND ASTM D3737. UNLESS OTHERWISE SPECIFIED, ALL GLUED LAMINATED TIMBERS
SHALL BE DOUGLAS FIR SPECIES. SINGLE SPAN BEAMS SHALL BE COMBINATION 24F-V4 AND MULTvSPAN
BEAMS OR BEAMS THAT CANTILEVER SHALL BE COMBINATION 24F-V8. ALL EXPOSED GLULAMS SHALL
HAVEAN ADDITIONAL TENSION LAMINATION SUBSTITUTED FOR A CORE LAMINATION DIV THE TENSION
SIDEOF UNBALANCED 24FV4 BEAMS AND ON BOTH SIDES OF BALANCED 24F-V8 BEAMS.
STRUCTURAL WOOD PANEL SHEATHING USED ON WALLS, FLOORS, OR ROOFS SHALL CONFORM TO
THEIR SPECIFIC REQUIREMENTS IN DOC PS 1, DOC PS 2, OR ANSLIAPA PRP 210. PLYWOOD AND OSB
SHALL BE GRADE C-D WITH EXTERIOR GLUE. REFER TO IBC SECTIONS 2303.1.4,2304.6, AND 2304.7 FOR
ADDITIONAL COMPLIANCE REQUIREMENTS.
PRE -MANUFACTURED JOISTS, BEAMS, AND TRUSSES
PRE -MANUFACTURED JOISTS, BEAMS, AND TRUSSES SHALL. BE SIZED, SPACED, AND DETAILED TO
MATCH THE LOADING AND DIMENSIONAL REQUIREMENTS INDICATED ON THE STRUCTURAL DRAWINGS.
TRUSSES SHALL COMPLYWITH IBC 2303.4, I -JOISTS SHALL COMPLY WITH IBC2303.1.2, AND COMPOSITE
BEAMS SHALL COMPLY WITH 2303. 1.9. THE MANUFACTURER'S DESIGNER IS RESPONSIBLE FOR CODE
COMPLIANCEAND SHALL PROVIDE SHOPDRAWINGAND CALCULATION SUBMITIALSAS SPECIFIED.
ENGINEER AND BUILDING OFFICIAL APPROVAL IS REQUIRED PRIOR TO FABRICATION OF
PRE -MANUFACTURED COMPONENTS.
REFER TO THE DESIGN LOADS FOR BASIC STRUCTURAL LOADING REQUIREMENTS. REFER TO THE
ARCHITECTURAL, ELECTRICAL, AND MECHANICAL DRAWINGS FOR ADDITIONAL LOADING AND OPENING
REQUIREMENTS NOT SPECIFICALL Y NOTED ON THE STRUCTURAL DRAWINGS. DEFLECTIONS SHALL NOT
EXCEED L1480 FOR LIVE LOADS OR L1360 FOR TOTAL LOADS UNLESS APPROVED IN WRITfNG BY THE
ENGINEER. ALL TRUSSES WI TH A DEPTH EQUAL TO OR GRE4 TER THAN 24"SHALL BE DESIGNED FOR A
BOTTOM CHORD LIVE LOAD OF I OPSF NOT A PPLIED CONCURRENT WITH THE TOP CHORD LIVE LOAD.
PRO VIDE TEMPORARY BRA CING UNTIL SHEA THING AND PERMANENT BRACING IS INSTALLED IN
ACCORDANCE WITH THE MANUFACTURER'S REO UIREMENTS. THE MA NUFACTURER SHALL PRO VIDE ALL
SPECIALTY ITEMS REQUIRED FOR A COMPLETE INSTA LLA TION OF THE SYSTEM (INCLUDING BUT NOT
LIMITED TO FULL DEPTH BRIDGING, BLOCKING, WEB STIFFENERS, AND PRODUCT SPECIFIC
CONNECTORS.
NAILS, SCREW_SBOLIS AND _CONNECTORS
REFER TO THE PLA N 3. NOTES, SCHEDULES, AND DETAILS FOR ALL NA IL ING REQUIREMENTS. NA fLING
NOT SPECIFIED SHAL; BE PER ISC TABLE 2304.9. 1. ALL NAILS SHALL CONFORM TO THE STANDARD
DIMENSIONS OF COMMON NAILS AS DEFINED BY THE NOS AND SHALL MEET THE FOLLOWING MINIMUM
GUIDELINES:
8d=0.1�1"Ox2l,2"
l0d-O.;40X3'
l6d - A 162"0 x 3 112"
1 Cd BOX NAILS (0. 128'0 x 3") MA Y BE SUBS TITUTED FOR 8d COMMON NA ILS WITH NO CHANGE IN NAIL.
SPA CING. FRAMING MEMBERS MA Y 8 E NAILED WITH 16d SINKERS (0, 14810 x 3 114 ), BUT ONL Y 16d
COMMON NAILS SHALL BE USED WHERE I 6d NA ILS ARE INDICA TED IN THE DRA WINGS. 07-HER NAILS MA Y
BE SUBSTITUTED ONLY WITH THE ENGINEER'S APPROVAL PRIOR TO START OF CONSTRUCTION.
ALL LAG SCREWS AND SOL 7 S IN WOOD MEMBERS SHALL CONFORM TO ASTM A30Z PROVIDE STANDARD
CUT WASHERS UNDER THE HEADS AND NUTS OF ALL LAG SCREWS AND BOLTS BEARING ON WOOD.
LEAD HOLES FOR BOLTS SHALL BE PROVIDED AND SHALL BEA MINIMUM OF 1132-AND AMAXIMUMOF
1116' LARGER THAN THEBOLT DIAMETER. LEAD HOLES FOR LAG SCREWSHANKAND T74READS SHALLBE
PER NOS 11. 1.4.2.
ALL WOOD CONNECTORS SHALL BE SIMPSON STRONG -TIE OR ENGINEER APPROVED EQUIVALENT.
CONNECTORS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDA17ONS
USING THEIR SPECIFIED NUMBER AND SIZE OF FASTENERS IF STRAPS CONNECT TWO MEMBERS, PLACE
112 OF THE NAILS, SCREWS, OR SOL IS INTO E4 CH MEMBER.
ALL NAILS, SCREWS, BOLTS, AND METAL CONNECTORS IN CONTACT WITH PRESSURE TRE4TED OR FIRE
RETARDANT TREATED WOOD SHALL BEHOTDIP GALVANIZED INACCORDANCE WITHASTMAI53,
WOOD FRAMING GENERAL NOTES
911 L PLATES BEARING ON CONCWETE FOUNDATIONS SHALL BE PRESSURE TREATED AND SHALL ATTACH
To THE CONCRETE WITH 1,270 ANCHOR BOLTS EMBEDDED 7' MINIMUM. PLACEANCHORS AT4�0' OC
MAXIMUM FOR SHEAR WALLS AND A76'-O"OC FOR BEARING AND PARTITION WALLS. USE A MINIMUM OF
(2) ANCHOR BOLTS PER SILL PLATE AND PLACE ONE WITHIN 12' OF EACH END OF EACH PIECE. REFER TO
THE SHEAR WALL SCHEDULE FOR MORE STRINGENT ANCHORAGE SIZE AND SPACING REQUIREMENTS.
CONTRACTOR SHALL INSTALL 3 GAUGE PLATE WASHERS BENE4TH EACH NUTAT EACHANCHOR BOLTIN
A SHEAR WALL THATEXTEND TO WITHIN 112"OFSHE4THED EDGE.
ALL SHEARANDIOR BEARING WALLS SHALL BEFRAMED WITH2XSTUDS @ 16-00. REFER TO PLAN
NOTES FOR TYPICAL HEADER SIZES NOTSPECfFICALLY CALLED OUT. ALL HEADERS SHALL BE
SUPPORTED BYA MINIMUM OF(I) CRIPPLEAND (1) FULL HEIGHTSTUD. COLUMNS BELOWFLUSH FRAMED
MULTIPLE JOISTBEAMS SHALL BEEOUAL IN WIDTH TO THE BEAM. ALL COLUMNS NOTCALLED OUTSHALL
BE (2) STUDS. BEAMSSHALL HAVEFULL BEARING ON COLUMNS AND POSITIVE CONNECTION SHALL BE
PROVIDED.
PROVIDE SOLID BLOCKING BETWEEN JOISTS AND RAFTERSATALL SUPPORTS, ATS�O'OCMAXIMUM
SPACING BETWEEN SUPPORTS, AND BENEATH PARTITIONS PERPENDICULAR TO THE DIRECTION OF
FRAMING. INSTALL DOUBLEJOISTS UNDER PARTITIONS EXTENDING ONEHALFOR MORE OF THEJOIST
SPAN.
MINIMUM NAILING REQUIREMENTS SHALL BE PER IBC TABLE2304.9. 1. THE USE OFNAIL GUNS IS
APPROVED IFNAILING INTO THE DIAPHRAGMS IS FLUSH WITH FACE OF SHEATHING. NAII. PENETRATIONS
GREATER THAN 1116-ARENorACCEPTABLE.
NOTCHES AND HOLES IN WALL STUDS AREALLOWED WITHIN THE PARAMETERS OF IBC SECTIONS
2308.9. 10 AND 2308.9. 11. NOTCHES AND HOLES IN JOISTS AND RAFTERS ARE ALLOWED WITHIN T14E
PARAMETERS OF IBC SECTIONS 2308.8.2 AND 2306.10.4.2.
VERTICAL SHRINKAGE WILL OCCUR AND ACCUMULATE A T EACH LEVEL FROM THE WOOD DRYING OVER
TIME. THIS IS ESTIMATED TO BE APPROXIMATELY 0. 15"PER FLOOR AND ASSUMES THE WOOD HAS AN
INITIAL MOISTURE CONTENT OF 19% OR LESS. ADDITIONAL SHRINKAGE WILL OCCUR IF T74E MOISTURE
coNTENTISHIGHER THE CONTRACTOR SHALL ALLOW FOR THIS MOVEMENT IN THEIR INSTALLA77ON OF
ALL VERTICAL ASSEMBLIES INCLUDING BUT NOT LIMITED TO PLUMBING, ELECTRICAL, MECHANICAL, AND
ARCHITECTURAL SYSTEMS.
GENERAL NOTES
STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH THEARCHITECTURAL, CIVIL,
ELECTRICAL, AND MECHANICAL DRAWINGS FOR BIDDING AND CONSTRUCTION. REFER TO THE
ARCHITECTURAL DRAWINGS FOR ELEVATIONS, SLOPES, NON-BE4RlNG WALLS, STAIRS, CURBS, DRAINS,
RAILINGS, WATERPROOFING, FINISHES, ETC. REFER TO THEARCHITECTURAL, CIVIL, ELECTRICAL, AND
MECHANICAL DRAWINGS FOR SIZEAIVD LOCATION OFPIPES, VENTS, DUCTS, AND OTHER OPENINGS NOT
SPECIFICALLYINDICATED ON THESTRUCTURAL DRAWNGS.
CONTRACTOR SHALL VERIFYALL DIMENSIONSAND FIELD CONDITIONS FOR COMPATIBILITY WITH THE
PLANS, SPECIFICATIONS, AND REFERENCED STANDARDS BEFORE PROCEEDING WITHANY WORK THE
MOSTSTRINGENTREQUIREMENTSHALL GOVERN ANY CONFLICT UNLESS APPROVED IN WRITING
OTHERWISE. ALL DISCREPANCIES SHALL BE BROUGHT TO THEATTENTION OF THE DESIGN TEAM
BEFORE PROCEEDING
CONTRACTOR SHALL BE RESPONSIBLE FOR STRENGTHAND STABILITY OFANYPARTLY COMPLETED
STRUCTURE. CONTRACTOR IS SOLELY RESPONSIBLE FOR JOB SITE SAFETYAND SHALL PROVIDE
TEMPORARYSHORING AND SUPPORTAS REQUIRED UNTIL THE STRUCTURE HAS BEEN COMPLETED.
CONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE DESIGN TEAM FOR
APPROVAL PRIOR TO FABRICATION OR CONSTRUCTION. CHANGES ON SHOP DRA WINGS DO NOT SA TISFY
THIS REQUIREMENT. REVIEW OFALTERNATE SYSTEMS MAYBEANADD177ONAL SERVICE BY THE
ENGINEER.
DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OFCONSTRUCTION. WHERE CONDITIONS ARE NOT
SPECIFICALLY INDICATED BUTARE OFA SIMILAR CHARACTER TO DETAILS SHOWN, SIMILARDETAIL'SOF
CONSTRUCTION SHALL BE USED, SUBJECT TO REVIEWAND APPROVAL BY THE DESIGN TEAM. I I
LEGEND
DEFINITION
SYMBOL
DEFINITION
SYMBOL
DIRECTION OF
NATIVESOIL
FRAMING
EXTENT OF
GRANULAR FILL
FRAMING
COLUMNS
STRUCTURALSTEEL
r r
COLUMNBEARING
IIATEDSHEATHING
ON BEAM
BEAM CONTINUOUS
SHEAR WALL
SwX
OVER SUPPORT
(SEE SCHEDULE)
COLUUNMARK
CONCRETE WALL
(SEE SCHEDULE)
BEARING STUD
FOOTING MARK
WALL
(SEESCHEDULE)
\LAJ
NON -BEARING
HOLDOWN MARK
STUD WALL
(SEE SCHEDULE)
BEARING STUD
HANGERMARK
�zvvvvvvus
SHEAR WALL
(SEE SCHEDULE)
NON-BF4RING
FLAG NOTE
STUD SHEAR WALL
(SEE PLAN NOTES)
CMU WALL
STEEL MOMENT
L__
FRAME CONN.
ABBREVIATIONS
(A)
ABOVE
GLB
HORIZ
KP
KSI
L
MECH
MF
MTL
NS
OC
OPP
PL
PLCS
PSI
UPSF,
pYr
PT
REINF
REQV,
SCHED
Sim
BOG
STO
STIFF
STL
SYMM
SW
TOD
TOS
TOW
TYP
UNO
VERT
WF
GLUE -LAMINATED BEAM
AS
ANCHOR SOLT
HORIZONTAL
ALT
ALTERNATE
KING POST
ARCHITECT.
KIPS PER SQUARE INCH
-ARCH
(s)
BELOW
ANGLE
SO
BARDIAMETER
MECHANICAL
BLKG
BLOCKING
MOMENT FRAME
BM
BEAM
METAL
SOT
BOTTOM
NEAR SIDE
BRNO
BEARING
ON CENTER
BTWN
BETWEEN
OPPOSITE
COMPLETE JOINT PENETRATION
PLATE
_CJP
CLR
CLEAR
PLACES.
CMU
CONCRETE MASONRY UNIT
POUNDS PER SQUARE INCH
COLUMN
POUNDS PER SQUARE FOOT
CONC
CONCRETE
POSTTENSIONED
rCol.
CONN
CONNECTION
PRESSURETREATED
CONT
CONTINUOUS
REINFORCING
RD
COORD
COORDINATE
REQUIRED
DBL
DOUBLE
SCHEDULE
DET
AL
SIMILAR
DIA
. M R
SLAB ON GRADE
Dim
DIMENSION
STANDARD
DIR
DIRECTION
STIFFENER
EA
EACH
STEEL
ELEV
ELEVATION
SYMMETRICAL
ES
E4CHSID
SHEARWALL
EX
EXISTING
TOP OF CONCRETE
EXP
EXPANSION
TOP OF STEEL
FLR
TOP OF WALL
FON
FOUNDATION
TYPICAL
FIG
FOOTING
UNLESS NOTED OTHERWISE
rs
FAR SIDE
VERTICAL
GENERAL CONTRACTOR
WIDE FLANGE
CD
UJ
Lij
z
1.4
3". uj
Lu
uj
lzQ
0
0)
c� Lu
C\l
A
L
"tONAL 12/20/11
REV DATE I DESCRIPTION
0 12W17 PERMITSUBMITTAL
PROJECTNO.: 17071.01
DESIGNED BY.' JMD
DRAWNBY* CAB
CHECKEDBY.' CAB
SHEET TITLE'
STRUCTURAL
NOTES
SHEET NO.:
S1.1
RECEIVED
DEC 28 2017
DEVELOPMENT SERVICES
COUNTER
SHEAR WALL SCHEDULE
RIMJOIST
SILL PLATE
SILL PLATE
FOUNDATI
SHEAR
APA-RATED
MIN FRAMING
NAILING
ORBLOCK
NAILING TO
ANCHORBOLTTO
ON SILL
CAPACITY
TYPE
SHEATHING
ATADJOINING
ATPANEL
CONN TO
RIMIBLKG
SLAB OR
PLATE
(PLF)
PANEL EDGES
EDGES
TOP PLATE
BELOW
FOUNDATION
SIZE
15132'
2x STUD
0.131"Ox2112"
LTP40RA35
0.131"Ox3114"
&V'0AB@D5'-8"OCOR
z(
242
SW6
ONESIDE
ANDBLKG
(9 6"OC
L@26-OC
C&6.5.w
11210AB03�10'OC
1112�
2 x STUD
0.131; X21,12"
ITP4 '..'
0 - "7.0 1),114 -1
Vm OR
2X
353
SW4
1 ONESIDE
AND LIG
4 CC
0 1 ITO C
1 0 4.5� C
JDAB�2-B Oc
'��AB
NOTES:
1. RETTER TO THE SHEAR WALL DETAIL IN THE TYPICAL WOOD FRAMING DETAILS.
2. THE VALUES IN THIS TABLE ARE BASED ON HF GRADE STUDS AND HF GRADE PLATES A RIMISLOCKING.
3. NAILS AT ADJOINING PANEL EDGES SHALL BE STAGGERED EACH SIDE OF THE COMMON JOINT
4. INTERMEDIATE FRAMING TO BE WITH 2x MINIMUM MEMBERS. FIELD NAILING 12"OC M4X1MUM-
5. A TALL SILL PLATE ANCHOR BOLTS IN 2x6 WALLS, INSTALL 3 GA x 3" x 4 112"PLA TE WASHERS WITH THE EDGE OF PLATE WASHER WITHIN
112'OF SHEATHED EDGE.
FOR 2x4 STUD WALLS, INSTALL 3 GA. x 3"x 31 PLATE WASHERS.
6. PRO WDE A MINIMUM OF 7"EMBEDMENT FOR A B INTO FOUNDA TION OR STEM WALL.
7.7116"SHEATHING MAY BE USED IN PLACE OF 15412"SHEATHING PROVIDED ALL STUDS ARE SPACED 16"OC OR PANELS ARE APPLIED WITH LONG DIMENSION
ACROSS STUDS.
HOLDOWN SCHEDULE .
MIN
ANCHOR
CAPACITY
MARK
TYPE
CHORD
STUD NAILS OR BOLTS
BOLT(SEE
(LB)
SIZE
NOTE2)
UST27
(2) 2x
(11) 16d E4 END
Z345
<�>
MST37
(2) 2x
(11) 16d EA END
Z345
<4>
LST-H . DBRJ
(2) a
(16) 16d SINKERS
STRAP
Z250
STHD14RJ
r (2) 2x
(24) 6d SINKERS
I
EMBED ST P
RA
T
3, 95
NOTES:
1. WE—FE-R TO THE LA TES T SIMPSON 8 TRONG - 7 7E CA TA L 06 FOR A DDI TIONA L INS TA L LA TION RED UIREMEN IS.
2. ANCHOR BOLTS SHALL EXTEND INTO FOOTING OR FOUNDATION WALL PER DETAIL 6IS3.1. USEPABX-12
ANCHORS AT INTERIOR FOOTINGS AND PAOX-24 ANCHORS EXTENDING THRU THE STEM AT EKTERIOR
FOOTINGS. INCREASE FOOTING DEPTHS AS REQUIRED FOR ANCHORAGE.
3. AT ALL HOLDOWN CHORDS, PROVIDE PANEL EDGE NAILING PER SHEAR WALL SCHED.
FOUNDATION PLAN NOTES:
T—PIACEALL F"REZ"i STEEL, ANCHOR BOLTS, AND HOLDOWNS PER THE STRUCTURAL NOTES AND
H 0 TH
SCHEDULES ON THE S I SHEETS AND THE FOUNDA TION DETAILS ON THE S3 SHEETS REFER T E
FRAMING PLANS ON THE S2 SHEETS FOR LOCA 77ON OF SHEAR WALLS.
2. THE CONTRA C TOR SHALL VERIFY A LL DIMENSIONS, WA LL L OCA TIONS, UTILITY PLACEMENT AND
CONCRETE ROUGH OPENINGS WITH THE ARCHITECTURAL DRAWINGS PRIOR To CONSTRUCTION AND
NOTIFYALL PARTIES OF ANY DISCREPANCIES.
3. EXTERIOR FOOTINGS SHALL BEAR ON FIRM NATIVE SOIL OR COMPACTED STRUCTURAL FILL A MINIMUM OF
I �6"BELOW GRA DE. REFER TO THE GEOTECHNiCAL REPOR T FOR A DDITIONAL SUBGRADE PREPARA TION
REQUIREMENTS AND FOR CONDITIONS REQUIRING STRUCTURAL FILL REFER TO DETAIL 10 ON S3.1 FOR
rYPICA L 0 VEREXCA VA TION REQUIREMENTS A S NOTED IN THE GEOTECHNICAL REPORT
4. SLAB ON GRADE SHALL BE A MINIMUM OF 4- THICK W/ 6x6 - WIA�WIA WELDED WIRE FABRIC REINFORCING.
PROVIDE 2"MINIMUM CLEARANCE TO BOTTOM OF SLAB. SLABS SHALL BE PLACED 0 VER A 10 MIL VAPOR
BARRIER A TOP RIGID IASULA TION PER A RCH 0 VER 4"OF SUITA BLE DRAINING SUBGRA DE MA TERIAL AS
NOTED IN THE GEOTECHNICAL REPORT.
5. TO. FIG AND TO. WALL ELEVATIOJ ARE FOR REFERENCE ONLY. CONTRACTOR IS RESPONSIBLE FOR
ESTABLISHING FINAL FOOTING ELEVATIONS BASED ON FIELD CONDITIONS 8 FOR COORDINATING TOW&
TOP ELEV W(ARCH DRAWINGS.
6. CONTROL JOINTS ARE REQUIRED IN THE SLAB ON GRADE REFER TO THE TYPICAL SLAB ON GRADE
DETAILS FOR CONSTRUCTION REQUIREMENTS. ALL JOINT LOCATIONS SHALL BE APPROVED BY T74E
ENGINEER AND ARCHITECT PRIOR TO PLACING CONCRETE
7. ALL CONTINUOUS FOOTING REINFORCING SHALL BE PLACED THRU SPREAD FOOTINGS IFAPPLICABLE.
PRO VIDE CORNER, HOOKED, OR BENT BARS MA TCHING FOO TING REINFORCING A T ALL INTERSECTIONS
AND CHANGES IN FOOTING DIRECTION.
54�0"
1'-6"WIDE�9"DEEPCONT
EXTERIOR FOOTING, TYR
(D 2
Lu
LLI
(D
z
%
PROVIDE (2) #4 CONTATBOT
Jill
ui
u!
m
OF #2
2XIO DF#2
16"OC
---------------
@ 16-OC
I I
CONT
PROVID
or
F-� A
10 DF#2
9
0(10DF#2
2xI0 OF#2
C& 16"00
3'-O"x
�0"x 12'DE
16"OC 2'-O"x "x 8"D FrG,1
-xj
- II-D
WI(3) EA INA ;,)I, ryp
EA WA T
@ 16- DO
------
L
Lu
WI(4)
BOT
PWAYD
La) WL SPAC
L SPAC
3'-O'x 3- J"x 12'DEEP
W1 (4) #4 E4 INA Y TOP &
BOT
Q cd
2XIODF#2
2XIO DF#2
Cd) 16" OC
C)
is 16. DO
ZARWEI I
c) Lu
2�01x2'-0"x8'DEEPFTG
2'-0'x2�0'x8"DEEPFTG
W/ (3) #4 EA WAY BOT, TYP
W1 (3) #4 EA WAY SOT, Typ
0 CRAWL SPACE, UNO
LM CRAWL SPACE UNO -
Q
uj
LTHICIJ Big
7.3
BOTOFST A
z
REFER TO I VS3.1
A .
3'-O"� X-0"x 9"DEEP M W1 (4) #4
2 �6"x 2-6"x 9"DEEP FIG W1 (3) #4 EA WAY SO - CONTREINFORCING
A WAY BOT, TYP (4) CORNER SHALL RUNTTHROUGH FTG
LOCATIONS. CONT REINFORCING
SHALL RUN THROUGH FIG
0'x9'DEEPFTGW/(4)#4
EA
WAY BOT. CONT REINFORCING
SHALL
RUN THROUGH FIG
L
A
ONAL
09/21/16
54'-0"
REVI DATE DESCRIPTION
o li2,2a'17 PERmtrSUSMITIAL
& 04113118 PERMITRESUBMITTAL
2 0&21/18 PERMiTRESUBMITTAL
PRCJECTNO.� 17071.01
DESIGNED BY' JMD
DRAWNBY.' CAB
CHECKED BY: CAB
SHEET TITLE
FOUNDATION
PLAN
)A TION PLAN t-% f% 1
RESUB
AUG 3 1 2018
BUILDING DEPAgLM
Crry OF EDM Or
I
FLOOR FRAMING PLAN NOTES:
FnEFER To THE STRUCTURAL NOTES ON THE Sl SHEETS AND TO THE TYPICAL WOOD FRAMING DETAILS
ON THE S4 SHEETS FOR FRAMING REQUIREMENTS NOT SPECIFICA LL Y SHOWN ON THE FL OOR FRAMING
PLAN OR IN THESE PLAN NOTES.
2, FLOOR SHEA THING SHALL BE 314'SHEA THING WITH A 4W20 SPAN RA TING. A TTA CH TO FRAMING BELOW
WITH 10d NAILS SPACED AT 6"00 ATALL DIAPHRAGM BOUNDARIES, PANEL EDGES, $HEAR WALLS, AND
COLLECTOR ELEMENTS INDICATED ON PLANS. NAILING A T INTERMEDIATE FRAMING SHALL BE I Od NAILS
SPACED AT 12"OC ' REFER TO TYPICAL FRAMING DETAILS FOR SHEATHING LA YOUT. PROVIDE ADHESIVE
ATOP EACH JOIST AS SPECIFIED BY THE ARCHITECT BEFORE INSTALLING SHEA THING. FLOOR SHEATHING
IS UNBLOCKED UNO ON PLAN
3. TYPICAL HEADERS FOR EXTERIOR AND BEARING WALL LOCATIONS SHALl BE 4�8 DF#2 FOR SPANS LESS
THAN 4'SUPPORTED BYA MINIMUM OF (1) 2x CRIPPLE STUD AND (1) 2x FULL HEIGHT STUD. FOR SPANS UP
TO 6� USE 4XIO DF#2 SUPPORTED BY (1) CRIPPLE STUD AND (1) FULL HEIGHT STUD. ALL CRIPPLE AND FULL
HEIGHT STUDS SHALL MA TCH WID TH OF WALL FRA MING.
4. W�LL STUD FRAMING SHALL SEAS FOLLOWS:
2xS HF STUD 0 16 OC FOR EXTERIOR WALLS AND INTERIOR 6"BEARING WALLS.
2X4 HF STUD @ 16: OC FOR INTERIOR 4"BEARING WALLS.
2X4 HF STUD tP 24'OC EA FACE FOR PARTY WALLS.
2X4 OR 2x6 HF STUDS @16- OC FOR INTERIOR NON -BEARING WALLS,
REFER TOARCHMECTURAL DRAWING FOR DETERMINATION OF WALL TYPE. ALL SILL AND TOP PLATES
SHALL BEHFSTUD GRADE.
5.ALLCOI.UMAfS, TRIMMER STUDS, AND BEARING WALLS SHALL BE CONTINUED DOWN TO THE FOUNDATION
UNLESS SUPPORTED BYA BEAM BELOW. SOLID BLOCKING SHALL BE PROVIDED WITHINJOISTSPACESAT
THESE LOCATIONS. PROVIDE (2) STUDS MINIMUM AT FLUSH BEAMS UNO.
6. MULTIPLE PLY BEAMS SHALL BE FASTENED TOGETHER WITH (2) ROWS OF 10d @ 12- OC. PROVIDE 2-
MINIMUM EDGE DISTA NCE TOP & BOTTOM AND AL TERNA TE NA ILING ON EA CH FACE.
7. PRO VIDE CS 16 STRAP A T LOCA TIONS WHERE COL UMN OR BEAM CUTS DOUBLE TOP PLA TE. EXTEND
STRAP 12"BEYOND THE CUT EACH DIRECTION WITH (10) 10d EA SIDE
SECOND FLOOR FRAMING PLAN
SCALE. 114" - I'0'
(D @
ui
3-- LL,
LLj
2
C)
Q
a)
(Z)
C) C\l
z
Q
uj
Lul
FREV. DATE
0 IZW17
EV D
ATE
'7
04113118
W
owl/18
C
P PROJEOTNQ�
E - T .
SIGNED
DES' ' D
. BY
DRAWNBY."
C " Y
CHECKED BY'
A.
L
DIVA 06121118
DESCRIPTION
PERMITSUBMITTAL
PERMITHESUBMITTAL
PERMITRESUBMITTAL
17071.01
imo
CAB
CAB
SHEET TITLE:
FLOOR FRAMING
I PLAN
SHEETNO.:
S2.2
RESUB
AUG 3 1 2018
BUIgN,GFDEPARTM W
C EDMOjD!
ROOF FRAMING PLAN NOTES.
1. REFER TO THE STRUCTURAL NOTES ON THE SI SHEETS AND TO THE TYPICAL WOOD FRAMING DETAILS ON
THE S4 SHEETS FOR FRAMING REQUIREMENTS NOTSPECIFICALLYSHOWN ON THE ROOF FRAMING PLAN
OR IN THESE PLAN NOTES.
2. ROOF SHEATHING SHALL BE M'SHEATHING WITH A 32116 SPAN RATING. ATTACH TO FRAMING BELOW
WITH Bd NAILS SPACED AT 6"OC AT ALL DIAPHRAGM BOUNDARIES, PANEL EDGES SHEAR WALLS, AND
COLLECTOR ELEMENTS INDICATED ON PLANS. NAILING AT INTERMEDIATE FRAMING S14ALL BE 8d NAILS
SPACED A T 12"00. REFER TO TYPICAL FRAMING DETAILS FOR SHEATHING LA YOUT. ROOF SHE4774ING IS
UNBLOCKED UNO ON PLAN.
3. TYPICAL HEADERS FOR EXTERIOR AND BEARING WALL LOCATIONS SHALL BE 4X6 DF#2 FOR SPANS LESS
THAN 4' SUPPORTED BYA MINIMUM OF (1) 2x CRIPPLE STUD AND (1) 2x FULL 14EIGHT STUD. FOR SPANS UP
TO 6� USE 4�8 DF#2 SUPPORTED BY (1) CRIPPLE STUD AND (1) FULL HEIGHT STUD. ALL CRIPPLE AND FULL
HEIGHT STUDS SHALL MATCH WIDTH OF WALL FRAMING.
4. V�ALL STUD FRAMING SHALL BE AS FOLLOWS.
2�6 HF 6 TUO 0 16" OC FOR EX TERIOR WA L L S AND IN TERIOR 6"BEA RING WA LL S.
2x4 HF STUD 0 16: OC FOR INTERIOR 4 - BEARING WALLS.
2x4HFSTUDL&24 OC EA FACE FOR PARTY WALLS.
2x4 OR 2�6 HF STUDS LM16' OC FOR INTERIOR NON -BEARING WALLS
REFER TO ARCHITECTURAL DRAWING FOR DETERMINATION OF WALL TYPE ALL SILL AND TOP PLATES
SHALL BE HF STUD GRADE
5. ALL COLUMNS, 7 RIMMER STUDS, AND BEARING WALLS SHALL BE CONTINUED DOWN TO THE FOUNDA TION
UNLESS SUPPORTED BYA BEAM BELOW SOLID BLOCKING SHALL BE PROVIDED WITHIN JOISTSPACESAT
THESELOCATIONS.
6. ROOF TRUSSES SHALL BE PRE-ENGINEERED BY OTHERS AND SPACED AT24" OC UNO, REFER TO DESIGN
LOADS ON S-1 FOR ADDIT701VAL LOAD AND SUBMITTAL REQUIREMENTS. CONTRACTOR SHALL PROV17DE
ALL TEMPORARY& SAFETYBRACING &BLOCKING AS REQD BY THEMANUFACTURERS LITERATURE.
7. ATTACH EACH END OFEVERYOTHER ROOF TRUSS TO THE EXTERIOR WALL TOP PLATE BELOW WITHA
SIMPSON HI CLIP.
8.- -*-:-:HATCHED AREAS INDICATE OVER -FRAMING AT24' OC PER THE TYPICAL ROOFFRAMING DETAILS.
9. i�6LTIPLE PLYBEAMS SHALL BE FASTENED TOGETHER WITH (3) ROWS OF 10d L& 12- OC. PROVIDE2'
MINIMUM EDGE DISTANCE TOP& BOrTOMAND ALTERNATE NAILING ON EACH FACE
ROOF FRAMING PLAN
1 SCALE'114*= V-0"
w R
LLI
'D
w
Lu
Lu
ao
cd
Q
z
C)
cS Lu
C) N
z
Q
Lu
A.
ONAI, 04/15/16
REV. DATE DESCRIPTION
0 121201ff PERMITSUBMITTAL
04113118 PERMITRESUBMITIAL
,PROJECTNO.: 17071.01
DESIGNEDBY.' JUD
DRAWNBY: CAB
CHE
I CKED BY. CAB
SHEET TITLE
ROOF FRAMING
PLAN
SHLE7 NO. RESUB
S2. 3 MAY I � 2018
.UILDING DEPMARTMENI
CITY OF ED ONDS
LAP SPLICE CORNER BARS WITH LAP EA. IN AREAS WITH EXPOSED
SIDE MAYBE SUBSTITUTED CONIC FLOORS, EDGE SLAB
FOR 900 HOOKED BARS ------ WITH 118'MAXRADIUSAND CONCOSRLAB ON GRADE PER
z� FILL JOINT WITH SEALANT PLAN NOTES
4 ,
44 &OOX2�0 SMOOTH SLIP REINF SHALL NOT PASS THRU
JOINT
4 DOWEL BARS AT 12"OC, TYP
UNO, GREASE 112 OF BAR NOTE,
BID 90'HOOK / , 1 -1,, 1 1. CONTROL OR CONSTRUCTION JOINTS ARE REQUIRED TO
TYP UNO J BREAK UP EACH SLAB INTO RECTANGULAR AREAS OF LESS 'T
THAN 400 SQUARE FEET, AREAS SHALL BE AS SQUARE AS
ADDED VERT CORNER, END, AND I � - A L TR NCH EXCA VA TION
ALTERNATE HOOK I . - _/ I — L PRACTICALWITHNO CUTE ANGLES. ALL JOINTS SHAL BE PARALLEL TO I. Ix
WALL INTERSECTION BARS SHALL APPROVED BY THEARCHITECTPRIOR TO PLACEMENT. LLI
FORSINGLELAYER MA TCH SIZE OF WALL REINFORCING 4 2. PLACE SLAB ON GRADE ON VAPOR BARRIER OVER SUITABLE 4 VA, uj
COMPACTED SUBGRADE MATERIAL. REFER TO PLAN NOTES. 1�4 4
SLEEVES TO : � .,
V-6' EAR PIPE 1. NO PIPES
14 'R NOTE.' CONSTRUCTIONJOINT ' 4. CALL ::�,— (D
REFER TO STRUCTURAL NOTES, MIN L SIDES ALLOWED IN
2 THIS REGION. z
PLANS, AND DETAILS FOR REINF. 4 1 LOWERFTGS
ADD VERTAT WALL ALL BARS SHALL BE CONTINUOUS 4 ASREOD
OR SPLICED PER STRUCT NOTES SAWCUTJOINT INAREAS WITH CONC SLAB ON GRADE IF BAR REINF USED, PROVIDE CONO SLAB ON GRADE
END FOR SINGLE 4 EXPOSIED CONC FLOORS FILL JOINT PER PLAN OR NOTES 'Z BARS WILAP SPLICE PER PER PLAN OR NOTES TOF
4
HOCK
' LINO
�:NAH-OK
T
'NGLELA-R
4
LA YER WITHSEALANT INLIEUOFSAWCUT STRUCTURAL NOTES PIPE 4
CTORMAYUSE t� uj
BID 180* HOOK JOINTS CONTRA -7 . SOF
AT WALL ENDS PREMOLOEDJOINTSTRIP. SLABSTEP
CORNER BARS TO MATCH SIZE AND PER PLAN 4
ADD (2) VERTAT WALL SPACING OF HORIZ WALL REINF . I �l . I
FOR (2) x
END LAYERS
T -�T� , 4 p
LOWER BOF
x — X X�*—x AS REOD
4.
m"A
l
PIPE TRENCH EXCAVATION PARALLEL
1�0'MIN TO FOOTING IS NOTALLOWED
PLACE VERTREINF OUTSIDE LINO BELOW THIS LINE. STEP FIG AS
CONTROUCONTRACTION JOINT SLAB STEP REQUIRED FOR THIS CONDITION
L TY�PUICAL CONCRETE WALL REINFORCING DETAIL TYPICAL SLAB ON GRADE DETAILS PIPE PENETRATION A T FOUNDA TIONMALLS
2 2 SCALE.. 1, 1,"
BILL PLATE NAILING PER SW
SCHED
NOTE: PANEL EDGE NAILING ALONG
WHERE CONCRETE WALL WITH FULL HTOFHOLDOWN STUDS STUD FRAMING PER PLAN OR FULL DEPTH BLKG ATALL
HT�3�0- EXISTS, ROD MAY NOTES. SHEATHING& NAILING, COLUMNS A HOLDOWN CHORDS
EXTEND 24"MIN INTO WALL W1 SHEAR WALL PER PLAN AND SCHED PER SWSCHEDULE
D12 . NUT A WASHER As SHOWN. 2x JOIST PER PLAN WITH
SSTB ANCHOR BOLTS MAYBE PANEL EDGE NA ILING PER S W CONVENTIONAL NAILING AT RIM &
ADD (1) #5 IN WALL LAP SPLICE SUBSTITUTED AS ALLOWED IN SCHED TYP @ALL SILL PLATES SILL FLOOR SHEATHING& NAILING
EXTENDO-0- 3�0'MIN yp THE HOLDOWN SCHEDULE PER'PL I ANNOTES
BEYOND EA SIDE T 410 PERFORATED PVC PIPE WITH CONT2x RIM BOARD TO MATCH
OF EA STEP PERFO TIONS DOWNWARD COUNTERSINKADDITIONAL DEPTH & GRADE OFJOIST
AND 6"OFRAMINUS GRAVEL ALL
TEXTILE FABRIC. SLOPE TO THREADED ROD AS REDD PLANANDSCHED PT SILL PL WIANCHOR BOLTSIZE Lu
DRAIN 118"PER f-O"MIN. OR PER FORHOLDOWNWIDBLNUT AND SPACING PER STRUCTURAL
CIVIL DRAWINGS AS APPLICABLE. AND WASHERATa4SE.
AROUND. Wl"RAPINNON-WOVEN END STUD WHERE REDD HOLDOWN PE FRAMING
GEO
NOTES, PLANS, OR SW SCHED
EXTEND ROD TO BOT OF FIG,
4 UNO ON HOLDOWN SCHED
d I I I � FINISHED GRADE SLOPED z
4 0 0 AWAYFROM BLDG PER ARCH
0 00 00
0o 4 4
'20 TOP OF cc
SENT BARS TO MUCH (j)
& LAP FOOTING REINF 0 00 - 00-- 4 4 14 (9> 16� OC HCRIZ
M4
4 WI(2) CONT AT TOW
-0 4 FIG DRAIN PER
b 4 TYPICAL DETAIL #4 ap 18"OC VERT
OMPACTED FILL PER LINE OF MAX FXCAVATI
C IFSOILISOV T 0 o
STRUCTURAL NOTES 0
3"CLR EXCAVATED, REPLACE Z" 0 0. )
-0: L ADD (2) #4x4'AT TOP OFINTERIOR 00 �O A
Typ UNDISTURBED EARTH OR WITH LEAN MIX CONCRETE. 0 0 00
.... 10 0 0
,7
FIRM I RING SOIL T HOLDOWN LOCATIONS 0 0
'0
T 0 6�
OA�l OMPACTED I g
I WITHOUTA STEM WALL. REMAINING I
STRU TURAL FILL FIG REINFORCING NOTSHOWN FOR 0.0
CLARITI�
�� -b .0.0
AIL Oz)o� 0
—TYPICAL FOOT.ING STEP. TYPICAL FOOTING DRAIN 6rd �IL:
SCALE.'112"= 1�0" -i] 10d 0) 4- 00 EA BLOCK DET ALTHOOKAS
COL FULL DEPTH BLKG ATALL 2�JOIST PER PLAN LAPPED AT SHOWN
(3) 10d END NAILS EA UMNS & HOLDOWN CHORDS :��
END EA BLOCK BEAM, FLOOR SHEATHING &
10d 0 6"OC NAILING PER PLAN NOTES BEARING FOUNDATION AT CRAWLSPACE
CONT2K RIM BOARD TO MATCH SCALE. 1"= 1`0" A .
DEPTH& GRADE OFJOIST
FRAMING WA
cp.
0 0 0 STRUCTURAL FILL PER
0.
0 GEOTECHNICAL REPORTAND
0 00�p 00 STRUCTURAL NOTES
2XBLKG@4'-O.TO 2x BLKO TO MATCH DEPTH S 4 L
MATCH DEPTH& GRADE GRADE OFJOISTFRAMING TOE BEAM PER PLAN ;0.0.-E)P-2 -u 12120111
OFJOISTFRAMING NAIL TO BEAM 0 6- OC 00 * VF
COLUMN PER PLAN W/ 0 . FINISHED GRADE OR
BLOCK SIMPSON ABU SERIES .�6.0 ---- PAVING SLOPED #4 CONTNOSING BAR REV. DATE DESCRIP77ON
-rr- SIMPSONA35EACH
POSTBASEANOPC .�6.0 SLABONGRADEAN SUBGRADE
AWAYFROMSLDG IF D
SERIESPOSTCAP oco 000 PERFOUNDATIOA LAN.SLOPE 0 IZ207 PERMIT SUBMITTAL
PERARC14 SLAB PER ARCH PLAN
REFER TO BEARING
7
FOUNDATIONATCRAWLSPACE �o'?o'o x
DETAIL FOR INFORMATION NOT X—X—x -.A-- x ��- I<
0. 4f SPECIFICALLY CALLED OUT.
o
o
o T
00 1 4 ///:Toot 000ob ofoob
0 0 0 e 0 FTGWIDTH.(2 E H o0p
0 P �e�gso ob b
OF OVEREXCA #4 (9) 18 D.C. EXTEND
0 60
0 p I , -
0o - c BAR 2� INTO SLAB 4 PROJECTNO.: 17071.01
0 .0
Li V4 IN
0 c FIRM UNDISTURBED SOIL SUITABLE DESIGNED BY.' JMD
0,00
0
00 0 LbL, 1 Z4 FOR BEARING AS DETERMINED BY
0 0 CONTRACTOR MAYEXTEND THEFOOTING THE GEOTECHNICAL ENGINEER #4CONTUNO ON DRAWNBY.' CAB
0 DEPTH TO SUITABLE BEARING SOIL IN LIEU PLANS 1�0" 1 �O"MIN BELOW SLAB FOR PORCH CHECKEDBY: CAB
OF 0 VEREXCA VA TION & S TRUCTURAL FILL. OR PATIO APPLICATIONS. EXTEND SHEET TITLE."
REFER TO GEOTECHNICAL REPORT FOR TO CONTFTG CiD GARAGE DOOR.
L 0
'H DEPTH 0 O�
"",G T117E
x
SIZE AND REINF
PER PLAN ANTICIPATED FOOTING DEPTH ELEVATIONS EX TEND TO FROST DEPTH WHERE FOUNDATION
REOD BYJURISDICTION. DETAILS
NON-BEARINGFOUNDATIONATCRAWLSPACE 1�11�NED SLAB El�G
E SHEETNO.:
TT?R FOOTING AT CRAWLIPACE &
�L IIIREXCAIATIIN DETAIL �L
A
S3.1
RECEIVED
DEC 28 2017
DEVELOPMENT SEFMCES
COUNTER
HEADER WITH CRIPPLE
STUDS PER PLAN
(WHERE APPLICABLE)
FULL-HEIGHTHOLDOWN
CHORD PER SCHEDULE.
PROVIDE PANEL EDGE
NAILING.
PT SILL PLATE WIANCHOR
BOLTS PER SHEAR WALL
SCHEDULE. PROVIDE
SIMPSON BP PL WASHERS
WITHIN 112"OFSHEAT14ING.
PROVIDE PANEL EDGE
NAILING INTO SILL PL.
CONCRETESTEMORFTG
NOTES,
1. REFER TO STRUCTURAL NOTES FOR
ADDITIONAL INFORMATION.
3TAGGER NAILS ONEA
SIDE OF PANEL JOINT
WHERE REQUIRED ON
SHEAR WALL SCHED
I n I ------- I n I ------- I n I -----
FRA MING ArADJOINING
PANEL EDGES PER
SH&4R WALL SCHED
i i ij
--------------
i r
------- ILI
------ 1L---
I
AS SIZE AND SPACING
PERPLANANDSHEAR
WALL SCHEDULE, TYP RIM BOARD
ORIBLOCKING
r,--',�TYPI�CAL SH�EAR W�ALL DETAIL
SCALE. 314— P-O"
PANEL EDGE NAILING PER PANEL �*DGE NAILING PER
SHEAR WALL SCHEDULE SHEAR WALL SCHEDULE
NAILING PER BUILT-UP
STUD DETAIL PANEL EDGE NAILING NAILING PER BUILT-UP
PER SWSCHEDULE STUD DETAIL
WALL FRAMING, SHEATHING,
AND NAILING PER PLAN AND
SHEAR WALL SCHEDULE OR
STRUCTURAL NOTES, TYP
A. CORNER INTERSECTION
2� RIPPED TO WIDTH
OF PARTY WALL
PANEL EDGE NAILING
PER SINSCHEDULE
WALL FRAMING, SHEATHING,
AND NAILING PER PLAN AND
SHEAR WALL SCHEDULE OR
STRUCTURAL NOTES, TYP
B.T'INTERSECTION
PANEL EDGE NAILING PER
SHEAR WALL SCHEDULE
NAILING PER BUILT-UP
STUD DETAIL
WALL FRAMING, SHEATHING,
ANDNAILING PERPLANAND
SHEAR WALL SCHEDULE OR
STRUCTURAL NOTES, TYP
C. PARTY WALL INTERSECTION
BEAMPE
AND SCt
SIMPSONLTP4
EACH SIDE 0
COL. PER P
- PANEL EDGE NAILING
NOTES:
PER SHEAR WALL
1. PAWELS SHALL BE 4'� 8'EXCEPTATBOUNDARIES AND CHANGES IN
SCHEDULE. PROVIDE
FRAMING WHERE THE MINIMUM PANEL DIMENSION SHALL BE 24�
EDGE NAILING 0
2. NAILING SHALL BE PER PLAN AND NOTES. MINIMUM NAIL SPACING IS 8'O.C.
HOLDOWN CHORDS
A T PANEL EDGES AND 12'O.C. A T INTERMEDIATE FRAMING, UNO.
SHEATHING PER SHEAR
WALL SCHEDULE Wf FIELD
NAILING CM 12- 00
HOLDOWN CHORD PER
SCHEDULE REFER TO
TYPICAL BUILT-UP
COLUMAIDETAIL
- ADDITIONAL END
STUD IF REQUIRED
TO PROVIDE
COUNTERSINKFOR
HOLDOWNBOLTS
-HOLDOWNANCHORPER
SCHEDULE
- SIMPSON CNIN COUPLER
NUT W1 SIZE TO MA TCH
FRAMING AND SPACING
PER PLAN (SHEATHING
NOTSHOWNFOR
CLARITYATFRAMING)
8- OC MAXSPACING BETWEEN
ADJACENTNAILS INA ROW
ADJACENT NAILS INA
ROWARETOBE
DRIVENFROM
OPPOSITE SIDES, TYP
CONT. PANEL EDGES.
PROVIDE2xOR3�BLKG
STAGGER NAILS EA SIDE OF8TUD
TIGHT TO FRAMING WHEN
WITH I 112"EDGE DISTANCE.
SPECIFIED.
PROVIDE 0. 148'x 3'NAILS FOR (2)
(3) STUDS MAX TO
STUDS & 0.207'x 4 112"NAILS FOR
4'x 8'SHEA THING PANEL,
BE USED FOR
(3) STUDS.
TYP. STAGGER PANELS 4'
BUILr-UPCOLUMNS
PERP TO FRAMING
UNO ON PLANS
PROVIDE (1) ROW OF STAGGERED
NA IL ING FOR 2X4 STUDS. PRO VIDE
(2) ROWS FOR 26 STUDS.
HOLDOWIVANCHORAGE
- PROVIDE SOLID BLKG TYPICAL FLOOR/ ROOF SHEATHING DETAIL TYPICAL BUILT-UP STUD COLUMN DETAIL
EQUAL TO WIDTH OF 2 SCALENTS SCALE.'I'- V-0"
HOLDOWN CHORD ABOVE
DBL TOP PLATE
PER TYP DETAIL
0.l3I"0x3'NAlLS@ 12"OC
2 114"END STAGGERED FACE NAILING TYPICAL
BEAM WIDTH, UNO
PARALLEL TO STUD WALL
CONC STEM
WALL & FTG
7DTyp
'STANCE' FULL LENGTH OFDBL TOP PLATE
TOP CHO. 3"00
SPLICE "AACING
SIMPSONA35AT
WALLS WITH SP NS
OF
GREATER THAN 6'--"
(2) ROWS (6) 0.13
@3-OCEA
BOTTOM
CHORD
SPLICE
(6)OAllox 3
NAILS E4 END
PROVIDE CONT. TOP PLATES
WHERE LENGTH IS 12'OR LESS
TYPICAL. WALL STUDS
BEAA41HDR PER PLAN
F
PER PLAN OR NOTES
AND NOTES
-o—E—S-ICE,
TYPBUILT-UPSTUD—lt
SPUCESOCCURATf OFVERTSTUDS
NAILING
(1) FULL HTSTUD UNOONPLANS
.UL S
__�fl
IDSPERPLAN,-
&TYPICAL TOP PLATE SPLICE DETAIL TYPICAL HEADER DETAIL
40�--`?
4 SCALE: I" - '-P SCALE: 1 1'0"
TREAD Ll RISER PER
ARCH. USE 11/8"
202 DF#2 NOTCHED STRINGER
@ 16- OC MAKSPACING
PLYWOOD TREAD UNO.
DO NOT OVERCUT TREAD
JOIST FRAMING PER
PLAN & SCHEDULE -
STUD WALL
FRAMING PER
PLAN & NOTES
COL. PER PLAN OR
SCHEDULE
SHE.ARWALL INTERSECTION DETAIL.. �F�
L �.��FLU.SHBEA.MSUP.PQRT DETAILS.
040 �� 0 LA
BEAM PER PLAN
AND SCHEDULE
SIMPSON A35 E4
SIDEOFBEAM
BEAM WIDTH, UNO
PERPENDICULAR TO STUD WALL
21 BLKG TIGHT TO OR RISER NOTCHES
STRINGERS
FIG PER
PLAN
2x6 DF#2 SISTERED TO
SIDE OF2XI2 WI(2) ROWS
OF 10d NAILS STAGGERED
( (P6�0
6 CASSHOWN
go T,
o PT 2� THRUST PLATE
TIGHT TO STRINGERS.
PROVIDE (2) HILTI X-DNI
F S
A� TENERS E4 BLOCK W/
2"MIN EMBED INTO FTS.
STRINGER 0 LOWER LANDING
FRAMING PER PLA
2�12DF#2NOTCHED
STRINGER W12XB
REINFORCEMENT
NOTE,
1. REFER TOARCHITECTURAL DRAWINGS
& IBC FOR DIMENSIONAL TOLERANCES
OFSTAIRS I LANDINGS.
2. PROVIDE GUARD AND HANDRAILSAS
REQUIRED PER ISO
3. MAKHORIZONTAL STRINGER RUN IS 8�
PROVIDE INTERMEDIATE BEAM OR
WALL FRAMING WHERE REQUIRED.
2x12 DF#2 TREADS PER ARCH
NOTCHED USE I 118"PLYWOOD
STRINGER TREAD UNO.
w
(D
La
Lu
uj
--j Lu
0
c)
0 N
uj
A
A
L
QVAL 12/20/11
REV. DATE DESCRIPTION
0 121"17 PERMITSUBMITTAL
EA 16-OCMAK TNO.:
STRINGER ADD (3) 10d UNO ON PLANS DESIGNED BY:
NAILS EA SIDE DRAWIVBY.'
CHECKED BY.
\ OEC
DF#2 SISTERED TO 2XI2
SIMPSON LSC EA PER STAIR SECTIONS SHEET TITLE.'
STRINGER WOOD FRAMING
STRINGER (@ LANDING STRINGER SECTION DETAILS
TYPICAL STAIR DETAILS SHEETNO.:
SCALE: I"= 1�0" I" S4.1
17071.01
JMD
CAB
CAB
RECEIVED
DEC 28 2017
DEVELOPMENT SERVICES
COUNTER
STUD FRAMING PER PLAN OR
STUD FRAMING PER PLAN OR
NOTES. SHEATHING& NAILING
NOTE.' NOTES. SHEATHING & NAILING
PER SIN SCHED
REFER To TERI= PERSINSCHED
WALL DETI OR
SILL PLATE NAZUNG PER
SILL PLATE NAILING PER
PANEL EDGE NAILING PER SW
SWSCHED
PANEL EDGE NAILING PER SW
SINSCHED
SCHED TYP LM SILL & OBL TOP
SCHED Typ I& SILL & DEL TOP
FULL DEPTH BLKGATALL
PLATE
FULL DEPTH BLKG A T ALL
PLATE
COLUMNS & HOLDOWN
BREAK SHEATHING ATPLATE
COLUMNS & HOLDOWN
CHORDS
10d NAILS L& 4- OC 2XBLKG
CHORDS 2X BLKG
COIV77NUOUS 2x RIM
ii
i I rl
t CONTPXRIM
BREAK SHEATHING ATPLATE
SILL PLATE NAILING PER SIN
SCHED
L JOISTS PER PLAN AND
(3)0.131*OX3" SILL PLATE NAIL
JOISTS,PER N AND JOISTS PER PLANAND
SCHED WITH (3) 8d TOE
NAILSE41CHEND
SCHEL) WITH (3) 8d TOE SCHED WITH (3) 6d TOE
NAILS TO TOP PLI TYR
NAXS TO TOP PL, TYP. LAP NAILS TO TOP PL, TYP.
NOTES
FLOOR SHEATHING &
JOISTS FOR FULL BRNG ON PROVIDE FULL BRNG ON
1. CUN—TRACTOR MAY SPLICE WALL
NAILING PER PLAN NOTES
2X BLOCKING La) 4'-0'
WALL WALL UNO
SHEATHING AT RIM CENTERLINE
DO MAX
2W BLOCKING OR FRAMING
AS AN ALTERNATE DETAIL TO
--,A—
2X4 BLKG OR FRAMING
CLIP WISPACING PER SW
SLKG OR CLIPS AT TOP PLATE
CLIP WISPACING PER SW
SCHED
Z NON -SHEAR WALL NAILING SHALL
SCHED
NOTE."
REFER TO INTERIOR BEARING
ON BOTH SIDES WALL DETAIL &
INTERIOR NON -BEARING WALL
DETAILS FOR INFORMATION NOT
SPECIFICALLY CALLED OUT.
-�— 10d NAILS LED 4' OC
2� BLOCKING 0 4'-0-
DO A14X
BE PER ISO TABLE2304.9 INTERIOR BEARING ON BOTH SIDES INTERIOR BEARING ON ONE SIDE ONLY
EXTERIOR BEARING WALL DETAIL EXTERIORNON-BEARING WALL DETAIL INTERIOR BEARING WALL DETAIL INTERIOR BEARING WALL DETAIL
ul SCALE: 1, m I'-o" k,�SCALF. I"= I �O" 0 SCALE.'I'= V-0"
STUD FRAMING PER PLAN OR
NOTE., NOTES. SHEATHING & X4fUNG
WE—FER TO INTERIOR BEARING PERSWSCHED PT2x LEDGER TO MATCHDECK
W DETAIL FOR INFORMATION
NOT SPECIFICALL Y CALI ED 01 IT. SILL PLATE NAILING PER JOIST DEPTH (2x8 MIN). PROVIDE 4
ALL
PANEL EDGE NAILING PER SW SWSCHED LEDGERLOK 0 6' OC FOR JOIST
SCHED TYP C& SILL & DEL TOP SPANS UP To ""& (04-OCFOR
PLATE JOIST SPANS UP TO 12' 0". STAGGER CONTINUOUS2klilflf
COLUMNS & HOLDOWN TOP 8 BOT W1 I 314"MIN
CONTINUOUS 2x RIM l0dNAILSQj)4'OC FULL DEPT74 BLKG ATALL (4) lOd NAILS SCREWS EDGE DISTANCE
CHORDS
69
Lij
CONT2�Rlhk JOISTS PER PLAN AND (3) 10d NAILS PTAI DECK JOIS TS W1 SL OPE Do
(3)0.13110�3' HANGERSIcMIA= i 2x 0)
NAILSE41CHEND F811 MPR Is SCHED, TYP FLOOR E4CH END. CUTPER PLAN AND SCHED..
SHE4THING &NAILING PER CONT a RIM, TYP
PLAN NOTES. NOTES
NOTES: 3LKG 0 4'-O"OC
2x BLOCKING 9 4'-0' 1. SHEATH SAME WALL SIDE EA FLOOR 2x 1 1. REFER TO TYPICAL S71JD WALL DETAILS
DO MAX FOR STACI�ED SHEAR WALLS. FRAMING CLIP W1 SPACING NOTE.' MAX EA SIDE FOR INFORMA TION NOT SPECIFIC4LL Y
—%A— 2. HOLDOWN5 SHALL BE INSTALLED ON L PER SIN SCHED REFER TO BEARING PARTY WALL- CALLED OUT. VA—
SHEATHEDSIDEOF PARTY WALL DETAIL FOR INFORMATION NOT 2. REFER TO ARCH DINGS FOR FLASHING,
3. SHEA THINGMA Y BE INSTALLED ON SPECIFICALLYCALLED OUT. DECK SURFACE, ETC.
OUTSIDEFACE.
Lu
-BEA.RIN r-EARING PARTY WALL DETAIL NON -BEARING PARTY WALL DETAIL
INTER.IORNON G WALL DETAIL
SCALE.'I"= 1`0"
LENGTH OF NOTCH SHALL MAXHOLE0 SHALL NOT
NOT EXCEED 113RD THE q EXCEED 113 THEJOIST DEPTH
JOIST DEPTH (I.E. 3"FOR 20 0, 3.75"FOR Z112). HOLDOWN & FASTENERS HOLDOWN & FASTENERS
MINIMIZE HOLE DIAME7ER PER PLAN & SCHED PER PLAN& SCHED
WHERE POSSIBLE
PRE-DRILLHOLEAT FILL JOIST SPACE WITH BLKG FILL JOIST SPACE WITH BLKG
TO M4 TCH TOTAL WIDTH OF
CORNERS OFNOTCHES TO MATC14 TOTAL WIDTH OF
DONOTOVERCUT STUD COLUMNABOVE STUD COLUMN ABOVE PT 2x LEDGER TO MATCH DECK
JOISTDEPTH(Z,BMIN) PRQVIDE4'
LEDGERLOK 0 6- OC FOR JOIST A .
SPANS UP TO 8 -0- & @ 4' OC FOR WA
NOTCH A T END OF JOISTSPANS UP TO 12'0'. STAGGER BEAM PER PLAN
JOISTS SHALL NOT NOTCH DEP SCREWS TOP & SOT W1 I 314"MIN
EXCEED 114 THE JOIST ORHOLE0 EDGEDISTANCE
DEPTH. DO NOTNOTCH
WHERE PRACTICABLE. 114OFSTUD 4M
WIDTHM4X 12E I
NAL
2� JOISTS PER PLAN OR
5z
SCHEDULE. REFER TO MFR
LE
RECOMMENDATIONSFOR
MAX HOLE 0 SHALL NOT I-JOISTHOLES AND NOTCHES. FLOOR FRAMING PER PLAN FLOOR FRAMING PER PLAN REV. DATE DESCRIPTION
PT2KDECKJOISTS WISLOPE
�HE -1
EXCEED 40 0 CUT PER PLAN AND SCHED 0 l2wt7 PERMITSUBMfTTAL
S% SOFFITOR CEILING
'y I —
DEPTH(I.E. 114 FIR , /,g ADDITIONAL TRIMMER STUD ADDITIONAL TRIMMER STUD
1114-FOR2x4). MINIMIZE .'MlNCLR NOTE.' WHERE REOD ATFACE OF WHERE REODATFACE OF PER ARCH A 04113118 PERMIT RESUBMITTAL
HOLE DIAMETER WHERE TO EDGE 7 7-07TCHES A R E I V 0 T PERM 17 TED IN TH E OPENING v�— NOTES
POSSIBLE. MIDDLE 113 OF THEJOISTSPAN 1. REFER TO TYPICAL STUD WALL DETAILS
2. NOTCHES ARE NOT PERMITTED ON FOR INFORMATION NOT SPECIFICALLY
THE BOTTOM (TENSION FACE) OF FULL HEIGHT CHORD PER FULL HEIGHT CHORD PER CALLED OUT
JOISTS WHERE THE WIDTH IS 4x OR HOLDOWNSCHED SISTER HOLDOWW SCHED. SISTER 2. REFER TO ARCH DWGS FOR FLASHING,
GREATER TOGET14ER PER TYP TOGETHER PER TYP DECK SURFACE, ETC.
BUILT-UP STUD DETAIL BUILT-UP STUD DEIAIL PROVECTNO.: 17071.01
DESIGNED BY: JMD
DRAWNBY.' CA
(-�-�ALL�QWABL�EHQL�ES& NOTCHES.. 0 TYPICAL HOLDOWN DETAILS CHECKEDBY.' CAB_
SCALE.'I"= V-0" SCALE.'I"- 1�0" SHEETTITI.E.'
WOOD FRAMING
DETAILS
SHEET NO.:
RESUB
S4.2 MAY 14 2018
BUILDING DEPARTMENT
CITY OF EDMONDS
Lu
Lu
z
'D
Z
uj
2x PAPAPET024-OC. BUILT
2� HF PAPAPET STUDS Q3
ROOF SHEATHING AND NAILING
INTEGRAL WITH TRUSS.
16"OC. PROVIDE 4�O"MIN
PER PLAN NOTES PROVIDE
SHEATHING PANEL AT
8dQ 4- OC EA BLOCK
DIAPHRAGM BOUNDARYNAILING
DIAPHRAGM BOUNDARY
EXTERIOR WALL PROVIDE
SIMPSON H2.5A AT4'-O" OC
FULL LENGTH OF DR40 TRUSS
NAILING PER PLAN NOTES, 8d 0
PER PLAN.
=R
INSIDE FACE T02X BELOW.
PRE MFR ROOF TRUSS PER
PRE-MFR ROOF TRUSS PER
6"OC MIN U,O
NAILING
PLAN. ROOFSHEATHIIVG&
PER PLAN NOTES
NAILING PER PLAN NOTES
PLAN. DESIGN TRUSS FOR AN
DIAPHRAGM BOUNDARY
ALLOWABLE IN -PLANE SHEAR
FULL DEPTH TRUSS BLKG BTWN
NAILING PER PLAN NOTES
LOAD OF260PLFFROM ROOF
EA TRUSS DESIGNED FOR
SHEATHING TO SHEAR WALL
IN PLANE SHEAR OF 260PLF
W:-
UNO ON PLANS
FROM Top To BOT CHORD
GABLE END TRUS S
.
2�4 BLKG OR FRAMING CLIP
RX4 BLKG WISILL PLATE
W1 SPACING PER SWSCHED
NAILING OR FRAMING CLIP
zi
PER SW SCHED
SILL PLATE NAILING PER SW
SILL PLATE NAILING PER SIN
SCHED
SCHED
PANEL EDGE NAJUNG PER
S WSCHED TYP AT DBL TOP
PANEL EDGE NAILING PER SW
PLATE AND AT TOP CHORD
zz
PANEL EDGE NAILING PER SW
SCHED TYP 0 SILL A DBL TOP
OF GABLE TRUSS
=11
SCHED TYPATDBL TOPPLATE
PLATE
�P�_t
SIMPSON HI OR'SIMILAR
STUD FRAMING PER PLAN OR
2X6 DIAGONAL BRACEAT4',0'OC W1
STUD FRAMING PER PLAN OR
STUD FRAMING PER PLAN OR
EVERY OTHER TRUSS
NOTES. SHEATHING &
(4) 10d FACE AE41LS E4 END. ALIGN W1
H2.5AABOVE
NOTES. SHEATHIAG & NAILING
NOTES. SHE47HING A NAILING
NAILING PER SWSCHED.
PERSINSCHED.
PER SWSCHED
214 BLKG Wl SILL PLATE
EXTEND SHEATHING FULL
NAILING OR FRAMING CUP
HEIGHT W1 NO PANEL JOINTS
2� BLKG (9) 16- OC AT TOP & BOT OF
W1 SPACING PER SWSCHED
ABOVE TOP PLATE
EACH BRACE W1 DEPTH TO MA TCH
TRUSS CHORDS PROVIDEA35
FRAMING CLIP TO WALL DBL TOP PL.
TRUSS ALIGNS WITH SHE4R WALL
2�4 RAFTERS 24 - OC
I
SILL PLATE 1, 1
NAILING PER SW 16d@ 6' OC, TAP
SCHED
2XCONTMEMBER
FULL LENGTH OF
SHEAR WALL.
PROVIDE3"M[N
2X4 CONTINUOUS CO RIDGE
2X4 VERT ALIGNED W1 EA JOIST
BELOW, TYP. RIPBOTOPSTUD
TOM4TCHROOFSLOPE
OVERLAP WITH TRUSSPERPLAN&
TOPPLATE. SCHEDULE ROOFSHEATHING 2X4 CONTNAILER LM24*OC W1
& NAILING PER PLAN NOTES. (2) l6d INTO EA JOIST
TRUSS OFFSET FROM SHEAR WALL
EXTE.RIOR BEARING WALL DETAIL. ROOF TRUSS NON -BEARING WALL DETAIL DRAG TRUSS SECTION OVERFRAMING DETAIL
I
SCALE.'1"= V-0" 30 ZLE.*I"_ 110,
SCALE: I"= V-0'
brI2BLKG -N
ROOF SHEATHING &
NAILING PER PLAN NOTES.
D.IA,=BOUNDARY BUILT-UP a PARAPET DIAPRAGM BOUNDARY NAILING PER PLAN
PLAN NOTES. NOTES A T ALL SHEA THING BREAKS
PROVIDE 8d 02D 6' OC MIN.
ZES MLL St
CONT2xDFRIM
BUILT-UP2K Z, JOISTS PER PLAN AND (STRUCTURAL) RIPPED 2� FRAMING TO FORM CRICKET
SCHEDULE. ROOF
SHEATHING & NAILING SILL PLATE NAILING PER SW SCHED
PER PLAN NOTES
CONT2xDFFASClA 2K JOIST FRAMING PER
(STRUCTURAL) PLAN W1 FULL BRhS ON
GIRDER TR"�3
LADDER FRAMING PER
PLAN WLUS HANGER
E4 SIDE 2x4 BLKG EA FACE OF
DIAPHRAGM BOUNDARY
NAILING PER PLAN NOTES,
8d L& 6'OC MIN UNO
(3) 0.13 I"x 3"END NAILS SHEAT NCNA
EACH BLOCK TOGETHER WHI10d LM 6�h��
0
FULL DEPTH 2x BLKG RIPPED T 7 BEAMPERPLAN
MATCHROOF'SLOPE. SIMPSON HI OR SIMILAR
TH 2x BLKG @ 4'-0- OC MAX. ALIGN W`
EVERYOTHERJOIST LADDER FRAMING & PROVIDE CS22 GIRDER
SILL PLATE NIALING PER SW 2�0'STRAP OVERTOP OF
4 B W, SL'
D
SCHED 'b(4 BLKG W1 SILL PLATE NOTE.
SHEA THING A T EA BLOCK USE (7)
NAILING OR FRAMING CLIP REFER TO EXTERIOR BEARING 8d NAILS AT EA END OF STRAP MIN.
R WSp C, P , \�- PRE�MFR TRUSS PER PLAN W12�
STUD FRAMING PER PLAN OR WISPACINGPERSWSCHED WALL DETAIL FOR INFORMA77ON MFT,
NOTES. SHEATHING& NAILING NOT SPECIFICAI I Y CAI I ED 01 IT HANGER BY TRUSS VER
PER SIN SCHED. PROVIDE PANEL SLOPED ROOF FRAMING PER PLAN TR TEND INTEGRAL WITH
LISS, PROVIDEWIDTHAS
EOD FOR INSULATION
EDGE NAILING 0 DBL TOP PL R
ROOFBEARING WALL ROOF NON -BEARING WALL DETAIL
SCALE: 1- l'O" 6 SCALE. 1"- 1',0"
A A
Lu
LLI
z
CD
uj
Lu
Lli
Ui
C)
Lu
uj
Lu
al
11
EE
A.
w
9A
IREV.1 DATE I DESCRIPTION
0 0 ITZ20/171 PERMITSUBMfTTAL
PROJECTNO.: 17071.01
DESIGNED BY.' JMD
DRAWNBY: CAB
CHECKEDBY. CAB
SHEETTnLE*
WOOD FRAMING
DETAILS
RESUB
S4.3MAY 14 2018
BUILDING DEPARTMEN
ol_ry OF .0 ONDS
SW QUARTER OF SECTION20 TOWNSHIP 27N, RANGE 04E
TURNBERRY LANE CONDOMINIUM PI-IASI-71
RIM_ DMH-
93.50
TAX PARCEL #00695480030300 (ONE OF MULTIPLE)
BOTTOM, OF STRUC7URE=86.9
20800 72NO AVENUE WEST
t 36(N) Np=ga67
EDMONDS, Vj/A 980264�607
IE 12'(SE) CMP�((�'Xil 0 NOT MEASURE)
OWNER: (MULTIPLE)
0
10' BSBL
SITEBM
—
LA- EALIO
—96
:Ef. 5-7
8.0, TRASH
8.5"
EN�OSURE
LANDSCAPING
VAN
F
L J,
\\,x\
F R N ING
to
PROPOSE; BLD6'�'
15' BIBL-�\
�MAIN FFE 97.81''
FIRELANEN ARK1NG
15' BSBL
,X\
85,
8.5, 8.0' 8.0,
X—
L- — — P,,�TIO
10' BSBL
1703-99—
EX. ASPH
DRIVEWAY
TAX PARCEL #00566900200303
209Y2 72ND AVENUE WEST,
EDMONDS WA 98026
OtIVNER.KHALID KHAN
3D'
19.9" 10.6,
FOUND J" ORASS DISC
STAUPED W1 -X- IN 4-112- OfA
IRON PIPE F7LLED W/ Comc,
IN CASE, Dom 0.5,
(6ASIS OF POSITION)
11,A1,E 611�o
CB 11
RIM-99.98
Up-. r Ir 127E&S) CMP=90.37
91,
M,
. S2
o,
. tri
'30.
cr It
IE 12"(N&.�) CMP�89,11
LP, TSF
JP, UG
N
W * E
S
10 1 10
BENCHMARK AND DATUM:
1. HORIZONTAL DATUM:
ASSUMED BASED ON EVERGREEN CONDOMINIUMS
AS RECORDED IN VOLUME 60 OF PLATS, PAGES 56 THROUGH 59,
RECORDS OF SNOHOMISH COUNTY, WASHINGTON,
THE FOLLOWNG RECORDS WERE ALSO REFERENCED:
A) RECORD OF SURVEY AS RECORDEDUNDER RECORDING NUMBER
201409025004, RECORDS OF SNOHOMISH COUNTY, WASHINGTON.
B) RECORD OF SURVEY AS RECORDED IN VOLUME 49 OF SURVEYS,
PAGES 213, RECORDS OF SNOHOMISH COUNTY, WASHINGTON,
C) PLAT OF AURORA HEIGHTS, ACCORDING TO THE PLAT THEREOF
RECORDED IN VOLUME 12 OF PLATS, PAGE 120, RECORDS OF
SNOHOMISH COUNTY, WASHINGTON.
D) PLAT OF SEATTLE HEIGHTS DIVISION FOUR, ACCORDING TO THE PLAT
THEREOF RECORDED IN VOLUME 9 OF PLATS, PAGE 11 RECORDS OF
SNOHOMISH COUNTY, WASHINGTON.
E) SNOHOMISH COUNTY ASSESSORS MAP FOR THE SOUTHWEST
QUARTER OF SECT10N 20, TOWNSHIP 27 NORTH, RANGE 4 EAST, W.M.
2. BASIS OF POSITION:
HELD THE. MONUMENT IN THE CENTERLINE OF 72ND AVENUE WEST AT THE
SOUTHEAST CORNER OF THE ABOVE NOTED PLAT OF AURORA HEIGHTS.
SEE MAP FOR PLOTTED LOCATION AND DESCRIPTION.
3. BASIS OF BEARING:
HELD THE BEARING BETWEEN THE ABOVE NOTED BASIS OF POSITION AND
THE FOUND MONUMENT AT THE CENTERUNE INTERSECTION ON
72ND AVENUE WEST AND 208TH STREET SOUTHWEST TO BE
N 02'13' 02" W PER DIRECT INVERSE. SEE MAP FOR PLOTTED LOCATION
AND DESCRIPTION.
4. VERTICAL DATUM: ASSUMED
MASTER BENCHMARK:
THE MONUMENT IN THE CENTERUNE OF 72ND AVENUE WEST AT THE
SOUTHEAST CORNER OF THE ABOVE NOTED PLAT OF
AURORA HEIGHTS. SEE MAP FOR PLOTTED LOCATION AND DESCRIPTION.
ELEVATION = 100.00 FEET
SITE BM#I: WEST RIM OF SANITARY SEWER MANHOLE OPPOSITE THE SITE 30
FEET SOUTH OF A UTILITY POLE ON THE EAST SIDE OF 72ND AVENUE
WEST AND 3 FEET EAST OF THE EAST EDGE OF PAVEMENT OF 72ND AVENUE
WEST. ELEVATION = 100.11
SITE BM#2: GOLDSMITH SURVEY CONTROL POINT SLA-1 — SET REBAR AND
CAP IN BACK YARD, 18 1 3 FEET WEST OF THE NORTHWEST HOUSE CORNER
AND 7.1 FEET SOUTH OF A 6 FOOT WOOD FENCE RUNNING ALONG THE
NORTH PROPERTY LINE. ELEVATION = 96.74
AVROVED4,,PLANNING
0�1 t, �77- 1�1-
1961,st 1W-
sv—
/V
5 33
VICINiTYMAP
SCALE: 1" 2000'
NOTE:
SEE CIVIL CONSTRUCTION PLAN SET FOR CIVIL SITE
CONSTRUCTION AND UTILITY INFORMATION.
APPINOVED AS NOTED
RING
Data
Z011e--� ��- Cornerif Fiagl)
Setback
Front A��g
Sides 6) 0
Rear
Other
HEIGHT CALCS:
A--95.75
B=97.50
C=96.50
D=95.25
MAX BLDG HEIGHT=25'
PROPOSED BLDG HEIGHT=22.5
AVG GRADE=96.25
ACTUAL=120.34
MAXIMUM=121.25
IMPERVIOUS SURFACE. -
PARCEL AREA
7,798
SIF
EXISTING ROOF=
2,164
SF
EXISTING PAVEMENT=
336
SF
PERVIOUS=
5.298 SIF
7.789
SF
PROPOSED BLDG=
2277
SF
PROPOSED PAVING=
2:502
SF
.LANDSCAPING=
2,635
SF
7,414
SF
REPLACED IMP=
2.111
SF
NEW IMP=
2,669
SF
R + N=
4,780
SIF << 5,000
PGIS=
2,502
<< 5,000
S r�
Know what's below.
Call before you dig.
GENERAL NOTES
1. ALL MATERIALS AND WORK SHOWN ON THESE PLANS SHALL CONFORM TO THE CITY OF EDMONDS STANDARD
PLANS AND DETAILS, THE FOLLOWING SPECIFICATIONS AND CODES, AND ALL OTHER APPLICABLE LOCAL
MUNICIPAL, STATE, AND FEDERAL CODES, RULES AND REGULATIONS:
- CURRENT INTERNATIONAL BUILDING CODE i
- 2018 WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL
CONSTRUCTION
- WASHINGTON STATE DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR THE PUGET
SOUND BASIN (CURRENT EDITION)
2. STANDARD PLAN AND TYPE NUMBERS INDICATED ON THESE DRAWINGS REFER TO CITY OF EDMONDS
STANDARD DETAILS, UNLESS NOTED OTHERWISE
3. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOBSITE WHENEVER CONSTRUCTION IS IN PROGRESS.
4. DEVIATIONS FROM THESE PLANS MUST BE APPROVED BY THE ENGINEER OF RECORD AND THE LOCAL
GOVERNING AUTHORITY.
5. CONTRACTOR SHALL RECORD ALL APPROVED DEVIATIONS FROM THESE PLANS ON A SET OF "AS -BUILT"
DRAWINGS AND SHALL SUMMARIZE ALL AS -BUILT CONDITIONS ON ONE SET OF REPRODUCIBLE DRAWINGS FOR
SUBMITTAL TO THE OWNER PRIOR PROJECT COMPLETION AND ACCEPTANCE. A SET OF AS -BUILT DRAWINGS
SHALL BE SUBMITTED TO THE CITY OF EDMONDS PRIOR TO FINAL APPROVAL OF THE BUILDING
OCCUPANCY/FINAL PROJECT APPROVAL.
6. ELEVATIONS SHOWN ARE IN FEET. SEE SURVEY FOR BENCHMARK INFORMATION.
7. THE LOCATIONS OF EXISTING UTILITIES AND SITE FEATURES SHOWN HEREON HAVE BEEN FURNISHED BY
OTHERS BY FIELD SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED
APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR
TO INDEPENDENTLY VERIFY THE ACCURACY OF ALL UTILITY LOCATIONS SHOWN AND TO FURTHER DISCOVER
AND PROTECT ANY OTHER UTILITIES NOT SHOWN HEREON WHICH MAY BE AFFECTED BY THE IMPLEMENTATION
OF THIS PLAN. CONTRACTOR SHALL VERIFY LOCATION, DEPTH, SIZE, TYPE AND CONDITION OF EXISTING
UTILITY LINES AT CONNECTION OR CROSSING POINTS BEFORE TRENCHING FOR NEW UTILITIES. ENGINEER
ASSUMES NO RESPONSIBILITY FOR THE COMPLETENESS OR ACCURACY OF THE EXISTING UTILITIES AND SITE
FEATURES PRESENTED ON THESE DRAWINGS. ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF CONFLICTS THAT
ARISE.
8. CONTRACTOR SHALL LOCATE AND PROTECT ALL U11LITIES DURING CONSTRUCTION AND SHALL CONTACT THE
UNDERGROUND UTILITIES LOCATION SERVICE (1-800-424-5555) AT LEAST 48 HOURS PRIOR TO
CONSTRUCTION.
9. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE PROJECT SITE BEFORE STARTING WORK
AND SHALL NOTIFY OWNER'S REPRESENTATIVE OF ANY DISCREPANCIES.
10. PIPE LENGTHS WHERE SHOWN ARE APPROXIMATE AND MAY CHANGE DUE TO FIELD CONDITIONS.
11. CONTRACTOR SHALL OBTAIN A COPY OF THE GEOTECHNICAL REPORT (WHERE APPLICABLE) AND SHALL
THOROUGHLY FAMILIARIZE HIMSELF WITH THE CONTENTS THEREOF. ALL SITE WORK SHALL BE PERFORMED IN
STRICT COMPLIANCE WITH THE RECOMMENDATIONS OF THIS REPORT.
12. STRUCTURAL FILL MATERIAL AND PLACEMENT SHALL CONFORM TO THE RECOMMENDATIONS OF THE PROJECT
GEOTECHNICAL REPORT.
13. SUBGRADE SOILS IN ALL AREAS WHERE RAIN GARDENS, INFILTRATION OR PERVIOUS PAVEMENT IS TO BE
PLACED SHALL BE DELINEATED AND PROTECTED AT ALL TIMES FROM COMPACTIVE ACTIVITIES (i.e. HEAVY
EQUIPMENT, STOCKPILING).
14. MANHOLES, CATCH BASINS, UTILITIES AND PAVEMENT SHALL BEAR ON MEDIUM DENSE TO VERY DENSE
NATIVE SOIL OR COMPACTED STRUCTURAL FILL. IF SOIL IS DISTURBED. SOFT, LOOSE, WET OR IF ORGANIC
MATERIAL IS PRESENT AT SUBGRADE ELEVATION, REMOVE AND REPLACE WITH COMPACTED STRUCTURAL FILL
PER GEOTECHNICAL REPORT.
15. SEE SURVEY AND ARCHITECTURAL DRAWINGS FOR DIMENSIONS AND LOCATIONS OF BUILDINGS, LANDSCAPED
AREAS AND OTHER PROPOSED OR EXISTING SITE FEATURES.
16. SEE ARCHITECTURAL DRAWINGS FOR PERIMETER FOUNDATION DRAINS. FOUNDATION DRAINS SHALL BE
INDEPENDENT OF OTHER SITE DRAIN LINES AND SHALL BE TIGHTLINED TO THE STORM DRAIN SYSTEM WHERE
INDICATED ON THE PLANS.
17. ALL REQUIRED STORMWATER FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO INSTALLATION
OF ANY PAVEMENT UNLESS OTHERWISE APPROVED BY THE ENGINEER.
18. ALL ROOF DRAINS, PERIMETER FOUNDATION DRAINS, CATCH BASINS AND OTHER EXTERNAL DRAINS SHALL BE
CONNECTED TO THE STORM DRAINAGE SYSTEM, UNLESS NOTED OTHERWISE.
19. ALL FOOTING DRAINS SERVING BUILDINGS, WALLS, ROCKERIES, ETC. SHALL CONNECT TO THE DRAINAGE
SYSTEM DOWNSTREAM OF THE SITE STORMWATER DETENTION SYSTEM.
20. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL PERMITS REQUIRED FOR INSTALLATION OF ALL SITE
IMPROVEMENTS INDICATED ON THESE DRAWINGS.
21. A SEPARATE IRRIGATION PERMIT MUST BE OBTAINED FROM THE CITY PUBLIC WORKS DEPARTMENT. PRIOR To
FINAL CONSTRUCTION ACCEPTANCE, PROVIDE TO THE CITY WATER QUALITY TECHNICIAN. A COPY OF THE
BACKIFLOW TEST REPORT. TEST REPORTS CAN BE FAXED TO 425-744-6057 OR EMAILED TO
JEFF.KOBLYKOEDMONDSWA.GOV. BACKIFLOW TESTING SHALL BE COMPLETED BY THE OWNER ANNUALLY
THEREAFTER.
22. AS A MINIMUM REQUIREMENT, ALL DISTURBED AREAS ON AND OFF SITE SHALL BE RETURNED TO THE
EQUIVALENT OF THEIR PRECONSTRUCTION CONDITION IN ACCORDANCE WITH APPROPRIATE REQUIREMENTS AND
STANDARDS.
23. ALL DISTURBED SOIL AREAS SHALL BE COMPOST AMENDED AND SEEDED OR STABILIZED BY OTHER
ACCEPTABLE METHODS FOR THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF
CONSTRUCTION. SEE EROSION CONTROL PLANS FOR SPECIFIC GRADING AND EROSION CONTROL REQUIREMENTS.
24. THE CONTRACTOR SHALL KEEP OFF -SITE STREETS CLEAN AT ALL TIMES BY SWEEPING. WASHING OF THESE
STREETS MILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL.
25. THIS PROJECT IS NOT A BALANCED EARTHWORK PROJECT. BOTH EXPORT AND IMPORT OF SOIL AND ROCK
MATERIALS ARE REQUIRED.
26. SLOPE OF FINISHED GRADE SHALL BE CONSTANT BETWEEN FINISHED CONTOURS OR SPOT ELEVATIONS SHOWN.
27. FINISHED GRADE SHALL SLOPE AWAY FROM BUILDING WALLS AT MINIMUM 5% SLOPE FOR A MINIMUM
DISTANCE OF 10 FEET.
28. CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL INSTALL AND MAINTAIN SHORING AND BRACING AS
NECESSARY TO PROTECT WORKERS, EXISTING BUILDINGS, STREETS, WALKWAYS, UTILITIES AND OTHER EXISTING
AND PROPOSED IMPROVEMENTS AND EXCAVATIONS AGAINST LOSS OF GROUND OR CAVING EMBANKMENTS.
CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF SHORING AND BRACING, AS REQUIRED.
0
Know what's below.
Call before you dig.
SW QUARTER OF SECTION 20 TOWNSHIP 27N, RANGE 04E
29. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY AND FOLLOW CITY PROCEDURES FOR ALL WATER
SERVICE INTERRUPTIONS, HYDRANT SHUTOFFS, STREET CLOSURES OR OTHER ACCESS RESTRICTIONS.
CONTRACTOR SHALL NOT RELOCATE OR ELIMINATE ANY HYDRANTS WITHOUT FIRST OBTAINING WRITTEN
APPROVAL FROM THE FIRE MARSHAL.
30. COORDINATE AND ARRANGE FOR ALL UTILITY CONNECTIONS, UTILITY RELOCATIONS AND/OR SERVICE
INTERRUPTIONS WITH THE AFFECTED OWNERS AND APPROPRIATE UTILITY COMPANIES. CONNEC11ONS TO
EXISTING UTILITIES SHALL BE MADE ONLY WITH ADVANCE WRITTEN APPROVAL OF THE AUTHORITIES
GOVERNING SAID UTILITIES.
31. ALL UTILITIES SHALL BE PLACED UNDERGROUND.
32. EXISTING UTILITY LINES IN SERVICE WHICH ARE DAMAGED DUE TO CONSTRUCTION WORK SHALL BE REPAIRED
AT CONTRACTOR'S EXPENSE AND INSPECTED AND ACCEPTED BY CITY OF EDMONDS AND OWNER'S
REPRESENTATIVE PRIOR TO BACKIFILLING.
33. NEW U11LITY LOCATIONS ARE GENERALLY SHOWN BY DIMENSION, WHERE NO DIMENSIONS ARE INDICATED,
LOCATIONS MAY BE SCALED FROM DRAWINGS. FIELD ADJUSTMENTS SHALL BE APPROVED BY OWNER'S
REPRESENTATIVE AND CITY.
34. FIELD STAKE ALL UTILITY STUBS AT THE PROPERTY LINE.
35. TRENCH BACKFILL OF UTILITIES LOCATED WITHIN THE CITY RIGHT-OF-WAY SHALL BE COMPACTED TO 95%.
COMPACTION TEST REPORTS SHALL BE PROVIDED TO THE CITY PRIOR TO PAVING.
36. WHERE NEW PIPE CLEARS AN EXISTING OR NEW UTILITY BY 6" OR LESS, PLACE POLYETHYLENE PLASTIC
FOAM AS A CUSHION BETWEEN THE UTILITIES.
37. SEE MECHANICAL DRAWINGS (WHERE APPLICABLE) FOR CONTINUATION OF SITE UTILITIES WITHIN THE BUILDING.
38. SEE ELECTRICAL DRAWINGS (WHERE APPLICABLE) FOR EXTERIOR ELECTRICAL WORK.
39. SEE LANDSCAPE DRAWINGS (WHERE APPLICABLE) FOR SITE IRRIGATION SYSTEM.
40. PIPE MATERIAL AND SIGNAGE SUBMITTALS SHALL BE PROVIDED TO CITY ENGINEERING DIVISION FOR
APPROVAL PRIOR TO INSTALLATION.
CONSTRUCTIONSEQUENCENOTES
1. SCHEDULE A PRE-CONSTRUCTON MEETING WITH CITY ENGINEERING
DIVISION AT 425-771-0220, EXT. 1326. TWO DAY (48 HR)
NOTICE IS REQUIRED.
2. REVIEW TEMPORARY EROSION AND SEDIMENT CONTROL NOTES.
3. CALL FOR UTILITY LOCATES.
4. INSTALL TESC MEASURES AND MAINTAIN DUST CONTROL WHILE
PREVENTING DISTURBANCE OF ANY AREAS OF VEGETATION OUTSIDE
THE CONSTRUCTION ZONE.
5. HAVE EROSION CONTROL MEASURES INSPECTED BY CITY OF
EDMONDS CITY ENGINEERING INSPECTOR. ALL TEMPORARY
SEDIMENTATION AND EROSION CONTROL MEASURES MUST BE IN
PLACE AND. INSPECTED PRIOR TO ANY CONSTRUCTION OR SITE
CLEARING. EROSION AND SEDIMENTATION CONTROL PRACTICES
AND/OR DEVICES SHALL BE MAINTAINED UNTIL PERMANENT
VEGETATION IS ESTABLISHED.
6. DEMOLISH EXISTING STRUCTURES.
7. ROUGH GRADE SITE AS REQUIRED TO INSTALL DRAINAGE FEATURES.
8. CLEAR, GRUB & ROUGH GRADE SITE. REVEGETATE DISTURBED
AREAS NOT SUBJECT TO ADDITIONAL SURFACE DISTURBANCE
IMMEDIATELY AFTER ROUGH GRADING. (OTHER EXPOSED
AREAS SHALL BE STABILIZED PER EROSION CONTROL NOTES
ON SHEET C5)
9. INSTALL UTILITIES AND OTHER SITE IMPROVEMENTS, INCLUDING
FRONTAGE IMPROVEMENTS.
13. STABILIZE AND COMPOST AMEND ALL EXPOSED SOILS PRIOR TO
REVEGETATION OF ENTIRE SITE.
14. ESTABLISH LANDSCAPING AND PERMANENT VEGETATION. ALL
TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED
UPON FINAL SITE STABILIZATION AND APPROVAL BY CITY
INSPECTOR.
NOTE: CONTRACTOR TO VERIFY AND FOLLOW ALL CURRENT
CITY OF EDMONDS STANDARD DETAILS. CHECK COE
WEBSITE FOR MOST CURRENT DETAILS, DOWNLOAD AND
UPDATE PRIOR TO BEGINNING ANY CONSTRUCTION.
NOTES:
I . A SEPARATE RIGHT-OF-WAY CONSTRUCTION
PERMIT IS REQUIRED FOR ALL WORK WITHIN
THE CITY RIGHT-OF-WAY.
2. REFER TO SEPARATE DEMOLITION PLAN AND
PERMIT - BLD20171836
3. SEE SOILS RECOMMENDATION PER SOILS REPORT BY
COBALT GEOSCIENCES, DATED SEPTEM13ER 25, 2017.
OTILaT C0jVFMffjV0FT
C40T109V-
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERINNG THE LOCATION, DIMENSION, AND
DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT. BY
POTHOUNG THE UTILITIES AND SUi THE HORIZONTAL AND VERTICAL LOCATION PRIOR
TO CONSTRUCTION. THIS SHALL INCLUDE CALUNG UTILITY LOCATE 0 1-800-42+-5555 AND
THEN POTHOUNG ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS
TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST LOCATIONS OF SAID UTILITIES
AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBUC INFORMATION AND
ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL
CONSULT J.C. MCDONNELL ENGINEERING. PC TO RESOLVE ALL PROBLEMS PRIOR TO
WATER REVISION PER CITY COMMENTS
JCM
-
'01'0118
REVISED PER CITY COMMENTS
JCm
6WI24-118
REVISED PER CITY COMMENTS
OAF
8
REWSED PER CITY COMMENTS
DAF
051021,
-
0�1, S� -,W
J,
$W
!"w
%
Date:_
UTff-1TYPURVEYORS
SEWER
CITY OF EDMONDS-
WATER
CITY OF EDMONDS
POWER
SNOHOMISH COUNTY PUD
GAS
PUGETSOUND ENERGY
S1 OF 1
SITE PLAN
C1 OF 8
COVER SHEET
C2 OF 8
TESC PLAN
C3 OF 8
GRADING AND FRONTAGE IMPROVEMENT PLAN
C4 OF 8
DRAINAGE AND UTILITY PLAN
C5 OF 8
DETAILS
C6 OF 8
UTILITY DETAILS
C7 OF 8
DRAINAGE DETAILS
AS NOTED
C8 OF B
STRIPING PLAN
�ERING
TC1 OF I
TRAFFIC CONTROL PLAN
(zr_/Z0/A
SURVEYOR
T
GOLDSMI H LAND DEVELOPMENT SERVICES
1215 114TH AVE SE
BELLEVUE, WA 98004
PO BOX 3565, BELLEVUE, WA 98009
425-462-1080
www.00ldsmithencinearina.com
STRUCTURAL LoT COVERAGE.
PROPERTY TOTAL AREA= 7,798 SF (0.179 AC)
STRUCTURAL IMPERVIOUS= 2,277 SF
PERCENT COVERAGE= 29.2%
IMPERVIOUS SURFACE:
PARCEL AREA
7,798 SF
EXISTING ROOF=
2,164 SIF
EXISTING PAVEMENT=
336 SF
PERVIOUS=
5�298 SF
7,789 SF
PROPOSED BLDG=
2277 SIF
PROPOSED PAVING=
2:502 SIF
LANDSCAPING=
2,635 SF
7.414 SF
REPLACED IMP=
2.111 SF
NEW IMP=
2.669 SF
R + N=
4,780 SF << 5,000
I PGIS=
2,502 << 5.000
J.C.McDONNELL 1 m 11 It m 8 IF
N a GINEERING, PC I-,
P.O. BOX 13199, MILL CREEK, WASHINGTON TEL:(425) 744-0916
APPLICANTIOWNER MARK CUMMINGS
SLATER HOMES CORP.
9718 SLATER AVE NE
KIRKLAND, WA 98033
slaterhomescorp0hotimail.caim
ARCHrTECT J3 ARCHITECTS, LLC
11702 98TH AVE NE, SUITE 104
KIRKLAND, WA 98034
.(TEL) 425-242-0369
RYAN ALBRECHT
(CELL) 206-931-2650
FEROJE ENGINEER J.C. MCDONNELL ENGINEERING, PC
.6608 216TH ST SW, SUITE 306
MOUNTLAKE TERRACE, WA 98043
(TEL) 425-744-0916.(FAX) 425-744-09411
john@lcmcdoh.com .
V:
SEATTLE HEIGHTS DIV 4 BUK 002 D-02 IN 75FT OF TH PTN LOT 3 BUK
2 LY WHIN THES 1/2 OF Bi 2
LOT AREA: 7.798 SF (0.18 ACRES)
60566900200302 RE95UD 20904 - 72ND.AVENUE
W, EDMONDS. WA. 98020
OCT 17 20%
_W99r.1wi
COVER SHEET
EDMONDS 4- UNIT
SECTION20 TOWNSHIP27N, RANGE 04E
SNOHOMISH COUN7Y, WASH1N]TON
DATE IREV. BY DATE 1PROJECT MANAGER SCAL
TjW 1111412017 TJW 10/1 ill=
)RAWING FILE
6W J3 EDMONDS
,5
'115A
SW QUARTER OF SECTION 20 TOWNSHIP 27N, RANGE 04E
TURNBERRYLANIF CONDOAVIVIUM PHASE I
TAX PARCEL #00895480030300 (ONE OF f.4ULT?PLE)
20600 72ND A VENUE WEST
EDMONDS, WA 98026-9007
OWNER (MULTIPLE)
END
E FNC
z
xR
A
CL
VE F74C
FNC END
C CDR -
x 0.3'kp�i�
KEYSTONE
p WALL,
'Er
MIT---
RIM-98,50
BOTTMI OF SMUCTUREmS6.9
IE 36'(N) CMr-90.67
IE 12'(SE) CMP-(C.OULD NOT MEASURE)
CONDOMINIUM
FN
IT 4.6
98- x U X xaNc —END
ORE RET,61?
COS OTE�ORI SSS RKE RON
,-�L LOCA TION)
SITE BM#2
SLA-1
V-96.74
COS (RECORD
LOCAVON)
coNc
MNDO
�WLLW-
ccwc srFp—pj] TBR
PROTECT IP
NO VI
6' MOD FFJqCE
EAvE (TYP) 21 2'W EA VE
9,w BIG R
OIL
FILL' mil
REMOVE E.
WATER METER
T.—
TREE
Mp
TfR\\
I 3.9'W EA
N89'1&5,"E 103.99
FNC ENV
FNC INT
ols
C 4'S x oI'W
Id
111SE
TAX PARCEL #00566900200303
20912 72NO AVENUE WEST,
CDAIONDS. WA 98026
QIVVNER: W-ALID KHAN
ME RET F.
�w
'G MAILBOX
EXISTI�
TO Ejtj REMOVED
ZI Q
EROSION CONTROL NOTES
1 . APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN
x. [A`N� APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS,
STAIRS PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES. UTILITIES, ETC.).
N 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE,
REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE
APPLICANT/CONTRACTOR UN71L ALL CONSTRUCTION IS COMPLETED AND APPROVED AND
VEGETATION/LANDSCAPING IS ESTABLISHED.
rouNo J" BRASS DISC 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN. SHALL BE CLEARLY F LAGGED
STAMPED IV/ -X- IN 4-?12" DIA W E IN THE FIELD PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE
N?ON FILLED W1 CONC. 13EYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE
CAPSEIPEDONN 0.5' MAINTAINED BY THE APPLICANT/CONTRACTOR FOR. THE DURATION OF CONSTRUCTION.
(BASIS OF POSIRON)
4AIF -
4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST.BE CONSTRUCTED IN CONJUNC ON TH' ALL
00.00 Tj N
ilD 2 1� S CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS, TO INSURE THAT SEDIMENT
LCO/I AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE
RIM APPLICABLE WATER STANDARDS.
UP,UG, T' - JE 1�29(9ia%) CMP-9037 10 0 10 20
5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED
ER1, SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE
1 inch 10 ft. UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND
SEDIMENT -LADEN WATER DO NOT LEAVE THE SIT E.
6. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/CONTRACTOR AND
MAINTAINED AS NECESSARY TO ENSURE THEIR CONTINUED FUNCTIONING.
7. THE ESC FACILITIES ON. INACTIVE SITES SHAL L BE INSP ECTED AND MAINTAINED A MINIMUM OF
ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT.
B. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A
TRAPPED CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR
TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE
S IR DOWNSTREAM SYSTEM.
9. STABILIZED CONSTRUCTIONI ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES
MAY BE REQUIRED TO INSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF
THE PROJECT.
7
1-5
V
IE B-(N) CONC=88.91
IE 8"(S) CONC=88,56
S17E BMII
ElEv. too. I I
4 SPLIT
RAIL FENCE
:::91
Vkl
30,
11111-17, 7�
IE 12'(N&S) CMP=89.11
C81
LP, TSF
UP.UG
NOTES
A SEPARATE RIGHT-OF-WAY CONSTRUCTION
PERMIT IS REQUIRED FOR
ALL WORK WITHIN
THE CITY RIGHT-OF-WAY.
REFER TO SEPARATE DEMOLITION PLAN AND
PERMIT - BLD20171836
.TE.S C. 1LE6Z1vD
REMOVE EX FOG UNE
BMP CIN CLEARING LIMITS
BMP C105 TEMPORARY CONSTRUCTION ENTRANCE SEE COE DETAIL ER 901 SHEET C5
—SF—
BMP C233 SILT FENCE SEE COE DETAIL ER-900 SHEET C5
—OB—
ORANGE BARRIER FENCE
SURVEYOR
GOLDSMITH LAND DEVELOPMENT SERVICES
1215 114TH AVE SE
BELLEVUE, WA 98004
CiD
STOCK PILE BMP C123 "PLASTIC COVERING"
PO BOX 3565, BELLEVUE, WA 98009
425-462-1080
www.goidsmithengineering.com
APPLICANTIOWNER
MARK CUMMINGS
0 C81
CATCH BASIN INSERT SEE COE DETAIL ER-902 SHEET C5
SLATER HOMES CORP.
9718 SLATER AVE NE
KIRKLAND, WA 98033
slaterhomescorp0hotmail.com
- - - - - -
SAWCUT UNE
ARCHITECT
J3 ARCHITECTS, LLC
11702 98TH AVE NE, SUITE 104
KIRKLAND, WA 98034
REMOVE ASPHALT/GRAVEL
(TEQ 425-242-0369
RYAN ALBRECHT
(CELL) 206-931-2650
PROJECTENGINEER
J.C. MCDONNELL ENGINEERING, PC
b I) uts 216TH ST SW, SUITE 306
MOUNTLAKE TERRACE, WA 98043
(TEL) 425-744-0916 (FAX) 425-744-0946
john@jcmcdon.com
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
DATE:
BY:
TY ENGINEERING DIVISION
Know what's below.
Call before you dig.
I
&T(L17TC01vFL[CT)v01TE.-
CA&T10iV.-
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCA'nON, DIMENSION, AND
DEPTH OF ALL EXISTING UTUTIES WHETHER SHOWN ON THESE PLANS OR NOT. BY
POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VER71CAL LOCATION PRIOR
TO CONSTRUCTION. THIS SHALL INCWDE CAWNG UTILITY LOCATE 0 I -so -5 AND
0-424 555
THEN POTHOUNG ALL OF THE EXISTNG UTIUTIES AT LOCATIONS OF NEW UTILITY CROSSINGS
TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCA11ONS OF SAID UTILITIES
AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMAT10N AND
ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL
NS
po ULT J.C. MCDONINELL ENGINEERING. PC TO RESOLVE ALL PROBLEMS PRIOR TO
ROCEEDING WITH CONSTRUCTION,
MCD
WAS
2;137
GIST
TONAL
. OCTOBER 1 2(18
H
E r
J.C.McDONN Li,
ENGIT G, PC
0
c;: i c-- c-- r-c3
N P,O. BOX 13199, MILL CREEK, WASHINGTON TEL(425) 744-0916
j N N ���FAX: (425) 744-0946
4
WATER REVISION PER CITY COMMENTS
JCM
10�,�,
3
REWSED PER CITY COMMENTS
JCM
5W—
2
REVISED PER CITY COMMENTS
1
1 REVISED PER CM COMMENTS
DAF
05.102118
=- ---
REV. NO.
I DESCRIPTION
—
INITIALS
DAT E IC
LEGAL DESCRIPTION:
SEATTLE HEIGHTS ON 4 BLK 002 D-02 - N 75FT OF TH PTN LOT 3 BLK
2 LY WHIN THES 1/2 OFBUK 2
LOT AREA: 7,798 SF (0.18 ACRES)
TAXACCOUffNO.(S). SITEADORMS.,
00566900200302 RF-BUS;O9004 - 72ND AVENUE W.
OCT 17 2018 EDMONDS, WA. 98020
-W9mmv
TESC PLAN
EDMONDS 4-UATIT
SECTION 20 TO WWSHLP 27 N, RANGE 04 E
SNOROARSH COUNTY, WAS117NGTON
�®RAWMN BY DATE REV. BY DATE -CT MANAGERI SCALE
TJWT; 1111412017 TJW 101101201iicm AS SHOWN
RA_N, "'I
DRA7VdNG FILE NAME I CHK. BY I F.B. NO. JOB NO. SHT. NO..
6043
6043 J3 EDMONDS PLANSEE69 JCm I
SW QUARTER OF SECTION20 TOWNSHIP 27N, RANGE 04E
TURNSERRY LANE CONDOMINIUM PHASE I RIW-9D&A540
TAXPARCEI 1100805480030300 (ONE OF MULTIPLE) BOTTOM OF STRUCTURE-86.9 :3
20600 72NDAVENUE WEST IE 36"(11) CUP-90.67
EDMONDS, WA 98026-G607 12-(SI) CUP=(COULD NOT MEASURE)
OWNER fMULTIPLE)
E 99.38
X Y11/_ 2
2L-
9
sss JR_ Fey)--
N69'18`5 �71011 -FG 9F.06
10' BSBL FG 97.80 7 _p9-821
97.54
St a W
W + 3
;i,� Q
T A
F-d 99 19
LANDSCAPING I
A
91�.96
DA191. 38__ W
FG 97.6 k�u 98,77
Fp 98
FG 97 76 FG1 98 34
�IEG19 2) t
SM11
RIM
F 97.25 L�
-(N) CONC=08.91
1E 8
T
PROPOSED BLDG 15 87BL- SITE BMJI
ELEV-10011
98.88-
1E 8"(s) coN 88 5`
-FG 97.61
MAIN FIFE 97,k
I Q)4
Fd
G 8.58
FG )7.76 7e,
in
15' BSBL
8.0, 8-
>
:2
z Cn
--JFG8.48
FG utbJ21
----------- 7- G
10' BSBL FG 97.8 �FG 97.54 6
N89* 10
JEI 18 41
INFILTRATION FACILITY FG98..
STORMTECH SC-740
ALL VAULTS NEED TO BE RATED TO
SUPPORT A GVW OF 75,000 LBS
AND A POINT LOAD OF 45,000 LES
(24'X24" JACK PAD)
FG ?8.15
FRONT AXLE = 23,000 LBS, EG DRIVEWAY 97.29 EX' A PHA�T
REAR DUAL AXLES = 48,000 LBS. DRIVEWAY EG DRIJVEWAY 98.15
EG DRIVEWAY 97.84
:,n
TAX PARCEL #0056000200303
20912 72ND AVENUE WEST,
EDMONDS, WA 90026
OWNER: KHALID KHAN cp
30A 30'
C9 V
"u-977r
IE I2'(N&,.,5) CMP=89,11
LP, TSF
UPIUG
bTj1=C0NFL1CTiV0,Tf.-
NOTE: CONTRACTOR TO VERIFY AND FOLLOW ALL CURRENT C4UWI5W- 4
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYNG THE LOCATION, DIMENSION. AND
CITY OF EDMONDS STANDARD DETAILS. CHECK COE EPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY
4 WATER REVISION PER CITY COMMENTS XA# 10/10/18 'POTHOLING THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR
WEBSITE FOR MOST CURRENT DETAILS, DOWNLOAD AND
UPDATE PRIOR TO BEGINNING ANY CONSTRUCTION. 3 REVISED PER CITY COMMENTS JCm 08 4 18 TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY LOCATE @ 1-800-424-5555 AND
Know what's below THEN POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS
2 REVISED PER CITY COMMENTS DAF 07105118 TO PHYSICALLY VERIFY WHETHER OR NOT CONFUCTS EXIST. LOCATIONS OF SAID UTILITIES
AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBUC INFORMAT10N AND
05102118 AR - SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL
Call before you dig, I REVISED PER C17Y COMMENTS CIA, COFNSULT LC. MCDONNELL ENGINEERING. PC TO RESOLVE ALL PROBLEMS PRIOR TO
REV. NO. DESCRIP77ON IN177ALS DA TE PROCEEDING NTH CONSTRUCTION.
FOUND 3" BRAS6 DISC
STAMPED W/ 'X' IN 4-IIP- DIA
IRT APE PLIED IV/ CONG,
IN CASE, DOW 05
(BA,14S OF POSINON)
LJMAIER B&
ELEV_'oo
co 11 .98
'IU=99
p
URUG, 1E 12"(E&S) CMP�90.37
EB
N
NOTES:
W E
A SEPARATE RIGHT-OF-WAY CONSTRUCTION
PERMIT IS REQUIRED FOR ALL WORK WITHIN
THE CITY RIGHT-OF-WAY.
*UTILITY PATCHES WITH LESS THAN 20-�FEET. OF
S
SEPARA11ON SHALL BE COMBINED AND FULL WIDTH OR
HALF WIDTH OVERLAY WILL BE REQUIRED DEPENDING ON
1 0 0 10 20
THE EXTENT OF DISTURBANCE. WHERE UTILITY PATCHES
FALL, ENTIRELY WITHIN ONE TRAVEL LANE, THE OVERLAY
SHALL EXTEND TO THE CENTERLINE OF ROADWAY. WHERE
I inch 10 ft.
U11LITY PATCHES EXTEND INTO BOTH TRAVEL LANES
THEN A FULL WIDTH OVERLAY IS REQUIRED.
CONSTRUCTIONNOTES
MATCH NEW TO EXISTING.
NEW 7' WIDE CONCRETE SIDEWALK PER COE STD. DETAIL TR-53
TO
�BACK OF SIDEWALK
SIDEWALK RAMP S=7.87%, 8.3% MAX. V404 -It-541
NEW DRIVEWAY ENTRANCE PER I COE STD. DETAIL TR-541 SHEET C5.
SIDEWALK RAMP S=6.66V, 8.3% MAX. W
NEW CONCRETE VER11CAL CURB AND GUTTER PER COE STD. DETAI
12
(D ADA PARKING AND STRIPING PER WSDOT DETAIL SHEET )j.
EXTRUDED CURB PER COE STD. DETAIL TR-522.
@) ASPHALT PEDESTRIAN RAMP - MATCH INTO EXISTING DRIVEWAY.
PAVING RESTORATION PER COE STD. DETAIL GU-410 SHEET C5.
DELETED
@ CONSTRUCT NEW CURB TO CLEAREX WATER VALVE It
@ DELETED 15A61INWAN61
eN Aw6mmgNIT
8 ROOFLINE
TRASH ENCLOSURE SCREENING AND GATE PER ARCHITECTURAL PLAN.
SEE DROP -PIN DETAILS SHEET C8.
LEGEND
PROPOSED ASPHALT
PROPOSED CONCRETE
FLOW UNE AT FACE OF CURB
,,-EG 98.88 EXIST GRADE SPOT ELEVATION
,FG 98.88 FINISHED GRADE SPOT ELEVATION
FLOW ARROW
USPOSTAI
PROVED FOR
BY,
us S7
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
DATE: hxhels
BY:
cITT-INGINEERING DIVISION
SW QUARTER OF SECTION20 TOWNSHIP 27N, RANGE 04E
TURNBERRY LANE CONDOMINIUM PHASE I DUN
TAX PARCEL #V089548003000 (DIVE OF MULTtPLk) RIM-98.50
BOTTOM OF STRUCTURE-86.9
20000 72ND AVENUE VVEST IF 36-(N) CMP-90.67
EDMONDS. WA 96020-9607 �E V'(SE) CUP=(COULO NOT MEASURE)
01,114NER: (MULTIPLE)
�2
x y
ECORD
I'D
5 (RECORD C RON
LO
Co LOCATION) 41-2115,
10' BSBL
sill em I
DS T P TRASH
EN LOSURE
E=�0,6.00'
8
1 10 9
Sp�LANDSCAPING
RINKLER
-W-
R1 R ROOM COS (REC t:
'I LOCA
B 5"fYFPE 1 4
�OW
ERF. FOOTING W
DRAI� (TYP) 3 8: Sj=93.25 I N.
b E NW =93.42
S ET IL 2
CLEARING LIMITS S C-1 I
EET N
IE 96.00
PROPOSED BLD �7BSBL-
,MAIN FFE 97.
Z4 I
co
25.25'
A
�'N
bl
@B
5 BSBL SO x 4 DEEP DRYWELL B
SEE DETAIL SHEET §ECI \\\ \ @ I , ..
1710 (7�
10.5
z
0 1 . . I
4" ROOF DRAIN (TYP) 0 0
P P E
M I Ox
So
4 LF 8" So
------------ --- 20 Ll
10' BSBL IE=I96 00 6' So p 12 T ' J, 12"SO ko-II
N89*1&5 E 103.99
YARD DRAIN #1 CB#4, TYPE 1 �AHJ S' ,,j
WITH ELBOW 96- SEE DETAIL
RIM=97.73 RIM=97.1± CB#2, TYPE 2 -1-ISHEETW
IE=95.73 _j RIM=98.73
CONNECT FOOTING DRAINS QEL,)� 8"IE (N)=92.75 CS 2
W13
T� TYPE 12"(E(NW,E)=89.8B C,;7
6"IE (W)=93.42 ELBOW 8"IE(E)=96.21
SEE DETAIL RIM=98.0±
SHEET C7 8"IE (N)=92.54 5 LF 8" DI @ 20.4%
12"IE (SE -95.5 EX t6PHA T'\
SEE DETAIL VIET %C-1 CURB INLET #1 DR4WAY
INFILTRATION FACILITY RIM=98.18
STORMTECH SC-740 (10)CHAMBERS 8"IE 97 23
ISOLATION FIRST ROW SEE DETAIL SH71at;W
BOTTOM AREA=351 SF
B070M EL.=92.50 TAX PARCEL IW0566900P0030 C7
20912 7210 A VENUE WEST,
EDMONDS, WA 96026
Olv"JER: KHALIO KHAN. Op
4-
NOTE: CONTRACTOR TO VERIFY AND FOLLOW ALL CURRENT
CITY OF EDMONDS STANDARD DETAILS. CHECK COE
WEBSITE FOR MOST CURRENT DETAILS, DOWNLOAD AND
UPDATE PRIOR TO BEGINNING ANY CONSTRUCTION.
LEGEND
F1 PROPOSED CATCH BASIN 0
FLOW LINE
ss- PROPOSED SIDE SEWER
FLOW ARROW
PROPOSED CONCRETE
PROPOSED ASPHALT
RESTORED GRAVEL
F#jr,�;
Know what's below.
Call before you dig.
CLEANOUT
WATER METER
BMP T5.13 POST -CONSTRUCTION SOIL QUALITY AND DEPTH
IN THE AREA OUTSIDE OF. THE CLEARING LIMI TS WILL BE LEFT UNDISTURBED IN
THE NATIVE VEGETATION AND SOIL.
THE PROPOSED LANDSCAPE AREAS WILL HAVE A TOPSOIL LAYER NTH A
MINIMUM ORGANIC
MATTER CONTENT OF 10% DRY WEIGHT IN PLANTING BEDS,
AND 5%,ORGANIC MATTER CONTENT IN TURF AREAS, AND A PH FROM 6.0 TO
rOUND 3' BRASS DISC
8.0 OR MATCHING THE PH OF THE UNDISTURBED SOIL. THE TOPSOIL LAYER
STAMPED W1 -X- IN 4-112" DIA
IRON PIPE rILLED K/ CONC,
SHALL HAVE A MINIMUM DEPTH OF 8 EIGHT INCHES EXCEPT WHERE TREE
IN CASE, DOW 0 5-
ROOTS LIMIT THE DEPTH OF INCORPORATION OF AMENDMENTS NEEDED TO MEET
S THE CRITERIA. SUBSOILS 13ELOW THE TOPSOIL
(64SIS OF POSITION)
LAYER SHOULD BE SCARIFIED AT
4AMR 8V
LEAST 4 INCHES NTH SOME INCORPORATION OF THE UPPER MATERIAL TO
aEv�lo 00
L___Lce
10
0 10 20 AVOID STRATIFIED LAYERS. WHERE FEASIBLE.
II
UP. UG, R' CMP-90,37
I inch 10 ft.
UTILITY CONNECI1011
BY OTHERS
STORMTECH CONSTRUCTIONNOTES
10" INSPECTION PORT, SEE DETAIL SHEET C7
DOE SPECIFICATIONS F OR SOIL T5.13
'A
SEWER CONSTRUCTIONNOTES ALL AREAS SUBJECT TO CLEARING AND GRADING THAT HAVE NOT
BEEN COVERED BY IMPERVIOUS SURFACE, INCORPORATED INTO A
DRAINAGE FACILITY OR ENGINEERED AS STRUCTURAL FILL OR SLOPE
SHALL, AT PROJECT COMPLETION, DEMONSTRATE THE FOLLOWING;
6" CLEANOUT WITH 12" CI LAMPHOLE COVER. IE=87.5± FIELD VERIFY.
3
SEE COE ST) DETAIL SS-200, SHEET C6.4f A 00 OF TItf- CY1111IN4 LATML 1) A TOPSOIL LAYER NTH A MINIMUM ORGANIC MATTER CO I INTENT
jr
L.L BF, ROLAWD - C69 W.
OF TEN PERCENT DRY WEIGHT IN PLANTING BEDS, AND 5%
EXISTING CLEANOUT TO REMAIN. ADJUST RIM TO FINISHED GRADE gwri ORGANIC MATTER CONTENT IN TURF AREAS, AN) A,�PH FROM
]E=88.5± FIELD VERIFY.
J
SMH 3
(D
6.0 TO 8.0 OR MATCHING THE PH OF THE ORIG&L UNDISTURBED
SOIL. THE TOPSOIL LAYER SHALL HAVE A MINIMUM DEPTH OF
EXISTING CLEANOUT TO REMAIN. ADJUST RIM TO FINISHED GRADE EIGHT INCHES EXCEPT WHERE,TREE ROOTS LIMIT THE DEPTH OF
IE=88.96± FIELD VERIFY.
RIM-100.11
INCORPORATON OF AMENDMENTS NEEDED TO MEET THE CRITERIA.
IE 81N) CONC-Ba9l
SUSSOILS.BELOW THE TOPSOIL LAYER SHOULD BE SCARIFIED AT
IE 8-(S'l CONC=86,58
LEAST 4 INCHES WITH SOME INCORPORATION OF THE UPPER
S17E BM11
ELEV=100.11
WATER CONSTRUCTIONNOTES MATERIAL TO AVOID STRATIFIED LAYERS, WHERE FEASIBLE.
IE 6"(N)=89.01(NEW)
I
El
2) PLANTING BEDS M UST BE MULCHED WITH 2 INCHES.OF ORGANIC
ADJUST RIM TO FINISHED GRADE. MATERIAL.
V
1" WATER METER PER COE STD. DETAIL WA-130 SHEET C6. 3) QUALITY OF COMPOST AND OTHER MATERIALS USED TO MEET
FH ASSEMBLY (W/STORZ ADAPTOR) PER COE STD. DETAIL WA-100 SHEET C6. THE ORGANIC CONTENT REQUIREMENTS:
El
A) THE ORGANIC CONTENT FOR -PRE-APPROVED� AMENDMENT
EXISTING WATER SERVICE SHALL BE CUT AND CAPPED AT THE MAIN RATES CAN BE MET ONLY USING
R
COMPOST THAT MEETS
'COMPOSTED,
THE DEFINITION OF MATERIALS" IN WAC
BLUE REFLECTIVE PAVEMENT MARKER 173-350 SEC11ON 220. THIS CODE IS AVAILABLE AT THE
-ro ore, iveTzovsb aq
-
DEPT. OF ECOLOGYS WEBSITE:
1" POTABLE WATER LINE (HOPE OR EQUAL)
111e, Sf V,
I-10L
-To iWT(tLiL,
El
HTrP://WWW.ECY.WA.GOV/PROGRAMS/SWFA/COMPOST/
FIRE SUPPRESSION PER NFPA 13R THE COMPOST MUST ALSO HAVE AN ORGANIC MATTER
5 1-wIvAlida v"It
CONTENT OF 35% TO 65%, AND A CARBON TO NITROGEN
5-megm P? vitu
11
P -RAPKIT rnmmrrmnm
F E RATIO BELOW 25:1. THE CARBON TO NITROGEN RATIO MAY
-1
OWD CnL LklW%1119 ,
� &5S C,
BE AS HIGH AS 35:1 FOR PLANTINGS COMPOSED ENTIRELY
[j]2'.X TAP TO MAIN W/2" GATE VALVE OF PLANTS NATIVE TO THE PUGET SOUND LOWLANDS REGION.
JU
AMIII CIFS -
_rW
JAI
CB#1, TYPE 2
DOUBLE CHECK DETECTOR ASSY PER COE STD. DETAIL VIA�442* SHEET C6. B) CALCULATED AMENDMENT RATES MAY BE MET THROUGH
...... . ... RIM=99.50 10111.11
S
0
USE OF COMPOSTED MATERIALS AS DEFINED ABOVE; OR
90 LF 2" PE OTHER ORGANIC MATERIALS AMENDED TO MEET THE
12"IE (N,S,W)=89.6OJ`j'
wir
ca
CARBON TO NITROGEN RATIO REQUIREMENTS, AND MEETING
-71N
0 frit 1")
THE CONTAMINANT STANDARDS OF.GRADE A COMPOST.
(�,_ L.
10610,1fifil- 131&� fu ",
Im sovff
T*m
WtmT tw sm�) ftvjo - THE RESULTING SOIL SHOULD BE CONDUCIVE TO THE TYPE
kj La�ftTvj Jai%_ J 5!t4A(fWN6,
MI
N M -ro 5#1K 140itTil, - OF VEGETATION TO BE ESTABLISHED.
CONTRACTORS NOTES
iz 'R
1 .
A SEPARATE RIGHT-OF-WAY CONSTRUC71ON PERMIT IS
REQUIRED FOR ALL WORK WITHIN THE CITY RIGHT-OF-WAY.
REFER TO SEPARATE DEMOLITION PLAN AND PERMIT -
BLD20171836
2.
EXISTING SIDE SEWER FROM THE POINT AT WHICH IT IS CAPPED
ON PRIVATE PROPERTY, TO THE PROPERTY LINE, SHALL BE TV'D
BY THE PROPERTY OWNER. TV RECORD SHALL BE PROVIDED TO
THE CITY TO DETERMINE IF IT IS ACCEPTABLE TO REUSE. IF
THE EXISTING SIDE SEWER IS 4"IT WILL NEED TO BE REMOVED
IMPERVIOUS SURFACE:
AND REPLACED WITH A 6"LINE REGARDLESS OF CONDITION,
PARCEL AREA 7,798 SF
3.
EXISTING LATERAL, FROM THE PROPERTY LINE TO THE MAIN, 59W99 1,"ejzM
EXISTING ROOF= 2,164 SF
fE CWP=59.11
SHALL BE TVD/INSPECTED BY THE CITY SEWER DIVISION TO
DETERMINE IF IT IS IN ACCEPTABLE CONDITION FOR REUSE. IF Wkf -Nl� Uq ( I-V
T EXISTING PAVEMENT= 336 SF
NOT, A NEW 6-LATERAL FROM THE MAIN TO THE PROPERTY 4NI) K Ix To mm
PERVIOUS= 5,298 SF
7,789 SF
LINE WILL BE REQUIRED. C&EPT to pi Pr-
4.
IF EXISTING SEWER LATERAL IS NOT PROPOSED FOR REUSE, IT D4V NOT- e1'rfWD
SHALL BE AND CAPPED AT THE To p"w4zTq
PROPOSED BLDG= 2,277 SF
PROPOSED PAVING= 2,502 SF
LP,7SF
CUT
PROPERTY LINE. WNIF, + 54#*LZ
LANDSCAPING= 2,635 SF
49(2"ITEb
7.414 SF
5.
A 1 -INCH METER MAY BE NECESSARY OF FIRE SPRINKLING IS
REPLACED IMP= 2.111 SIF
REERED, BY THE FIRE MARSHALL. IF FIRE SPRINKLING IS
NEW IMP= 2,669 SF
REQUIRED BLDG SVC LINE ON PROPERTY MUST BE UPSIZED TO
R + N= 4.780 SF << 5,000
1.5-INCH.
6.
UNDERGROUND WIRING REQUIREMENTS OF ECDC 18.05 SHALL BE
PGIS= 2,502 << 51000
FOLLOWED. ALL UTILITY SERVICES SHALL BE INSTALLED
E 11 CATC BASIN UNDERGROUND.
FURVEYOR GOLDSMITH LAND DEVELOPMENT SERVICES
FIRE HYDRANT SITE UTILITY PLAN
DESIGN BY OTHERS
THIS IS A SKETCH. NOTHING IN THIS VIEW RELATING TO VERIZON, PUD POWER LINES OR
OTHER POWERED UTILITIES SHALL BE CONSTRUED AS A DESIGN OF SAID UTILITIES BY
J.C. MCDONNELL ENGINEERING, PC. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR
SHALL CONSULT THE APPROPRIATE UTILITY OR THE EDMONDS INSPECTOR TO RESOLVE
ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION.
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
DATE:
BY:
Q _j;4Y NGINEERING LAIM51ON
--.Gqy
: tA�Iv�)
SW QUARTER OF SECTION 20 TOWNSHIP 27N, RANGE 04E
�" . �" Wo
FILTER FAEIR C
TO * 1 2" 14
FABBIC EQUAL
NATIVE BACKna
IRA RIC MATEIRAL IN CONTROLS BILLS
TABLES OR WIRE RINGS TO ATTACH
� TO WRE
2* . 2' W00D/SRE1- POSTS�
FILTER
12*
NOTES,
1. CONTRACTOR/OEVELOPER SHALL MAINTAIN AND ENSURE
PR PER EPOSION CONTROL THRWGHOUT PROJECT.
CITYEINSPECTION REQUIRED ON
2. SILT FORCE n BE PLACED DOWNSLORE OF
CONSTRUCTION
ALL ROSHON CONTROL METHODS
ACTIVITY.
BEFORE OTHER WORK CAN BEGIN
FABRISC FENCE
AT
RJANUTARY 02OIE8
CITY OF EDMONDS
FILTRATION YSTEMS
PUBLIC WORKS
[FILTER
STANDARD
DEPARTMENT
DETAIL
R ENS. N
ER-900
GRAm
FILTER SOCK TH
OVER FLOW HOLES
(TYP)
NOTES,
"".-AGATCH
BASIN
I. CONTRACTOR/D VIBLOPER MAU
MAINTAIN THIS APPILICATON AT ALL
TIMES DURING CONSTRUCTION PERIOD.
2. ANY SEDIMENT IN CATCH BASIN INSERT
SH M BE REMOVED MEN INSEST IS
ONE-THIR RJU.
3 CITY INSPECTION REQUIRED ON ALL
MOGRON CONTROL METHODS BEFORE
OTHER WORK CAN BEGIN.
TEMPORARY
REVISION DATE
JANUARY 2018
CITY
OF EDMONDS
SEDIMENT TRAP
R_
PUBLIC WORKS
FOR CATCH BASINS
STANDARD]
DEPARTMENT
DETAIL
APPROVED Or. R� ENGUM
ER-902
FULL MOTH
SS/EGRESS
DETAIL NOTES,
(D ME MINIMUM LENGTH MALI. BE EXTENDED AS NECESSARY M E-RE MATERIAL IS NOT TRACKED OFF Sim
AND/OR INTO ME PUMC RIGHT-F-WAY.
Q AM DRIVEWAY RAMP AND/OR Sim ACCESS ROAD 15' WIDE MIN. SEE TABU BELOW FOR RIODUIRRED I.ENGTH.
NOTES,
1. SURFACE WATER - AM SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTIO ENTRANCES SHAILI. BE
FRED ACROSS ME ENTRANCE IF PIPING IS IMPRACTICAL. A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE
PERMITTED.
2. MAINTENANCE - ME E TRANCE MAU BE MAINTAINED IN A CONDPRON WHICH WILI- PREVENT TRACKING OR FLOWING
OF BEBINENT OFF 9TE AND/OR ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC MR BRING WITH
ADDM_ QUARRY SPAUS AS CONDIT-S DEMAND AND REPAIR AND/OR MEARROUT OF ANY MEASURES USED TO
TPAP BEGIME"M AU SEDIMENT SPILLED. DR FED. WASHED OR TRACKED OFF SITE AND/OR ONTO PUBUC
RIGHT-01-WAY MUST BE REMOVED IMMEDIATELY.
WH ELS SHAI.L BE CLEARED M REMOVE SEGIMEN PRIOR M LEAVING ME SM. MEN WASHING IS USED, IT SHALL
BE DO E ON AN AREA STABILIZED WITH MARRY SPAU-B AND MiCH DRAINS INTO AN APPROVED SEDIMENT
TRAPPING DE'VICE.
4. INSPECTION AND NEEDED MAINTENANCE SHAIJ- BE PROWDED AFTER EACH RARL
PROXIT UEN OF (FEET) - BOADE AM OR ASPHALT
PR
SOE_ QUARRY SRAU1* TRANSITION MOE MONTAGE
< 1 /4 ACRE �G 17aW 7�7700VE-6' MINED
* 1 ACRE BY CITY INSPECTOR. TY INSPECTION REQUIRED ON
* 3 ACRE ALL EROSION CONTROL METHODS
BEFORE OTHER WORK CAN BEGIN
I C,
STABILIZED CONSTRUCTION UARY `20AX18
CITY OF EDMONDS ENTRANCE
PUBLIC WORKS NDARD
DEPARTMENT DETAIL
APPRM ". R. ENGLISH ER-901
1 :19
I 11T - BE A IEIT STRAIGHT ["MA -1 1/�"
LINE ALL EXPOSED VERTICAL BODIES SHALL PC 6 22
BE TACKED NEATLY PER WSOOT STANDARD (sin: NOTES 5)
EXISTING
IRU ED SURFACE BASE7 PORT OR NAT; ATEM'k.
I11R11 PER ':rDOT IM BACXnU. HALL BE CDMPACRE
SPEC "'(3) TO 9 MAXIMUM DENSITY
(SEE NOTE 3) (SEE NOR 2)
--.I
NOTES:
1. SEE CITY OF EDMONDS MOCIFICATONS TO MMSON 9 OF ME CURRENT WSDOT STANDARD SPECIFICATIONS FORI
BAMMUNG REQUIREMENTS
2. BUD IT PROCTOR AND DENSITY TESTS FROM CERTRIED TESTNG COMPANIES DOMMENRIG THAT ME BACKIFILL
NUTS A MINIMUM OF 95% DENSITY PER ARTM D 1557.
3. CIC DO MAU BE A MINIMUM 6' OR MATS EXISTING WHICHEVER IS GREATER. MEN MATCHING EXISTNG
III BOTH GREATER THEN 6". MEN GIC SHAL1- BE INSTALLED IN MULTPUE EQUAL THICKNESS LIFTS NOT
EXCEEDING 6".
4. ROADWAY HMA DEPTH MAU BE A MINIMUM OF e MICK. UNLESS ARPROVED BY ME EIRONEER. ANY DEPTH
GREATER THAN � SHAU MATCH EXISMIG.
5. ALLEY HMA DEPTH SHALL BE A MINIMUM OF 2' THICK. UNLESS APPROVED BY ME ENGINEER, ANY DEPTH
G EATER MAN 2" SHALL MATCH EXISTNQ
6. UNLESS PROVED BY ME ENONEER. THE HNA MAU BE INSTALLED IN MULTIPLE EQUAL THICKNESS LIFTS NOT
EXCEEDING 2'.
7. FINAL PAWMERT JOINTS SHALL BE NEATI.Y AND UNIFORMLY SEALED WITH WSDOT STANDARD SPEcincATINS
5-.�(5)C APPROVED JOINT REALANT UR APPROVED EQUAL
"E"" DATE
TYPICAL HMA AND JANUARY -B
CITY OF EDMONDS UTILITY PATCH
PUBLIC WORKS STANDARD
DEPARTMENT DETAIL
�4 APFFAM " R. ENGLISH GU-41 0
NOTE: CONTRACTOR TO VERIFY AND FOLLOW ALL CURRENT
CITY OF EDMONDS STANDARD DETAILS. CHECK COE
WEBSITE FOR MOST CURRENT DETAILS, DOWNLOAD AND
UPDATE PRIOR TO BEGINNING ANY CONSTRUCTION. Know what's below.
Call before you dig.
-1. (SE.-
IUH -1. VA.
B. Ram -NDEl-
CURB/cUTTER
(SEE mom 8)
-2--
, r '' I . ". , I
CRLME JRFACE BASE
COURR PER MOOT SM
SPEC .- Sp)
(SEE NOTE *�)
INA CLASS 1/2-
8 -22
E NOTES 3 & 4)
NOTES,
1. SEE CITY OF EDMONDS MODIFICATORE M DIMSOR 9 OF ME MR-T WSBOT STMDAM SPECIFICATIONS FOR
SACKFIUING REQUIR ENTS.
2. IS C DEPTH SHALL BE A MINIMUM 6' OR MATCH EXISTING WHICHENER IS GREATER. MEN MATCHING EXISIBNG
CSBC DEPTH GREATER MEN 6". THEN CIC SHAtJ- BE INSTNUED IN MULTIPLE EQUAL THICXNEES UFTS NOT
EXCEEDING 6".
3. ROADWAY HNA DEPTH MAU BE A MINIMUM OF � TRICK. UNLESS APPROVED BY ME ENGINEER. ANY DEPTH
GREATER AN e MAIJ- MATCH ENISIGNS.
4. ALLEY HM DEPTH MALL BE A MINIMUM OF 2" TRICK. UNLESS APPROVED BY ME MONGOL ANY DEPTH
CREATE MAN 2" MALL MATCH EXISTING.
UNLE APPROWD BY ME EINGNEEIL ME RNA MAU BE INSTALLED IN MULTIPLE EQUAL THICKNESS LIM NOT
EXCEEDING ".
6� IMAI. PAVEMENT JOINTS MALL BE NEATLY AND UNIFORMILY SEALED WITH WSDOT STANDARD SPECIMCATION5
5-04.3(5)C APPROVED JOINT SEAI.ANT OR APPROVED EQUAL,
6. FOUR TO EDMONDS COMMUNITY DEVELOPMENT CODE TABLE OF STR97 STANDARDS FOR RIGHT-OF-WAY AND
PAVEMNT WIDTHS.
7. REM TO EDMONDS COMMUNITY DEVELOPMENT CODE SIDEWM STANDARDS FOR SIDEWALK REOUIREMENTR.
8. REM TO CI STANDARD CURB DETAILS
REMOH DAR
CITY OF EDMONDS1 PUBLIC STREET JANUARY 2018
PUBLIC WORKS STANDARD
DEPARTMENT DETAIL
TR-505
APPIRM IM R. ENGLISH 19
I-EXPANSIDNI I W �/-D. UMNMY
MIRY
j
.4
-0. GI. I, --j
PLAN MEW
(NOT TO EC-)
FULL -TH 'Ir EXPANSION
CURB/GUTTER MIRY ATERIAL
BEE
COE SM
TIR-521 2X MAX
I R
2- MIN SIR MINUS CSM
ON NAIRVE BEARING SOIL
SEE NOR 9
NOTES, (NOT M SCALE)
1. CITY INSPECTOR REMIRED ON FORM WORK MOR M PGJR.
2. CONCRETE SHALL BE CLASS 3GOD.
3. ITMISH SHALL BE LIGHT BROW.
4. SIDEWALK THICKNESS MAU BE 4.
1, 1GEWAUK 111S AT DRIVEWAYS MAILL BE 1* 111,
S. CURB AND GUTTER SHALL BE POURED SEPARATELY FROM SIDEWALK.
UDS FOR CTION BORES AND TRUTY VAULTS MAU BE NON-SKII) AS SPECIFIRD BY ENGINEER.
1, SEE ICE BIG BY. TR-150 MR P1111� BOOT BARRIER INSTALLATON,
G RUYCNADF SHALL RE COMPACRI) M 95% MAXIMUM IR-
R=U4MM DATE
CONCRETE SIDEWALK
PUBLIC WORKS STANDARD
DEPARTMENT DETAIL
APPROVED IM A. ENGUM TR-531
I R
b'71LI17 COYFUCFYOTE
CA600jv.-
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND
WATER REWSION PER CITY COMMENTS
JcM
IG',0XI8
DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT, BY
POTHOUNG THE UTIUTIES AND SURVE)ING THE HORIZONTAL AND VERTICAL LOCATION PRIOR
REWSED PER CITY COMMENTS
JCM
TO CONSTRUCTION. THIS SHALL INCLUDE CALUNG UTIUTY LOCATE 0 1-800-424-5555 AN
THEN POTHOUNG ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS
REVISED PER CITY COMMENTS
DAF
TO PH SICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES
AS SHYOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMAT10N AND
REVISED PER CITY COMMENTS
DAF
21,81
ARE SUBJECT TO VARIATION. IF CONFUCTS SHOULD OCCUR, THE CONTRACTOR SHALL
-
-
:TE
CONS LT J.C. MCDONNELL ENGINEERING. PC TO RESOLVE ALL PROBLEMS PRIOR TO
DESCRIP77ON
105
1 TNI77ALS
PROCEVEDING WTH CONSTRUCTION.
URR 10 V7TER
M ��A k&Lio
S
NOTES'
1. dTY INSPECTOR REGUREG ON FORM WORK PRIOR M POUR.
2- I'S BE TRUE I LIKE AND GRACE 11 -U- ITAKED.
ERP NSIGN JOR- SHALL. BE F.ACED ADAGENT M ANY STRUCTURE.
EXPAX.. - SNAU RE EWRY 1C FEET.
S. EXPANSION JCWTS MAILL RAW 1/2' M 5/8- WIDE PREMOI-DED JOINT MILLER.
-1 SIRAU BE 111 1000,
FINISH MAU BE LIGHT ED ON.
a CURB SHALL BE - WITH AR CURING COMPOUND OR MAU BE COVERED AND KEPT MOIST FOR � NO-
9. REMO
GIRECMEPLACENENT OF CONCRETE CURB V� BE FROM EXPAHMON W EXPANSION JOINT. UNLESS OTHERNSIS
Y CITY ENGRBER.
1D. A 2-FT MINIMUM ASPHALT SARCUT MAY SE REQUIRED AS DETERM�INEIG BY CITY ENGINEER.
�1, A11R8/IUTTER SHALL BE 11' OR AS DIRECTED BY CITY ENGINEER.
2. U VERIRCAL EDGES MALL BE TACKET.
RIEVISION DATE
CONCRETE CURB JANUARY 2018
I;j TR-520
CITY OF EDMONDS AND GUTTER
PUBLIC WORKS STANDARD
DEPARTMENT I DETAIL
I APPROVED W. R. EINGUM
DRIVEWAY APPROACH
SM DTL NO PAVE�ENT
DO E""'
1/2' EXPARSO �Ri
_11 IAI
MR. (D
1�7
(D CU 8 AND GUTTER SHAU. BE POURED SEPAR- MOM ME SIDEWALK. CITY INSPECTOR REQUIRED ON FORM WORR
PRIOR M POUR.
GDRIVEWAY APRON INDUCING WHO RAMPS SHALL BE A MINIMUM OF R* THICK AND MAU BE PLACED ON 2" OF 51W
STC COMPACTED M 91 MAXIMUM DMSITY.
SUBGRADE SHALL BE COMPACTED TO GSX MAXIMUM DENSITY.
(D 2' ASPHALT SAKUT MAY BE REQUIRED WITH GURB/GUTMR INSTALLATION. BEFER M WE SM GIL M-52D.
@ CONCRETE MAU BE CLASS 3000.
@ MR TRANSIMON SHOULD MAINTAIN A SLOPE NO GREA,MR MAN 8- IF ME MORE REWIREMENT CANNOT BE
ACHIEVED MAMMUM CURB ME MARSTON LENGTH SHALL BE tS-MT.
MAINTAIN 1/2- UP AT CUTTER.
IF DRIVEWAY WIDTH EXCEEDS 15', INSTALL A FUU. DEPTH EXPANSION JOINT AT CENTER OF DRIVEWAY
INSTALI. MINIMUM 5-FT TRANSMON PANEL BETWEEN DRIVEWAYS AND WHEN CONNECTING M EXISMG SIDEWALK.
MR1H SHALL BE UGHT PRO..
DAN
CITY OF EDMONJ DRIVEWAY APPROACH JANUARY 2018
IDS TT -PE I
PUBLIC WORKS STANDARD
DEPARTMENT I DETAIL
4- 1 APPROM IM R. ENOUSH TR-541
8
PLACE -BE MARKS EVERY 10'
E 1: 2
L
--T DRIVEWAY WIND OR MR. RAMP SLOPE
CONSTRUCT OUT :F
RNA PAVEMENT
CONCRETE MR HALL BE
NO LESS MAN 3' IN HUGHT
El I VENINT 1*1' FROM ME
FAC CURB IF NECESSARY TO
SUPPORT EXTRUDED CURB
HMA PAVEMENT
F/7777/-/Z/777/7��
TED 5/8- MM
NOTES� BELOW HMA EXTENSION
1. NOT 70 BE USED IN RIGHT-OF-WAY EXCEPT TO REPAIR EXISMI EXTRUDED MRS. AS APPROVED BY CITY ENGINEER.
2. EPDXY IS ME ONLY ATTACHMENT METHOD M BE USED BETWEEN HMA AND EXTRUDED CURB.
I CONCRETE MALL BE AIR-EINTRARIED CLASS MOD PER WSOOT STANDARD SPECIFICATIONS.
REVISIGIM DAN
gM OF EIDMIONDS1 1C. 10, NCRETE JAN ARY -15
CURB
PUBLIC WORKS STANDARD
DEPARTMENT DETAIL
I APPROVED n R. DROUSH TR-522
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
DATE: S!/W145
h, L--
BY, A-1 I)
IfNGINEE IN DIVISION'
J.C.McDONNELIJIL,
ENGINEERING, PC
1 IF ri t-- 4--- r--3
P.O. BOX 13199, MILL CREEK, WASHINGTON TEI 744-0916--p
GOLDSMITH LAND DEVELOPMENT SERVICES
1215 11 4TH AVE SE
BELLEVUE, WA 98004
PO BOX 3565 . BELLEVUE, WA 98009
TAYACr0&ATN0.(S)- S1TEA0,0RFSS.-
00566900200302 R[ROUM 20904 - 72ND AVENUE
W, EDMONDS, WA. 98020
OCT 17 2018
DETAILS
EDMONDS 4- LWT
SECHON 20 TOWNSHIP 27 N, RANGE 04 E
SNOHOAHSH COUNTY, WAS11INGTON
DRAWN BY DATE ' ,,,,DAI PROJECT MANAGERPCAUE
T1W 1111'flqoIARIIV� By 09nd .1r.14 N/A
6D43 J3
I
GRIPPER PLUG
OR APPROVED
Ij,
l" OR 6" SIDE S�MR
GENERAL CLEANOUT DETAIL
NOT` " EVE
12' PVC ME
6" FISER
al
6" WYE AND CITY STUB
45. SEND
LOCKING COVER
C OR 6"
SIDE SEWER CLEANOUT/DETAIL
SEE MOM
AT PROP RT LINE CIT EASEMENT
LEVELM. _A`
SEE NOW 4
NOTES�
ASPHALT SURFACE
1. SEWE PIPE MAU. BE SOR-35 AND JOINTS SMALL BE
GASKETED.
2. PIPE BLOPE TO BE 2% MIN AND UP TO 50% MAX.
I CLEANOUT COVER TO BE EAST XROAN IRON WORKS
MOT LONG 12" PVC
'I.EEW
PRODUCT NO M6102 STAR PIPE COSP48L OR APPROVED
6' RISER
END OF PIPE GRIPPER
4. LE NG COU.AW SMALL. BE CONSTRUCTED AS FCU.OWE-.
PLUG (CHERNE 270261
OR APPROVED EQUAL)
IN ROADWAYS PER COE M DWG GU-424
CLEANOUT
INVIDEWALKAANDSCAPED ARM EITHER 24' Se'"
4DI T OR CONCRETE
EP CONCRETE COLLAR OR 24" DIAMETER . G' DE11
CONCRETE
CGU,Ul
REWSION DAM
CITY OF EDMQ SEWER CLEANOUT DETAILS
LA1Y 2DI.
PUBUC WORKS
STANDARD
DEPARTMENT
DETAIL
APPROVED SO R. ENGLISH
SS-200
SW QUARTER OF SECTION 20 TOWNSHIP 27N, RANGE 04E
NOUN HYDRANT PLUMB
PROMDE 3' MINIMUM
CLEARAHCE AROUND HYDRAMT
l' STORZ ADAPTER
U'LE ROAD j
1/2' EXPANSION DO
RAISED PA T
"NT N TENA` -AX ARKERS
Al ABOVE FINISHED AIJON VALVE BOX EARS
M'H- M MAGE
y . : PARALLEL WITH THE
CClCRETE FINISH MADE WATER LINE IT SERVES
P.
AR NO HYDRANT m A Mj I' R,w CAST RICH
1 DATE VALVE
C1 1-1/2' 'AM ADXSTAGUE VALVE TEE.TH
AS ESTRAIN 1. GED
OCH. V INAN EGA -LUG OR IN
AROUND HYDR M UAL MOM COYIECTION CON ECTION
DR N HOLES E FOR HYDRANT
BOTTOM OF GO '_%` " ..- .- VAL.
COVER TOP ITYP)
PAR
WA &LI?
SERVES
U IT
CAST 'RM
A X a
4 AS VALVE
ST
GED
E ON
AND 'DOES �/jj
WITH MR. IS. OR
APPROVED EQUAL -4 THR11T 1-1
10 MIL P S11C
UNDISTURBED EARTH BETWEEN BLOCK
T
10.12'.4' CONC. BLX. l2*'.l" TEE 2 N
L; ' MI
GONG ELK AARAIII
`ETWEEEN
HYDRANT CCNNECVON PIPE TO
C
C "4
BE DUCTILE IRON CILkSS N , C
AN INTERMEDIATE MMTS TO AM.
.TS
BE RIESTRARRED TS
T
THRUS
MON
NOTES,
1. HYDRANTS AMD AU. MATERIA1.S TO BE IN ACCORDANCE WITH CITY OF EDMONDS APPROVED MATERIAL MCD.GAAGNE
LISTINGS.
CONSTRUCT 3' X 3' X 3.5" THICK CMCRETE PAD AROUND HYDRANT PIPE HYDRANTS SET IN CONCRETE RECURES AN
EWAN ON STRIP AROUND HYDRANT BARREL IN ADISIT014. THE INSTALLATION OF THE HYDRANT ON PRIVATE PROPERTY
SHALL EQUAL OR EKCEED STANDARDS SET FORTH FOR THE INSTALLATION OF PUBLIC FIRE HYDRANTS IN THE CITY OF
EDMOND.
3. A HYDRANTS SMALL HAVE A 6' MECHMICAL JOINT (MJ) BASE TRAFFIC MOM PROVIDED WITH (2) 2-1/2- H06E
NOZMS AND (1) 41/2' NATCHN.,STANDARD THREAD (MST) PUMPER NOZM WTH 4- STORE QUIN COUPUMG
ADAPTER
4. PUMPER PORT SMALL. FACE THE EIREET OR ROADWAY MR FIRE ENGINE ACCM&
5. THREE FOOT MINIMUM LEVEI. CUEARANCE SMALL BE MAINTAINED AROUND HYDRANT MEN PLACING LANDSCAPING.
6. FIRE YORANTS SMALL BE PAINTED SAFETY YELLOW BRAND: KELLY MOORE (170063 SUNBURST YELLOW) OR APPROVED
EWAL
7�RAISED PAVES T MARKER TO BE PLACED ** 11 PAVEMENT CA OR PAINTED LINE ON HYDRANT SIDE OF ROAD.
FIRE HYDRANT LOCATION SHALI_ BE MOM ON THE PLANS AT A LOCATION APPROVED BY THE CITY ENGINEER.
ReAM DA
CITY OF EDMOND FIRE HYDRANT ASSEM13LY 1ANU1lY 111
PUBLIC WORKS STANDARD
DEPARTMENT DETAIL
APPROVED BVk R. ENGUM WA-100
F.I.I. GRADE-\ ko
SuPpum
BALL VALVE
Li Li
G� FLOW
E;IN
MATERIAL UST:
AL. I" SERVICES TO BE TYPE "I' SOFT COPPER TUMNO
1* BAU_ CORP. STOP WITH CC THREAD INLET AND COPPER (M) GRIP W�T (FORD OR MUELLER)
DUAL PURPOSE UNION
MIPT X,C " GRIP %VoALSE
GINO EX N M=STOP EQUAL. TO FM B844444 FOR I"
@mffa I' METER SETTIER WSH ANGLE SAUL METIM VALVE lr HIGH WIN DUAL
PURPOSE UNIONS ON INUET AND OU7LET. HORIZONTAL IN HORIZONTAL, OtJTUET EQUAL TO FWD V3711-44
WHEN PLACING NEW SERACES' USE SAME AS ABOVE AND ADD A SHOLE CHECK, EMAIL TO FORD 11-44
$1' - IF IERICE SADDLE I -Al. TO IONAC 1111
IN UNPAVED KAS; CARSON 4 MSBCF WTH GUCTIUE 1ARON COVER AND CAST RON READER DDM;
N PAVED AREAS: ARMOR CAST A6001946P2 BOX W/ 60019696S Ra LID
FOR VACANT LOT (FUT.RE USE) LOCATION MARKED MTH PANTED 2- X 4- STAKE WITH 'WATER- SIENOUED ON IT
ill GA, VIA. COATED "RE TRACEI (TAFED TO PLASTIC PIPE EVERY IV) TO BE GROUNDED AT METER AND HOUSE
SCHEDULE 40 3/4" OR V PLUG. REMOVE MEN CONNECDON IS MADE TO CUSTOMER UNE WITH COMPRES$ION nT1RNG
WATER SIERMCE TO HOUSE. INSTALLED BY OMER/CMTRAC� (PER PLUMBING CODE)
PROP TY OWNER RESPONSIBLE FOR PURCHASING 3/4' OR 1' METER THROUGH THE CITY AT DEVELOPMENT SERVC S
DEPARV T. CITY SNU. SUPPLY AND INS� METER AFTER PURCHASE. IF USING 3/4" METER. CONTRACT. WILL
PROVIDE REDUCERS
U. BE SET AT THE PROPERTY LINE UtUESS APPMAW BY THE CITY ENGINEER.
D-EMS11I)EJS W-_� N-0-T XEA�-T IN DRIVEWAY A1EA1 UNLESS TRAFIC RATED BOX IS APPROVMED Y CITY ENGINEER.
FEMBEN
�4 - 1 JANUARY D20AX18
CITY OF EDMONDS WA3 ERN SERV;CE
PUBLIC WORKS INSTALLATION STANDARD
DEPARTMENT DETAIL
APPRIWID 11" F. ENGLISH WA-130
NOTE: CONTRACTOR TO VERIFY AND FOLLOW ALL CURRENT
CITY OF EDMONDS STANDARD DETAILS. CHECK COE
WEBSITE FOR MOST CURRENT DETAILS, DOWNLOAD AND
UPDATE PRIOR TO BEGINNING ANY CONSTRUCTION.
Know what's below.
Call before you dig.
I
UF1LrJTC01VFL1C_TjV0TE-
C46TIOAr.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION. DIMENSION, AND
DEPTH OF ALL EXISTING UTIU11ES WHETHER SHOWN ON THESE PLANS OR NOT, BY
POTHOUNG THE UTILITIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR
TO CONSTRUCTION. THIS SHALL INCLUDE CALUNG UTILITY LOCATE 0 1-1500-424-5555 AND
THEN POTHOUNG ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTIUTY CROSSINGS
TO HYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILITIES
AS SHOWN ON ESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND
ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL
'ONS ULT J.C. MCDONNELL ENGINEERING, PC TO RESOLVE ALL PROBLEMS PRIOR TO
1PROCEEDING VATH CONSTRUCTION.
4
WATER REVISION PER CITY COMMENTS
JCM
-10-
�1101,18
3
-2
REVISED PER CITY COMMENTS
JCM
�8 -,
'24,,18
REVISED PER CITY COMMENTS
DAF
- -
07105118
I
. __
DAF
�A/,B
rREV NO.
DESCRIP77ON
INMAIS I
DATE
I Ao"' C"`NECT.N W/ STGRZ FITTING
(AS REQD BY FIRE DEPT)
CH
- - - - - - - - - - -
7)
ALL A- LADDER CUT FLAN
. ...UIRED
D AS RED
SHAUL BE GORE
PENETRATIONS
ELS W P`_ %TO- P YFROPYLENE
TPPL SMALL BE INSTAU_E ON LAG WTH PULL UP HANDRAIL
HA CLOSE TO HINGE C ACTOR TO INSTAL� PER
M RER RECOMMENDATIONS AND
LEA` LID (MODEI-I.W. DMATE LOCATION WITH ENGINEER.
HAT PEENING TO BE LOCATED
WDON , OF INSIDE VAULT WALL
FOR EA LADDER ACCESS
NOTES, 1j, ITAH, S' TO
(*,�.-Njr OF
UT
"D" D-10 ESTRIAN LOA -30
1. ACCESSES BY LW. MATCH, Ti` FF
"ATC WADJ WITH SID OU DRAIN.
2. DCOA MUST . TESTED BY A E BACXFUO SEEM& STER.
I ALL M CMS MUST BE PRO D TH PCV P .
4. A CITY APPROVED VALVE IS REQUIRED BETWEEN TH PP MAIN AND THE
VAUL'
S. SEE COE SM DIlLs 83 AND WA4 FOR DCDA L ON AND
CONNECTION REQUIREMENTS.
6. A BLY MUST BE TESTED AFTER INSTALLATION AN I THEREAFTER
BY A WASHINGTON STATE CERTMED DCOA ASSEMBL S REPORT MUST
BE T TO THE CITY OF EDIMIONDS WATER DIVIR
7. SEE GDE STD DT_ W1428 FFOR PR UE VIEW.
VAULT SZES ff MINIMUM
APPRODGM EQUIPMENT I MINOM INSIDE VAULT D 1."OM THE FLOOR
METER EI�
AND TYPE _ DIN SIGNS (WILUD SIAMESE CNN ON)
A 8 1 C 1 0 AN
4" . 31C V-SI" v-1. I I � -, ", SENSUS SR2 WTH ECR/`WP REMOTE
6w x 31V '-2- 10'-B' 15-7y ll'-O' I READ THE EGRAM, SMALL. BE
a'-,' 1 B INSTALLED ON AN OUTSIDE WAM
A 4'-5' V-4- 1 0'-9* Lf,t" 1V-G- FOR SY METER READING
INDOOR
to" B,-.1 1'-8* IO'-Ijr8-6- 14'-6' i B7_ 6'-B" �IESMJ;61_ INSTALLATION
APRIL 2018
COMMERCIAL MUL FAMILY
CITY �OF EDMONDS I DOUBLE-CHECK I
BUC WORKS DETECTOR ASSEMBLY (PLAN) STANDARD
EPARTMENT APPROVED By, F. �11111M Tl
7 ------ 7_
YCEMENT
VAULT BOX
1--s" Typ 6 . ....
@ 0 0
NOTES:
1. THE DCDA SHALL BE A WASHINGTON STATE
APPROVED - MODEL SHALL BE WATTS
6- MIN
007DCDA OR APPROVED EQUAL
2. VAL LT MUST BE UTILITY VAULT MODEL OR
APPROVED EQUAL
--)FFOR 2 INCH DCDA: UTILITY VAULT #644-LA
PLAN V!
FOR 3 INCH D DA: UTILITY VAULT #675-LA
SENSOR SR2 WOLPL
3. LOS FOR VAULT SHALL BE LW HATCH -
R MOTE READ,
WATERTIGHT WITH GUTTER AND SIDE DRAIN.
SHALL BE INSTALLED -H-20 DOUBLE LEAF TRAFFIC
SIZE SHALL BE 3' WIDE x 6' LONG.
ON.HATCH CLOSE TO 13FARING LID FOR ALL AREAS
4. APPROVED DOUBLE CHECK DETECTOR
HIM E EXCEPT IN HIGH TRAFFIC AREAS
ASSEMBLY TO 11 HORIZONTAL WITH THE
USE H-30 DOUBLE LEAF . .
TRAFFIC RATED LID IN HIGH
GROUND.
5 . TESTCOC TO EITHER FACE OUTWARDS OR
KFSROM
EXISTING TRAFFICCAREAS (IE'. DRIVEWAY
UPWARDS ASSEMBLY.
GROUND ENTRAIN ES
6. ALL TEST COCKS MUST BE PROVIDED WITH
PVC PLUGS.
U6=
7. THOROUGHLY FLUSH LINES PRIOR TO
6* MIN SIDE DRAIN
INSTALLATION OF ASSEMBLY.
8. DO NOT INSTALL IN AN AREA SUBJECT To
DRAIN TO GRAVEL SUMP
FLOODING
OR TO CATCH BASIN��
MUST BE PROTECTED FROM FREEZING
CONDMONS,
To. IF SOIL CONDITIONS OR PRESENCE OF GROUND
WATER Do N ALLOW DRAINAGE TO SUMP,
OT
DRAIN
HALL BE DIRECTED TO ONSITE
DRAINAGE SYSTEM.
6* Typ
MIN
Il' .1144 VIRINNEL:11
\-CONNECT TO EXISTING
H.
D DL E
DL.
SERVICE LINE
PROV10E BENDS &
i*
CONNECTIONS AS REQUIRED
S FLOOR DRAM
/8' MINUS C.S.T.C. FLOOR DRAIN
GRAVEL (12- MIN, 2' PVC
_ To S. E
COMPACTED WASH D ROCK DRAIN SUMP (SIZED PER DESIGN)
SIDE V!
MAX DENSITY (SEE
,- NOTE 111)
SIZE OF PIPE USED .1. MINIMUM DEPTH 01 BOX INCLUDIN. REQUIRED CLEARANCES.
HEIGHT TO TOP OF STEM BASED ON THE SIZE OF PIPE USED.
MUST BE TESTED AFrER INSTALLATION AND YEARLY THEREAFTER BY A
WASHINGTON STATE CERTIFIED DCDA ASSEMBLY TESTER. THE TEST
REPORT MUST BE SENT TO THE CITY OF EDMONDS WATER DMSION.
Q2",L3" DOUBLE CHECK
REVISION DAT
JANUARY 2018
CITY OF EDMONDS
ETECTOR
PUBLIC WORKS
ASSEMBLY
(DCDA) (NEW)
STANDARD
DEPARTMENT
DETAIL
APPROVED BY: R. ENGUSH
WA- 141
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
DATE: 1-0/mA016- .
BY. !ITY ENGINEERING DIMS10H -
J.C.McDONNELL _u I m ' v ' ir
ENGINEERING, P� - U U
BOX 13199, MILL CREEK, WASHINGTON TEL(425) 744-091�
SURVEYOR GOLDSMITH LAND DEVELOPMENT SERVICES
1215 11 4TH AVE SE
BELLEVUE, NA 98004
PO BOX 3565 , BELLEVUE, WA 98009
425-462-1080
www.goldsmithengiheering.com
TAXACCO&Nnvo (S).- StIZEADDRFSS-
00566900200302 20904 - 72ND AVENUE
REE,0U[B W, EDMONDS,. WA. 98020
OCT 17 2018
UTILITYDETAILS
EDMONDS4-LTATIT
SECTION 20 TOWNSHLID 27 N, RANGE 04 E
SNOHOAffSH COUNTY, WASMNGTON
LDRAW-N
BY DATE REV. BY DATE PROJECT MANAGER SCALE
W
TjW 111141201
j
TJW 012011
loll
JCm
N/A
URA... FILE NAME
CHK. BY
F.B. NO.
JOB NO.
SHT. NO.
4 ONDS PLANSETAIR9
I JCM
1
I 6043
C60F8
SC-740 END
SC-740 CHAMB
ADS 601T OR EQUIVA
OVER ENTIRE ISOLATOR
AASHTO M288 CLASS 2
NOW -WOVEN GEOTEXTILE-
2 LAYERS OF ADS 315 FILTER FABRIC
ON BOTTOM OF ISOLATOR ROW
DESIGN ENGINEER IS RESPONSIBLE FOR -
ENSURING SUITABILITY OF SUBGRADE SOILS*
SW QUARTER OF SECTION 20 TOWNSHIP 27N, RANGE 04E P h; +; I I ul; IT p 16 D
GRANULAR WELL GRADED SOIL/AGGREGATE MIXTURES,
<35% FINES. COMPACT IN 6 IN LIFTS TO 95% PROCTOR DENSITY.
SEE THE TABLE OF ACCEPTABLE FILL MATERIALS IN
STORMTECH'S DESIGN MANUAL, INSTALLATION MANUAL,
OR WWW.STORMTECH.COM.
PAVEMENT
DEPTH OF STONE
TO BE DETERMINED
3Y DESIGN ENGINEER
6" MIN.-
6" 51 �-12" MIN. TYP.
STORMTECH SC-740 CHAMBER SYSTEM -SEE STORMTECH'S DESIGN MANUAL
FOR STORMTECH
AB", STORMTECH SECTION INFORMATION CALL
�1� NOT TO SCALE 1-888-892-2694
CatthBasin
(&rd Drain),
0 0
DRY WELL
361 h plarre-L-r
MIFF]Iledith
PLAN VIEW
11/2' T Washed
DrainRock
NTS
Nis& Center of Hole
with 11 Capped IyVC
or Other maps
Topsoil
FlwhwfthStAce
--30-
90W
Fine Mesin Srrea-. Min. 4d3-
PVC Pipe
CalchBasin
Drain)
11, I!eTh Diannater in.
Sides of Hole
Unedwith
AO Wiedwith
llfz-�rWasl`Iad
FifterFabric
DrainRocK
DRY WELL
H 41h Groun�watm TaL-19
SECTION
T
NTS
Downspout Infiltraddn.DpyWell
NOTE: CONTRACTOR TO VERIFY AND FOLLOW ALL CURRENT
CITY OF EDMONDS STANDARD DETAILS. CHECK COE
WEBSITE FOR MOST CURRENT DETAILS, DOWNLOAD AND
UPDATE PRIOR TO BEGINNING ANY CONSTRUCTION. vt
Know what's below.
Cal I before you dig.
L,.q I Ln D.IL011`11
NOT 7*0 SCALE
CONCRETE COLLAF
PAVEMENT
C NCRETESLAB
(MO..) MIN THICKNESS
FLEXSTORM CATCH 17
PAR�6215NYFX
WITH USE OF OPEN GRATE
10'(250..) NSERTA TEE
PA T#1O"5STIF
INSERTATEETOBECEN EREO
ON CORRUGATION CREST
Will Ila Ull III ULZ,, L U1 UA
R-3165
ITH
CONCRETE COLLAR NOT REQUIRED
FOR UNPAVED APPLICATIONS
t0b 00� 101USMULt
16- 1— —) NYLOPI-AST INLINE
GRAIN BODY WISOUD HINGED
COVER 0 GRATE
T
PAR 715AG101P
SOLID C VER: 1599CGC
GRATE: 1599COS
0 J,
1W (25D ..) SDR35 PIPE
SC-740 CHAMBER
SC-740 10" INSPECTION PORT DETAIL
NT.
12" FROM
CB #3
LTf=C0yFHC_r1v01Tff.-
C4zT10Ar-
THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION. DIMENSION, AND
WATER REVISION PER CITY COMMENTS
JCM
0,,,0,,, 6
D TH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT. BY
PEOPTHOLING THE UnUTIES AND SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR
REVISED PER CITY COMMENTS
JCM
09,12�,118
To CONSTRUCTION. THIS SHALL INCLUDE CALLINO UTILITY LOCATE 0 1-800-424-5555 AND
THEN POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS
REWSED PER CITY COMMENTS
DAF
07105118
To PHYSICALLY VERIFY WHETHER OR NOT CONFUCTS EXIST. LOCA70NS OF SAID UTILITIES
AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMAT10N AND
REWSED PER CITY COMMENTS
ARE SUBJECT TO VARIAnON. IF CONFLICTS SHCULD OCCUR, THE CONTRACTOR SHALL
�AF
1�,
ICONSULT J.C. MCDONINELL ENGINEERING. PC TO RESOLVE ALL PROBLEMS PRIOR TO
PROCEEDING INITH CONSTRUCTION.
CATALOG ORATE MEAL
NUMBER TVft OMN pt"
14 1
IHI V
7� 7 '2
CatalogNombo A 3 E F
R-3165 17 x 20 2 23-1/8 x 5-1/2
24-7/8
All dimensions are listed in inches unless otherwise noted.
q) 2017 Neeuah roondry
7' CONC SIDEWALK
4 TYR
12" 8" MIN
0
+ 8
4- 1 C
8.1 N
4/
8"
4 -'�-8" MIN CURB INLET SECTION A
OVERLAP
SIDEWALK PL4N VIEW
CURB GRAVEL SURFACE
A I /_
CB #2, TYPE II
v
AA-L W-RLVTj1;,75
_j
REBAR
1. 4'± 114va,
s-ro izvi 9,
EX 8"
5f4AILIL SO UAI
AIT
WATER MAIN
wn�
sl-11P, tdQ01-11 Alf Auiau)
EX 12" SD
—4.
48 LF 12" @ 0 5%
CURB INLET DETAIL
CB
fil, TYPE II
I/
VELOR
G - OL DSMITH LAND DEVELOPMETT SERVICES
1215 114TH AVE SE
BELLEVUE, WA 98004
PO BOX 3565, BELLEVUE, WA 98009
425-462-1080
www.goldsmithengineering.com
TAXACC06A,Tivo.�S).- STEADDRESS.-
00566900200302 UqF*5U0 �20904 - 72ND AVENUE
W, EDMONDS, WA. 98020
OCT 17 2018
_6%WS9%v"
. . . . . . DRAINAGEDETAMS
J.C.McDONNELL'
H I EDMONDS 4- UATIT
N ENG11 G P�H 0 SECTTON20 TOWNSHIP 27N, RANGE 04 E
A 0 9 SNOHOARSH COUNTY, WASHINGTON
ta E�h r_43 DRAWN BY DATE REV. BY DATE IPROJECT MANAGERI SCALE
C.O. BOX 13199, MILL CREEK, WASHINGTON TEL(425) 744-0916 TjW 1111412017 TjW 10�1012011 JCM I N/A
N :�:�FAX: (425) 744-0946 DRAWING FILE: NAME K� M11 Y FAI, NO, 111111 N16 I SlT. No.
6043 J3 EDMONDS PLANSEr. wg ICHJ 1 '643 C70F8 I
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
DATE:
BY.
=PENUINEERM DIVISION I
SW QUARTER OF SECTION 20 TOWNSHIP 27N, RANGE 04E
x
N89*18.
sss PA LOCA770JU _,3�5
10' BSBL
_ZA
96 - — — — — — — — — — — — — — TRd
8.5' 8.5' 8.0, 8.0,
EN�(
LANDSCAPING 3
3
7
17
z
—15' BSEIL
12"
12"xI8'SIGN WITH INTERNATIONAL
SYMBOL OF ACCESS AND"STATE
DISABLED PARKING PERMIT
REQUIRED"TEXT
.CrUMS VMZ' SIGN WITH "VAN ACCESSIBLE'
TEXT
z Y\ 0/\
CONCOETE.F.(
ADA PARKING Sldk&E� IL
RESERVED PARKING SIGN AND
POST WITH R7-801 A PLAQUE
ACCESSIBLE PARKING DETAIL
NOT TO SCALE
Vt.
Know whars below.
Call before you dig.
DE, WHITE
LINE (TYP.)
I PEDFUTRMNACCESSDETAff,
CONSTRUCTION NOTES
(D VAN% PA NO SAV49tr4r, A1,406, C, "I
WHITE PAINT STRIPE SEE PEDESTRIAN ACCESS DETAIL THIS SHEET swc-W11
ADA PARKING AND STRIPING PER ACCESSIBLE PARKING DETAIL THIS SHEET
N ADA PARKING SIGN PER DETAIL THIS SHEET
4" WIDE YELLOW PAINT STRIPE, 6" OFFSET FROM CURB AND PEDESTRIAN STRIPES.
TIRE LANE -NO PARKING" YELLOW LETTERING, MINIMUM 12" HIGH WITH MIN. 2" STROKE.
W_ _E DIAGONAL STRIPING PER ACCESSIBLE PARKING DETAIL THIS SHEET
IMF SEE DROP PIN DETAIL THIS SHEET
s
10 0 10 20
1 inch = 10 ft.
NOTES:
A SEPARATE RIGHT-OF-WAY CONSTRUCTION
PERMIT IS REQUIRED FOR ALL WORK WITHIN
THE CITY RIGHT-OF-WAY.
LEGEND
PROPOSED ASPHALT
PROPOSED CONCRETE
NOTE:
DROP PIN HOLES MUST BE LOCATED IN THE DOOR CLOSED AND
OPEN POSITIONS. THE OPEN DOOR POSITIONS MUST BE LOCATED
SUCH THAT THE DOOR DOES NOT OBSTRUCT VEHICLE ACCESS,
A*Vl 121111194 KvA 6111" NO L-095 "fm lot
3/4" SCH. 40 PIPE OR OF
DOOR DROP PIN—*,. SUFFICIENT INSIDE DIAMETER FOR
THE TRASH ENCLOSURE DOOR PIN
DROPPNHOLEDETAM
NOT TO SCALE
APPROVED FOR CONSTRUCTION
CITY OF. EDMONDS
DATE:
BY..
EN73INEERING DIMSION
SOMA',
o -110
SW QUARTER OF SECTION20 TOWNSHIP 27N, RANGE 04E
MINIMUM SHOULDER TAPER LENGTH = L/3 (feet)
SHOULDER
WIDTH
(feet)
Posted Speed (mph)
25 30
35
40
45
50
55
60
65
70
8'
40 40
1 1
60
90
120
130
150
160
170
190
10,
40 60
90
90
150
170
190
200
220
240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THEN 8'.
MINIMUM LANE CLOSURE TAPER LENGTH = L (feet)
LANE
Posted Speed (mph)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
105
150
205
270
450
500
550
-
-
-
115
165
225
295
495
550
605
660
-
-
125
180
245
320
540
600
660
720
780
840
SIGN SPACING = X (1)
1500'± 55 /70 MPH FREEWAYS & EXPRESSWAYS
800'± 60 /65 MPH RURAL HIGHWAYS
500'± 45 155 MPH RURAL ROADS
350'± 35 140 MPH RURAL ROADS & URBAN ARTERIALS
200'± (2) 25 /30 MPH RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
100'± (2) 25 MPH OR LESS URBAN STREETS
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE
RAMPS,AT-GRADE INTERSECTIONS AND DRIVEWAYS.
(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TO FIT
ROADWAY CONDITIONS.
CHANNELIZATION DEVICE
SPACING (feet)
MPH
TAPER
TANGENT
50/70
40
80
35/45
30
60
25/30
20
40
LEGEND
N
TEMPORARY SIGN LOCATION
CHANNELIZING DEVICES
TRAFFIC SAFETY DRUM
SEQUENTIAL ARROW SIGN
TRANSPORTABLE ATTENUATOR
PORTABLE CHANGEABLE MESSAGE SIGN
DATE 113/2018
PLOTTED BY Ilddelf
DESIGNED BY
ENTERED BY
CHECKED BY
0.
Know what's below.
Call before you dig.
BUFFER
SPACE
12'MINIMUM
4-
EXISTING LANE
EXISTING
A
TRAFFIC SPACE
2-
SHOULDER
WORK AREA
TYPICAL SECTION 0
114,
ROAD
NA S
W5-1
BUFFER DATA
LONGITUDINAL BUFFER SPACE = B
SPEED (MPH)
25
30
35
40
45
50
55
60
65
70
LENGTH ](feet)
155
1
200
' 250
305
, 360
, 425
0
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DISTANCE = R
HOST VEHICLE WEIGHT
9,900 TO 22,000 Ibs.
HOST VEHICLE WEIGHT
> 22,000 lbs.
< 45 MPH
45-55 MPH
> 55 MPH
< 45 MPH
45-55 MPH
> 55 rv" P Hn
100,
123'
172'
1 74'
100,
150-j
0 0 0 0
0 A
7�-
W. -
//-7—// 0 0 —
WORK ARE�/ 0 0
x x I X L B low
\BI
ROAD 48" 48" SEE NOTE 3
WORK
AHEAD
48" 48"
W20-1 48" W4-2(L) NOTES
ON6
MBrLANE "tAv"c1(00,;W%Nk4v 1. SEE SPECIAL PROVISIONS FOR WORK HOUR RESTRICTIONS.
—0M =-- - "L-L Im pwft at ,a
AHEAD 66" ; 1D1Vr4c%WP31 Or- TO(WIL Z RECOMMEND EXTENDING DEVICE TAPER (L/3) ACROSS SHOULDER.
48" )f -fKkr0r- r-ON101L DWROS 5iIALL 3. USE TRANSVERSE DEVICES IN CLOSED LANE EVERY 1000'± (RECOMMENDED).
oftm comm"I %KR
AMM Sumtvlvwx. 4. ALL SIGNS ARE BLACK ON ORANGE.
"q ge 5. RECOMMEND ADVANCE NOTICE FOR ANY OVER WIDTH LOADS PRIOR TO
LANE CLOSURE FOR ALTERNATE ROUTES IF APPLICABLE.
19LANE CLOSURE AMASAW
NOT TO SCALE
Sinale Lane Closure with ShiftITC-17.dbn
JOB NUMBER
CONTRACT NO,
A11111111111111111i�
MP
Washington State
Department of Transportation
B.-T-El
TRAFFIC CONTROL PLAN
0 i-t-
9ohv
W094 1 �
PLAN REF NO
TC-1 7
SHEET
OF
SHEETS
APPROVED FOR CONSTRUCTION
CITY OF EDMONDS
DATE: vo 11a liki 6
E'Y:
11 EAZTFNEERING DIMSION
sc,\0i4- D
1,0 -110
SMH
RIM-100.52
FOUND 4'X4* CONC MON IE 870) CONC-90.49
W1 1-112- PUNCHED IE 8'(S) CONC=90.45
BRASS DISC IN CASE, IE 8-(YO PVC-90.57
DOWN 0.2'
vi
TURNBERRY LANE CONDOMINIUM PHASE I OMH
RIAI= tTAICRS
TAX PARCEL #00895480030300 (ONE OF MULTIPLE)
TURE3865
BOTTOM OF STURC .9
20800 72ND AVENUE WEST
IE 36-(N) CUP=90.67 FOUND 3' BRASS DISC
EDMONDS, WA 98026-9607 E 12-(SE) OMP=(COULD NOT MEASURE)
_7 I" I�N1-112*
OWNER. (MULTIPLE) I'RON PIMMIF11LUED CONa
(N S& DPON .5�
S C, I'M
IA.
KEYSTONE A
1 30. V6100.00
33 -0, 1 ELE
RET WALL 30,
CONDOMINIUM
2
RIM=99.98
TSF IE 121(E&S) CUP-90.37
98 FNC END
N X 4.6'W a�.
qL89
X8 _-IT
30.01 ER
8 0.9E RE OR FH WV
SSS LOCATION) J.IE RET C
COS (RECORD
LOCATION) - - - - - 21.2'W EAVECCOOR I
22.9'W SO R
SITE 142
SLA-I
96 ELEV-98.74
o�3
ow
LOT 3, BLOCK 2,
IWE INC END SEATTLE HEIGHTS
DIVISION 4,
(RECORD LIME 9, PAGE 11 OIL RLL?
F COS VOL 10
x LOCATION) m
I 1i I �
CONC
WNDOW TAKPARCEL #00566900200302
KELL 20904 72ND AVENUE WEST pp
SO
EDMONDS, WA 98021-7205
... V
1.5'E FNC t V . LLC TREE STUMP SWH
r OWNER: CUMMI D IVW RIU-10all
I -(N) CONC
E 8 -8&91
HOUSE IE 87(5) CONC-88.56
J,
SITE BM#I
ELEV-100.11
VN
A CONC STEP X RPE-iiam VIN
TREE
STUMP
1.5'E FNC Jo.,f
;7.
Z 4' SPUT
7
:�77".
.... .... . .... .......
�U_l Oil: RAIL FENCE
�A
On
.4 .
21.8 PC.
4.7' E FNC END 19 EA
L
FNC CDR
0.
IN X O.JE 4.5' WOOD FENCE
RCF-TRICO
RCF-W1GV 6' WOOD FEI�CE LSO 14490
O.WN X O.OV
C INT C END
LS1 4490 96
CI*S 0.4S X CAW m
0.
EP
O's x 0,01
�R r
J�
HOUSE V8,
TT_
TAX PARCEL #00566900200303
20912 72ND AVENUE WEST,
EDMONDS, WA 98026 EP 'lop
OWNER., KHALID KHAN
30, 30,
C3 II
RIM=9Z76
8 IE 12-(N&S) CMP--89.11
LP, TSF
T URUG
RIM=8a4
MON NOT FOUND� IE 8 (N) CONC=72.J6
IE 8 CONC_3
0�
G 0 L IDS MV I]TH
LAND DEVELOPMENT SERVICES
1215114thA�SE, B_ 3 654 1- A
Bell".W"BOD4 I 7g
T 425462 1080 F4254627719 =6�=9'009
- 7ZI
IE 8-(E) CONC-73.14
IE 8-(W) CONC-72.33
PLOTTED. 2017102/03 09:06 EMALM DgtUMy,1g by
DRAWN: WIE.
APPROVED: KREESE
FIELD BOOK: 2689
PAGE #.' 48
SW 1/4, SW 1/4, SECTION 20, TOWNSHIP 27 N, RANGE 4 E,W.M.
NOTES CITY OF EDMONDS, SNOHOMISH COUNTY, WASHINGTON
1 . HORIZONTAL DATUM: ASSUMED BASED ON EVERGREEN CONDOMINIUMS AS RECORDED IN VOLUME 60 OF PLATS, PAGES 66 THROUGH 59, RECORDS
OF SNOHOMISH COUNTY, WASHINGTON, THE FOLLOWING RECORDS WERE ALSO REFERENCED:
A) RECORD OF SURVEY AS RECORDED UNDER RECORDING NUMBER 201409025004, RECORDS OF SNOHOMISH COUNTY, WASHINGTON.
B) RECORD OF SURVEY AS RECORDED IN VOLUME 49 OF SURVEYS, PAGES 213, RECORDS OF SNOHOMISH COUNTY, WASHINGTON.
C) PLAT OF AURORA HEIGHTS, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 12 OF PLATS, PAGE 120, RECORDS OF SNOHOMISH
COUNTY, WASHINGTON.
D) PLAT OF SEATTLE HEIGHTS DIVISION FOUR, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 9 OF PLATS, PAGE 11 RECORDS OF
SNOHOMISH COUNTY, WASHINGTON.
E) SNOHOMISH COUNTY ASSESSORS MAP FOR THE SOUTHWEST QUARTER OF SECTION 20, TOWNSHIP 27 NORTH, RANGE 4 EAST, W.M.
2. BASIS OF POSITION: HELD THE MONUMENT IN THE CENTERLINE OF 72ND AVENUE WEST AT THE SOUTHEAST CORNER OF THE ABOVE NOTED PLAT OF
AURORA HEIGHTS. SEE MAP FOR PLOTTED LOCATION AND DESCRIPTION.
3. BASIS OF BEARING: HELD THE BEARING BETWEEN THE ABOVE NOTED BASIS OF POSITION AND THE FOUND MONUMENT AT THE CENTERUNE
INTERSECTION ON 72ND AVENUE WEST AND 208TH STREET SOUTHWEST TO BE N 02*1 T 02'W PER DIRECT INVERSE. SEE MAP FOR PLOTTED
LOCATION AND DESCRIPTION.
4. VERTICAL DATUM: ASSUMED
MASTER BENCHMAM THE MONUMENT IN THE CENTERLINE OF 72ND AVENUE WEST AT THE SOUTHEAST CORNER OF THE ABOVE NOTED PLAT OF
AURORA HEIGHTS. SEE MAP FOR PLOTTED LOCATION AND DESCRIPTION. ELEVATION = 100.00 FEET
SITE BM#1: WEST RIM OF SANITARY SEWER MANHOLE OPPOSITE THE SITE 30 FEET SOUTH OF A UTIUTY POLE ON THE EAST SIDE OF 72ND AVENUE
WEST AND 3 FEET EAST OF THE EAST EDGE OF PAVEMENT OF 72ND AVENUE WEST. ELEVATION = 100.11
SITE BM#2: GOLDSMITH SURVEY CONTROL POINT SLA-1 - SET REBAR AND CAP IN BACK YARD, 18.3 FEET WEST OF THE NORTHWEST HOUSE CORNER
AND 7.1 FEET SOUTH OF A 6 FOOT WOOD FENCE RUNNING ALONG THE NORTH PROPERTY LINE. ELEVATION = 98.74
S. SURVEY WORK PERFORMED IN CONJUNCTION WITH THIS SURVEY UTILIZED ONE OR MORE OF THE FOLLOWING SURVEY INSTRUMENTS AND
PROCEDURES:
A) FIELD TRAVERSE AND / OR GLOBAL NAVIGATION SATELLITE SYSTEM (GNSS) POSITIONING SYSTEM SURVEY.
B) ELECTRONIC TOTAL STATIONS, INCLUDING TOPCON GPT 3005, TOPCON PS-103A, NIKON DTM-430, NIKON DTM-530 OR LEICA TCRP12011.
C) TOPCON HIPER LITE PLUS GNSS EQUIPMENT.
D) TOPCON GR-3 GNSS EQUIPMENT.
E) ALL FIELD TRAVERSE WORK COMPLIES WITH CURRENT STANDARDS AS OUTLINED IN WAC 332-130-070,080 AND 090. ALL INSTRUMENTS
MAINTAINED TO MANUFACTURERS SPECIFICATIONS AS REQUIRED BY WAC 332-130-100.
6. THE LEGAL DESCRIPTION AND EASEMENTS SHOWN HEREON, IF ANY, ARE PER TICOR TITLE COMPANY ALTA COMMITMENT FOR TITLE INSURANCE NO.
70032257, DATED MARCH 02,2016. ONLY EASEMENTS NOTED IN SCHEDULE B OF THE ABOVE NOTED REPORT THAT CAN BE PLOTTED ARE SHOWN
HEREON.
7. MONUMENTATION NOTED AS FOUND WAS FIELD VISITED ON JANUARY 23.2017.
B. PLANIMETRIC AND TOPOGRAPHIC INFORMATION SHOWN HEREON WAS OBTAINED ON JANUARY 23,2017 AND IS CURRENT TO THOSE DATES ONLY.
9. UNDERGROUND UTILITIES SHOWN HEREON ARE PER 4 COMBINATION OF FIELD LOCATED SURFACE 083ERVABLE FEATURE3 AND RECORUS OF THE
APPLICABLE UTILITY PURVEYOR. ALL LOCATIONS SHOULD BE VERIFIED PRIOR TO ANY CONSTRUCTION.
LEGAL DESCRIPTION
THE NORTH 75 FEET OF THAT PORTION OF LOT 3. BLOCK 2, SEATTLE HEIGHTS DIVISION 4, LYING WITHIN THE SOUTH HALF OF SAI 0 BLOCK 2, S EAT rLE
HEIGHTS DIVISION 4, ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 9 OF PLATS, PAGE 11, RECORDS OF SNOHOMISH COUNTY,
WASHINGTON.
LEGEND
BG BUILDING MON MONUMENT
Q!I, BM BENCHMARK RCF REBAR & CAP FOUND (AS NOTED)
@ CB 11 CATCH BASIN (TYPE 2)L RET RETAINING WALL
CONC CONCRETE RPE ROOF PEAK ELEVATION
COR CORNER SAN SANITARY SEWER
0 COS SEWER CLEAN OUT SLA, GOLDSMITH SURVEY CONTROL POINT
DI DUCTILE IRON SMH SANITARY SEWER MANHOLE
@ DMH STORM DRAIN MANHOLr SSS SANITARY SIDE SERVICE
EB ELECTRIC BOX TSF TRANSFORMER
EC EDGE OF CONCRETE TYP TYPICAL
EM ELECTRIC METER UG UNDER GROUND
EP EDGE OF PAVEMENT -0- UP UTILITY POLE
_6_ PH FIRE HYDRANT EEI WM WATER METER
FNC FENCE WV WATER VALVE
GVL GRAVEL GAS LINE
CTION OVERHEAD UTILTY LINE
�NT :NTERSE
VW RRIGATION VALVE SANITARY SEWER LINE
LP LIGHT POLE �D STORM LINE
LS# LAND SURVEY NUMBER WATER LINE
MB MAILBOX _x_X_ FENCE LINE
0 5 10 20 30
SCALE: 1"= 10
0
0
Know what's below.
Ca I I before you dig.
SLATER HOMES CORPORATION JOBNO. 17017
TOPOGRAPHIC SURVEY SHELT
FOR
SLATER HOMES CORPORATION
20904 72ND AVENUE WEST, CITY OF EDMONDS SNOHOMISH COUNTY, WASHNGTON I
CITY COPY
RECEIVED
DEC 28 2017
DEVELOPME NT SERVICES
COUNTER
2010 WSEC k IRC VF-NTILATION TAELe z4ovi
CLIMATr- ZONr-
MARINM 4
(R-VALUe w OR
U-FACTOR)
FENESTRATION U-17ACTOR (b)
00,
OMGHT (b) U-FACTOR
0.011
CLAZIEP 1`51156TARTION OHGC o�)
N/A
CEILING R-VALUa (0
41d
WOOP FRAME WALL om R-VALUI!
VIA-
MADO WALL R.VAWE 0)
?vzI 0)
FLOOR R-VAI Ile
�11 (9)
IMLOW-GRAPE OM WALL R-VALUff
161/10/?l 1,. 715
GLA5 Cd) R-VALUE J, PEFTH
10,24+1
FOR 04:1 -,. - CONTINUOUS IMOULATION-A,- INTERMEPIATE FRAMING
�L%F�TM6MP�MMMAMUft�l��TO�l�N6T�INA�V��l��
�Tht� OR�
.�NOT M Ue" THAN THM X-VALUE WeMW
0) Twe M TON J��M � � 6M*hM THM 54oO �N �E� TO kL - MNUST�AWN.
M=�IION, O-I&MV My M � T� OWeP reNeS�A�ON $� RMIJI-eNTS IN �ATe ZONZ� I DW.H 0
WH-e �- S46C F. � OKA"" MW NOT - I&
wAolslm
INT-9 OF THe WALL, OR K-21 CAMTY N�710N � A TH� � MMM THE � ANO TH. Mee�T W� AT
THe RMOR Or TH4 SA�ENT WALL IVA012IRTO � K MAT= TO AE � WITH 94 CAMN N�TON ON THe
INleRIM Q` THe �MT WXL R�O �ONMNS N�rON ON TNe �� Oit �M Or TM W" � MMNO
T� 5eTNeZN �R ANP ��!OeNT W"
0) R-W WNTN� 041-TON 10 ReQUIee7 M- H�TeP SW0 ON M M�O, eeE M."4
(�) THM Me NO 9� RIMURWENT9 IN THI N-Ne -e
(0 e-MeNT W" IN-AlON 6 NOT k=- IN -HUM I-ATION AS PM� PY �C R�M MP T� Rl�
C.) I--
(h) MROT VX 10 �MV N�N, e-NO '� -T-Uo N-ATION M IN�Te 6OW. eo 1�10 MeANO R4* �W
N� 9 - �NIJOU� 10�MON O� �TeP INONS, IF e�� OMtATNIN& �5 40 eNT OR
'e" or THe �m N wo�Tox -E 9� " `�WeO To . � 'y No - � ��p . TNe
�TIONO WH= 5 M.W- �HMTHIN& M JW TO �T- A WN"� TOT& SHIMTHING, THMNe65
()THe6
U) THe 9INMe R�- OR �T.V�W �N&0, TMe INO-MON - M � To R-�b
w - N��Te �ANN6) MoTeo OTANOMP I -No 16 �eo ON �S INS-TeP � WIN- R41
INO_MON
(j) LOG AW WWP TWW 6 WrTH A NINHIM AV- OF �.O INCHeO Me � MON TN� N-M.
ReOAReNeNT
TA� F,0240 FOOTNOR4
0) �CNESMMON "�M5 eN� Se OTANW rROM MIA%R�MWT. -I.A11ON O� AN �oeP 90=e OR A�
Ol=- IN �. R41Z.0
GENERAL NOT59,
THEO" GENERAL NOTES ARE TO SE U9EP AS A 6UPFLEMENT TO THE PRAWINCO.
ANY PIGCRerANCIe9 FOUNP AMONG THE PRAWINGO, GENERAL NOTES AMP OtTe
CONPITIONS SHALL DE RErORTrP TO THE ARCHITECT, WHO *HALL. CORRECT SUCH
P SCRerANCY I I WRITING. ANY WORK POINE OY THE CONTRACTOR AFTER THE
P19COVERY OF'A PIOCRErAINCY SHALL !�E PONE AT THE CONTRACTORS OWN RISK.
ALI- 14FTHOM AMP MATERIALS TO CONFORM TO THE FOLLOWING OULPING COPIES AS
AS AMENPEP AMP APOrTeP 15Y THE CITY OF ePMONP5. WA
20 0 IN ERNATIONAL. EUILPIN& COPE WITH STATE AMENPINIENTO
T
MTERNATIONAL. MECHANICAL COPE ONCLUPIN& INTERNATIONAL FUEL COPE) WITH
STATE AMENIPMENTS,
2016, INTERNATIONAL FIRE COPE WITH STATE AKENIPMENTS
golo UNIFORM FLUM15IN& COPE WITH STATE AMISNIPMENTO
Zolp) WAOHINGTO14 STATE ENERGY COPE (WAC 014)
F
_PMONP9 COMMUNITY PEVELOFMENT COPE - OURRENT EPITION
PEFFEREP FeRMIT "MITTALD,
THE! FOLLOWING ITEMS WILL EE %IEMIT1EP AS PErERREP SUDMITTAL5 OR SEPARATE
rERMITS FOR REVIEW
5MOKI! PLAR140 (OC *074,2, 04171AD. ,
ALL SMOKE ALARMS OHALL 15E L15TEP IN ACCORPANCE WITH UL%17 AMP INOTALLEP IN
ACCORPANCE WITH THE rROVIGON9 OF THE 15C AMP THE rROVISON* Or NFrA 72.
9MOK! ALARMS SHALL 151! IIOV INTERCONNECTEP WITH 15ATTERY 0ACK-UF.
EXHAUST HOOP MAK!Ur AIR (14100") KITCHEN EXHAUST HOOPS EXHAUSTING OVER
400CFM 5HALL- 15F EQUIPPEP WITH MAKELF AIR AT A RATE ArFROXIMATELY EQUAL To
THE! EXHAUST RATE. SUCH MAKE UF SYSTEMS SHALL ISE eQUIrrEP WITH A MEANS OF
CL06URE! AMP OHALL 515 AUTOMATCALLY CONTROILLEP TO START AMP OrERATE
SMULTANEOUSI WITH THE EXHAUST SYSTEM.
FIRIEDLOCKINIC. OHALL M rROVIPEP TO CUT OFF ALL CONCMEP PRArT OMMINSO ANP TO
FORM AN EFFECTIVE rlRe DARRIER DI!TWW.M STORIES AMP 15FTWeeN Tor STORY AMP
ROOF SPACE INSTALL rER 0C 'ADZ
WATER-REOISTANT GYrSUM OACKING OOARP 015C 2SOIDS). GYFGUM "AKP USEP AS A
I�AQKER 150ARP FOR CERAMIC MILE SHALL CONFORM TO AOTM C170. WATER-R5515TANT
GYrSUM 150ARP SHALL NOT 15E INSTALLEP OVER A VArOR RETARPER IN A SHOWER OR
TUIS COMrARTMI!NT. CUT OR eXPOSEP 5129159, INCLUPING TH09E AT WALL INTER15ECTIONe
SHALL M OZALIEP AS RECOMMENPEP 15Y THE MANUFACTURER.
FASTENERS IN PRESERVATIVE TRFATEP WOOP W 2�0410X)N FASTENERS, INcLUPIN&
NUTS AMP WASHERS, FOR FRrOERVATIVE TREA71517 WOOP OHALL DIE HOT PIFrEP
ZINC-COATER 9ALVANIZEP OTEE_ STAINLESS STEEL, OI=N 06RONZE OR COFFER.
��MA PRIF EPSE SHALL Off FROMPEP AT EAVES AMP GASLES Of'
5 AMP OHALL EXTEMP 10 INCHES 5ELOW SHEATHING AMP Z' UP
ROOF PECK
7010 WAeHINISTONSTATr- MMGY COP5
ROOF TRUSS PWIGM AMP LAYOUT - NIPPER P15519MEP
ENERGY CREPITO FER W915C TAME 40( S,
MECHANICAL SYSTEM PEV&N -0dPPER PeOCNEP
OF.4,15,00 - SMALL PWELLIN& UNIT - L0 CREPIT6 RECtUIREP
rLUM15IN& SYSTEM PESIGN - ISIPPER PE51SNeP
ELECTRICAL. 5YOTE14 PMIGN - EIPPER PESIGNEP
#CREPIT r,. - or, FONTS, EFFICIENT WATER HEATING G.,
FIRM SPRINKLER 5Y5TEM PF51914- 15PPER PMSMEP
ALL SHOWER HEAD AMP KITCHEN OINK IFAUCIETO INOTALLEP IN THE HOUSE SHALL.
FIRE ALARM OYOTEM PEOI&N- EIPPER P15619141517
ISE RATEP AT Wro GrM OR LESS. ALL OTHER LAVATORY FAUCETS SHALL Off
RATEP AT 1.0 GPM OR LESS.
WATER MFTER rERMIT
GIPE SEWER FERMIT
#CREPIT 0.; L0 FONTS' EFFICIENT WATER HEATING 0.,
CAO, ROPANE OR OIL WATER HEATER WITH A MINIMUM EF OF 0.01.
AUTOMATIg,rIRF GrRI:1�RT!,1YGT!1'ff= 0".2 11 V- CHArTER 96".1.2
-
U, F Q F
RO R 1A AN IN FT. N HEIGHT IN EUILPIN99
NOT EXCEEMNS ( .0 FEET IN HEIGHT ADOVE CRAPI! SHALL EE rPRMITTFP TO eir
INOTAILLEP THROUGHOUT IN ACCORPANCE WITH NFFA OR.
-VENTI ATING SYSTEM VeFA.INTERMITTENT WHOLE HOUSE U6INr EXHAUST FANG 0MC_
40!�,04, CHAFTER 01-02 WAC)
CONCRETE ffOUNPATONO.
-WHOLE HOU515 rAN SHALL OrERATE INTERMMENT.-Y AMP CONTINUOUSLY
r
CONCRETE FOUNPATONe SHALL 1515 P -51ONEP 114 ACCORPANICe WITH IV, CHArTeR 10
-AuToMATcc 24-HR CILOCK GET TO OFERATE rKACTIONAL.'ON'T]Me IN ooliam
AMP ACI NO AS AMENIPEP 114 SECTION 1*002 Or THE 2010 IV,
-OUTPOOR AIR Wit L DE PRAWN FROM AJR INLETS 1149TALLrP IN WNPOW9 (4o�.S( A)
ALL FXTeR OR WALLO ARE REQUiREP TO M OUFrORTEP ON CONTINUOUS FOOTING,
FRACTIO14AL OrIERATION TIME (+) OF 24 HR TIMER TO 15E GET 15Y MECHANICAL.
ALL EXT52OR FOOTINGS SHALL DIE rLACW AT LEAST 10 INCHES 15ELOW THE!
CONTRACTOR. 1020 CFM FA14 016 CrIA @,Zr?]N WC) WILL OE UOW ANPOET TO A 4-HOUR
UNP16TUROM CROUNP SURFACE A14P ALSO MUST EXTEMP 15ELOW THE FROST UNIE,
CYCLE THE ONTIMI! MINUTES 15ASEP ON TA15LE 40S.OJ AMP ASHREA 621-2010,
FOUNPATION AMP SHALL NOT 15E OU15JECTEP TO MORE THAN 64 rCF EQUIVALENT
IZFP MINUTES PER 4-HR CYCLE IF RATE! &0 (TAISLE MIrvO7.,5.M)3 krva
rLUIP rRESSURE (WELL PRAIMEP OOIL.). NOR TO A OURCHARGE,
ISO MINUTEIS PER 4-HR CYCLE IF RATE 70 (TAELE 141007."0% +-/,*
107 MINUTES FER 4-HR CYCLE IF RATE 190 (TA15LE M*61741.110% f-.7D
REFER TO STRUCTURAL SHEETS MOR APP!710NAL INFORMATION RWAFMNS
Zia MINUTES PER 40HR CYCLE IF RATE 100 (TAOLI! 141*07aft)3 4-41
CONCRETE FOUNPATIONG
reRMANENT CERTIFICATE OHAILL 151! rO5TeP WrrH1N 15 FEET O?THE MZCTRICAL rAMEL.
PAMrrROOrIN& OEC 000),
OR ON THE FANEL TOE) r. THE CERTIrCAT! SHALL OP COMFLeTEP 15Y THE OULPER OR
rOUNPATION WALL* THAT RETAIN EARTH AMP ENCLOSE INTERIOR 6FACES, AMP FLOORS
RE910TERW PE61" rROrIE991ORAL AMP U5T THE FOLLOWING. INSULATION R.VALUEO
EMLOW GRAPE SHALL DE PAWFROOFEP FROM THE TOP Of THE rOOTIMC TO THE 1`11419HEP
FOR ALL, OUILPIN& FRAMING AMP FOUNPATION/SLAI COMFONENTO, PUCT INSULATION
C
'J�APE' CONCRETE WAILL9 OHALL $9 PAMFrROOFEP 15Y ArrLYINS ANY ONE OF THE
OUTeVE CONPITIONFP AREAS. GLAZING U VALUES ANP/OR 9H&C VALUES, TYrI! AMP
MATERIALS LIGTeP IN 115C IO&S
EFFICIENCY OF HEATING/COOLING SYSTEM AMP HEATING EGUIrMENT, PUCT LEAKAGE
INFILTRATION C 44),
RATES INCLUPING TEST CONPITIONS AMP AIR LEAKASE RI!SUL.T0 CW05C 401a),
1. EXTERIOR JO10N`NT0RA0RLXw_WINIPOW AMP POOR FRAMES, OrFNINGS SiETWEEN WALLS AMP
HIGH EFFICACY WMINARI50 (WGFX 404J 70% Of' ALL L-LIMIMARIES SHALL SE H19H
FOUNPATIONS, 5LTWffE!N WALLS AMP ROOF AMP 15ETWEEN WALL PANEL, o. M.-s- Al
EFFICACY,
FENETRATION Of UTIUTY SERVICES THROUC41 WALL.G. FLOOR AMP ROOMANP ALL OTHER
OreNINC, IN TH SUILPING ENVIEL ff OHALL EF 5FALEP, CAUILKEP AMP SAOrPTEP OR
TWTIMC IREP FOR ALL 15UILPINGO AMP SHALL OCCUR ANYTIME
' (W5W REQU
WEATHERSTRIM LIMIT AdR0LfEAKAGE, OTHER EXTERIOR JOINTS AMP 5EAM5 SHALL
Frep To
P
AFTER R UGH -IN AMP AFTER INSTALLATION OrrENETIZATION5 Or THE DULPIN&
15E GMILAPi.Y TREATER OR TArFP. OR COVER1512 WITH MOISTURE VArOR FERMeADLE
ENVeLOM ACCEFTA151-F AJR LEAKAGE TO 15E LESS THAN * AIR CHANCES rER HOUR
HOU51EWRAr
Z ALL EXTERIOR POORO OR POOR* SERVING AS ACCESS TO AN ENCLOVEP UNHEATEP
WITH A 5LOWER POOR AT A PRE95DRE OF I INCH WS, (00 rA5CAL5)
AREA SHALL EE WeATHERSTRIFFEP TO WMIT LEAKAGE AROUNP THEIR PERIMETER WHEN
SEALING (WOM 40"IN PLY -TO SHALL 15E LEAK TG5TEP IN ACCORPANCE WITH WOU
IN A aOSW rOSMOM
�. RECEeOEP LIGHTING FIXTURES WHEN 11,16TAILLEP IN THE OULPING ENVELOre
R"O USING THE MAXIMUM PUCT LEAKAGE RATES SPECIFIER
OHALL Offi
-POST CONSTRUCTION J, ROUGH-N, TOTAL. LEAKAGE TO Ee LP09 THAN OR EQUAL TO
-TYrI! IC RATEP AMP CffRTrII!P UNPER A5TM EZO!� TO HAVE NO 14ORE THAN 2,0 CFM AIR
4CrM PER 100 64'. OF CONPITIONMP FLOOR AREA AT OJ INCHES W,9. FOR ENTIRE OYSTEM.
INCLUPING AIR HANPLER ENCL05URE, ALL REGISTER EOOT6 SHALL 51! TWEP OR
MOVEMENT
-THE AGHTINO rrATURE SHALL !Ir TWTEP AT 7& 17ASCALS OR L07 L"/SF rRESSURE
OTHERWIO OEALEP PURIM& TEST. LEAKAGE TO OUTPOOR5 SHALL 515 LESS THAN OR
E*CrM
PIFFERENCE AMP LAISO.EP OHOWIM& COMrLIANCI!
EQUAL TO rER 1610 OQUARE MET OF CONPITIONEP FLOOR AREA
-6HALL 515 INSTALLEP WITH A GASKET OR CALAX AT THE CaLING TO PREVENT AdR
PUCT INSULATION P NrZ�IQH eWqEC *v"l k 405�z.,51, PUCTS SHALL 06P INOULATEP
LEAKAGE
TO A MINIMUM R-O, EXCErT r LocATep comrLeTeLy WITHIN THE 15UILPING THERMAL
VArOR 15ARRIER OUNP COVERS 40r,, leo*)�
FNVeLOrF PULPINS FRAMING CAVITIES SHALL NOT 01! USEP AS PUCT9 OR MEMUM5,
AN ArrROVEP VArOR RETAR IER OH NI tN6TALLMP ON THE WARM 91PE ON WINTER)
INSTALLATION IF PUCTO OHAILL NOT PIOPLACE REQUIREP eNVELOFE IN5ULAnO1N.
OF INSULATION
HOT WATER rM NeULATION (WO15C R40.*.L$). INSULATION FOR HOT WATER Fire. 150TH
-rVA (VArOR RETARPER) FAINT WITH A PRY cur rI!RM RATING Or I MAY. SHALL 15M USEP
WITRN RW-5FAM-,-,HALL HAVE A MINIMUM THERMAL
AS THE VAFOR RETARPeR FOR A" EXTERIOR WALL.5 AMP ALL C15UNCO WITHOUT HEATEP
RE66TANCC (R.VAL.UE) OF R-6.
GrACE AI5OVF_
- CROUNP COVER, & MIL 15LACK FOLYFTHYLENE OR ArFROVIEP EQUAL OHALL OF LAIP
15ULPINC ENVEWFE
OVER GROUNP WITHIN CRAWL OFACES AMP SHALL. er OVERLArFW WMINIMUM AT
THE �
TR5_UNPEK5S?4IEP_HAe FROMPFP EUILPIM& ENCLOSURE POCUMENT5 THAT IN MY
THE JOINTS AN SHALL ff=NP TO THE FOUNPATION WALL
rROFE65IONAL JUPSAFNT ARE ArFROMATE TO SATISFY THE REQUIREMENTS OF RCW
64.00-000 THROUGH &4.020.0,961.
PUILPIN& 1146rECTION
CPK5MRCW5URI! MUST 15M INGrECTEP 15Y A QUAL1rsEP SUILPING ENCLOSURE
INGrWTOR PUFJMG THE COURSE OF CONSTRUCTION. THIS INSPECTION 15 TO DIE
COMrLffTEP 15Y A THIRP FARTY INPErENPENT 11,15715CTOR.
EXTERIOR WALL. RATING ANALY046
ER Y r`_ --I ION PISTANce, 20'.Z"
Zr' TY RAT, I
50U H r ERT FIRE GWA ON PIOTANM go 41"
rER 115C TAOLE 602, OCC GROUr R. TYFE Vl!�. FIRE RATING - 0
g:-a
IH
N5,91oIrn"'F 10D oo
l5ITff FLAN- F-PMONP5 MULTI -UNIT
FROrERTY INFORMATION,
15UILPING ANALYS15-
FARCE[. 0,
O02rANCY, R-Z
APPRES15.
CONSTRUCTION Tym: v_E
20,904 7ZNP AVE W
WMONPG, WA VbeZ( ,
ALLOWAELZ HEIGHT, 20'Two 1(,�AOCNP)
FROFOSEP HEIGHT, Zz�&
ZONING: RM4r,
LOT AREA, 7,7Vb OF
ALLOWAOLE 0 STORIES (INIFFA46R) 0 STORMS (TASLE 004.4)
5MACK9:
rROrO6EP STORIES, Z
FRONT. Ir"
REAR. 10,
ALLOWADLE FL.00R AREA (WrAJ�R), 7,6100 OF (TA151.15 W&.9.)
SPEYARP, 10'
rROr050P FLOOR AREA,
FIRST FLOOR, 1,771 OF
59CONP FLOOR, 2,140 OF
ALLOWADLe OULPIN , AREA CNFFAleR�.
C
71000 OF x Z STORIES - 14,0,70 or
rROrO5EP t5ULPING AREA� �.Vll Or
H H L*HT 15OLL
IC
SHIELD LIGHT AWAY
FROM AqJ. rRorepTlee,
105-es Tyr.
2" rE LIMP FROM
WATER METER TO
XPA IN R16FR
ROOM
HIGH WIGHT
LAMPOCArl -9 *HIeLP
L=AW�y From
Tyr.
ME
LANP9CArING
z
A, 4;cova- Apwgrj-
9 TAF At MAIN T
z WATER METER
-M ij
VICINITY I4AP:
15OX
rROrOGeP
A' MAS
F VIE TRU To
rL7rRTO ATC -
LOCATION) ARF-A C LATION
UNIT 0101 UNIT Tell
UNIT 1409
�tOfl UNIT -ZOI
U141T *ZOO
TOTAL.
j
PPMOVEU AS NOTED
NNEERING
BY ENC
D.t.:IL
Zone - - -
Comer - Fla& -
Setbacks Required Actual
Front
Sides
Rear
Other
Height
LOT COVIERACE.,
IMFERVIOUO OURrA5Z COVERAGE,
HEICHT CALCILLATION.
LEGAL PESCRIFTION,
ISUILP114C FOOTFRINT
2177 OF.
rROrO5W ROOF - Z,Z77
AVERAGE EXISTING 5&.20,
"'
THE NORTH 70 FEET OF THAT FORTION Or
COVERAGE.
rROrOSEP FAIANG - 2,077
TOTAL, 4.77* OF.
MAX. HEIGHT 12110
FROPOSEPH =TH.
t
LM, Eli.= 0. SEATTLE HEIGHTS PIV19ION 4.
2.277/7.70e 20%
4,771d/7,7VO- ( 1%
HIGHEST rOINT� IZA�l4
LYNG WITHIN THE SOUTH HALF Or OAIP
, 121.20'
15LOCKZ, SEATTLE HEIGHT* PIV15ION 4.
AQcORPtNG TO THI! FLAT THEREOF R15CORPEP
SCOrE Or WORK:
IN VOLUMEV Or FLATS, FACE It ReCORP9 OF
5NOHOM16H COUNTY, WASHINGTO14
06UILPING FOOTrRtNT 2277
LOT AREA 7700
COVERAGE &I*
OULPINIO M9
FAVN& =.�71g
TOTAL 477-5
NOTRLirCT N 0.046 or
4-UNIT RTMENT 15UILPING WfTH
OURrACIE rARIKIN& LOT
MAX. COVERAGE (40?�_
0,40
LOT AREA 77OD
REVISION
MAY. COVERAGE Or
-
6 ,,, V
lMrERVIOUO COVERAGE Ohl
t 6 2019
CITY COPY BUILDING DEPARTMENT
CITY OF EDMONDS
SHF-r-T 1NPeX
C
r,0Vr_R-CvF_NF_RAL NOTr:9
51
' WIL 91TF- MAN
CA
' OVr-R 5H=
CZ
Tr -Sr- MI AN
91ZAPINO XW7RORTArv��,
MEEOVeMeNT MAN
C-4
2RAINArve ANP UTILITY MAN
CIO
MTAILS
C4
TILITY ReTAIL5
07
RAIWA&r: -PeTAILS
Ge
RIFIN& FLAN
TO
OVA �ICCONT�ROLPLA�
L11
NPSCArF- PLAN
L?
NPSCAre PeTAIL6
I
NPATION rLAN
MOOR FCXN
15 UNITS/ CONS
F9
r-K rLOOK MAN
(0
rLAN
7
VATION9
7A
A Me
e
IONS
AP-11
ITeCTURAL PeTAIL6
51.1
TURAL 14=9
52.11
PATION MAN
SZ1
R rRAMINCv
Sz.�
FRAMIN& �&NN -
e�.i
TION PIETAIL5
54.11
MAMING PeTAILS
911.2
FRAMIN& Pr-TAILe
Zl
OOP FRAIAIN& PeTAILS
G 10'. 20, 41� ro,
`j
o
N15 .-1
1
Ow E.
6 U
2)
cint t
X
u
L Uj Vk)
Uj
>
<
< C�:
Z
lu
F- 'S�
lu
>
P-
k'A
N, 4� lz�) :z
2 (�N (3
0,
Uj 0,
Uj
LL1
LIJ
TZ
U)
11f
LLI
0
C)
�HEFT *