Loading...
Building PermitType: RESIDENTIAL BLDG Subtype: NEW SINGLE FAMILY I Status: ISSUED Parcel No: 27041800313800 Subdivision: Fire Sprinklers: Yes Valuation: $649,356.72 Code Edition: 2018 Site Address: 8823 194TH ST SW EDMONDS,WA 98026 Lot: 0 Lot Area: 15056 Occupancy Type: R3 No. Stories: 2 Zoning: RS-12 Construction Type: VB # of Dwelling Units: 1 Scope of Work: LANDSVERK QUALITY HOMES INC- NEW SFR (LOT A) WA State Contractor L & I #: LANDSQH023JN Applied: 11/29/2023 Issued: 6/5/2024 Final: Expiration Date: 6/5/2026 Issued by: BAC CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL 24113 56TH AVE W, APPLICANT JOSEPH ROWETT MOUNTLAKE TERRACE WA (425)742-2742 JOSEPH@LQH-INC.COM 98043 24113 56TH AVE W, CONTACT LANDSVERK QUALITY MOUNTLAKE TERRACE WA (425)742-2742 joseph@lqh-inc.com HOMES, INC. 98043 CONTRACTOR LANDSVERK QUALITY HOMES 24113 56TH AVE W, MOUNT (425)742 2742 joseph@LQH INC.COM INC LAKE TERRACE WA 98043 24113 56TH AVE W, LANDSVERK QUALITY HOMES OWNER MOUNTLAKE TERRACE WA INC 98043 A FEE INFORMATI• DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# BLD - RES - PLAN REVIEW 001.000.345.83.000.00 $4.25 $4.25 6/5/24 R37579 BLD - RES VALUE BASED FEE 001.000.345.83.000.00 $4,250.00 $4,250.00 6/5/24 R37579 BLD - RES VALUE BASED PLAN 001.000.345.83.000.00 $3,608.25 $3,608.25 12/14/23 R33286 REVIEW CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 12/14/23 R33286 PERMIT ENG - INSPECTIONS 001.000.345.83.400.00 $1,134.00 $1,134.00 6/5/24 R37579 ENG - PEER REVIEW DEPOSIT 001.000.245.963 $3,000.00 $3,000.00 5/13/24 R37066 MECHANICAL BASE PERMIT FEE 001.000.322.10.000.00 $57.00 $57.00 6/5/24 R37579 NEW SINGLE FAMILY MECHANICAL 001.000.345.83.000.00 $340.00 $340.00 6/5/24 R37579 SYSTEMS PARK IMPACT - RES ADMIN FEE 001.000.345.83.000.00 $60.00 $60.00 6/5/24 R37579 PARK IMPACT - SINGLE FAMILY 332.100.345.85.000.00 $2,734.05 $2,734.05 6/5/24 R37579 STATE BUILDING CODE SURCHARGE 001.000.237.150 $6.50 $6.50 6/5/24 R37579 - RES STORMWATER GFC - SFR UNDER 422.000.379.00.000.00 $799.00 $799.00 6/5/24 R37579 5000 - 12.31.23 AND PRIOR TRANSPORTATION IMPACT - 001.000.345.83.400.00 $60.00 $60.00 6/5/24 R37579 ADMIN FEE - SFR Printed: Wednesday, June 05, 2024 11:06:31 AM 1 of 4 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # TRANSPORTATION IMPACT FEE - 112.502.345.86.000.00 $6,249.14 $6,249.14 6/5/24 R37579 SFR TREES - FEE -IN -LIEU 143.000.345.81.000.00 $30,112.00 $30,112.00 6/5/24 R37579 TOTALS: $52,459.19 $52,459.19 CONDITION TYPE STATUS NOTES 48 HRS NOTICE-ENGR FINAL FOR 48 Working hours notice is required when requesting your FINAL engineering inspection. NFORMATION 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS INFORMATION REQUIREMENTS. FOR In addition to the required pressure relief valve an approved listed expansion tank shall EXPANSION TANK INFORMATION be installed on all hot water tanks per UPC 608. FOR The engineering division requires 48 hours notice prior to the date of the FINAL FINAL INSPECTION SCHEDULING INFORMATION Inspection. Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION Printed: Wednesday, June 05, 2024 11:06:31 AM 2 of 4 'RESIDENTIAL BLDG Permit PERMIT NUM City of Edmonds ' "01 C C 1 . •. - Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. INSP PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION FOR SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS INFORMATION www.mybuildingpermit.com Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT FOR items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. PLANNING CONDITION PRIOR TO FINAL Notice on Title - Protected Trees FOR Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. PROJECT CIVIL ASBUILT INFORMATION Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov. FOR Heat pumps, AC units and similar equipment greater than 36 inches in height are not SIDE YARD EQUIPMENT INFORMATION allowed within required building setbacks. Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES B-1 SETBACKS B-2 FOOTINGS B-2 FOUNDATION WALL B-3 EXT WALL SHEATHING B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 FRAMING B-4 HEIGHT VERIFICATION B-4 INTERIOR SHEAR Printed: Wednesday, June 05, 2024 11:06:31 AM 3 of 4 ' : '- 'AAM City of Edmonds PERMIT NUM w- 121 5th Ave N, Edmondsrmit 98020 1 1 www.edmondswa.gov B-4 SHOWER PAN B-5 INSULATION ENERGY B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" A-1 TESC AND MOBILIZE E-3 STRM CONVEYANCE E-3 STRM COVENANT E-3 STRM FOOTING DRAIN E-3 STRM MGMT FACILITY E-3 STRM PERVIOUS SURFACES E-3 STRM TIGHTLINE E-4 ACCESS WIDTH SLOPE E-4 WATER SERVICE LINE E-5 DRIVEWAY SLOPE E-5 ENG SPECIAL INSPECTION E-9 COMPOST AMEND E-9 PROJECT ASBUILTS X-2 ENGINEERING FINAL A-1 ENGINEERING PRECON Printed: Wednesday, June 05, 2024 11:06:31 AM 4 of 4