Building PermitType: RESIDENTIAL BLDG Subtype: DECK I Status: ISSUED
Parcel No: 00612400000900 Site Address: 8602 OLYMPIC VIEW DR EDMONDS,WA 98026-
5318
Subdivision: 006124, 004346, 006331 Lot: 0
Fire Sprinklers: Lot Area: 11686 Zoning: RS-12
Valuation: $26,000.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: FREEMAN -NEW FRONT STEPS AND LANDSCAPING
WA State Contractor L & I #: DESIGOL826N9
Applied: 1/8/2024
Issued: 6/6/2024
Final:
Expiration Date: 6/6/2026
Issued by: NED
CONTACTS
NAME TYPE NAME
ADDRESS
PHONE
EMAIL
APPLICANT
KATIE LUCCA
9953 RAINIER AVE S., SEATTLE
(206)503-5953
KATIELUCCA@DESIGNBYOZ.COM
WA 98118
9953 RAINIER AVE S., SEATTLE
CONTACT
DESIGN BY OZ
(206)503-5953
katielucca@designbyoz.com
WA 98118
9953 Rainier Ave S, SEATTLE WA
CONTRACTOR
DESIGN BY OZ LLC
(206)999-1847
oz@designbyoz.com
98118
KYLE JORDAN & SHEILA
8602 OLYMPIC VIEW DR,
OWNER
kylejordanfreeman@gmail.com
FREEMAN
EDMONDS WA 98026
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE RECEIPT#
BLD - RES VALUE BASED FEE
001.000.345.83.000.00
$510.00
$510.00
6/5/24
R37639
BLD - RES VALUE BASED PLAN
001.000.345.83.000.00
$433.50
$433.50
3/5/24
R35189
REVIEW
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
3/5/24
R35189
PERMIT
ENG - INSPECTIONS - 4.1.24
001.000.345.83.400.00
$132.00
$132.00
6/5/24
R37639
STATE BUILDING CODE SURCHARGE
001.000.237.150
$6.50
$6.50
6/5/24
R37639
RES
TOTALS: $1,127.00
$1,127.00
• 1 •
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, June 06, 2024 6:25:02 AM 1 of 3
'RESIDENTIAL
BLDG PermitCity
• • • • -
EL
98020 1 11
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:OOam to 6:OOpm on weekdays and 10:OOam to 6:OOpm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
ESC REQUIREMENTS
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
INFORMATION
REQUIREMENTS.
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
REQUIRED SPECIAL
FOR
Special inspection for:
INSPECTIONS
INFORMATION
1. Soils as per Geotechnical Engineer report
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:OOam to 6:OOpm on weekdays and 10:OOam and 6:OOpm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
SPECIAL INSPECTION REPORTS
FOR
Submit all special inspection reports to the City Building Official on a weekly basis.
NFORMATION
Printed: Thursday, June 06, 2024 6:25:02 AM 2 of 3
'RESIDENTIAL BLDG Permit
PERMIT NUM
of Edmonds
EdmondsCity
980i 1 11
. •. •
FOR
All utilities shall be located prior to any excavation. New locates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
INSPECTIONS - Schedule Online
at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR COMPLETED
RESULT
B-1 SETBACKS
B-2 RETAINING WALL
B-7 BUILDING OTHER INSP
B-5 BLDG SPECIAL
Special inspection for:
INSPECTION
1. Soils as per Geotechnical Engineer report
A-1 TESC AND MOBILIZE
E-9 COMPOST AMEND
X-2 ENGINEERING FINAL
Printed: Thursday, June 06, 2024 6:25:02 AM 3 of 3