BLD2024-0419 ESTIMATE OF GARAGE WORK 3009_001Q-44aVW — Of%P
Painting orywall
GENERAL CONTRACTOR
Licensed - Bonded - Insured
24208 57th Ave W.
Mountlake Terrace, WA 98043
Robert Taboada 206-941-0393
qualitvonepd@ hotmail.com
Rough Estimate: 0211412024
General Contractor Lic # OUALIOP86309
New Construction -Commercial -Residential, Drywall & Painting, Interior Millwork & Much MoreW
Project
Garage Ceiling Drywall repair
Name
Nils Moerkeseth
Address
128 4th Ave. S Edmonds, WA 98020
Phone
425-350-3109
nilsmoerkeseth@yahoo.com
Batt Ceiling Insulation Installation Labor, Basic
Basic labor to install butt ceiling insulation with favorable site conditions.
Fit and secure batt insulation between open ceiling joists. Includes planning,
equipment and material acquisition, area preparation and protection, setup and cleanup.
Labor
Insulation Material
R-30 Kraft Faced Fiberglass Insulation Batt 16 in. x 48 in. (8-Bags) to cover
3360 sq.ft of ceiling
Material On
RC1 Resilient Channel
120 Pcs - 2in x 12 ft x25 GaugeRC1 Resilient Channel w/1 leg
RCI Resilient channel installation, labor only
Ceiling Drywall Installation Labor, Basic
Basic labor to install ceiling drywall with favorable site conditions.
Layout, fabricate and fit drywall sheets. With up to 1 cutout per 100 SF.
Secure to framing per manufacturer specifications. Includes planning,
equipment and material acquisition, area preparation and protection, setup and cleanup.
Labor
Material Gvnsum Wallboard
Non -discounted retail pricing for: Paper faced 5/8" thick gypsum board. 4' x 12' sheets.
Quantity includes typical waste overage, material for repair and local delivery.
An area of 3360 sq. ft. X 3-layers, includes 10% waste material.
Material &
1 of 1
'Irvwnll Topina Labor. Basic
Basic labor to tape drywall joints with favorable site conditions.
Cover joints and screw heads with mud. Embed tape in joint mud.
Lightly sand and re -mud joints 2x. Final sand for primer/finish ready.
Includes planning, equipment and material acquisition, area
preparation and protection, setup and cleanup.
Labor & Material
PVA Primer
Apply one layer of PVA Primer, includes labor & material.
Labor, Basic
Basic labor to paint ceiling with favorable site conditions. Spray - Back Roll.
Includes planning, equipment and material acquisition, area preparation and protection,
setup and cleanup.
Ceilinu Paintina Cost
Non -discounted retail pricing for: Interior wall and ceiling paint.
Latex based, paint satin, finish.
Quantity includes typical waste overage, material for repair and local delivery.
Material
Total Labor & Material C
NOTE. 10.25 % Washington State & City Tax NOT INCLUDED. F t
65%Advance at signing
pZ
$�
35% Once work completed
Any alteration or deviation from above specification involving extra cost will be executed only
upon written order, and it will be an extra charge over and above estimate.
Respectfully submitted on:
The above price, specifics
You are authorized to do
j J t I r, Moe rte s(R-A
Print
Signatu�
Date: Gil
2/14/2024 Per: Robert Taboada
PROPOSAQ
conditions are satisfactory and are hereby accepted.
as specified, Payment will be made as outlined above.
Qualit One Painting and Drywall
Print a subcontrac
Sig �a7
ture of subcontractor
Date: !J �' `% �U 4 CT