Loading...
BLD2024-0419 ESTIMATE OF GARAGE WORK 3009_001Q-44aVW — Of%P Painting orywall GENERAL CONTRACTOR Licensed - Bonded - Insured 24208 57th Ave W. Mountlake Terrace, WA 98043 Robert Taboada 206-941-0393 qualitvonepd@ hotmail.com Rough Estimate: 0211412024 General Contractor Lic # OUALIOP86309 New Construction -Commercial -Residential, Drywall & Painting, Interior Millwork & Much MoreW Project Garage Ceiling Drywall repair Name Nils Moerkeseth Address 128 4th Ave. S Edmonds, WA 98020 Phone 425-350-3109 nilsmoerkeseth@yahoo.com Batt Ceiling Insulation Installation Labor, Basic Basic labor to install butt ceiling insulation with favorable site conditions. Fit and secure batt insulation between open ceiling joists. Includes planning, equipment and material acquisition, area preparation and protection, setup and cleanup. Labor Insulation Material R-30 Kraft Faced Fiberglass Insulation Batt 16 in. x 48 in. (8-Bags) to cover 3360 sq.ft of ceiling Material On RC1 Resilient Channel 120 Pcs - 2in x 12 ft x25 GaugeRC1 Resilient Channel w/1 leg RCI Resilient channel installation, labor only Ceiling Drywall Installation Labor, Basic Basic labor to install ceiling drywall with favorable site conditions. Layout, fabricate and fit drywall sheets. With up to 1 cutout per 100 SF. Secure to framing per manufacturer specifications. Includes planning, equipment and material acquisition, area preparation and protection, setup and cleanup. Labor Material Gvnsum Wallboard Non -discounted retail pricing for: Paper faced 5/8" thick gypsum board. 4' x 12' sheets. Quantity includes typical waste overage, material for repair and local delivery. An area of 3360 sq. ft. X 3-layers, includes 10% waste material. Material & 1 of 1 'Irvwnll Topina Labor. Basic Basic labor to tape drywall joints with favorable site conditions. Cover joints and screw heads with mud. Embed tape in joint mud. Lightly sand and re -mud joints 2x. Final sand for primer/finish ready. Includes planning, equipment and material acquisition, area preparation and protection, setup and cleanup. Labor & Material PVA Primer Apply one layer of PVA Primer, includes labor & material. Labor, Basic Basic labor to paint ceiling with favorable site conditions. Spray - Back Roll. Includes planning, equipment and material acquisition, area preparation and protection, setup and cleanup. Ceilinu Paintina Cost Non -discounted retail pricing for: Interior wall and ceiling paint. Latex based, paint satin, finish. Quantity includes typical waste overage, material for repair and local delivery. Material Total Labor & Material C NOTE. 10.25 % Washington State & City Tax NOT INCLUDED. F t 65%Advance at signing pZ $� 35% Once work completed Any alteration or deviation from above specification involving extra cost will be executed only upon written order, and it will be an extra charge over and above estimate. Respectfully submitted on: The above price, specifics You are authorized to do j J t I r, Moe rte s(R-A Print Signatu� Date: Gil 2/14/2024 Per: Robert Taboada PROPOSAQ conditions are satisfactory and are hereby accepted. as specified, Payment will be made as outlined above. Qualit One Painting and Drywall Print a subcontrac Sig �a7 ture of subcontractor Date: !J �' `% �U 4 CT