BLD2024-0421 ESTIMATE OF CONDO UNIT WORKBLD2024-0421
RECEIVED
41Q^6"�W441%40
Painting a. Drywall
GENERAL CONTRACTOR
Licensed gnnded - Insured
24208 57th Ave W.
Mountlake Terrace, WA 98043
Mar 27 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
Robert Taboada 206-941-0393
quaIityonepd@hotmail.com
Rough Estimate: 0211412024
Gener-I Contractor Lic # QUALIOP86309
New Construction -Commercial -Residential, Drywall & Painting, Interior Millwork & Much More►►►
Project
Repair
Name
Nils Moerkeseth / Kathy Jones
Address
1128 4th Ave. S Unit # 201 Edmonds, WA 98020
Phone
425-350-3109
nilsmoerkeseth@yahoo.com
nrywall Repair
Hang 5/8 drywall from floor level up to 12" ft high, all around unit, included tape, mud,
sand match texture, and pva primer ready for painting.
Includes all labor material and acquisition, delivered, cleanup & haul away all debris.
Insulation
Install insulation to areas around exterior walls where need it.
5-1/2" thick X 15" wide
inrerior Painting
Prep area and paint interior walls only, two coats.
Entry, hallway, bathroom, laundry room, kitchen area and living room,
Master bedroom and office, Includes all labor and material.
Paint material and supplys
Kitchen Cabinets
Touchup kitchen Cabinets
Millwork Installation & Painting
Basic labor to install MDF base molding with favorable site conditions.
Measure, cut (1 miter and 1 coped end per section) base molding and finish
nail molding. Patch and smooth nail holes, painting caulk edge gaps
Includes planning, equipment and material acquisition, area preparation
and protection, setup and cleanup.
Load and haul away old materials, installation waste and associated debris.
This includes MDF trim to all doors, all trim and baseboards to be spray paint.
Carpet material & Labor installation
Hardwood flooring TBD
1 of 1
r]
Renoir & install Base Of the followina:
Kitchen area 52L=1n. ft, includes back support and kick toe base
Powder room 46-112" includes back support & kick toe base.
Laundry room 91n. Ft. includes back support & kick toe base.
Master bottom cabinet 8 In.ft.includes back support & kick toe base.
Bathroom vanity, 6-5" In. ft. includes back support & kick toe base.
Closet shelves bottom covers labor & material.
Includes, material, installation and paint
Labor & Material
Doors
Hand all doors, sheem, level.
Paint all new door casings, prep, spackle and caulk.
Door casing's to be special order, does not includes time for placing order and pickup.
Labor & Material
41
VO 10.25 % Washington State & City Tax NOT INCLUDED.
zoz 9P /;0- Ao -
60% Advance at signing
20% after drywall and wall painting is done.
20% Once work completed
Any alteration or deviation from above specification involving extra cost will be executed only
upon written order, and it will be an extra charge over and above estimate.
Respectfully submitted on: 2/14/2024 Per: Robert Taboada
ACCEPTANCE OF PROPOSaI
The above price, specifications and conditions are satisfactory and are hereby accepted.
You are a thorized to do the ork as specified, Payment will be made as outlined above.
9-1 A
1.,Frss M ce "eS�'tbi
Signature
Date: 02 Zvi ZGZ�
Qual j )On/e Painting and Drywall
�L roc F oer-e%i
Printe n e s bcontr
Sig ature of subcontractor
Date: L-PZ