Loading...
BLD2024-0421 ESTIMATE OF CONDO UNIT WORKBLD2024-0421 RECEIVED 41Q^6"�W441%40 Painting a. Drywall GENERAL CONTRACTOR Licensed gnnded - Insured 24208 57th Ave W. Mountlake Terrace, WA 98043 Mar 27 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT Robert Taboada 206-941-0393 quaIityonepd@hotmail.com Rough Estimate: 0211412024 Gener-I Contractor Lic # QUALIOP86309 New Construction -Commercial -Residential, Drywall & Painting, Interior Millwork & Much More►►► Project Repair Name Nils Moerkeseth / Kathy Jones Address 1128 4th Ave. S Unit # 201 Edmonds, WA 98020 Phone 425-350-3109 nilsmoerkeseth@yahoo.com nrywall Repair Hang 5/8 drywall from floor level up to 12" ft high, all around unit, included tape, mud, sand match texture, and pva primer ready for painting. Includes all labor material and acquisition, delivered, cleanup & haul away all debris. Insulation Install insulation to areas around exterior walls where need it. 5-1/2" thick X 15" wide inrerior Painting Prep area and paint interior walls only, two coats. Entry, hallway, bathroom, laundry room, kitchen area and living room, Master bedroom and office, Includes all labor and material. Paint material and supplys Kitchen Cabinets Touchup kitchen Cabinets Millwork Installation & Painting Basic labor to install MDF base molding with favorable site conditions. Measure, cut (1 miter and 1 coped end per section) base molding and finish nail molding. Patch and smooth nail holes, painting caulk edge gaps Includes planning, equipment and material acquisition, area preparation and protection, setup and cleanup. Load and haul away old materials, installation waste and associated debris. This includes MDF trim to all doors, all trim and baseboards to be spray paint. Carpet material & Labor installation Hardwood flooring TBD 1 of 1 r] Renoir & install Base Of the followina: Kitchen area 52L=1n. ft, includes back support and kick toe base Powder room 46-112" includes back support & kick toe base. Laundry room 91n. Ft. includes back support & kick toe base. Master bottom cabinet 8 In.ft.includes back support & kick toe base. Bathroom vanity, 6-5" In. ft. includes back support & kick toe base. Closet shelves bottom covers labor & material. Includes, material, installation and paint Labor & Material Doors Hand all doors, sheem, level. Paint all new door casings, prep, spackle and caulk. Door casing's to be special order, does not includes time for placing order and pickup. Labor & Material 41 VO 10.25 % Washington State & City Tax NOT INCLUDED. zoz 9P /;0- Ao - 60% Advance at signing 20% after drywall and wall painting is done. 20% Once work completed Any alteration or deviation from above specification involving extra cost will be executed only upon written order, and it will be an extra charge over and above estimate. Respectfully submitted on: 2/14/2024 Per: Robert Taboada ACCEPTANCE OF PROPOSaI The above price, specifications and conditions are satisfactory and are hereby accepted. You are a thorized to do the ork as specified, Payment will be made as outlined above. 9-1 A 1.,Frss M ce "eS�'tbi Signature Date: 02 Zvi ZGZ� Qual j )On/e Painting and Drywall �L roc F oer-e%i Printe n e s bcontr Sig ature of subcontractor Date: L-PZ