Loading...
BLD2024-0500+Transportation_Impact_Form+4.15.2024_1.24.25_PM+4196884APPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: �Y ' W Owner/Applicant 0 \ G Wi l . &-CG Name rj �c j 0 '22 ;1J` ( C� t Street/Mailing Address City State Zip Telephone: -7D 2- 9-7 . n 22) (} ItPk5 f"L!kSS Applicant Contact Person: S`t-C -k A Rct Name Street/Mailing Address 3 In o ,ram l,i ri 0A TQ I -77 City State Zip Telephone: iQ © to 2-1 I q,,2 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Contact Name Telephone: E-mail: 1. PROJECT DESCRIPTION a. Location - Street address: (Attach a vicinity map and site plan.) b. Specify existing land use: c. Specify proposed type and size of development: J (# of residential units and/or square footage of building) d. Date construction will begin and be completed: e. Define proposed access locations: 1�2_ � V C' oaf f. Define proposed sight distance at site egress locati : � d HANDOUT UPDATED 05.09.2023 APPENDIX A Page 2 of 2 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. Check the applicable box below and calculate the fees as necessary: XNO CHANGE ❑ CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. ITE Land Use Category I Per Unit Fee Rate New Use $ X Prior Use $ X Units in square feet, # of dwelling, vfo. etc. Use Fee New Use Fee: $ - Prior Use Fee: $ = FEE DUE: $ 1 [ 1 NEW DEVELOPMENT Per Unit Fee ITE Land Use Category Rate New Use $ U INDEPENDENT FEE CALCULATION Units in square feet, # of dwelling, vfD. etc. X Impact/Mitigation Fee: I $ Independent Review Fee: $296.00 (+ peer review fee) I $ FEE DUE FEE DUE City of Edmonds, Engineering Division Approval Date No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 05.09.2023 APPENDIX B Page 3 of 4 e. If appropriate, state traffic control warrants (e.g. stop sign warrants, signal warrants). f. Summarize local accident history' (only required for access to principal and minor arterials). 5. TRAFFIC VOLUMES Provide the following and other planned development traffic within the city.4 a. Describe existing ADT and peak -hour counts (less than two years old), including turning movements, on street adjacent to and directly impacted by the project. b. Describe the estimated ADT and peak -hour counts, including turning movements, the year the project is fully open (with and without project traffic). c. Describe the estimated ADT and peak -hour counts, including turning movements, five years after the project has been fully open (with and without project traffic). d. State annual background traffic growth factor and source. 6. LEVEL OF SERVICE (LOS) ANALYSIS a. Summarize Level of Service Analysis below and attach supporting LOS analysis documentation. Provide the following documentation for each arterial street or arterial intersection impacted by ten or more peak -hour trips. Other City -planned developments' must also be factored into the LOS calculations. LOS LOS Existing Conditions Existing M Delays Year of Opening With Project //A Without Project Five Years Beyond Change of Land Use With Project Without Project b. Note any assumptions/variations to standard analysis default values and justifications. 3 Available upon request at City of Edmonds Police Department a A list of planned developments are available at the City upon request for public records HANDOUT UPDATED 05.09.2023 APPENDIX S Page 4 of 4 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. Check the applicable box below and calculate the fee as necessary: CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 impact fee rate shall be used. ITE Land Use Category Per Unit Fee Rate New Use $ $ Prior Use Units in square feet, Use Fee # of dwelling, etc. X /w 0S = $ X New Use Fee. $ - Prior Use Fee: $ = FEE DUE: $ s L NEW DEVELOPMENT ITE Land Use Category Per Unit Fee Rate New Use $ ❑ INDEPENDENT FEE CALCULATION Units in square feet, # of dwelling, vfu. etc. f.`4 Impact/Mitigation Fee: 1 $ Independent Review Fee: $296.00 (+ peer review fee) I $ FEE DUE FEE DUE City of Edmonds, Engineering Division Approval Date 5 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 05.09.2023