Building Permit_1Type: RESIDENTIAL BLDG Subtype: NEW SINGLE FAMILY I Status: ISSUED
Parcel No: 00452000400801
Subdivision:
Fire Sprinklers: Yes
Valuation: $701,725.78
Code Edition: 2018
Site Address: 7901 240TH ST SW EDMONDS,WA 98026
Lot: 0
Lot Area:
Occupancy Type: R3/U
No. Stories: 2
Zoning:
Construction Type: VN
# of Dwelling Units: 1
Scope of Work: GOLDEN SEA VENTURES- LOT 1, NEW SFR P&M INCL
WA State Contractor L & I #: EVERGC*954BQ
Applied: 10/21/2021
Issued:3/27/2023
Final:
Expiration Date: 3/27/2025
Issued by: NED
CONTACTS
NAME TYPE NAME
ADDRESS I
PHONE
EMAIL
APPLICANT
DANTE PALMAFFY
12925 47TH DR SE, EVERETT WA
(425)345-2530
DPALMAFFY@AOL.COM
98208
CONTACT
GOLDEN SEA VENTURES LLC
12114 MARINE VIEW DRIVE,
(206)571-7777
JOHN_AN@EVERGREENCONTRACTIN
EDMONDS WA 98020
G.COM
2531 BROADWAY SUITE A,
EVERGREENCONTRACTING4@MSN.CO
CONTRACTOR
EVERGREEN CONTRACTING
(425)258-1015
EVERETT WA 98201
M
OWNER
GOLDEN SEA VENTURES LLC
12114 MARINE VIEW DRIVE,
(206)571-7777
JOHN_AN@EVERGREENCONTRACTIN
EDMONDS WA 98020
G.COM
PREVIOUS
FM ENTERPRISE LLC
10321 30TH ST NE, LAKE
(425)322-8549
SANDRA.GASPAR1045@GMAIL.COM
CONTRACTOR
STEVENS WA 98258
PRIOR
QUANTUM HOMES, LLC
1226 169TH PL SW, LYNNWOOD
(206)899-8893
DPALMAFFY@AOL.COM
CONTRACTOR
WA 98037
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
1 - BASE FEE FOR MECHANICAL
001.000.322.10.000.00
$50.00
$50.00
3/27/23
R27368
PERMITS
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
3/27/23
R27368
PERMITS
1 - BASE FEE FOR PLUMBING
001.000.322.10.000.00
$50.00
$50.00
3/27/23
R27368
PERMITS
2020 TRANSPORTATION IMPACT
112.502.345.86.000.00
$6,249.14
$6,249.14
3/27/23
R27368
FEE
4/30/2024: Has a separate permit,
001.000.322.10.000.00
$360.00
$360.00
3/27/23
R27368
and was double charged.
AIR CONITIONING SYSTEM OR HEAT
001.000.322.10.000.00
$50.00
$50.00
3/27/23
R27368
PUMP - 1.75 BTU OR LESS
AIR HANDLERS - 10,000 CFM OR
001.000.322.10.000.00
$30.00
$30.00
3/27/23
R27368
LESS
APPLIANCE VENTS
001.000.322.10.000.00
$30.00
$30.00
3/27/23
R27368
BLD - PERMIT RENEWAL
001.000.345.83.000.00
$1,127.50
$1,127.50
2/12/24
R34820
CITY TECHNOLOGY FEE CHARGED
001.000.321.99.100.00
$40.00
$40.00
9/24/21
R14967
PER PERMIT
Printed: Tuesday, June 18, 2024 6:45:13 AM 1 of 6
-RESIDENTIAL
BLDG PermitCity
• • • •
98020 1 1: 1
www.edmondswa.gov
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE RECEIPT #
EACH PLUMBING FIXTURE ON ONE
001.000.322.10.000.00
$360.00
$360.00
3/27/23
R27368
TRAP
ENGINEERING INSPECTION FEE
001.000.341.82.000.00
$770.00
$770.00
3/27/23
R27368
ENGINEERING PEER REVIEW
001.000.245.963
$715.00
$715.00
3/27/23
R27375
FAN CONNECTED TO SINGLE DUCT
001.000.322.10.000.00
$135.00
$135.00
3/27/23
R27368
FURNACE OR FIREPLACE
001.000.322.10.000.00
$30.00
$30.00
3/27/23
R27368
GAS PIPING - NEW OR LOCATED
001.000.322.10.000.00
$30.00
$30.00
3/27/23
R27368
PARK IMPACT - ADMIN FEE RES
001.000.322.10.000.00
$50.00
$50.00
3/27/23
R27368
PARK IMPACT FEE - SINGLE FAMILY
332.100.345.85.000.00
$2,734.05
$2,734.05
3/27/23
R27368
PERMIT FEE - RESIDENTIAL
001.000.322.10.000.00
$4,510.00
$4,510.00
3/27/23
R27368
PLAN REVIEW FEE - RESIDENTIAL
001.000.345.83.000.00
$3,833.50
$3,833.50
9/24/21
R14967
RESIDENTIAL STATE SURCHARGE
001.000.237.150
$6.50
$6.50
3/27/23
R27368
STORMWATER ENGINEER REVIEW
001.000.341.82.000.00
$65.00
$65.00
3/27/23
R27368
FEE
STORMWATER GENERAL FACILITY
422.000.379.00.000.00
$799.00
$799.00
3/27/23
R27368
CHARGE SFR UNDER 5000
TRANSPORTATION IMPACT ADMIN
001.000.341.82.000.00
$50.00
$50.00
3/27/23
R27368
FEE - SFR
WATER HEATER - TANKLESS
001.000.322.10.000.00
$15.00
$15.00
3/27/23
R27368
WATER HEATER - TANKLESS
001.000.322.10.000.00
$15.00
$15.00
3/27/23
R27368
TOTALS: $22,154.69 $22,154.69
CONDITIONS
CONDITION TYPE
STATUS
NOTES
48 HRS NOTICE-ENGR FINAL
FOR
48 Working hours notice is required when requesting your FINAL engineering inspection.
NFORMATION
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2
- PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other
administrative deviation from adopted codes ordinances or policies must be specifically
requested in writing and be called out and identified. Processing fees for such requests
shall be established by Council and shall be paid upon submittal and are nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
O
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 -
OCCUPANCY - Final approval on a project or final occupancy approval must be granted by
the Building Official prior to use or occupancy of the building or structure. Check the job
card for all required City inspections including final project approval and final occupancy
inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter
18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and
potential monetary liability for work performed by unlicensed plumbing contractors. For
more information contact L&I Department of Licensing at 1-800-647-0982.
Printed: Tuesday, June 18, 2024 6:45:13 AM 2 of 6
Permit
PERMIT NUM
City of Edmonds
ll!&
www.edmondswa.gov
FOR
CARBON MONOXIDE SYSTEMS
CARBON MONOXIDE SYSTEMS
NFORMATION
It is the owner's responsibility to repair/replace all damage of utilities or frontage
DAMAGE TO FRONTAGE
FOR
improvements in City right of Ways or Easements to City Standards caused by or
IMPROVEMENTS
INFORMATION
occurring during the permitted project.
ELECTRICAL PERMIT
FOR
Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309.
NFORMATION
FOR
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
INFORMATION
REQUIREMENTS.
FIRE FINAL INSPECTION
FOR
Request final Fire Department Inspection 425-775-7720.
NFORMATION
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
GAS PIPE TEST
FOR
Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted
NFORMATION
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
HOSE BIBBS
FOR
Hose Bibbs are required to have a permanently affixed anti -siphon device installed.
NFORMATION
INSP PRIOR TO BACKFILL
FOR
Call for all required inspections. All work shall be inspected prior to backfill.
NFORMATION
FOR
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
INFORMATION
www.mybuildingpermit.com
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish
the datum point and the point of average grade. Call for inspections to verify. These
MAXIMUM HEIGHT
O
items must be consistent with the approved plan. If the proposed height of a building is
INFORMATION
within 12 inches of the maximum height permitted for the zone an elevation survey is
required.
Final approval on a project or final occupancy approval must be granted by the Building
OCCUPANCY
FOR
Official prior to use or occupancy of the building or structure. Check the job card for all
INFORMATION
required City inspections including final project approval and final occupancy inspections.
New and existing buildings shall have approved address numbers, building numbers or
approved building identification placed in a position that is plainly visible from the street
POST ADDRESS
FOR
or road fronting the property. Address numbers shall be Arabic numerals or alphabet
INFORMATION
letters Numbers shall be legible from the public way, at least 4 inches high with a half
inch min stroke width on a contrasting background.
FOR
Electronic civil asbuilt shall be submitted to the City prior to final project acceptance.
PROJECT CIVIL ASBUILT
INFORMATION
Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov.
The issuance of this permit in no way constitutes approval from any other agencies
REGULATING AGENCIES
FOR
having regulatory authority over the facility and this construction activity. It is the
INFORMATION
responsibility of the property owner to obtain any and all such required approvals.
FOR
Heat pumps, AC units and similar equipment greater than 36 inches in height are not
SIDE YARD EQUIPMENT
INFORMATION
allowed within required building setbacks.
Printed: Tuesday, June 18, 2024 6:45:13 AM 3 of 6
: Permit
LM
City •Edmonds-
98020 1 1: 1
www.edmondswa.gov
Sound or noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND AND NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites and activities must comply with the noise limits of Chapter 5.30, unless a variance
has been granted pursuant to ECC 5.30.120.
Sound/Noise originating from temporary construction sites as a result of construction
activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of
FOR
7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
SOUND OR NOISE
INFORMATION
Sundays and Federal Holidays. At all other times the noise originating from construction
sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has
been granted pursuant to ECC 5.30.120.
Special inspections have been called for on this project and are noted on the approved
SPECIAL INSPECTION BUILDING
FOR
construction plans. It is the owner and or contractors responsibility to ensure that reports
DIVISION
INFORMATION
are provided to the City on a weekly basis.
FOR
All utilities shall be located prior to any excavation. New locates shall be called for if at
UTILITY LOCATES
INFORMATION
time of excavation, original locates are no longer identifiable.
City approved plastic piping may be used in water service piping provided that where
FOR
metal water service piping is used for electrical grounding purposes, replacement piping
WATER SERVICE PIPING
INFORMATION
shall be of like materials (UPC 604.8) a state electrical permit and inspection is required if
electrical grounding is altered or removed.
Installer shall provide the manufacturer installation, operating instructions, and a whole
WHOLE HOUSE FAN
FOR
house ventilation system operation description. A label shall be affixed to the whole
INFORMATION
house timer control that reads "Whole house ventilation, see operating instructions".
INSPECTIONS
- Schedule Online
at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR
COMPLETED
RESULT
NOTES
B-3 EXT WALL SHEATHING
B-3 GAS PIPING TEST
B-3 MECH ROUGH IN
B-3 PLUMB ROUGH IN
B-3 ROOF SHEATHING
B-3 UNDERFLR FRAMING
B-3 WATER SERVICE LINE
B-4 DRYWALL FASTENING
B-4 FRAMING
B-4 INTERIOR SHEAR
B-4 SHOWER PAN
B-5 BLDG SPECIAL
INSPECTION
B-5 INSULATION ENERGY
B-7 BUILDING OTHER INSP
X-3 BUILDING FINAL"
B-4 HEIGHT VERIFICATION
Printed: Tuesday, June 18, 2024 6:45:13 AM 4 of 6
: Permit
City •Edmonds-
lL:
•:� i 1 1: 1
www.edmondswa.gov
A-1 TESC AND MOBILIZE
E-5 DRIVEWAY SLOPE
E-9 COMPOST AMEND
E-9 PROJECT ASBUILTS
X-2 ENGINEERING FINAL
A-1 ENGINEERING PRECON
9/15/2023
APPROVED
PH 2O6-571-7777 REGARDS
12:00:00 AM
A-1 ENGINEERING PRECON
9/15/2023
APPROVED
Spoke with Balwant, no need to meet on site.
12:00:00 AM
A-1 BUILDING PRECON
9/15/2023
APPROVED
PH 2O6-571-7777 REGARDS
12:00:00 AM
A-1 BUILDING PRECON
9/15/2023
APPROVED
Approved
12:00:00 AM
B-2 FOOTINGS
10/5/2023
APPROVED
call 425-322-8250 felic
12:00:00 AM
B-2 FOOTINGS
10/5/2023
APPROVED
Thanks Les
12:00:00 AM
B-2 FOOTINGS
10/5/2023
APPROVED
Approved
12:00:00 AM
B-1 SETBACKS
10/5/2023
APPROVED
approved per surveyed footing pins
12:00:00 AM
B-2 FOUNDATION WALL
10/19/2023
APPROVED
please call 425-322-8250
12:00:00 AM
B-2 FOUNDATION WALL
10/19/2023
APPROVED
Approved
12:00:00 AM
E-3 STRM FOOTING DRAIN
11/1/2023
PARTIAL
Thanks
12:00:00 AM
APPROVAL
E-3 STRM FOOTING DRAIN
11/1/2023
PARTIAL
4" perf pipe installed around the foundation sloping
12:00:00 AM
APPROVAL
towards the back of the house. Still need to see the
connection to the conveyance system. Ok to back fill
around the foundation.
E-3 STRM TIGHTLINE
11/1/2023
PARTIAL
4" PVC pipe installed around the foundation sloping
12:00:00 AM
APPROVAL
towards the back of the house. Still need to see the
connection to the conveyance system. Ok to back fill
around the foundation.
B-2 FND DAMPPROOFING
11/2/2023
CORRECTION
Felix 425-322-8250
12:00:00 AM
REQUIRED
B-2 FND DAMPPROOFING
11/2/2023
CORRECTION
damp proofing shall added so its within 6" of the
12:00:00 AM
REQUIRED
main floor.
B-2 FND DAMPPROOFING
E-4 WATER SERVICE LINE
E-3 STRM TIGHTLINE
Printed: Tuesday, June 18, 2024 6:45:13 AM 5 of 6
'RESIDENTIAL BLDG PermitCity
-
• • • •
W-
121 5th Ave N, Edmonds WA 98020
ah�.ILI)2021-0810
www.edmondswa.gov•
E-3 STRM TIGHTLINE
11/20/2023
PARTIAL
4" PVC tightline installed between the foundation and
12:00:00 AM
APPROVAL
the storm stub connected to the 12" standpipe
conveyance system to the infiltration system.
E-3 STRM FOOTING DRAIN
11/20/2023
APPROVED
4" PVC footing drain outlet connected to the storm
12:00:00 AM
stub at the property line. Ok to back fill.
E-4 STRM STUB CONNECT
11/20/2023
APPROVED
Thanks Jeff
12:00:00 AM
E-4 STRM STUB CONNECT
11/20/2023
APPROVED
4" PVC tightline installed between the foundation and
12:00:00 AM
the storm stub connected to the 12" standpipe
conveyance system to the infiltration system.
E-3 STRM MGMT FACILITY
Note to Inspector: This inspection is for the
vegetated filter strip for the surface water runoff
from the driveway.
B-2 SLAB INSULATION
12/6/2023
CORRECTION
Thanks
12:00:00 AM
REQUIRED
B-2 SLAB INSULATION
12/6/2023
CORRECTION
Expose bearing points that are covered by insulation.
12:00:00 AM
REQUIRED
B-2 SLAB INSULATION
12/7/2023
APPROVED
Approved
12:00:00 AM
Printed: Tuesday, June 18, 2024 6:45:13 AM 6 of 6