Loading...
Building Permit_2Type: RESIDENTIAL BLDG Subtype: NEW SINGLE FAMILY I Status: ISSUED Parcel No: 00452000400803 Subdivision: Fire Sprinklers: Yes Valuation: $686,482.10 Code Edition: 2018 Site Address: 7905 240TH ST SW EDMONDS,WA 98026 Lot: 0 Lot Area: 8078 Occupancy Type: R-3 No. Stories: 1 Zoning: IRS-8 Construction Type: VB # of Dwelling Units: 1 Scope of Work: GOLDEN SEA VENTURES LLC- LOT 3, NEW SFR P&M INCL WA State Contractor L & I #: EVERGC*954BQ Applied: 10/21/2021 Issued:2/21/2023 Final: Expiration Date: 2/21/2025 Issued by: NED CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT DANTE PALMAFFY 12925 47TH DR SE, EVERETT WA (425)345-2530 DPALMAFFY@AOL.COM 98208 CONTACT GOLDEN SEA VENTURES LLC 12114 MARINE VIEW DRIVE, (206)571-7777 JOHN_AN@EVERGREENCONTRACTIN EDMONDS WA 98020 G.COM 2531 BROADWAY SUITE A, EVERGREENCONTRACTING4@MSN.CO CONTRACTOR EVERGREEN CONTRACTING (425)258-1015 EVERETT WA 98201 M OWNER GOLDEN SEA VENTURES LLC 12114 MARINE VIEW DRIVE, (206)571-7777 JOHN_AN@EVERGREENCONTRACTIN EDMONDS WA 98020 G.COM PREVIOUS FM ENTERPRISE LLC 10321 30TH ST NE, LAKE (425)322-8549 SANDRA.GASPAR1045@GMAIL.COM CONTRACTOR STEVENS WA 98258 PRIOR QUANTUM HOMES, LLC 1226 169TH PL SW, LYNNWOOD (206)899-8893 DPALMAFFY@AOL.COM CONTRACTOR WA 98037 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# 1 - BASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 2/18/23 R26543 PERMITS 1 - BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 2/18/23 R26543 PERMITS 2020 TRANSPORTATION IMPACT 112.502.345.86.000.00 $6,249.14 $6,249.14 2/18/23 R26543 FEE AIR CONITIONING SYSTEM OR HEAT 001.000.322.10.000.00 $50.00 $50.00 2/18/23 R26543 PUMP - 1.75 BTU OR LESS AIR HANDLERS - 10,000 CFM OR 001.000.322.10.000.00 $30.00 $30.00 2/18/23 R26543 LESS APPLIANCE VENTS 001.000.322.10.000.00 $30.00 $30.00 2/18/23 R26543 BLD - PERMIT RENEWAL 001.000.345.83.000.00 $1,108.75 $1,108.75 2/12/24 R34820 CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 10/21/21 R15448 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $360.00 $360.00 2/18/23 R26543 TRAP ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $770.00 $770.00 2/18/23 R26543 FAN CONNECTED TO SINGLE DUCT 001.000.322.10.000.00 $135.00 $135.00 2/18/23 R26543 Printed: Tuesday, June 18, 2024 7:49:35 AM 1 of 6 -RESIDENTIAL BLDG PermitCity • • • • 98020BLD2021-0811 www.edmondswa.gov DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # FURNACE OR FIREPLACE 001.000.322.10.000.00 $30.00 $30.00 2/18/23 R26543 GAS PIPING - NEW OR LOCATED 001.000.322.10.000.00 $30.00 $30.00 2/18/23 R26543 PARK IMPACT - ADMIN FEE RES 001.000.322.10.000.00 $50.00 $50.00 2/18/23 R26543 PARK IMPACT FEE - SINGLE FAMILY 332.100.345.85.000.00 $2,734.05 $2,734.05 2/18/23 R26543 PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $4,435.00 $4,435.00 2/18/23 R26543 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $3,769.75 $3,769.75 10/21/21 R15448 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 2/18/23 R26543 STORMWATER ENGINEER REVIEW 001.000.341.82.000.00 $65.00 $65.00 2/18/23 R26543 FEE STORMWATER GENERAL FACILITY 422.000.379.00.000.00 $799.00 $799.00 2/18/23 R26543 CHARGE SFR UNDER 5000 TRANSPORTATION IMPACT ADMIN 001.000.341.82.000.00 $50.00 $50.00 2/18/23 R26543 FEE - SFR WATER HEATER - TANKLESS 001.000.322.10.000.00 $30.00 $30.00 2/18/23 R26543 TOTALS: $20y872.19 $20,872.19 CONDITIONS CONDITION TYPE STATUS NOTES 48 HRS NOTICE-ENGR FINAL FOR 48 Working hours notice is required when requesting your FINAL engineering inspection. NFORMATION 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. FOR CARBON MONOXIDE SYSTEMS CARBON MONOXIDE SYSTEMS NFORMATION It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. ELECTRICAL PERMIT O Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. ORMATION Printed: Tuesday, June 18, 2024 7:49:35 AM 2 of 6 'RESIDENTIAL BLDG Permit PERMIT NUM of Edmonds EdmondsCity 98020BLD2021-0811 www.edmondswa.gov• FOR MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS INFORMATION REQUIREMENTS. FOR The engineering division requires 48 hours notice prior to the date of the FINAL FINAL INSPECTION SCHEDULING INFORMATION Inspection. FOR FIRE FINAL INSPECTION Request final Fire Department Inspection 425-775-7720. NFORMATION Approval of this foundation design is conditional subject to inspection of existing site soil FOR conditions. Retaining walls must be designed and constructed to resist the lateral FOUNDATION BEARING INFORMATION pressure of the retained material. Provisions must be made for the control and drainage of surface water around buildings. GAS PIPE TEST O Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted ORMATION Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its FOR officials, employees, and agents from any and all claims for damages of whatever nature, HOLD HARMLESS INFORMATION arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. FOR HOSE BIBBS Hose Bibbs are required to have a permanently affixed anti -siphon device installed. NFORMATION INSP PRIOR TO BACKFILL FOR Call for all required inspections. All work shall be inspected prior to backfill. NFORMATION FOR SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS INFORMATION www.mybuildingpermit.com LOT LINES STAKED OORMATION Lot line stakes must be in place at the time of foundation setback inspection. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Maximum Height 25 feet. The agent or contractor shall set up the equipment; establish the datum point and the point of average grade. Call for inspections to verify. These MAXIMUM HEIGHT FOR items must be consistent with the approved plan. If the proposed height of a building is INFORMATION within 12 inches of the maximum height permitted for the zone an elevation survey is required. Final approval on a project or final occupancy approval must be granted by the Building OCCUPANCY FOR Official prior to use or occupancy of the building or structure. Check the job card for all INFORMATION required City inspections including final project approval and final occupancy inspections. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly visible from the street POST ADDRESS FOR or road fronting the property. Address numbers shall be Arabic numerals or alphabet INFORMATION letters Numbers shall be legible from the public way, at least 4 inches high with a half inch min stroke width on a contrasting background. FOR Electronic civil asbuilt shall be submitted to the City prior to final project acceptance. PROJECT CIVIL ASBUILT INFORMATION Asbuilt shall be submitted to Engineeringpermits@edmondswa.gov. The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. FOR Heat pumps, AC units and similar equipment greater than 36 inches in height are not SIDE YARD EQUIPMENT INFORMATION allowed within required building setbacks. Printed: Tuesday, June 18, 2024 7:49:35 AM 3 of 6 : Permit - LM City •Edmonds 98020 1 1: www.edmondswa.gov • Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND AND NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of FOR 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding SOUND OR NOISE INFORMATION Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Special inspections have been called for on this project and are noted on the approved SPECIAL INSPECTION BUILDING FOR construction plans. It is the owner and or contractors responsibility to ensure that reports DIVISION INFORMATION are provided to the City on a weekly basis. FOR All utilities shall be located prior to any excavation. New locates shall be called for if at UTILITY LOCATES INFORMATION time of excavation, original locates are no longer identifiable. City approved plastic piping may be used in water service piping provided that where FOR metal water service piping is used for electrical grounding purposes, replacement piping WATER SERVICE PIPING INFORMATION shall be of like materials (UPC 604.8) a state electrical permit and inspection is required if electrical grounding is altered or removed. FOR Pursuant to UPC 605.2 a water service shutoff shall be installed on the water line as it WATER SERVICE SHUTOFF INFORMATION enters the building. Installer shall provide the manufacturer installation, operating instructions, and a whole WHOLE HOUSE FAN FOR house ventilation system operation description. A label shall be affixed to the whole INFORMATION house timer control that reads "Whole house ventilation, see operating instructions". INSPECTIONTYPE INSPECTOR COMPLETED RESULT !NOTES F-0 FIRE SITE INSPECTION B-2 RETAINING WALL B-3 EXT WALL SHEATHING B-3 GAS PIPING TEST B-3 MECH ROUGH IN B-3 ROOF SHEATHING B-3 UNDERFLR FRAMING B-4 DRYWALL FASTENING B-4 FRAMING B-4 HEIGHT VERIFICATION B-4 INTERIOR SHEAR B-4 SHOWER PAN B-5 BLDG SPECIAL INSPECTION B-5 INSULATION ENERGY X-3 BUILDING FINAL** Printed: Tuesday, June 18, 2024 7:49:35 AM 4 of 6 AL : Permit - City •Edmonds it: Edmonds 98020BLD2021-0811 www.edmondswa.gov B-4 HEIGHT VERIFICATION A-1 TESC AND MOBILIZE E-5 DRIVEWAY SLOPE E-9 COMPOST AMEND E-9 PROJECT ASBUILTS X-2 ENGINEERING FINAL A-1 ENGINEERING PRECON 9/15/2023 APPROVED PH 2O6-571-7777 REGARDS 12:00:00 AM A-1 ENGINEERING PRECON 9/15/2023 APPROVED Spoke with Balwant, no need to meet on site. 12:00:00 AM A-1 BUILDING PRECON 9/15/2023 APPROVED PH 2O6-571-7777 REGARDS 12:00:00 AM A-1 BUILDING PRECON 9/15/2023 APPROVED Approved 12:00:00 AM B-2 FOOTINGS 1/22/2024 PARTIAL Provide special inspection soils report. 12:00:00 AM APPROVAL B-2 FOUNDATION WALL 2/20/2024 APPROVED 4253228250 FELIX 12:00:00 AM B-2 FOUNDATION WALL 2/20/2024 APPROVED Approved 12:00:00 AM B-1 SETBACKS 2/20/2024 APPROVED approved per surveyed pins in footings. 12:00:00 AM B-7 BUILDING OTHER INSP This is for footing wall water proofing E-3 STRM FOOTING DRAIN 3/15/2024 APPROVED footing drain 12:00:00 AM E-3 STRM FOOTING DRAIN 3/15/2024 APPROVED 4" perf pipe installed around the foundation with 12:00:00 AM washed rock and filter fabric. Footing drains are connected to the storm stub on the east side of the property. Ok to back fill. B-2 FND DAMPPROOFING 3/15/2024 APPROVED This is for footing wall water proofing 12:00:00 AM B-2 FND DAMPPROOFING 3/15/2024 APPROVED Approved. Do not backfill over 4' until interior is 12:00:00 AM reinforced E-4 WATER SERVICE LINE 3/19/2024 PARTIAL 1 1/2" poly water service line installed from the east 12:00:00 AM APPROVAL side of the foundation around to the west side of the foundation. Line is bedded in sand. Ok to back fill. E-4 WATER SERVICE LINE E-4 STRM STUB CONNECT 3/19/2024 APPROVED 4" PVC tightlines installed around the foundation 12:00:00 AM connected to the storm stub on the east side of the property. Ok to back fill. E-3 STRM TIGHTLINE 3/19/2024 PARTIAL 4" PVC tightlines installed around the foundation 12:00:00 AM APPROVAL connected to the storm stub on the east side of the property. Ok to back fill. Printed: Tuesday, June 18, 2024 7:49:35 AM 5 of 6 'RESIDENTIAL BLDG PermitCity - • • • • Edmonds98020 1 1: www.edmondswa.gov E-3 STRM TIGHTLINE B-2 FOOTINGS 2/20/2024 APPROVED 12:00:00 AM B-3 PLUMB ROUGH IN Daniel 2064763304 B-3 PLUMB GROUND WK 4/16/2024 APPROVED 12:00:00 AM B-2 SLAB INSULATION 4/23/2024 APPROVED Thanks so much 12:00:00 AM B-2 SLAB INSULATION 4/23/2024 APPROVED Approved 12:00:00 AM Printed: Tuesday, June 18, 2024 7:49:35 AM 6 of 6