Building PermitType: DEMO Subtype: RES SECONDARY DEMO I Status: ISSUED
Parcel No: 27043100402600 Site Address: 7910 240TH ST SW EDMONDS,WA 98026-9117
Subdivision: LAKE MCALEER VILLA TRACTS, 005116, 004911 Lot: 0
Fire Sprinklers: Lot Area: Zoning:
Valuation: $0.00 Occupancy Type: Construction Type:
Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0
Scope of Work: DEAN -DEMO DECK *COD*
WA State Contractor L & I #:
Applied: 4/1/2024
Issued:6/21/2024
Final:
Expiration Date: 6/21/2026
Issued by: BAC
CONTACTS
NAME TYPE NAME
ADDRESS
PHONE
EMAIL
APPLICANT
DANIEL DEAN
23632 HIGHWAY 99 F315,
(206)501-5855
DRDANIELDEAN@HOTMAIL.COM
EDMONDS WA 98026
CONTACT
DANIEL DEAN
23632 HIGHWAY 99 F315,
(206)501-5855
drdanieldean@hotmail.com
EDMONDS WA 98026
CONTRACTOR
OWNER
23632 HWY 99 F, EDMONDS WA
OWNER
DANIEL DEAN
98026
11L
FEE INFORMATION
DESCRIPTION
ACCOUNT AMOUNT
PAID
PAID DATE
RECEIPT #
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
4/23/24
R36594
PERMIT
DEMO - INTERIOR OR SECONDARY
001.000.345.83.000.00
$172.00
$172.00
4/23/24
R36594
STRUCTURE
STATE BUILDING CODE SURCHARGE
001.000.237.150
$6.50
$6.50
4/23/24
R36594
RES
TOTALS: $223.50
$223.50
CONDITIONS
CONDITION TYPE
STATUS
NOTES
Printed: Friday, June 21, 2024 8:33:59 AM 1 of 2
DEMO PerCity mit
• • • -
•:� i 1 1 �
www.edmondswa.gov •
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests,
agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its
FOR
officials, employees, and agents from any and all claims for damages of whatever nature,
HOLD HARMLESS
INFORMATION
arising directly or indirectly from the issuance for this permit. Issuance of this permit shall
not be deemed to modify, waive or reduce any requirements of any City ordinance nor
limit in any way the City's ability to enforce any ordinance provision.
Installation, use and maintenance of equipment and components shall be per
MANUFACTURER SPECS
FOR
manufacturers specifications, installation instructions, and applicable state codes.
INFORMATION
Provide manufactures installation instructions on site for Building Inspector.
Nothing in this permit approval process shall be interpreted as allowing or permitting the
maintenance of any currently existing illegal, nonconforming or unpermitted building,
FOR
structure or site condition which is outside the scope of the permit application, regardless
NONCONFORMING DISCLAIMER
INFORMATION
of whether such building, structure or condition is shown on the site plan or drawing.
Such building, structure or condition may be the subject of a separate enforcement
action.
L INSPECTIONS
- Schedule Online at https://inspection.mybuildingpermit.com
INSPECTIONTYPE INSPECTOR
COMPLETED RESULT
NOTES
X-3 BUILDING FINAL"
A-1 BUILDING PRECON
Printed: Friday, June 21, 2024 8:33:59 AM 2 of 2