Loading...
Building PermitFAMILY HOME Permit City of Edmonds PERMIT NUM EdmondsADULT 98020 1 1 761 www.edmondswa.gov Type: ADULT FAMILY Subtype: NEW AFH COMPLIANCE Status: ISSUED HOME Parcel No: 00513500001600 Site Address: 7404 BRAEMAR DR EDMONDS,WA 98026-5136 Applied: 6/10/2024 Subdivision: 005135, 005131 Lot: 0 Issued: 6/26/2024 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: R3 Construction Type: VB Expiration Date: 6/26/2026 Code Edition: 2021 No. Stories: 0 # of Dwelling Units: 0 Issued by: BAC Scope of Work: AMAZING GRACE 2024- ADULT FAMILY HOME COMPLIANCE ONLY WA State Contractor L & I #: IN • NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT VICTORIA, STEVE AND LETTY 7404 BRAEMAR, EDMONDS WA (206)641-5607 AFHHOMES2024@GMAIL.COM SPIERS, KRASSNER 98026 CONTACT AMAZING GRACE 2024 AFH 7404 BRAEMAR, EDMONDS WA (206)641-5607 afhhomes2024@gmaii.com LLC 98026 CONTRACTOR OWNER OWNER MARIA LETTY KRASSNER PO BOX 345, LYNNWOOD WA (425)772-4463 98046 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # ADULT FAMILY HOME COMPLIANCE 001.000.345.83.000.00 $628.00 $628.00 6/10/24 R37731 CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 6/10/24 R37731 PERMIT STATE BUILDING CODE SURCHARGE 001.000.237.150 $6.50 $6.50 6/10/24 R37731 - RES TOTALS: $679.50 $679.50 77 CONDITION TYPE STATUS NOTES Printed: Wednesday, June 26, 2024 3:19:28 PM 1 of 2 -ADULT FAMILY HOME • _ rmit - City of • • • 98020 1 1 . •. 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. FOR The engineering division requires 48 hours notice prior to the date of the FINAL FINAL INSPECTION SCHEDULING INFORMATION Inspection. FIRE FINAL INSPECTION O Request final Fire Department Inspection online via mybuildingpermit.com. ORMATION The issuance of this permit in no way constitutes approval from any other agencies REGULATING AGENCIES FOR having regulatory authority over the facility and this construction activity. It is the INFORMATION responsibility of the property owner to obtain any and all such required approvals. INSPECTIONS - Schedule Online at https://inspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES X-1 FIRE FINAL B-6 AFH COMPLIANCE X-3 BUILDING FINAL** Printed: Wednesday, June 26, 2024 3:19:28 PM 2 of 2