Building PermitType: RESIDENTIAL BLDG Subtype: ALTERATION OR REMODEL I Status: ISSUED
Parcel No: 00390000000700
Subdivision: 003900, 003901
Fire Sprinklers:
Valuation: $31,348.00
Code Edition: 0
Site Address: 717 15TH ST SW EDMONDS,WA 98020-5119
Lot: 0
Lot Area: Zoning:
Occupancy Type: Construction Type:
No. Stories: 0 # of Dwelling Units: 0
Scope of Work: NGUYEN- FOUNDATION STABILIZATION AROUND GARAGE
Applied: 6/3/2024
Issued:6/27/2024
Final:
Expiration Date: 6/27/2026
Issued by: JOK
I WA State Contractor L & I #: MATVEFR837K5 I
CONTACTS
NAME TYPE
NAME
ADDRESS T
PHONE
EMAIL
APPLICANT
PERMIT MANAGER
18915 16TH AVE S, SEATAC WA
(253)327-1650
PERMITS@GOMATVEY.COM
98188
CONTACT
MATVEY FOUNDATION
18915 16TH AVE S, SEATAC WA
(253)327-1650
permits@gomatvey.com
REPAIR
98188
CONTRACTOR
MATVEY CONSTRUCTION INC
1912 S 146TH ST, SEATAC WA
(253)327-1650
permits@gomatvey.com
98168
MINH-QUAN & CHIEN-NGU
717 15TH ST SOUTHWEST,
OWNER
NGUYEN
EDMONDS WA 98020
•' ' •
DESCRIPTION
7BLDRESPERMIT
ACCOUNT
AMOUNT
PAID
PAID DATE
RECEIPT #
-VALUATION
001.000.345.83.000.00
$570.00
$570.00
6/27/24
R38147
BASED
BLD - RES - PLAN REVIEW
001.000.345.83.000.00
$484.50
$484.50
6/5/24
R37578
CITY TECHNOLOGY FEE - PER
001.000.321.99.100.00
$45.00
$45.00
6/5/24
R37578
PERMIT
STATE BUILDING CODE SURCHARGE
001.000.237.150
$6.50
$6.50
6/27/24
R38147
- RES
TOTALS: $1,106.00
$1,106.00
77
[11111K 111 •
CONDITION TYPE
STATUS
NOTES
Printed: Thursday, June 27, 2024 11:16:55 AM 1 of 2
'RESIDENTIAL
BLDG PermitCity
• • • • -
EL
98020 1 1 1
www.edmondswa.gov•
1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors
in interests, agrees to indemnify defend and hold harmless the City of Edmonds,
Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly from the issuance of this permit. Issuance
of this permit shall not be deemed to modify, waive or reduce any requirements of any
City ordinance nor limit in any way the City's ability to enforce any ordinance provision.
2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or
other administrative deviation from adopted codes ordinances or policies must be
specifically requested in writing and be called out and identified. Processing fees for such
requests shall be established by Council and shall be paid upon submittal and are
nonrefundable.
3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a
ALL BUILDING PERMITS
FOR
result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only
INFORMATION
during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on
Saturdays, excluding Sundays and Federal Holidays. At all other times the noise
originating from construction sites/activities must comply with the noise limits of
Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted
by the Building Official prior to use or occupancy of the building or structure. Check the
job card for all required City inspections including final project approval and final
occupancy inspections.
5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW.
Property owners who hire an unlicensed plumber may assume the risks and potential
monetary liability for work performed by unlicensed plumbing contractors. For more
information contact L&I Department of Licensing at 1-800-647-0982.
FOR
The engineering division requires 48 hours notice prior to the date of the FINAL
FINAL INSPECTION SCHEDULING
INFORMATION
Inspection.
Approval of this foundation design is conditional subject to inspection of existing site soil
FOR
conditions. Retaining walls must be designed and constructed to resist the lateral
FOUNDATION BEARING
INFORMATION
pressure of the retained material. Provisions must be made for the control and drainage
of surface water around buildings.
SPECIAL INSPECTION REPORTS
FOR I
Submit all special inspection reports to the City Building Official on a weekly basis.
NFORMATION
'
•
- •INSPECTIONTYPE
INSPECTOR
7PLETED
RESULT
NOTES
A-1 BUILDING PRECON
B-2 FOOTINGS
B-3 UNDERFLR FRAMING
B-4 FRAMING
B-7 BLDG SITE INSPECTION
X-3 BUILDING FINAL**