Loading...
APPROVED BLD BLD2020-0581+SIGNED SPECIAL INSP FORM+8.3.2020_6.45.26_PMRESUB Aug 04 2020 CITY OF EDMONDS Mo DEPARTMENT DEVELOPMENTSERVICES OF ED �a SPECIAL INSPECTION AND TESTING AGREEMENT U N Permit #: BLD2020-0581 Project: Murray, 630 Alder Street Prior to issuance of a permit, this form must be completed in its entirety and returned to the City for approval. The completed form must have signatures of acknowledgment by all parties. DUTIES AND RESPONSIBILITIES Special Inspection Firm and Special Inspectors: The Special Inspection firm of will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to be employed): Reinforced Concrete Bolting in Concrete Prestressed Concrete Shotcrete _ Structural Masonry X Structural Epoxy _ High Strength Bolting Spray applied Fireproofing Smoke Control Systems Lateral Wood Structural Observation by design professional Soils Expansion Bolts/Threaded Expansion Inserts All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection records shall include: A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. \\edmsvr-userfs\userprof$\dakau\Desktop\Comments Letters and Special Inspection fomns 2019\Special Inspection forms\Sl 2020-0581 Murray, Epoxy hold down existing foundation.doc6/30/2020 Contractor- The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, for review by all parties. The special inspection functions are considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. Building Department: The building department shall review any revisions and addenda. The City inspector will monitor the special inspection functions for compliance with the agreement and the approved plans. The City inspector shall be responsible for approving various stages of construction to be covered and for work to proceed. Design Professionals: The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in such a way as to ensure that all required City approvals are obtained, prior to work shown on the revisions being performed in the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special inspector or agency. ENFORCEMENT A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved plans and this document, may void this agreement and the Building Official's approval of the special inspector. In such a case a new special inspector and/or firm would need to be proposed for approval. A failure of the design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS I have read and agree to comply with the terms and conditions of this agreement. �I Owner: Signature Date / ,LA' ZOOP Contractor: (U N r) (-I p E D� Signature Date: �g.� ��-�5 (11"i ��6�r wsmj Signature I ptj � ' f �/L 1 Date: 7 �l D ' & ZV Special Insp.Z41 20str0w — Signature49&v��Date: I ao ;L O P�cs�d�k Special Insp. Agency Dct Roscnax& dr►1C ACCEPTED FOR THE CITY OF EDMONDS BUILDING DIVISION M. (Um" Date: 8/18/2020 \\edmsvr-userfs\userprof$\dakau\Desktop\Comments Letters and Special Inspection forms 2019\Special Inspection forms\SI2020-0581 Murray, Epoxy hold down existing foundation.doc6/30/2020 f'allRlA7 N � STANDARD �: Q MMJW DETAIL / ER-9oo 4- �---+5E4SonIaL yE�P A �o 4 Loi iy FLAT W QIw .,•.. ,. `I r TOPSOIL.."R" � �enodE ��xi�a I ,�'i� r F3& W N U1 Rao F W l W Zel FPXkf1 5b, .0 cum Wurto 0 DATUM ' I dd.D' D LDE IZ STD r14 rLvvL O Ca3� �LDM e37- f,:DMwv,5 qVnZD- CCU) FoUND�'(IDIU c7a�N5 t�4 DOWELS f-PoxY. i IJ°T�: �KoNr rOZC14 rro mv-E Rio" ihl(o �rpac�, 1 OTTO ROSENAU & ASSOCIATES, INC. Geotechnical Engineering, Construction Inspection & Materials Testing 6747 M. L. King Way South, Seattle, Washington 98118-3216 USA Tel: (206) 725-4600 . Toll Free: (888) OTT04-US • Fax: (206) 723-2221 WBE W2F5913684. WABO Registered Agency • Website: www.ottorosenau.com New Project Questionnaire: Please fill in the following fields completely so we can ensure that your project is set up correctly. Project Information Project Name: Murray Site Address: 630 Alder St, Edmonds Building Dept.: City of Edmonds Superintendent: Project Description: Testing & Inspection Scope: Epoxy Billing Information Company Name: Jerry Murray Mailing Address: 630 Alder St Phone Number: Contact Person: Contact Phone No.: P.O. Number: City: Edmonds 425-770-4073 Permit Number: BLD2020-0581 Phone Number: State: WA Zip: 98020 Fax Number: Email Address.: Prefers Invoices: ❑ via email P via mail Job Number: Report Distribution (Note: If the building dept. is specified above, they are included automatically and do not need to be listed below) Company Name: Hanson Design Mailing Address: 652 Alder St Contact Person: Phone Number: City: Edmonds Kristin Hanson 425-774-7129 Company Name: Mailing Address: City: Contact Person: Phone Number: Company Name: Mailing Address: City: Contact Person: Phone Number: Company Name: Mailing Address: City: Contact Person: Phone Number: State: WA Zip: 98020 Email Address: hansondesign@hotmail.com Project Role: ❑Owner❑✓ Arch. ❑Eng. ❑Cont. ❑Other State: Email Address: Project Role: ❑Owner ❑Arch. ❑Eng Zip: ❑Cont. ❑Other State: Zip: Email Address: Project Role: ❑Owner ❑Arch. ❑Eng. ❑Copt. ❑Other State: Zip: Email Address: Project Role: ❑Owner❑Arch. ❑Eng. []Cont. ❑Other