APPROVED REV1 BLD2023-0029+Structural_Analysis_or_Calculations+3.13.2024_1.34.57_PM+4127889BLD2023-0029
CITY OF EDMONDS
BUILDING DIVISION
RIWED PLAN PROJECT NAME Lantz Ridge Beam
03/21/2024 PROJECT# 20-417
www.dibbleengineers.com
! 1029 Market Street, Kirkland, WA 98033 SUBJECT
425.828.420o Roof Framing Plan
4. 2/28/2024
(4) 2X4 POST
0
ua o
N
0
Coffee
Bar
SHEET# SSK-1 (REV)
DATE 2-28-2024
RY MWD
EXST
7'-0" by 4'-0"
Eating
,4rea
REVISION
Mar 13 2024
4 D
/ a Z
Xcn
cV
w�
o
I
I
/
r--T--
I I
viRefr
I
r
�
I I
I
X
I
I
IL
I
04
Lo
04
Lckitchen
I
O
.I
l m
VERIFY CONTINUOUS 2x6 i
i
o r-
--a 11---------
CEILING JOIST, TYP. UNO i
i
I TYP.
I
—-------------- 4f
-:1
E--I
- ---I—
----
I
< si
I'-3" 4'-0"
4'-O" 2'-O"
I
- -
(2) 2x6 CEILING JOIST_
62
3 $�l
I
\CJ?62 II
43.
��
�
\\
r
I
---= TYP. Ftry-------�
(E) DBL 2x6 '
r(4)2X�
N,
3'x3'x8"w/
(3) #4 EA WAY, BOTT
Bedroom/Study Nall
1'-9" SQR' x 8"DP
CONC FTG. W/
(2) #4 EA WAY, BOTT
(4) 2X4
POSTP�l RI
i�
NELU
. > I
walk-in Pantry I /
III /
Iil� I
NELU
�� Mud Room