Loading...
EOR addressing roof framingMULHERN+KULP RESIDENTIAL CIRt1C1t1RAI rNGINrFRING 7220 Trade Street, Suite 295, San Diego, CA 92121 ► p 619-650-0010 ► mulhernkulp.com April 12, 2024 Scott McMillen ARCHITECTURAL INNOVATIONS, P.S. 14311 SE 1611 St. Bellevue, WA 98007 GZ Edmonds LLC Remodel Edmonds, WA FRAMING CONDITION M+K Project #; 203-24002 Reference Updated Structural Markups, Prepared by Mulhern + Kulp, dated 0211212024 Scott, Pursuant to your request, we are providing this letter to address the framing condition at the above referenced home in Edmonds, WA. It has been reported to our office that there is an existing 3-ply ceiling joist supporting only ceiling that is parallel to the new 3'/z"xl 8" flush bottom GLB and offset approximately 3'-6" towards the kitchen. A new double ceiling joist supports only the existing triple ceiling joist and hangs into the new 18" GLB at about midspan. There is an existing vertical 2x4 nailer at the east entry side exterior with 2x4 existing sloping rafters bearing on top and 2x4 new ceiling joists hanging in. It has also been reported that there is an existing header above a replaced sliding glass door across from the stairs that is to remain, and the existing framing above did not change, Please note a representative from our office has not visited the site to confirm these as -built conditions, but photos were provided. Based on our evaluation, the new 3'/z"x18" flush bottom GLB installed in accordance with the above referenced markups and the existing header supporting the existing framing above the new sliding glass door are adequate to support all code required loading. The existing 2x4 nailer shall be fastened to the existing double top plate with''/a"x3'/z" Simpson SDS screws at 12" on center. Additionally, the existing rafters shall also be fastened to the existing 20 nailer with Simpson H3 ties at each rafter. Once the hardware as described herein is installed, the framing shall be adequate to resolve all code required loading. Please feel free to call if you have any questions. Respectfully, Doti of WAS cat MULHERN & KULP STRUCTURAL ENGINEERING, INC. y _ 0 John C. Leone, E.I.T. Staff Engineer// ,e� 6478 A� Coll, ��crs reR� Nicholas J. Martignetti, P.E. Associate Owner + San Diego Office Director �SSroNAI01 5ignalure, Seal d Date