REVIEWED RESUB 1 BLD2023-0084+ENERGY_INFO+5.16.2023_1.16.55_PM+3548180BLD2023-0084
RESUB
May 16 2023
�= pSp The Association of
v Pool & Spa Professionals®
CITY OF EDMONDS
DEVELOPMENT SERVICES
T
ANSVAPSP/ICC 15 ENERGY EFFICIENCY COMPLIANCE INFORMATION FOR RESIDENTIAL SWIMMING POOLS
PROJECT NAME
AND ADDRESS
CONTRACTOR NAME
AND ADDRESS:
REVIEWED
BY
�OWNER:
TY OF EDMONDS
CONTRACTOR PHONE:
DATE:
i ms mTormatloI U a< �,an-, - *,A 1 kA-- Q-1 ■wlmming Pool and Spa tnergy tmciency Standard Writing Committee of the Association of Pool and Spa
Professionals (APSP). It is not part of the American National Standard ANSI/APSP/ICC-15 2011 but is included for information only. Contractors should acquire and comply
with the ANSI/APSP/ICC-15 2011 standard which can be purchased at www.apsp.org.
1. §5.2.1: Calculated pool volume
a. Gallons: ; or
b. Calculated Gallons: (surface area) X (average depth) X 7.48 (gal/ftA3) _ 0
2. §5.2.1: Calculated maximum filtration flow rate
(Pool volume : 360 or 36gpm whichever is larger)
3. §5.2.2: Auxiliary Pool Load: flYes, RNo?
(Enter the highest "auxiliary pool load" to be powered by the swimming pool filtration pump. Do not add auxiliary
pool load flow rates together, only the highest is used.)
4. Calculated maximum flow rate
(Item 2 or item 3, whichever is larger.)
5. §5.5.1: Pipe sizing:
a. Minimum suction pipe diameter
(Enter the smallest pipe size from Table 1 with a 6 fps flow capacity the same or more than item 4.)
b. Minimum suction branch pipe diameter
(Calculate: Item 4. 36 (gpm) _ Branch Pipes 1 (quantity) = branch flow rate 36 (gpm).
Enter the smallest pipe size from Table 1 with a 6 fps flow capacity the same or more than the calculated
suction branch flow rate.)
c. Minimum return pipe diameter
(Enter the smallest pipe size from Table 1 with a 8 fps flow capacity the same or more than item 4.)
d. Minimum return branch pipe diameter
(Calculate: Item 4. 36 (gpm) _ Branch Pipes 1 (quantity) = branch flow rate 36 (gpm).
Enter the smallest pipe size from Table 1 with a 8 fps flow capacity the same or more than the calculated
return branch flow rate.)
6. §5.4.1: Filter type and size:
a. Filter type: (Cartridge, DE, Sand)
b. Minimum filter area
(Calculate: item 4. 36 (gpm) _ filter factor 0.375 )
Filter factors: Cartr'd e=0.375, Sand=15, Diatomaceous Earth=2
7. §5.4.2: Backwash valve: Yes, 0 No?
(When using a backwash valve, enter result of item 5c or 2 inches whichever is larger)
Table 1
Pipe Size:
1.5"
2"
1 2.5"
3"
3.5"
1 4"
15"
8"
Nominal GPM @ 6 fps
38
63
90
138
185
1 238
374
540
Nominal GPM @ 8 fps
51
84
119
184
247
1 317
1 419
1 120
8. Pump selection:
§5.3.2.1: Pools 17,000 gallons or less, select pump* from the database with a Curve -A gpm flow equal to item 2 or less.
§5.3.2.2: Pools 17,001 gallons or more, select pump* from the database with a Curve-C gpm flow equal to item 2 or less. *Multi -
speed pumps must have one speed listed that satisfies this requirement.
4/4/12
a. Pump model
b. Pump flow
(§5.3.2.1, 5.3.2.2: Applicable Curve A or C gpm flow listed in database)
ANSI/APSP/ICC- 15 Standard Writing Committee Form
1.
0
gallons
2.
36
gpm
3.
gpm
4.
36
gpm
5a.
1.5
inches
5b.
1.5
inches
5c.
1.5
inches
5d.
1.5
inches
6a.
Cartridge
6b.
96.0
sq. ft.
7.
2.0
inches -
8a.
8b.
_
gpm
1oft
RESUB
May 16 2023
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
ANSI/APSP/ICC 15 ENERGY EFFICIENCY COMPLIANCE INFORMATION FOR RESIDENTIAL SWIMMING POOLS
Component
Section
Requirements
Check
Heaters
4.4.1.1
Heater has no pilot light
4.4.1.2
Readily accessible on -off switch mounted outside of the heater
4.3.1.3
No electric resistance heating unless for inground spa with tight fitting cover with R-6 insulation,
or for pool with 60% of documented pool heating from on -site solar or recovered energy.
❑
4.3.2
Heater efficiency: gas/oil fired heater efficiency at least 78%, heat pump COP at least 4.0
❑
Pool systems
5.1.1
Pool filter pump listed in database
❑
5.3.1
Pool filter pump with total horsepower 1.0 or more is multi -speed
❑
5.3.3
Multi -speed pump controller programmed to default to the filtration flow rate when no auxiliary
pool loads are operating within 24 hours and programmed with temporary override capability for
servicing.
5.3.4
Single -speed pump controller capable of operating pump during off-peak electric demand.
5.5.2
Pipe before pump has at least 4 diameters of straight pipe.
❑
5.5.3
System installed with solar, or setup for the future addition of solar heating equipment by
installing 18 inches of horizontal or vertical pipe after the filter and before a heater, or built-in or
built-up connections, or dedicated pipe to and from the pool.
5.5.6
Directional inlets for mixing pool water.
❑
NoN- Rbl.
�o Icc
R'V
4/4/12 ANSI/APSP/ICC- 15 Standard Writing Committee Form 2 of 2