Loading...
APPROVED ENG BLD2024-0089+Transportation_Impact_Form+1.19.2024_12.56.48_PM+4009501RECEIVED Jan 19 2024.iv E CITY OF EDMO DEVELOPMENT SE ICES f1F DO RT��F� . BLD2024-0089 APPENDIX A Page I of 2 v J/ Transportation Impact Analysis zn��go PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Worksheet Name of Proposed Project: TeaSteeps LLC - Change of Use Permit Owner/Applicant Kathryn Paul Name 12918 Mukilteo Speedway, Suite C-23 #155 Street/Mailing Address Lynnwood WA 98087-5125 City Telephone: (818) 723-2029 Applicant Contact Person: John Paul Name 12918 Mukilteo Speedway, Suite C-23 #155 Street/Mailing Address Lynnwood WA 98087-5125 State Zip City Telephone: (818) 470-0034 Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Telephone: 1. PROJECT DESCRIPTION Contact Name E-mail: State Zip a. Location - Street address: 660 Edmonds Way, Suite B, Edmonds, Washington (Attach a vicinity map and site plan.) b. Specify existing land use: Suite B is presently unoccupied. c. Specify proposed type and size of development: Speciality Retal In Existing Space (# of residential units and/or square footage of building) d. Date construction will begin and be completed: No construction, all existing to remain. e. Define proposed access locations: Existing driveway access from Edmonds Wy & 226th St SW. f. Define proposed sight distance at site egress locations: From Edmonds Wy: 55' 7". From 226th St SW: 102' 10". HANDOUT UPDATED 05.09.2023 APPENDIX A Page 2 of 2 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC 3.36.130. Check the applicable box below and calculate the fees as necessary: ® NO CHANGE NO CHANGE IN USE - SHOPPING CENTER TO SHOPPING CENTER. RANGE IN USE Fee nor use shall be based on fee established at the time the prior use was pe ed. If the previou a was permitted prior to the adoption of Ordinance 3516 ective date: 09/12/04), the 20 act fee rate shall be used. ITE Land Use Category Per Unit Fee ate New Use 826 - Specialty Re $ 4.48 Prior Use 710 - G al Office $ 7.95 its in square feet, # of dwelling, etc. 850 X 8�\ Use Fee New ee: $ 3,808.00 - Prior Use Fee: $ 6,757.50 = FEE DUE: $ 0. 1 ❑ NEW DEVELOPMENT Per Unit Fee ITE Land Use Category Rate New Use $ ❑ INDEPENDENT FEE CALCULATION Units in square feet, # of dwelling, vfb, etc. X Impact/Mitigation Fee: 1 $ Independent Review Fee: $296.00 (+ peer review fee) 1 $ FEE DUE FEE DUE 2/8/2024 City of Edmonds, Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. HANDOUT UPDATED 05.09.2023