Loading...
REV1 BLD2021-1387+REVISION INFO+3.13.2023_12.04.57_PM+3417547ACOFFMAN ENGINEERS March 10, 2023 City of Edmonds Planning and Development 121 5th Ave N Edmonds, Washington 98020 Project: Port of Edmonds 471 Admiral Way Edmonds, Washington Permit Numbers: BLD2021-1386 (Mechanical) & BLD2021-1387 (Plumbing) Subject: Summary of Revisions to Permit Documents Dear Cit of Edmonds Plan Reviewer: Revisions were made to the mechanical and plumbing permit documents to accommodate a revised architectural layout of several rooms on the second floor of the building. Room #218 Commission Meeting was relocated to the perimeter of the building and two new restrooms were added. The shell & core Leasable Office space was deleted from the project. Please see the list below for a summary of the mechanical and plumbing changes that were made as a result of these layout changes. Mechanical- • New fan coil unit FCU-12c added to serve the Commission Meeting Room. Future FCU- 13 removed. Layout of fan coil units in this room also revised. (Sheets: M0.3, M1.2, M1.4, M2.2, M3.4). • VRF heat recovery unit HRU-01 relocated to storage room #219 for easier access above the grid ceiling. (Sheets: M0.4, M1.2, M1.4). • Ventilation calculations revised for the new layout. Diffusers/grilles and ductwork revised accordingly in Commission Meeting Room, Restrooms, Storage Room, and Corridor. (Sheets: M0.4, M1.2). • Pipe routing revised to accommodate revised locations of FCUs & HRU. (Sheets: M1.4). Plumbing: • Sanitary waste & vent and domestic water pipe routing revised to serve new restrooms. Plumbing stub -outs for future Leasable Office were deleted. (Sheets: P1.2, P1.3, P1.4, P2.1) • Plumbing fixture unit counts (DFU & WSFU) revised to account for new restrooms and deletion of future Leasable Office. (Sheets: P0.3, P2.1) Sincerely, COFFMAN ENGINEERS, INC. Oyvind Naess, P.E., LEED AP Principal, Mechanical Engineering 1101 Second Avenue, Suite 400 1 Seattle, WA 98101 Phone 206.623.0717 www.coffman.com