Loading...
REVIEWED BLD2023-1145+Structural_NOTES & Calculations+9.11.2023_2.20.15_PM+3775974RECEIVED 9/13/23 BLD2023-1145 m _ .............................................info@b2engineers.com BY 425-318-7047(0) CITY OF EDMONDS - CITYOF EDMONDs 425-318-0031 (C) DEVELOPMENT BUILDING DEPARTMENT' SERVICES DEPARTMENT '.'.'"""".'.'""""""""""""""' 09-06-23 P� of VIVA Sy ski Mr. Jan Hromada LEV Architecture jan@levarchitecture.com N d �fj LPL 43789 RE: Shemanski Remodel °�FCTURALE-\4 23917 761" Ave W, Edmonds, WA 98026 SS�oNAL E Removal of Basement Shearwall Dear Mr. Hromada: The existing structural drawings show the interior wall at the basement level, proposed to be removed, is a wood shearwall SW-2 (see below snapshot of the existing drawings). The drawings also show that there is no shearwall at the main level above. It is our opinion that this shearwall is not necessary since we have full height concrete walls along the east side of the house which would provide much higher capacity and stiffness to resist any lateral loads, compared to any wood shearwalls. In addition, based on your site visit check today (September 6 2023), you have confirmed there is no shearwall at this location at the basement level since there is no OSB or plywood sheathing on either sides of the wall studs. 1� I I yob Po't 3• J¢ H/ i 33 I N REC R IGI AGE IT ND. Styr "TyDc�i Oaibl �{i 2 sw9iFn� STORAGE � A W LLTOBEHEM4:" ,A ORY UTILITY (DENOTED .� as sHEnmvnus -zI T4 •=m �mm v�b�l-e�.mcasDa�mr I1 INTIHE AST 1 b FULL HEI CWILL ory THE EasTsoE c - L HEIGHT GETHE HGLEE awc �aa>E2 DOHDHETE wauRESI. E IN II DE THHEH USEIDE Ire IL_jj•OL b BASEMENT FLOOR PLAN �— SCALE%"-IF0{�}! II City dEd—& Building EepaliM Sj-�F.T 1 STER SUITE sv 4p aaoa Tw+.+ LIVING ROOM k. w ro Feel free to reach out to me for additional questions. Sincerely, Basri Basri P.E. S.E. Principal 2