APPROVED ENG BLD2023-1026+Transportation_Impact_Form+8.15.2023_12.23.54_PM+3726473APPENDIX A
Page 1 of 2
Transportation Impact Analysis
Worksheet
Ifte. I Sys
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
Name of Proposed Project: R n h A t a c 11 m i
Owner/Applicant
Yuhua Zhan
Name
27100 121st n1 se
Street/Mailing Address
KPnt WA 98030
ity State Zip
Applicant Contact Person:
Name
Street/Mailing Address
City State Zip
Telephone:
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name
Telephone:
1. PROJECT DESCRIPTION
Contact Name
E-mail:
a. Location - Street address: 7 7 s 1 1 HIAIV Q Q * 1 1 1 F d m n n rl c
I jr
WA Q Q O 7; (Attach a vicinity map and site plan.)
b. Specify existing land use: C n m m p r r l A l hiiildinq
c. Specify proposed type and size of development: Kin r h a n ci p
I'm(it of residential units and/or square footage of building)
d. Date construction will begin and be completed: h P a 1 n on A l i g l l s f
e. Define proposed access locations: Tp n ant c n A r p f r n n t d n n r
HANDOUT UPDATED 09.02.2021
APPENDIX A
Page 2 of 2
f Define proposed sight distance at site egress locations: hi / 0
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 3.36.125, except as otherwise provided for independent fee calculations in ECDC
3.36.130.
❑ CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 impact fee rate shall be used.
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use $ X
Prior Use $ X
New Use Fee: $ 1 - I Prior Use Fee: $ 1 _ 1 $
❑ NEW DEVELOPMENT
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use $ X =
X. NO CHANGE
❑ INDEPENDENT FEE CALCULATION
Fee
MITIGATION FEE RECOMMENDATION:
$
INDEPENDENT FEE CALCULATION: $240.00 (+ consultant fee)
$
TOTAL TRANSPORTATION IMPACT FEE
$
ENGINEERING DIVISION
APPROVED AS NOTED
City of Edmonds, Engineering Division Approval D to
NO IMPACT FEES - RESTAURANT TO RESTAURANT INTERIOR TI ONLY 09/05/202?
' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.
HANDOUT UPDATED 09.02.2021