Loading...
Building PermitType: MECHANICAL Subtype: RESIDENTIAL MECHANICAL I Status: ISSUED Parcel No: 00594400007901 Subdivision: 005944 Fire Sprinklers: Valuation: $0.00 Code Edition: 0 Site Address: 8209 FREDERICK PL EDMONDS,WA 98026-5032 Lot: 0 Lot Area: 23,087sf Occupancy Type: No. Stories: 0 Zoning: RS-20 Construction Type: # of Dwelling Units: 0 Scope of Work: ARAGON- HEAT PUMP, GENERATOR & GAS PIPING Applied: 6/20/2024 Issued: 7/3/2024 Final: Expiration Date: 7/3/2026 Issued by: NED I WA State Contractor L & I #: GREENHH7716M I NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT GREENWOOD HEATING AND 14027 INTERURBAN AVE S, (206)784-1818 PERM ITS@GREENWOODHEATING.CO AC TUKWILA WA 98168 M CONTACT SELECT AIR SERVICES DBA 14027 INTERURBAN AVE S, (206)784-1818 permits@greenwoodheating.com GREENWOOD HEATING TUKWILA WA 98168 CONTRACTOR GREENWOOD HEATING AND 14027 INTERURBAN AVE S, (206)784-1818 permits@greenwoodheating.com AC TUKWILLA WA 98168 OWNER CECILIA ARAGON 6030 ANN ARBOR AVE NE, (510)612-0548 SEATTLE WA 98115 DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # AC OR HEAT PUMP - 1.75 BTU OR 001.000.345.83.000.00 $57.00 $57.00 7/3/24 R38317 LESS CITY TECHNOLOGY FEE - PER 001.000.321.99.100.00 $45.00 $45.00 6/24/24 R38044 PERMIT GAS PIPING - NEW OR RELOCATED 001.000.345.83.000.00 $34.00 $34.00 7/3/24 R38317 GENERATOR 001.000.345.83.000.00 $114.00 $114.00 7/3/24 R38317 MECHANICAL BASE PERMIT FEE 001.000.322.10.000.00 $57.00 $57.00 6/24/24 R38044 TOTALS: $307.00 $307.00 CONDITIONS CONDITION TYPE STATUS NOTES Printed: Wednesday, July 03, 2024 2:05:56 PM 1 of 2 MECHANICAL PERMIT NUM City of • • • www.edmondswa.gov1 1 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. FOR ALL OUTDOOR UNITS INFORMATION ELECTRICAL PERMIT O Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. ORMATION FOR The engineering division requires 48 hours notice prior to the date of the FINAL FINAL INSPECTION SCHEDULING INFORMATION Inspection. GAS PIPE TEST FOR Gas pipe test must be observed by City Building Inspector, affidavits shall not be accepted NFORMATION INSPECTIONS - Schedule Online at https:Hinspection.mybuildingpermit.com INSPECTIONTYPE INSPECTOR COMPLETED RESULT NOTES B-3 GAS PIPING TEST B-3 MECH ROUGH IN X-0 MECH FINAL" Printed: Wednesday, July 03, 2024 2:05:56 PM 2 of 2