Loading...
BLD201907880 y, ED NO 'P , 471-.9 M 170:90, 1215THAVENUENORTH- EDMONDS, WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISSUEJ)-0177V5019 P-e-nnit #: BLD-2-6-19078-8, BUILDING PERMIT Expiration Date: 01/15/2020 Project Address: 8516 196TH ST SW, EDMONDS Parcel No: 00455200110100 MI I I � I unitablu=111 WIMRTWHTIF� MAPLEWOOD MANO7 HOA JEFFREY HECK PRECISE HEATING AND COOL 8516 196TH ST SW PO BOX 1455 CIO LaMAR MOORE EDMONDS, WA 98026-6319 MONROE, WA 98272 POB 1455 MONROE, WA 98272 (425) 319-3428 (206) 510-4250 LICENSE #: EIXP: JOB DESCRI[PTION WALLMOUNTED HEATPUMP FOR ELEVATOR MACHINE ROOM AND REFRIGPIPINGAND CONDENSATEEVAP. PAN VALUATION: $0 PERMIT TYPE: Commercial PERMIT GROUP� 40 - Mechanical GRADING: N CYDS: 0 TYPE OF CONSTRUCTION - RETAINING WALL ROCKERY: OCCUPANT GROUP: OCCUPANT LOAD FENCE: 0 X 0 FT.) CODE: IOTHER: ------- OTHER DESC: IZONE: INUMBER OF STORIES: 0 IVESTED DATE: INUMBER OF DWELLING UNITS 0 ILOT 4 LXISTING AREA ENT- 0 1 ST FLOOR: 0 2ND FLOOR 0 PROPOSI]II) ARLA IM7M=N T � 0 1 ST FLOOR: 0 2ND FLOOR: 0 13RD FLOOR 0 GARAGE 0 DECK: 0 OTHER: 0 0 GARAGE 0 DECK� 0 OTHER 0 IBEDROOMS- 0 BATHROOMS: 0 1BEDROOMS:'0 BATHROOMS: 0 FRONTSETBACK SIDESIETBACK RLARSETBACK REQUIRED: PROPOSED: :�FQUIRED� PROPOSED: IREQUIRED. PROPOSED HEIGHT ALLOWED:O PROPOSED:O IREQUIRED: PROPOSED: SETBACK NOTES: I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HIS/hIER DEPJTY AND ALL FEES ARE PAID. L U i bb-a± afff Hcci(- -490 : rZ, -9 D V --7/1511 c-L I I SiqnJure' Print Narne Date Released By Date ATTENTION UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPEC17ON HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC] 09/ IBC1 10/ IRCI 10. = HRE = APPLICANT = ASSESSOR C� CITY No R qA- 0 E -D p 9, rw WXN�` STATUS: ISSUED BLD20190788 i CONDITIONS I • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check thejob card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • SoundNoise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction s ites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. THIS PERMIT AUTHORVES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRrVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRK/EWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMF TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING ENGINEERING (425) 771-0220 EXT. 1326 1. Go to: www.edmondswa.gov Building Department Inspections 2. Then: Services are now scheduled online. If you FIRE (426) 776-7720 3. Then: Perm its/Development have difficulties, please call the 4. Then: Online Permit Info Building Department front desk for PUBLIC WORKS (425) 771-0235 5: If you don't have one already, create a assistance during office hours. login (upper right hand corner) (425) 771-0220 RECYCLING (425) 2754801 16: Schedule your inspection I I When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection — being requested, Contact Name and Phone Number, Date Preferred, and whether you prefer morning or afternoon. • B-Mechanical Rough In • B-Mechanical Final • B-Other BUILDING PERMIT APPLICATION Development Services Building Division 121 Sth Ave N / Edmonds, WA 98020 11)c. I 0V I I I VAA%i For handouts, submittal requirements, permit status and inspection scheduling information go to: www.edmondswa.gov. PLEASE NOTE: Intake appointments are required for New Single Family Residences, Large Additions, ADU's, New Commercial, and Major Tenant improvement application submittals. if plans are prepared by a profession- al, electronic files are requested in addition to the hard copies. Please bring electronic files on a flash drive or coordinate for electronic transfer. Please call 425-771-0220 to schedule an intake appointmentl JOB SITE INFORMATION/LOCATION: (Where the work is taking place) JobSiteAddress: 8516 196th St. SW Parcel: 0045S200110100 Lot /Unit/Suite #: Subdivision: PROPERTY OWNER: Name: Maplewood Manor HOA MailingAddress: _ 8516 196th St. SW City/State/Zip: WA 98026 Phone#: Nla Email: N/a OWNER INSTALLATION: *If yes, read and sign* Will work be performed by the property owner? DYes ZNo I own, reside in, or will reside in the completed structure. This installation is being made on property that I own which is not intended for sale, lease, rent, or exchange according to RCW 18.27.090. Owner Signature: APPLICANT / CONTACT INFORMATION: Name of Applicant: Jeffrey Heck Mailing Address: PO Box 1455 City/State/Zip: Monroe, WA 98272 Phone #: 425-319-3428 E-mail: Jeffrey@PreciseHeatandCool.com GENERAL CONTRACTOR: (if different from applicant) General Contractor: LaMar Moore Mailing Address: PO Box 1455 City/State/Zip: Monroe, WA 98272 Phone #: 206-510-4250 E-mail: LaMar @Precis eHeatandCool. com STATE UBI #: 603-122-887-001-0000 CITY OF EDMONDS BUSINESS LICENSE#: NR-025899 WA STATE CONTRACTOR L & I #: (CCB) & EXPIRATION DATE: PRECIHC89IL9 & 06/29/2021 Office Use Only Permit #: &Xe301(?-4Qf74?!K 0 Accessory Structure/ 0 Addition Detached GaraRe I] Demolition I Z Mechanical 0 New Single Family/ Duplex I ElPlumbing 0 Fire Sprinkler 0 Remodel I [I New Commercial/ Mixed Use 11 Re -Roof 0 Signs 0 Tank 0 Tenant Improvement El Other Remodel Permit fees are based on: The value of the work performed. Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the work indicated on this application. Valuation: $5220 Basement sq ft: Finished 0 Unfinished C1 Ist Floor, sq ft: 2nd Floor, sq ft: Garage/Carport., sq ft: I Deck/Covered Porch/Patio: I I Other sq ft: 0 Provide and install 1-12,000 Btu wall mounted ductless heat pump to condition the elevator machine room. * Provide and install the refrigeration piping and condensate evaporator pan. I certify that the information I have provided on this form/application is true, correct and complete, and that I am the property owner or duly authorized agent of the property owner to submit a permit application to the City of Edmonds. PrintName: Jeffrey Heck Signature: Date got GENERAL COMMERCIAL DATA Occupancy Group(s): Occupant Load(s): Type(s) of Construction: Fire Sprinklers: Yes 0 N o El WA STATE ENERGY CODE: If your project affects the building envelope, mechanical systems, and/or lighting, you must complete the appropriate WSEC forms. DEFERRED SUBMITTALS: All commercial building permits that will require associated plumbing, mechanical, fire sprinkler, and/or fire alarm permits are applied for separately. TI / CHANGE OF USE / NEW BLDG: Include TRAFFIC IMPACT worksheet MECHANICAL EQUIPMENT COUNTS (New and Relocated) BTUs Gas / Elec / Other Qty A/C Unit /Compressor 12, OOC Elec. 1 Air Handier /VAV Boiler Dryer Duct ExhaustFans Fireplace Furnace Heat Pump Unit Hydronic Heating Roof Top Unit (Provide eleva- tions if a Commercial Bldg) Other: PLUMBING FIXTURE COUNTS (New, Relocated or re -piped) Qty Qty Clothes Washer Tub/ Showers Dishwasher Backflow Device (RPBA, DCDA, AVB) Drinking Fountain Pressure Reduction/ Regulator Valve Floor Drain/Sink Refrigerator Water Supply Hose Bibs Water Heater - Tankless? Y or N Hydronic Heat Water Service Line Sinks Other: Toilets Other: GAS/FUEL CONNECTION COUNTS (New, Relocated or re -piped) BTUs Qty BTUs Qty A/C Unit Outdoor BBQ/ Fire pit Boiler Stove/Range/Oven Dryer Water Heater Fireplace/ Insert Other: Furnace Other: MEDICAL GAS, AIR VACUUM COUNTS (New, Relocated or re -piped) QtY Qty Carbon Dioxide Nitrous Oxide Helium Oxygen Medical Air Other: Medical - Surgical Vacuum Other: DEMOLITION Type of structure to be demolished: Square footage of structure to be demolished: AHERA Survey done? Y/N PSCAA Case #: Critical Areas Determination: Study Required El Conditional Waiver D Waiver 11 Fill in Place 11 Fill Material: Removal Size of Tank (Gallons) Critical Areas Determination: Study Required El Conditional Waiver 0 Waiver 1:1 GRAD E/Fl LL/ EXCAVATE Grading: Cut cubic yards Fill cubic yards Cut/ Fill in Critical Area: Yes 0 No El GENERAL PROVISIONS APPLICATIONS: Applications are valid for a maximum of 1 year. ESLHA Applications, 2 years. LICENSING: All contractors and subcontractors are required to be licensed with Washington State Department of Labor & Industries and have a current City of Edmonds Business License. 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page I of 7 : 4 ci 4 a Code Com fience Forms for Commercial Ruildings includino R2 & R3 over 3 stories and all R1 Revised January 2017 — i� s ng on a e mu, r . .- --- - - — Project Title: Maplewood Manor [Date 6/25/2019 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable I Code SectionT Code Provision T_ Information Required - Must be in pern7it documents Location in Documents Building Department Notes (yes,no,na) Equipment - Sizing, Perf rmance and Type Identify equipment to be used in manufactudng, industrial or commercial processes that do not No C403.1 Exempt process equipment provide space conditioning; identify provisions applicable to this equipment per C403.1 exception Provide load calculations performed per ASHRAE Std 183 or equivalent, using design MECH- Yes I C403.2.1 Load. calculations parameters per C302 and Appendix C; include load adjustments to account for energy LOAD recovery CALd Indicate that output capacities of heating and cooling equipment and systems are no greater M1 Yes I C403.2.2 Equipment and system than the smallest available equipment size that exceeds the calculated loads; note exceptions sizing taken Mi Provide equipment schedules on plans or complete MECH-EQ forms indicating type, capacity, C4012.3 HVAC: equipment rated and WSEC minimum efficiencies for all heating and cooling equipment; include supply Yes C403.2.3.2 performance requirements and OSA ofmis and operating hours for all air systems; identify heating and cooling equipment C403.2.13.1 (efficiency) that does not have a corresponding WSEC minimum efficiency (manufacturer rated) List all motors � 1/12 hip (that are not integral to a rated piece of equipment) in the mechanical or electrical equipment schedules on plans; indicate hp, rpm, number of poles and rated NA C405.8 Electric motor efficiency efficiency, or exception applied C403.2.14 For fractional hp motors (1 /12 - 1 hp), indicate whether they are an electronically commutated motor, have rated efficiency of at least 70%, or exception taken For all HVAC fan systems that provide heating and / or cooling, provide system total nameplate hp in MECH-FANSYS-SUM form For all applicable HVAC systems with total fan motor hp > 5hp, verify fan system motor hp or, NA C403.2.11.1 Fan power limitation bhp complies with fan power limits per equations in Table C403.2.1 11.11(l), provide MECH- FANSYS form for each system For all applicable HVAC systems with total fan motor hp > 5hp, indicate fan motors specified No C403.2.11.2 Motor nameplate hp are the smallest available motor hp size greater than fan bhp, note exceptions taken For all applicable HVAC systems with total fan motor hp > 5hp, identify in equipment schedule all fans required to comply with fan efficiency grade and indicate rated FEG is 2: 67, or No C403.2.11.3 Fan efficiency exception taken; indicate these fans are sized so total efficiency is within 15% of the fan maximum total efficiency Group R occupancy For all exhaust fans < 400 cfm in Group R occupancies, indicate in equipment schedule the NA C403.2.11A exhaust fan efficacy fan flow rate and efficacy (cfmfwaft), or exception taken; refer to Table C403.2.11.4 (CE-57) For fan motors �� 7.5 hp, indicate method of variable flow control (VSD or equivalent method) in No C403.2.13 Variable flow capacity - equipment schedule, or exception taken; for equivalent method for an HVAC system refer to fans HVAC System Controls for additional requirements Maximum air cooled chiller For chilled water plants and buildings with > 500 tons of cooling capacity, indicate air-cooled NA C403.2.3 capacity chiller capacity is 5 100 tons, or exception taken For buildings with �: 300 tons of cooling capacity, indicate method of mufti -stage or variable NA C403.4 Large capacity cooling capacity control (VSD, multiple staged compressors, or max capacity of any single unit < 66% systems of the total) For water-cooled centrifugal chillers not designed for operation at standard conditions, provide NA C403.2.3.1 Non-standard water-cooled calculations documenting maximum full load and part load rated equipment performance centrifugal chillers I requirements C403.2.13.1 Centrifugal fan open -circuit For open -circuit centrifugal fan cooling towers with �! 1,100 gpm capacity, indicate cooling NA C403.4.3.2 cooling towers towers comply with efficiency requirements for axial fan open circuit cooling towers For single boilers with > 500,000 Btu/h capacity, indicate multi -stage or modulating burner NA C403.4.2 Large capacity boiler For boiler system (single or multiple) with > 1,000,000 Btu/h capacity, indicate turndown ratio C403.4.2.5 systems per Table C403.4.2.5 and method (multiple single input boilers, modulating boilers, or combination) For pump motors ?! 7.5 hp, indicate method of variable flow control (VSD or equivalent C403.2.13 Variable flow capacity - method) in equipment schedule, or exception taken; for equivalent method for a hydronic NA pumps system refer to Hydronic System Controls for additional requirements Gas and oil -fired forced air For forced air furnaces with capacity �: 225,000 Btu/h and all unit heaters, indicate in C403.2.3 furnace and unit heaters equipment schedule intermittent ignition or IID, flue or draft damper, and rated jacket loss Combustion heating For combustion heating equipment with output capacity > 225,000 Btu/h, indicate modulating NA C403.2.4.8 1equipment or staged combustion control Packaged electric heating Verify all packaged electdc equipment with > 6,000 Btu/h cooling capacity and any amount 'of T Ir r NA C403.2.3.3 cooling equipment heating is a heat pump; include in equipment schedules Indicate systems providing heating in non -enclosed outdoor occupied spaces are radiant NA C403.2.12 Heating outside a building systems; refer to HVAC System Controls for additional requirements Indicate on plans the type, duty and exhaust air rate of each kitchen hood, refer to HVAC NA C403.2.71 Kitchen exhaust hoods System Controls for additional requirements r— n T% F E� L )el Indicate locations of OSA intake, and exhaust and relief outlet dampers on plans; indicate NA C403.2.4.3 Outdoor supply air, exhaust whether dampers are Class 1 motorized, or gravity and exception taken (include leakage and relief dampers rating, afm/sf); refer to HVAC System Controls for additional requirements for OSA dampers JUN 2 7 2( NA C403.2.4.3 Returnairdampers Indicate locations of return air dampers that are integral to economizer operation; verify dampers are motorized; indicate whether dampers are Class 1, or within packaged equipment BUILDI� eligible for leakage rating exception (include leakage rating, cfm/sQ 119 UP 4-XVc.?_0 I t7 — U 7 X 9 2015 Washington State Energy Code Compliance Forms forCommercial, R2 and R3 over 3 stories and all,Rl - Page 2 of 7 2015 Washinaton State Enerov Code Comoliance Forms for Cnmmp.rnini Rifflelinnq inri—finn P9 A P1 ­arl fnri,, -A �fi D! ;__1 -- ---- -- — Project Title: Maplewood Manor Date 6/25/2,019 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. App licable no,na) Code Section Code Provision Information Required - Must be in permit documents Location -in Building Department _(yes I D Notes NA. C403.2.4.3 Stairway and shaft vent FInd—ic-ate location of stairway and shaft vent dampers on plans; verify dampers are Class 1 dampers Imotorized; referto HVAC System Controls for additional requirements I IFor systems serving areas > 25,000 sf or spanning more than one floor, that include areas thati I NA C403.2.4.4 Zone isolation dampers are expected to be occupied non -simultaneously; identify isolation zone areas on plans and locations of associated isolation dampers in HVAC distribution system; refer to HVAC System Controls for additionM requirements For cooling systems with humidification equipment that are also required to have air NA C403.2.3.4 Humidification economizer, indicate humidifier is adiabatic (direct evaporative or fog atomization), or exception taken Additional Efficiency Package Option, More Efficient HVAC Equipment & Fan Performance - Must comply with all 3 provisions to be eligible C406 2 1 To comply with additional efficiency package option, calculate the percentage of heating and NA ' ' I C4031213 HVAC system selection cooling equipment in the project (based on output capacity) that do not have a corresponding WSEC listed efficiency; shall be less than 10% to comply NA C406.2.2 Minimum equipment To comply with additional efficiency package option, indicate that all listed heating and cooling C403.2.3 efficiencv I eauiament have a rated efficiency that exceeds WSEC listed effici n In �f - e. cv by at least 15% C406A2.3 To comply with additional efficiency package option, indicate rated FEG of stand alone fans is NA C4032 11.3 Minimum fan efficiency � 71; indicate these fans are sized so the fan efficiency at design conditions is within 10% of ithe maximum total or static efficiency HVAC System Controls Indicate locations of thermostatic and humidity control devices and the zones they serve on m2 plans, including perimeter system zones Where adjacent (neighboring) zones are controlled by separate thermostats (including perimeter systems used to offset heat gain or loss), and are connected by permanent Thermostatic controls openings > 10% of either zone sf area, indicate controls configured to prevent adjacent zones Yes C403.2.4.1 (thermostats and from operating in conflicting modes (one in heat, other in cool); applies to adjacent perimeter in umidistats� zones, adjacent noriperimeter zones, and adjacent perimeter and nonperir"neter zones If applying Exception 2 to nonpermeter zones adjacent to perimeter zones, indicate tha setpoints and deadband settings in these zones are coordinated so coo ing . I in a nonpenmeter zon e does not occur until the temperature in that zone i s 5*F higher than the adjacent perimeter zone temperature in heating NA C403.2.4.1.1 Heat pump supplementary Indicate staged heating operation with compression as the first stage of heating and heat supplemental heating controlled with outdoor lock -out temperature set to 40*F or less Yes C403.2.4.1.2 Deadband Indicate zone thermostatic controls configured with 5*F minimum deadband for systems that Ml control both heating and cooling If seR���co�gsysterns with !ieparate thermostatic control devices are used to serve a zone, indicate locations of both thermostatic control devices and the zone they serve NA Setpoint overlap restriction C403.2.4.1.3 (thermostats) on plans Indicate a limit switch, mechanical stop or DDC control with programming to prevent simultaneous heating and cooling Yes C403.2.4.2 Automatic setback and Indicate zone thermostatic controls configured with required automatic setback and manual ml C403 ' 2 ' 4 ' 2 ' 1 shutdown override functions, setback temperatures, and control method (automatic time clock or C403,2.4.2.2 programmable controls); note exceptions taken Yes C403.2.4.2.3 Automatic (optimum) start Indicate system controls that adjust equipment start time required to bring each area served ml up to design temperature just prior to scheduled occupancy NA C403.2.4.3 Outdoor supply air dampers Indicate automatic controls configured to close OSA damper during unoccupied equipment operation; not including economizer cooling, night flush or IMC required OSA / exhaust NA C403.2.4.3 Stairway and shaft vent Indicate method of activation of stairway and shaft vent dampers (fire alarm or interruption of dampers power) For systems serving areas > 25,000 sf or spanning more than one floor, that include areas that NA C403.2.4.4 Zone isolation controls are expected to be occupied non -simultaneously; indicate controls that allow for independent space conditioning of isolation zones; or exception taken NA C403.2.12 Heating outside a building Indicate occupancy sensing or timer switch controls configured to automatically shut off heating system when area served is unoccupied NA C403.2.4.5 Snow melt systems Indicate automatic controls configured to shut off system when pavement temperature exceeds 50'F and no precipitatiorf is falling, and when outdoor air temperature exceeds 40'F Yes C403.2.4.6 Freeze protection system Indicate automatic controls to shut off system when outdoor temperature exceeds 40*F, or ml controls conditions protect fluid from freezing Group R1 hotel / motel For hotels and motels with over 50 guest rooms, indicate automatic controls serving guest NA C403.2.4.9 guest rooms rooms that are capable of setback (heating) and set-up (cooling) of temperature setpoint by at I least 5*F; indicate control method - activated by room entry or occupancy sensor 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 3 of 7 1.1 �; 4 C4 4 C P�A�fn, fi,­ Pnr­ fnr r—n—ini Rijilrfirinq innhidinn R9 A R1 over 3 stories and all R1 Revised January 2017 Maplewood Manor Date Project Title: _F 6/25/2019 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Code Section 1 Code Provision 1 Information Required - Must be in permit documents 1 Location in Documents Building Department Notes �y �,nona .1 Group R2 / R3 dwelling For primary space conditioning system, indicate 5-2 programmable thermostats capable of two NA C403.2.4.10 units, Group R2 sleeping setback periods per day; for all thermostats indicate purpose (hearing only, cooling only, or C403.2.4. 1 1 units both), required temperature range and at minimum a 1 O*F deadband; or exception taken Indicate method of ventilation air delivery (natural or mechanical) for each zone If mechanically delivered, indicate that systems are configured to provide not more than 150% NA C403.2.6 Ventilation of, but at least the minimum required volume of outdoor air to each zone per IMC, ASHRAE C403.2.11.4 62.1 or other applicable code (WAC, OSHA, etc); or exception taken If delivered via natural ventilation, identify required elements per IMC including minimum openable area to the outdoors or qualifying adjoining spaces Identify spaces > 500 sf with occupant load > 25 people/1,000 sf per IMC; for each space indicate whether A is served by an HVAC system with total design OSA > 3,000 afm, and / or NA C4012.6.2 Demand controlled the system has airside economizer or automatic modulating OSA damper; indicate OSA ventilation controls are configured to provide demand controlled ventilation or provide supporting documentation for applied exception For gyms, classrooms, auditoriums and conference rooms > 500 sf, indicate occupancy -based OSA control when space is unoccupied and method (closes OSA damper or shuts -off NA C403.2.6.3 Occupancy sensors equipment); or alternate means provided to automatically reduce OSA when space is partially occupied For enclosed loading docks, indicate ventilation / exhaust system method of activation (gas NA C403.2.6.4 Enclosed loading dock detection system for CO and NO2, or occupancy sensors), and control method (staged or C403.2.6.4.1 ventilation modulating) C403.2.6.4 Enclosed parking garage For enclosed parking garages, indicate ventilation / exhaust system activated by gas detection NA C403.2.6.4.2 ventilation system for CO and NO2, and control method (staged or modulating); or exception taken Provide calculations that show a balanced accounting of total kitchen exhaust (include all hoods) with % of: supply air, transfer air from adjacent spaces, and make-up air; if applicable, indicate that direct make-up air to each hood does not exceed 10% of hood exhaust NA C403.2.7.1 Kitchen exhaust hoods For kitchens with total hood exhaust exceeding 2,000 cfm, indicate exhaust air rate per Table C403.2.7.1 and compliance method (DCV, energy recovery, or transfer air that would otherwise be exhausted) NA C403.2.7.2 Laboratory exhaust systems Refer to Systems Requiring Energy Recovery for requirements For HVAC fan motors � 7.5 hp, indicate method of variable flow control (VSD, or equivalent NA C4032.13 Variable flow capacity - control method that reduces design air volume by 50% at 113 static design pressure); note HVAC system fans exception taken For DX air handlers with economizer and cooling capacity 2: 65,000 Btu/h, indicate number of DX air handier variable cooling stages provided and method (multiple compressors and / or variable speed NA C403.3.1 cooling control compressors); indicate minimum displacement (capacity reduction) as % of full load (Under Integrated Economizer) Indicate control method (cooling capacity controlled in response to space temperature, space temperature controlled by modulating supply airflow, or both) For DX air handling units with cooling capacity �: 65,000 Btu/h and evaporative and chilled water air handling units with fan �: 0.25 hp, indicate whether system is single zone or multiple zone and related control method (cooling capacity controlled in response to space temperature, space temperature is controlled by modulating supply ainflow, or both) For mechanical cooling systems (includes DX and chilled water coils) that control cooling capacity in response to space temperature - Provide a minimum of two stages of fan control; NA C403.2.11.5 Fan airflow control indicate minimum fan speed is 5 66% of full speed drawing:5 40% of full speed fan power during periods of low cooling or ventilation only For other mechanical cooling systems (includes DX and chilled water coils) that control space temperature by modulating airflow (in lieu of, or in addition to, controlling capacity in response to space temperature) - Provide fan controls for modulating supply airflow; indicate minimum fan speed is:5 50% of full speed drawing:5 30% of full speed fan power during periods of low Fooling or ventilation only; or exception taken Provide central and zone level DDC controls as required based on system application, capacity or size thresholds and other qualification per Table C403,2.4.12.1 NA C403.2.4.12 DDC system capabilities Identify all DDC system input / output control points; indicate capability for trending and Ducting Systems Indicate on plans that all ductwork is constructed and sealed per IMC NA C403.2,8.1 C403.2.8.3 Duct construction For OSA ductwork, also indicate on plans that ductwork meets air leakage requirements per C402.5 and vapor retarder requirements per the IBC NA C403.2.8.3 Duct pressure Identify location of low, medium and high pressure ductwork on plans classifications High pressure duct leakage Indicate high pressure duct leakage testing requirements on plans; provide test results to NA C403.2.8.3.3 test 1jurisdiction when completed 2015 k/VaShinnf nA nto Pnomy r.nrlp r.nrnp!innr,-. P r s for Commercial, R2 nnd R.1 nv r 3 stories and all R! - Page 4 of 7 .1-0.. _t­ ­­1 ____ __ ------ . oirns - ­ _­ . ­ __e. 2015 Washinqton State Enerqy Code Compliance Forms for Commercial Buildinas includina R2 & R3 over 3 stores and all R1 Revised January Project Title: Maplewood Manor I Date 6/25/2019 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable CZ Z.ion Code Provision 7_ F Information b in permit documents Required - Must a Location In I Building Department j _n Lts ona) Documentsi Notes For supply and return ductwork located in unconditioned space or outdoors, indicate R-value of insulation on ductwork on plans; identify climate zone; note exceptions taken H rk located in conditioned sDace. identifv if desion suoDiv temoerature is < NA LAWIt" C403.2.8.2 Duct insulation 55*F o . r I > . 105 F and indicate R-value of insu . lation I on this ductwork on . plans; n . ote exception taken For OSA ductwork, shafts and plenums, indicate R-valua of insulation on these elements on plans per Table C402.1.3 for steel -framed walls; note exception taken Piping Systems NA C403.2.9 I Piping insulation I Indicate design temperature range of fluid conveyed in piping and thickness of insulation (in inches) on hydronic piping plans; or exception taken M2 NA C403.2.9.1 I jPiping insulation exposed to Indicate method of protection of pipe insulation from damage / degradation on hydronic piping weather plans Economizers Identify in equipment schedules on plans or in MECH-EQ forms all cooling systems requiring air economizer controls NA C40 1.3 n Air eco Qrni�er req unred provide MECH-ECONO form indicating systems --iflizing air economizer exceptions ' including those with water -side economizer in lieu of air economizer; indicate on plans eligible exception(s) taken and measures to comply with exception(s) NA C403.3.1 Integrated economizer Indicate air and water -side economizers are configured for partial cooling operation even operation - air and water where additional mechanical cooling is required to meet the load NA C403.3.2 Economizer heating systern Verify control method of HVAC systems with economizers does no, increase building heating i pact- air and water energy usage during normal operation NA C403.3.3.1 Air economizer capacity Indicate modulating OSA and return air dampers are configured to provide up to 100% OSA for cooling Verify mechanical cooling controls are interlocked with air economizer controls so the outsi e C403.3.1 jIntegrated air damper remains in 100% open position when mechanical cooling is also required to meet NA C403.3.3.2 air economizer the cooling load, until the leaving air temperature is < 45'F FCZ at ers . — �Y­ ... � ­.. ­.' capad y-2: 65,000 Btudh, verif�,,tha! contm! of eccnornize., c-13.—p not based only on mixed air temperature; or exception taken NA C403.3.3.3 Air economizer high limit Indicate high limit shut-off control method and required high limit per Table C403.3.3.3 controls For eligible systems where water -side economizer may be provided in lieu of air economizer, NA C403.3.4.1 Water economizer capacity indicate system is capable of 100% design cooling capacity at 50*17 db / 45*F wb OSA temperatures NA C403.3.4.2 Water economizer Indicate pressure drop across precooling coils and heat exchangers in water economizer maximum pressure drop system do not exceed pressure drop limit NA C403.3,1 DX air handling equipment For DX air handlers with economizer and cooling capacity � 65,000 Btulh, refer to HVAC control System Controls for requirements DX equipment economizer For DX air handlers with economizer and cooling capacity � 54,000 Btu/h, provide a fault NA C403.2.4.7 fault detection and detection and diagnostics (FDD) system to monitor economizer system operation and report I ldiagnostics ifaults I I Systems Requiring Energy Recovery For systems with design OSA > 5,000 cfm, or design supply air cfm and % OSA exceeding the values in Tables C403.5.1 (1) or (2), indicate exhaust air ER method; or exception taken with supporting calculations NA C403.5.1 Energy recovery (ER) ventilation / exhaust For rooms served by multiple systems with aggregate design OSA > 5,000 dm, or aggregate systems design supply air cfm and % OSA exceeding the values in Tables C403.5.1 (1) or (2), indicate exhaust air ER method; or exception taken with supporting calculations Indicate ER rated effectiveness that increases OSA enthalpy by 2: 50% based on delta between OSA and return air enthalpies at design conditions Laboratory exhaust systems For buildings with total lab exhaust > 5,000 cfm, indicate method of energy recovery used to NA C403.2.7.2 (energy recovery) pre -condition laboratory make-up air; ER effectiveness (min 25*F); or alternative method per exception (VAV exhaust, semi -conditioned makeup, or CERM calculation) For buildings with pools or spas with water surface area > 200 sf, indicate exhaust air ER C404.10.4 Pools and permanent spas method and use of waste heat (preheat ventilation air, pool water or service hot water); or NA (under exhaust systems exception token C404.1 1) (energy recovery) Indicate ER system has the rated effectiveness and is configured to decrease the exhaust air I Vemperature at design conditions by �: 36'F Energy recovery - I For buildings with on -site steam heating systems, indicate condensate water ER For buildings that use off-sfte generated steam where condensate is not returned to the I NA C403.5.2 steam condensate systems source, indicate on -site condensate water ER 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 5 of 7 -Mech;anical Permit Plans Checklist MECH-CHK — C �4_ C_—, P_ - l'—fi .... ;:­. f— r--ini Ri Orlin— inph Ainn P9 P P; nvpr I qtnripq and all R1 Revised January 2017 Project Titi e Maplewood M I anor ___TDate 6/25/2019 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Code Sedon Code Provision T Information Required - Must be in permit documents Location in Documents Building Departme nt Notes _�y�s,no,na) For buildings with food service, meat or deli departments that have �! 500,000 Btu/h of remote refrigeration capacity for coolers / freezers, indicate condenser ER and use of captured energy (service water heating, space heating, or dehumidification reheating) NA C403.5.3 Energy recovery - For buildings with? 40,000 sfoonditioned floor area and with a 1,000,000 Stu/h of remote cooler/ freezer condensers refdgeration capacity for coolers I freezers, indicate condenser ER and use of captured energy for service water heating and also for space heating, or dehumidification reheating For buildings with 24-hour operation and with > 1,500,000 Btu/h of heat rejection capacity and Energy recovery - design service hot water load > 250,000 Btu/h, indicate condenser ER to pre -heat service NA C403.5.4 condenser systems water; or exception taken. Provide calculations showing the amount of recovered heat that is utilized (60% of peak heat rejection load or pre -heat service water to 85,F). Hydronic System Controls For hydronic system pump motors -�: 7.5 hp, indicate method of variable flow control (VSD or equivalent method that requires � 30% design wattage at 50% design fluid flow); note NA C403.2.13 Variable flow control - exception taken C403.4.2.7 hydronic system pumps Identify whether hydronic coils have DDC controls and associated manner of pump speed control (differential pressure, zone hydronic demand, etc) For boilers that provide building heating, indicate controls that provide heating water temperature setback based on outdoor temperature For heating and chilled water systems � 300,000 Btu/h, indicate systems are configured to automatically reset supply water temperature based upon demand; or exception taken. NA C403.2.5 Hydronic system setback If system pump motor hp 2: 3 hp, also indicate controls automatically reduce flow by � 50%. C403.4.2.4 and part load controls For chilled water systems (2: 300,000 Btu/h, pump motor hp �: 3 hp) that serve water-cooled unitary air conditioners, indicate VSD or staged pu mps in chilled water system and heat rejection loop that reduce pump flow so that one control valve is nearly wide open, or to maintain a minimum differential pressure; or exception taken NA C403.4.2 Boiler sequencing Indicate automatic controls that sequence operation of multiple boilers NA C403.4.6 Hot gas bypass limitation For cooling equipment with hot gas bypass, provide either multiple step unloading or continuous capacity modulation; indicate bypass capacity per Table C403.4.6 Two -pipe changeover Indicate changeover deadband (min 15'F), heating / cooling mode scheduling and NA C403.4.2.2 systems changeover temperature range (limit 30*F) Chiller/ boiler plant pump Indicate controls are configured to automatically reduce overall plant flow and shut-off flow NA C403.42.6 isolation through individual chillers and boilers when not in use For cooling towers with fan motors � 7.5 hp, indicate VSD and method to adjust fan speed C403.2 13 1 1 ' ' ' Heat rejection equipment - (adjusted based on leaving fluid temperature or condenser temperature / pressure of heat . . NA C403.4.3.1.1 variable flow control rejection device) For multiple -cell heat rejection equipment with VSD, indicate controls that ramp all fans in C403.4.3.1.2 unison NA C403.4.13 Heat rejection equipment - Indicate open -circuit cooling towers with multiple pumps or VSD control are designed so all cooling tower flow turndown I cells can be run in parallel NA Water loop heat pump - Indicate capability of central equipment to provide minimum 20'F water supply temperature C403.4.2.3.1 cleadband deadband between heat rejection and heat addition modes; or exception taken Water loop heat pump - Indicate type of cooling tower (open- or closed-circuit) in equipment schedule; indicate method NA C403.4.2.12.1 heat rejection equipment, used to limit system heat loss when heat rejection is not needed Zone 4 Water loop heat pump - For open- or closed-circuit cooling towers, provide a heat exchanger that separates the cooling NA C403.4.2.3.2.2 eat rejection equipment, tower and heat pump loop Zone 5 NA C403.4.2.3.3 Water loop heat pump - For hydronic heat pump systems with total system power > 10 trip, indicate 2-way isolation isolation valves valves on each heat pump and variable flow system control Dedicated Outdoor Air Systems (DOAS) - Optional through 6/30/16, Prescriptive 7/1/2016 For buildings with office, retail, education, library and fire station spaces, identify these spaces C403.6 Dedicated outdoor air on plans; indicate that ventilation air in each occupied space is provided via a DOAS system; NA C403.6.3 systems or document compliance with C403.6.3 Impracticality; or exception taken (buildings complying with C402.4.1.4 or C406.6 may not utilize exceptions) Energy recovery ventilation For afl DOAS systems, indicate exhaust air ER method; or exception taken with supporting NA C403.6.1 with DOAS calculations. Indicate ER rated effectiveness that increases OSA enthalpy by � 50% based on delta between OSA and return air enthalpies at design conditions. Indicate equipment associated with the delivery of zone level heating and cooling (fans, Heating / cooling system hydronic pumps, primary air dampers, etc) are configured to shut off, and central equipment is NA C403.6.2 controls with DOAS configured to turn down, when there is no call for heating or cooling in the zone they serve If applying Exception to heating / cooling fans used for air mixing in the space during deadband periods, include fan watts per afm in equipment schedule 2015 Washington State Energy Code ComPliance Forms for Commercial. R2 and R3 over 3 stories and all R1 - Page 6 of 7 2015 Washinaton State Enerov Code Comoliance Forms for Commercial Buildinas includina R2 & R3 over 3 qtnripq and all R1 Ppviqpl Jnnim" Project Title: Maplewood Manor Date 6/25/2019 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Code Section - C - ode Provisi r Information Required - Must be in per I mit docum, . ents Location in I'Documents Building Department JL�s,nc Notes C402.4.1.4 Increased prescriptive NA C403.6 maximum vertical Indicate that all occupied, conditioned spaces are served by a DOAS per C403.6 Additional Efficiency Package Option, Dedicated Outside Air Systems (DOAS) NA C406.6 I Building provided with IDOAS To comply with additional efficiency package option, indicate that 90% or more of all occupied, 1conditioned I spaces are served by a DOAS per C403.6 Multiple Zone Air Systems Air systems serving multiple Identify supply air systems serving multiple zones and the zones they serve on plans; indicate NA C403.4.4 whether system is VAV and method of primary air control; or provide supporting zones documentation for applied exception to VAV Provide equipment schedules on plans or MECH-EQ form that list all VAV air terminals and types For each air terminal include: maximum airflow rates for primary supply air during zone peak FNA VAV systems serving C403.4,4 multiple zones heating and zone peak cooling; maximum airflow during reheating, recooling or mixing; minimum airflow rate to maintain reauired ventilation, and the basis for these values; if IMC or ASHRAE 62.1 multiple zone equation is basis for minimum flow rates, provide calculation on plans NA C403.4.4.1 Single duct VAV terminal lunfts Indicate single duct terminal units are configured to reduce primary supply air before reheating orrecooling NA C403.4.4.2 Dual duct systems - terminal For systems with separate warm air and cool air ducts, indicate terminal units are configured to units reduce the flow from one duct to minimum before mixing with air from the other duct Indicate locations of duct static pressure sensors on plans; include at least one sensor per major duct branch; verify controller setpoint pressure at each sensor is:5 1.2 Inc.". w.g. For systems with zone level DDC, indicate controls are configured to monitor zone damper NA C403.4. 1.1 VAV system static pressure sensors - C403.4.1.2 sensors and DDC set poin s t positions and reset static pressure setpoint based on the zone requiring most pressure; inciuciewntrol logic tfiat-autornatical etects and generates an -ilarmif-any zorfei-excessively I drives reset logic, and allows building operators to exclude zones from reset logic Multiple -zone VAV system For systems with zone level DDC controls, indicate controls are configured to automatically NA C403.4.4.3 ventilation optimization reduce outdoor airflow in response to changes in system ventilation efficiency; or exception controls taken NA C403.4.4.4 VAV system supply air reset Indicate controls automatically reset supply air temperature in response to building loads or outdoor air temperature; or exception taken Multiple Zone HVAC Systems, High Efficiency VAV - Required for systems utilizing C403.6 DOAS Exception 2, must comply with all 16 provisions NA C403.7, lAireconomizer Indicate system is configured for 100% air economizer operation and complies with all related --Item-1 --- I --- — — — -- economizer -requirements- per-C403.-3-(witiiout-economizer-exceptions)- NA C403 ' 7 ' Direct digital controls (DDC) Provide DDC controls for all components of system; identify all DDC system input I output Item 2 control points; indicate capability for trending and graphical display For systems with minimum OSA > 2,500 cfm, indicate outdoor airflow monitoring station that NA C403.7, Outdoor airflow measures OSA intake under atl load conditions; indicate control sequence that increases or Item 3 measurement and reduction reduces system OSA drn based on VAV terminal feedback of ventilation efficiency (per C403.4.4.3 without exceptions) or DCV (per C403.2.6.2) NA C403 ' 7, Supply airflow measurement For systems with minimum OSA > 2,500 cfm, indicate supply airnow monitoring station Item 4 capable of measuring supply air delivered to VAV terminals under all load conditions C403.7, Zone isolation and Verify maximum area served by a single HEVAV system is:5 50,000 sf, or one entire floor, NA Item 5 maximum area served whichever is greater; in addition K a system serves > 25,000 sf, that includes areas that are expected to be occupied non -simultaneously, indicate zone isolation controls per C403.2.4.4 NA C403 7 Interior / exterior zone design supply air Verify that VAV terminals serving interior cooling driven loads are sized per design supply air Item' 6. temperature temperature that is 5*F higher than VAV terminals serving exterior zones C403.7, Maximum air terminal inlet Identify air terminals with minimum primary aifflow setpoints > 50% of maximum setpoint in NA Item 7 velocity equipment schedule or MECH-EQ form; indicate air terminal inlet velocity does not exceed 900 fpm NA C403.7, Sequence of operation Indicate DDC system sequences of operation are designed and configured per ASHRAE GPC Item 8 36 NA C403.7, Maximum allowable system Verify fan system bhp is _-� 90% ofthe bhp limit per Option 2 equation in Table C403.2.1 1.1(1), Item 9 brake horsepower provide MECH-FANSYS form for each system Indicate all series and parallel terminal fans have electronically commutated motors; indicate C403.7, Fan -powered terminal unit DDC control system is configured to vary air terminal fan speed as a function of the load; Item 10 motor and control indicate fan speed during periods of low heating, low cooling, or ventilation only is:5 66% of ,peak design air flow or provide supporting documentation for applied exception 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 - Page 7 of 7 Mechanical Permit Plans Checklist MECH-CHK MIS WaRhinriton State Fnernv Code Comnliance Forms for Commercial Buildinas includina R2 & R3 over 3 stories and all RI Revised January 2017 Project Title: Maplewood Manor Date 6/25/2019 The following information is necessary to check a permit application for compliance with the mechanical systems and equipment requirements of the Washington State Energy Code, Commercial Provisions. Applicable Code Section I Code Provision I Information Required - Must be in permit documents I Location in I Building Department �,nona) Documents Notes C403.7, of single duct Indicate VAV terminal types on plans; verify fan -powered terminal units only serve perimeter NA Item 11 JApplication and fan -powered terminal zones with envelope loads; verify all other zones are served by single duct terminal units units C4037, Fan -powered terminal unit Indicate DDC controls are configured to automatically reset the primary supply air cfm setpoint NA Item 12 primary air reset of all fan -powered terminal units to the minimum required to maintain ventilation during occupied heating or deadband, based upon the VAV air handling unit OSA ventilation fraction For spaces > 150 sf with occupant density �: 25 people / 1000 sf, indicate space is served by a NA C403.7, High occupancy space dedicated terminal unit with DCV control that resets terminal unit ventilation setpoint; also Item 13 controls indicate occupancy sensor control that automatically reduces minimum ventilation to zero and sets back room heating and cooling setpoints by 2: 5'F For server, electronic equipment, telecom or similar spaces with cooling loads > 5 W/sf, NA C403.7, Dedicated HVAC systems indicate spaces are served by independent HVAC systems that are separate from HPVAV Item 14 systems serving rest of building; indicate dedicated HVAC systems have air economizer controls or energy recovery per C403.3 Exception 9 Indicate whether systems are served by a high efficiency heating water plant, or a high efficiency chilled water plant If complying via high efficiency heating water plant: Indicate all VAV terminals have hydronic heating coils served by heating water system with either gas -fired boiler(s) with thermal C403 7 efficiency a 90%, air -to -water heat pumps, or heat recovery chillers NA Item 1 Central plant efficiency — If complying via high efficiency chilled water plant: Indicate all VAV air handlers have cooling coils served by chillers with rated IPLV efficiency that exceeds WSEC listed IPLV by at least 25% per Table C403.2.3(7) (note water-cooled IPLV is max, all others are min); indicate smallest chiller or compressor in plant is:5 20% of total plant capacity, or provide thermal Ptorage sized for:5 20% of total plant capacity C403 ' 7, Fault detection and Indicate DDC system includes a fault detection and diagnostics (FDD) system configured to NA Item 16 I diagnostics monitor operation and provide fault reporting of required parameters for all VAV air handlers land VAV air terminal units in the HPVAV system HVAC Equipment Energy Use Metering HVAC equipment energy For new buildings > 50,000 sf and building additions > 25,000 sf, verify energy use metering of NA C409.3.1 use metering all equipment used to provide space heating and cooling, dehumidification and ventilation will be provided per C409; indicate equipment eligible for exception Documentation and System Specific Requirement To Support Commissioning Indicate that all mechanical systems, equipment, and controls for which the WSEC requires control functions and / or configuration to perform specific functions are required to be commissioned; ml Yes C408.2 Scope of mechanical systems commissioning For buildings with �t 240,000 Btulh total output cooling capacity or Z: 300,000 Btu/h total output heating capacity, indicate that all mechanical systems regardless of individual capacity are required to be commissioned; or provide building heating / cooling capacity calculation I demonstrating eligibility for exception Indicate in plans and specifications that Cx per C408 is required for all applicable mechanical systems; ml Include general summary with at a minimum of Items 1 thru 4 of the Cx plan per C408.1.2 C403.2.10 C408.1.1 Commissioning including: narrative description of activities, responsibilities of the Cx team, schedule of Yes C408.1.2 requirements in construction activities including verification of project close out documentation per C103.6, and conflict of C408.1.4.2 documents interest plan (if required); C103.6 Include in general summary that a Cx project report or Compliance Checklist (Figure C40l shall be completed by the Certified Cx Professional and provided to the owner I pn . or to the final mechanical inspection. Air system and hydronic Indicate in plans that air and fluid flow rates shall be tested and balanced within the tolerances Yes C408.2.2 system balancing defined in the specifications; indicate systems shall be balanced in a manner to first minimize throttling losses, then adjusted to meet design flow conditions 1 Yes C408.2.2.1 Air system balancing Indicate devices that provide the capability to balance all supply air outlets, zone terminals and devices air handling equipment requiring system balancing mi NA C408.2.2.2 Hydronic system balancing Indicate devices that provide the capability to isolate, balance and measure flow across all I devices hydronic equipment requiring system balancing including heating and cooling coils and pumps NA C408.2.3 Functional performance Identify in plans and specifications the intended operation of all equipment and controls during testing criteria all modes of operation, including interfacing between new and existing -to -remain systems Project Close Out Documentation Documentation and project Indicate in plans that project close out documentation and training of building operations Yes C103 close out submittal personnel is required for all mechanical components, equipment and systems governed by .6 requirements this code; indicate close out documentation shall include: record documents, O&M manuals, applicable WSEC compliance forms and calculations ml 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 2015 Wash inoton State Enerav Code COMDliance Forms for Commercial Buildinqs including R2 & R3 over 3 stories and all R1 Revised January 2017 Project Title: Maplewood Manor Date 6/25/2019 A separate MECH-FANSYS form must be completed for every HVAC system that exceeds the 5 hp threshold. For Building Dept. Use Fan System ID EV A P System Supply Fan Constant Volume (CV), Variable Air Volume (VA V), or HospitallLab C V Speed Control system that qualifies for VA V budget per C403.2. 11. 1, Exception I 0 Compliance is based upon either the fan motor nameplate horse power Compliance Option (Option 1), the fan brake horsepower (Option 2), or C403.7 high efficieny 2). The bhp V/ VA V fan brake horsepower (10% less than Option calculation provides adjustments for special equipment per Table C403.2.11.1(2). In Fan Equipment Schedule below, provide maximum design supply airflow rate (CFM) of all supply fans serving the conditioned space in Fan Fan System Supply cfp Equipment Schedule below, Fan System CFM Total is the supply airflow of the central air handler at peak design conditions. Additional volumetric air CFM Total flow provided at zone fan terminals, booster fans, or through induction is not included in the supply CFM total. However the fan power of this equipment is included in the HP and BHP calculations. Fan System Supply CFM Total is automatically calculated by the form. Fan Equipment Schedule Total CFM Total Nameplate Total BHP Fan ID and Location Fan Type Quantity of Fan Type (Note 1) HP (Note 2) (Note 3) F-V AP- I .-, Y, F,� 0 VI P I Note I - Total CFM is the maximum CFM of the listed fan(s) when Total Proposed: operating at peak design operating conditions. Note 2 - Total namplate hp of the listed tan(s). Total Allowance: Note 3 - Total brake horsepower (bhp) of the listed fan(s) at peak design operating conditions. Not required if Nameplate HP compliance option chosen. Compliance Message: F Brake Horsepower Allowance Adjustments CFM thorough this Assigned Pressure Calculated Pressure Drop, Adjustment, Device Type Description and Location device (CFMD) Drop, PID in w.c. PD in w c. A in bhp (Note 6) (Note 7) (Note 8) Note 4 - Bhp allowance for energy recovery devices and run around coil loops includes both air Total Adjustment (bhp): stredtfis, su mu uriviu 1ZI Lim Sum 0J Lit& Suppiy %,r-ivi ailu exhausL 00111 gri LIWOUVII the device. Note 5 - Energy recovery effectiveness is defined as change in the enthalpy of the outdoor air supply divided by the enthaply difference between the outdoor air and return air at design conditions. Note 6 - Assigned pressure drop (PD) adjustment per Table C403.2.11.1(2). Note 7 - Pressure drop (PD) adjustment shall be calculated per the applicable method defined in Table C403.2.11.1(2) based on specific system conditions. Note 8 - A = PD * CFMD14131 where A is the allowed system brake horse power adjustment, PD is pressure drop allowance, and CFMD is the chm through the device. zu-i !) vvasn!nQton titate tnergy. ume Uompliance i7orms tor Uommeroa!, RZ and- H'_4 over .3 stories and all RT General Instructions: Ar A. Include all fans directly associated with the delivery and removal of conditioned air to the zones served by the system. Enter CFM and brake horsepower (bhp) of each fan at peak design conditions and the nameplate horsepower (hp). Include supply, return and relief fans, exhaust and exhaust hood fans (>I hp), booster fans and fans included as part of make-up air units, dedicated outside air systems (DOAS), energy recovery ventilators (ERV), and series fan -powered terminal equipment. B. WAVparallEtl fan-ppwered terminals and economizer relief fans do not need to be included if the fans do not operatgLatpeak conditions. C. Fans not directly associated with the delivery and removal of conditioned air, such as condenser fans, do not need to be included in the fan power total, D. Fan power calculations are not required for non -central air HVAC systems such as 4-pipe fan coils and variable refrigerant flow (VRF) systems. unless individual fan systems are greater than 5hp. Ih- — ;� ­1­4­4 ar, .van cc Adyustrmcnts tab"G, ff a Devlce "nyl— 'V's � V into the Assigned Pressure Drop cell and the Calculated Pressure Drop call will be write -protected. If the Device Type requires a Calculated Pressure Drop, then enter this value into the Calculated Pressure Drop ceff and the Assigned Pressure Drop cell with be write -protected. to FAQ section of MECH-FANSYS-DOC for additional instructions. F Refer r-. 2015 Washinaton State Enerav Code COMDliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Dd I sign Load Calculation Summary MECH-LOAD-CALC 2015 Washington State Energy 7o—de T=mp iance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R-Revised January.2017 Project Title: Maplewood Manor Date 6/25/2019 The following information shall be included in the load calculation program summary submitted with the permit documents. If a load calculation summary is not available, provide the required information below. For Building Dept. Use Equip. ID Area(s) Served Heating Design Load in Btu/h (Note 1) Cooling Design Load in Btu/h (Note 1) Calculation Method (Note, 2) Not-�.-s EVAP-1 Elevator Machine Room 2,200 9,800 Manufacture Provided Note I - Design load shall account for the building envelope, lighting, ventilation and occupancy loads of the space(s) served by the mechanical system. Heating and cooling loads shall be adjusted to account for load reduction achieved by an energy recovery system, if applicable. Note 2 - Computer load calculation program, worksheet (identify source), or equivalent computation procedure in accordance with ASHRAE Standard 183. 2015 Washington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all R1 Mechanical Summary MECH-SUM 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2 & R3 over 3 stories and all R1 Revised January 2U1 ( Project Information Project Title: Maplewood Manor Date 6/25/2019 ApplicantInforination. Provide contact information for individual who can respond to For Building Dept. Use inquiries about compliance form information provided. Company Name: Precise Heating and Cooling LLC. Company Address: PO Box 1455 Monroe, WA 98024 Applicant Namc- Jeffrey Heck Applicant Phone: 425-319-3428 Project Description El New Building Building Addition El Tenant Improvement System Retrofit No System Changes Briefly describe mechanical systems in the text box provided ElTotal Bldg Performance (TBP) This path includes all mandatory provisions per C401.2 Option 2. MECH-SUM, MECH-CHK and C407 Energy Analysis forms required. El Load calculation summary MECH-LOAD-CALC Form Design Load Calculations Provide design load calculations for all mechanical systems and equipment seiving the building heating, cooling or ventilating needs. If a load calculation summary is provided with the permit documents that includes all applicable compliance infonnation then the MECH-LOAD-CALC form is not required. F_/1 mechanical Plans [:] MECH-EQ Forms (TBD) Mechanical Schedules Indicate location of equipment compliance information. ll'provided on plans then MECH-EQ forms are not required, however, include on plans all applicable compliance information listed in MECH-EQ tables. 0 DOAS is required per C403.6 effective July 1, 2017 (office, retail, education, library and fire station occupancies) All occupied, conditioned areas shall be served by a DOAS that delivers required ventilation air in a manner that does not require space conditioning fan operation. Space conditioning fans cycled off when no heating or cooling is required. Dedicated Outdoor Air E Ventilation provided via natural ventilation per 2015 IMC in lieu of DOAS (C403.6, Exception 1) System Requirements and El ventilation and space conditioning provided by a HEVAV system per C403.7 in lieu of DOAS (C403.6, Exception 2) High Efficiency VAV DOAS included in project, although not required (occupancy not office, retail, education, library or fire station) Alternate F-1 DOAS related allowances included in project: F-1 Prescriptive vertical fenestration maximum area allowance increased to 40% per C402.4.1.4 with 100% of conditioned floor area in building served by DOAS. Exception to air economizer per C403.3 Exception 1, include MECH-ECONO form. Project includes HVAC air distribution systems that provide heating and/or cooling Ifyes, provide a MECH-FANSYS -SUM form. Fan Power F-1 For one or more systems, the total fan motor nameplate hp of all fans in HVAC system exceeds 5hp. Ifyes, provide a seperate MECH-FANSYS form for each HVAC system exceeding the 5 horsepower threshold. Refer to Section C403.2. 11 and MECH-FANSYS-DOC horrequirements and exceptions. Hydronic chilled water El water -loop heat pump No hydronic systems HVAC Hydronic Systems Hydronic heating water E] Geothermal Ej C406.2 More efficient HVAC equipment and fan systems Requires 90% of heating and cooling capacity to be equipment listed in tables C403.2.3(l)-(9) or air -to -water heat pumps and heat recovery chillers. All equipment listed in tables C403.2.3(l)-(7) must be 15% more efficient than minimum requirements. All stand alone supply, return, and exhaust fans over 1hp must have FEQ � 71 and must be C406 Additional Efficiency selected within 10% of maximum total or static pressure. F-1 C406.6 Dedicated outdoor air system (DOAS) Options - Mechanical Requires 90% of conditioned floor area to be served by a DOAS per C403.6 that delivers required ventilation air in a manner that does not require space conditioning fan operation. C406.7 Reduced energy in service water heating Requires 90% of floor area be in occupancy types listed in C406.7. 1 and that 60% of annual hot water energy use be provided by heat pump, waste heat recovery or solar water -heating systems. PRECENED C --r iL 11 CuL Y JUN 2 7 2019 .8tDQ01q-078'9' BUILDING 2015 VVashington State Energy Code Compliance Forms for Commercial, R2 and R3 over 3 stories and all Ri M-e-chanical pg. 2 MECH-SUM -S-lummary, 2015 Washin ton State. Energy_qcde iance Forms for Commercial Buildingsj ing - _____g _ -, md-mL _R24_fjq,over3storiesandaIlR1 Revised Jarnuary 2917 Equipment Type (s) [_1 Hot water heating tank(s) F-1 Instantaneous Ej No service water systems Service Water Heating Systems F-1 F-1 Heat exchange from space heat boiler or Distributio n Type (s central hot waterlsteam Circulation System On -demand Commissioning Commissioning is required for: D Mechanical systems per C408.2 El Service water heating systems per C408.4 If required, commissioning shall be perfonned for all applicable systems regardless of individual equipment capacity. Exceptions to commissioning requirements: Total output capacity of all mechanical space conditioning systems in the building do not exceed 240,000 Btu/h cooling or 300,000 Btu/h heating. Mechanical systems commissioning not required. Capacity of largest service water heating system in building does not exceed 200,000 Btu/h. Service water heating systems commissioning not required. Low Energy and Semi -Heated Spaces (Note 6 and 7) Peak Space Heating Cooling Conditioning Space Area Served, Capacity, Btu/h Capacity, Btulh Capacity, Compliance Type Location in Plan(s) Space(s) Served square feet (Note 4) (Note 5) Btu/h-sf Check Notes Note 4 - Provide total installed heating output capacity of systems serving Low Energy or Semi -Heated space(s) in btuh. Note 5 - Provide total installed cooling capacity of system sewing Low Energy spece(s) 0 Bt,.,.?h. Not allowed Lor semi -heated spaces. Enter 0 ifno cooling. Note 6 - Referto Section C402.1.1 Low Energy Building. Intalledpeak space conditioning capacity, heating orcooling, may not exceed3.4 Btulh*sf Note 7 - Referto Section C402.1. 1.1 and Semi -Heated Space definition in Chapter2. Totalheating output capacitymay not exceed 8 Btulh*sf Onlysystems without electric resistance heating and no cooling are eligible for the wall insulation exception under semi -heated. EMIR IS NOT OCCUPIABLE SPACE. DOES NOT REQUIRE OUTDOOR AIR CALCULATIONS CONDENSATE EVAPORATOR SCHEDULE TAG AREASERVED MAKE MODEL ELECTRICAL CAPACITY VO LTAG E WATTS Not Shown COND-1 Continental T12-0370-P120 117 160 50 oz. DucnESS AIR HANDLER SCHEDULE TAG AREASERVED MAKE MODEL WEIGHT (LBS) CFM I ELECTRICAL DIM NSIONS WxDxH (in) VOLTAGE PHASE HERTZ EVAP-1 Elevator Machine Room CARRIER 40MAQB12B-3 19 1 380 208/230 1 1 60 33X8XI2 jo City of Edmonds f-,.) Maple — Fire Stott ri Presbyter, Ed"onds Adventist Church ,ck St SW 196th St SVI fd ln� U 11516 1 111h Stmet Souttivrest 111in. "I VICINITY MAP PERMIT #: TBD I PARCEL #: 00455200110100 1 LEGAL DESCRIPTION: MAPLEWOOD MANOR (A CON DOM I N I U M) BLK 00 1 D-00 - APT # 101 TGW UND 1.8697% INT IN COMM AREAS& FACS DESC IN PARA G OF DEC REC V 476/PG 406-431 AF NO 2182310 SCOPE OF WORK: Provide and install 1-12,000 Btu wall mounted ductless heat pump to condition the elevator machine room. Provide and install the refrigeration piping and condensate drain piping. All piping to be routed exposed to the adjacent wall mounted condenser in the parking area. CONDENSER SCHEDULE WEIGHT Co.' ing Heating ELECTRICAL DIMENSIONS MCA MOCIR TAG AREA SERVED MAKE MODEL LES) Tons Capa city Capacity SEER/EER DB (BTU) (BTU) VOLTAGE PHASE HERTZ LxWxH (in) (a mps) (amps) COND-1 Elevator Machine Room CARRIER 38MAQB12R-3 92 1 12000 11800 22.5/12.5 9 15 208/230 1 60 56 35X15X22 2 ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE CoMPU $ ANCE I ABBREVIATIONS � AFF ABOVE FINISHED FLOOR AHU AIR HANDLING UNIT BDD BACKDRAFT DAMPER BPD BY-PASS DAMPER BTUH BRITISH THERMAL UNIT PER HOUR CD CEILING DIFFUSER CFM CUBIC FEET PER MINUTE DB DECIBAL DH DUCT HEATER EA EXHAUST AIR EER ENERGY EFFICIENCY RATIO EG EXHAUST GRILLE ESP EXTERNAL STATIC PRESSURE EXH EXHAUST FCU FAN COIL UNIT FD FIRE DAMPER, FLOOR DRAIN FPM FEET PER MINUTE FSD FIRE AND SMOKE DAMPER GIF GASFURNACE GIRD GRILLE, REGISTER, DIFFUSER HP HORSEPOWER, HEAT PUMP NTS NOT TO SCALE OBD OPPOSED BLADE DAMPER OD OUTSIDE DIMENSION OF DIAMETER OSA OUTSIDEAR OU OUTDOOR UNIT RG RETURN GRILLE RPM REVOLUTIONS PER MINUTE RA RETURN AIR SA SUPPLY AIR SG SUPPLY GRILLE SP STATIC PRESSURE TG TRANSFER GRILLE VAV VARIABLE AIR VOLUME VFD VARIABLE FREQUENCY DRIVE VTR VENT TO ROOF VVT VARIABLE VOLUME & TEMPERATURE ZD ZONE DAMPER HVAC NOTES 1. DUCT CONSTRUCTION, SEALING, AND INSULATION TO MEET REQUIREMENTS OF SEC C403.2.8 OF THE 2015 WSEC. 2. SMOKE DETECTORS INSTALLED IN MAIN RETURN PER SEC 606 OF THE 2015 IMC. 3. EQUIPMENT INSTALLATION INSTRUCTIONS TO BE ON SITE FOR INSPECTORS. 4. ALL HVAC EQUIPMENT TO BE LABELED FOR THE SPACE SERVED. 5. DUCTS TO BE SUPPORTED AT EACH CHANGE IN DIRECTION, VERTICAL AT 12'!-0' MAX, HORIZONTAL AT 10A" MAX WITH STRAP, OR 8!-0" MAX FROM TRAPEZE SUPPORT 6. SYSTEM CONTROLS TO MEET SEC C403.2.4 OF 2015 WSEC. 7. HVAC INSTALLATION SHALL BE COMPLETE WHEN ALL SECTIONS OF 408 IN 2015 WSEC HAVE BEEN SATISFIED, INCLUDING AS -BUILT DRAWINGS, SUBMITTALS, O&M MANUALS, BALANCE REPORT, AND COMMISSIONING REPORT. 8. ALL ECONOMIZERS PROVIDED SHALL MEET SEC C403.3 OF 2015 WSEC 9. ALL SUPPLY GRILLES TO HAVE MANUAL VOLUME DAMPERS FOR BALANCING OF SYSTEM UPON COMPLETION. 10. ALL PIPING TO BE INSULATED ACCORDING TO SEC C403.2.9 OF 2015 WSEC. 11. FRESH AIR INTAKE AND RELIEF/EXHAUST WILL BE EQUIPPED WITH A LOW LEAK, CLASS 1A MOTORIZED DAMPER THAT AUTOMATICALLY CLOSES DURING UNOCCUPIED HOURS TO COMPLY WITH SEC C403.2.4.3 OF 2015 WSEC 12. GAS PIPING TO BE INSTALLED IN ACCORDANCE WITH THE 2015 IFGC TABLE C404.6. 13. 5 DEGREE DEADBAND IN ACCORDANCE WITH C403.2.4.1.2 14. All EQUIPMENT SPECIFIED THE SMALLEST SIZE THAT EXCEEDS THE CALCULATED LOADS PER WSEC C403.2.2. LEGEND A H CEILING SUPPLY DIFFUSER & EXHAUST FAN 17 PL CEILING RETURN GRILLE CEILING EXHAUST FAN CEILING EXHAUST GRILLE INLINE EXHAUST FAN CEILING SLOT DIFFUSER FLEX DUCT THROTTLE VALVE C ROUND DUCT UP MANUAL BALANCE DAMPER ROUND DUCT DOWN Ff FIRE DAMPER VAV FAN BOX FST FIRE SMOKE DAMPER NON -RETURN DAMPER MOTORIZED DAMPER IiiTU-11 ROOF TOP UNIT SMOKE DAMPER FEF-11 EXHAUST FAN EJ WADAMPER SUPPLY FAN FIRE DAMPER ABOVE DIFFUSER FVG-71 RETURN GRILLE FIRE DAMPER ABOVE GRILLE UH -71 UNIT HEATER THERMOSTAT Ffi4H-�l INFRARED HEATER SENSOR FH--P--11 HEATPUMP GAS METER AIR CONDTIONING UNIT ISM] SMOKE DETECTOR AIR HANDLING UNIT ITY F EDMO 0 tJL)ILUIINIU I-JUA-i-XII I Mr-H I WORK cAa /c, L ADDRE_S'%"'_�'J_�= OWNER APPROVED DA - rE 7 L 'I L BLDG. OFFICIAL: AAA "'fPrffCV15ffN P.O.BOX 1455 MONROE, WA 98272 206.861.2525 co 11- 0 3: C14 C:) C Cf) 00 cu M U) < C- 0 Co C6 a) 0 E 1000 -0 Lu PPROVED NS MUST BE N JOB SIT E, APPROVAL STAMP: DRAWN BY- JEFF HECK DRAWN FOR; PERMIT DATE STARTED: DATE DATE PLOTTED: 6/25/19 SCALE: AS NOTED REVISIONS: DESCRIPTION: MECHANICAL LAYOUT SHEET: M1 F EC OF JUN t0A M2 BUII I ;> P L-J- ON 1NG ELECTRICAL ROOM HALLWAY ELEC. 5OX XLCTN. (OLD) EV- ELEC. 5OX- LCTN. (NEW) FIRE SPRINKLER ROOM 2'ro D EMIR Jmo REMOVE RETURN; CLOSE OPENING 2'& 1 D MANAGER OFFICE 25" CLEARANCE -5 IN MIN. CLEARANCE SEE CARRIER MANUAL 141 3'ro D 0 0 z 1p OPEN -TO -AIR PARKING GARAGE GERATION PIPING 1/2"0 ---NOTE: ALL CONDENSATE TO 5E ROUTED TO PAN EVAPORATOR FOR DISPOSAL (SEE SCHEDULE) 0 FIRE SPRINKLER---" co -1 PIPE ltl- MECHANICAL PLAN - GROUND LEVEL SCALE: 1/2" = 1' P.0.130X 1455 MONROE,WA 98272 206.861.2525 Z5 3: c: cn COR co . 65 < 0 c- 0 — 3: 0 co C:)- co 0 co 'V"- E Lo _0 00 ui APPROVAL STAMP: DRAWN BY: JEFF HECK DRAWN FOR: PERMIT DATE STARTED: DATE DATE PLOTTED: 6/25/19 SCALE: AS NOTED REVISIONS: DESCRIPTION: MECHANICAL LAYOUT SHEET, M2 PzF-00% OF jUH 2 7 , M2 BUILD I