BLD20190630OV ED IV
51
(:�Y CITY OF EDMONDS
1215THAVENUENORTH -EDMONDS, WA 98020
PHONE: (425) 771-0220 - FAX: (425) 771-0221
STATUS: ISSUED 07/23/2019
Expiration Date: 07/23/2020
Parcel No: 00434400700800
PILATESEDMONDS
C/O 2020 LLC EDMONDS
307 BELL ST
EDMONDS, WA 98020
Permit #: BLD20190630
1�roject Address: 20 IMAIN ST #103, EDMONDS
PILATES EDMONDS
BRODRICK CONSTRUCTION INC
307 BELL ST 4103
C/O CURTIS BRODERICK
EDMONDS, WA 98020
14829 CASCADIAN WY
LYNNWOOD, WA 98087
(206) 550-9275
(206) 949-1996
LICENSE #: BRODRCI923JJ EXP:05/09/2020
T/1, ADDINGNEW PILATES TO NEW POST OFFICE I3LDG.,PLLJMBIN(3k.AN]D MECHANICAL UNDER SEPARATE PERMIT.
A
VALUATION: $10,000
PERMIT TYPE: Commercial
?15M�11;17 GROUP: 71 -Tenant Improvement
GRADING: N CYDS: 0
TYPE OF CONSTRUCTION: V-A
RETAINING WALL ROCKERY:
OCCUPANT GROUP: B
OCCUPANT LOAD: 15
FENCE: 0 X 0 FT.)
CODE: 2015 IBC
,OTHER: ------- OTHER DESC:
IZONE: BD2
NUMBER OF STORIES: 0
IVESTED DATE:
NUMBER OF DWELLING UNITS: 0
LOT #:
�90621���
BASEMENT: 0 1 ST FLOOR: 1697 2ND FLOOR: 0
BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0
3 RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
3 RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0
BEDROOMS: 0 BATHROOMS: 0
BEDROOMS: 0 BATHROOMS: 0
FRONTSEYBACK SIDESE"I'BACK REARSE'll'BACK
REQUIRED: PROPOSED: IREQUIRED: PROPOSED: FQTIRED: PROPOSED�
HEIGHT ALLOWED:O PROPOSED:O IREQUIRED: PROPOSED:
SETBACK NOTE& No parking required for commercial uses. Fitness studio a1lo%ved in BD2.
PERMIT APPROVAL
I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO
PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION
INSURANCE AND RCW 18:27.
THIS APF)4CATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICLALQhR HIS/HER DEPUTY AND A" FEES ARE PAID,
V ' Signature Print r4arne Date Released By te
ATTENTION
ITIS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF
OCCUPANCY HAS BEEN GRANTED, UBC109/ IBCI 10/ iRCI 10�
FIRE APPLICANT = ASSESSOR CrjFy
v r
STATUS: ISSUED
BLD20190630
• Separate Pen -nit Required For: HVAC, Plumbing, Sign, L&I Electrical
• Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of
the buikling or structure. Check the job card for all required City inspections including final project approval and final
occupancy inspections.
• Any request foraltemate design, modification, variance or other administrative deviation (hereinafter "variance") from
adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing
fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable.
Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been
specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision
of city code or state law does not approve any hem not to code specification.
Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits
of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding
Sundays and Federal Holidays. At all other times the noise originating from construction sites /activities must comply with the
noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold
hanrdess the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of
whatever nature, arising directly or indirectly fi-omthe issuance for this permit. Issuance of this pen -nit shall not be deemed to
modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY
CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT
TIME LIMIT: SEE ECDC 19.00.005(A) (6)
BUILDING
ENGINEERING (425) 771-0220 EXT. 1326
1. Go to: www.edmondswa.gov
Building Department Inspections
2. Then: Services
are now scheduled online. If you
FIRE (425) 775-7720
3. Then: Permits/Dewlopment
haw difficulties, please call the
4. Then: Online Permit Info
Building Department front desk for
PUBLIC WORKS (426) 771-0235
5: If you don't haNe one already, create a
assistance during office hours.
login (upper right hand comer)
(425) 771-0220
RECYCLING (425) 275-4801
6: Schedule your inspection
I
When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection
being requested, Contact Name and Phone Number, Date Preferred, and whether you prefer morning or afternoon.
• B-Preconstruction meeting
• B-Ceiling Coid
• B-Framing
• B-SheetrockNail
• B-Plumbing Final
• B-Building Final
• B-Other
• F-Fire Final
I4C. is 9 NJ
BUILDING PERMIT Office Use Only
APPLICATION I Permit #: 0 9
WVW%'PJJ111W" wlv�_'Ua
Building Division
121 5th Ave N / Edmonds, WA 98020
425.771.0220
For handouts, submittal requirements, permit status and inspection
scheduling information go to: www.edmondswa.gov.
PLEASE NOTE: Intake appointments are required for New Single Family
Residences, Large Additions, ADU's, New Commercial, and Major Tenant
Improvement application submittals. If plans are prepared by a profession-
al, electronic files are requested in addition to the hard copies. Please bring
electronic files on a flash drive or coordinate for electronic transfer.
Please call 425-771-0220 to schedule an intake appointment!
JOB SITE INFORMATION/LOCATION: (Where the work is taking place)
Job Site Address: _00/ Act �4 5-f-
Parcel: 06q-Z Yq007()6 700
Loll
Lot /Unit/Suite #: Subdivision:
PROPERTY OWNER:
Name: U11440qds we_'o
Mailing Address:
City/State/Zip:
Phone #:
Email:
OWNER INSTALLATION: *If yes, read and sign*
Will work be performed by the property owner? El Yes K No
I own, reside in, or will reside in the completed structure. This
installation is being made on property that I own which is not
intended for sale, lease, rent, or exchange according to RCW
18.27.090.
Owner Signature:
APPLICANT/ CONTACT INFORMATION:
Name of Applicant: PAL Q6rnICIS
MailingAddress: �6_7 Rell �t J�/Q 3
City/State/Zip: TU h4 0 Vil Ld A- q6OZO
Pho,ne#: [4/4-5-5'0—qZ75'
E-mail: dniotid5' C-(j V"
GENERAL CONTRACTOR: (If different from applicant)
General Contractor&dn'r I —
Mailing Address:N82� achnn We,_g
City/Sti.te/Zip: L
— "hi1Lvt6r?_ Vj`�
Phone #: t 45-c/(0
E-mail: r gmet f� yn
STATE UBI #: 60 Z -7,33 7W
, or
CITY OF EDMONDS BUSINESS LICENSE #:
WA STATE CONTRACTOR L & I #: (CCB) & EXPIRATION DATE:
TYPE OF PERMIT (Provide Details on Page 2)
E] Accessory Structure/ El Addition
Detached Garage
• Demolition
El Mechanical
• New Single Family / Duplex
0 Plumbing
El Fire Sprinkler
0 Remodel
[I New Commercial/ Mixed Use
0 Re -Roof
El Signs
El Tank
ATenant Improvement
El Other
Remodel Permit fees are based on:
The value of the work performed. Indicate the value (rounded to
the nearest dollar) of all equipment, materials, labor, overhead,
and the profit for the work indicated on this application.
Valuation: /0,' 06 o
PROPOSED NEW SQUARE FOOTAGE FOR THIS APPLICATION
Basement sq ft: Finished El Unfinished El
1st Floor, sq ft:
LZol
2nd Floor, sq ft:
Garage/Carport:, sq ft:
Deck/Covered Porch/Patio:
Other sq ft:
PROJECT DESCRIPTION
'lb i�'L'Icf 10(4 n1 sko
- -
I certify that the information I have provided on this form/application is true,
correct and complete, and that I am the property owner or duly authorized
agent of the property owner to submit a permit application to the City of
Edmonds.
Print Name:Ckir 4-tks 9,4n-ct
ff
Signature: Date6�t9 —12
GENERAL COMMERCIAL DATA
Occupancy Group(s): Occupant Load(s): S3
Type(s) of Construction:
Fire Sprinklers: Yes No El
WA STATE ENERGY CODE: If your project affects the building envelope,
mechanical systems, and/or lighting, you must complete the
appropriate WSEC forms.
DEFERRED SUBMITTALS: All commercial building permits that will require
associated plumbing, mechanical, fire sprinkler, and/or fire alarm
permits are applied for separately.
GCHANGE OF USE / NEW BLDG: Include TRAFFIC IMPACT worksheet
MECHANICAL EQUIPMENT COUNTS (New and Relocated)
BTUs Gas Elec Other Qty
A/C Unit /Compressor
Air Handler /VAV
Boiler
Dryer Duct
Exhaust Fans
Fireplace
Furnace
Heat Pump Unit
Hydronic Heating
Roof Top Unit (Provide eleva-
tions if a Commercial Bldg)
Other:
PLUMBING FIXTURE COUNTS (New, Relocated or re -piped)
Qty QtY
Clothes Washer
Tub/ Showers
Dishwasher
Backflow Device (RPBA, DCDA, AVB)
Drinking Fountain
Pressure Reduction/ Regulator Valve
Floor Drain/Sink
Refrigerator Water Supply
Hose Bibs
Water Heater - Tankless? Y or N
Hydronic Heat
Water Service Line
Sinks
Other:
Toilets
Other:
GAS/FLIEL CONNECTION COUNTS (New, Relocated or re -piped)
BTUs Qty BTUs Qty
A/C Unit
Outdoor BBQ / Fire pit
Boiler
Stove/Range/Oven
Dryer
Water Heater
Fireplace/ Insert
I I
Other:
I
Furnace I Other:
MEDICAL GAS, AIR VACUUM COUNTS
(New, Relocated or re -piped)
Qty
Qty
Carbon Dioxide
Nitrous Oxide
Helium
Oxygen
Medical Air
Other:
Medical - Surgical Vacuum Other:
DEMOLITION
Type of structure to be demolished:
Square footage of structure to be demolished:
AHERA Survey done? Y/N
PSCAA Case #:
Critical Areas Determination:
Study Required 0 Conditional Waiver 0 Waiver El
Fill in Place El Fill Material:
Removal 0
�Sie of Tank (Gallons)
Critical Areas Determination:
Study Required El Conditional Waiver El Waiver 0
GRADE/FILL/EXCAVATE
Grading: Cut cubic yards
Fill cubic yards
CLt / Fill in Critical Area: Yes El No El
GENERAL PROVISIONS
APPLICATIONS: Applications are valid for a maximum of I year.
ESLHA Applications, 2 years.
LICENSING: All contractors and subcontractors are required to be licensed
wit Washington State Department of Labor & Industries and have a
current City of Edmonds Business License.
Scanneo
DATE: June 28, 2019
TO: City of Edmonds Building Department
FROM: Curt Brodrick, Brodrick Construction Inc.
RE: Occupant Load Rational
Plan Check: BLD2019-0630
Project: Tenant buildout for Pilates Edmonds
Project Address: 201 Main Street #103
To whom it may concern;
Pilates Edmonds asks for an approval of exception IBC 1004.1.2 Exception, where as
approved by the building official the occupancy load may be determined by the actual number
of occupants for whom the occupied space is designed, although less than those determined by
calculation, and shall be permitted to be used in the determination of the design occupancy
load.
Here is our rational;
Please find attached to the revised plan submittals a Suite Equiptment and Use Layout
Plan that demonstrates the maximum number of single operator pilates equiptment appliances
with required free space for safe operation. Due to the size and nature of the equiptment we
feel the maximum number of pilates clients would be 7 with 3 instructors constituting a
maximum of 10 occupants. The pilates sessions are 55 minutes with turnover every hour.
Meaning when I client completes their session there is a 5 minute gap before the next client is
scheduled, therefore there is no overlap of clients.
We are pleased to concede to a mutual agreed occupant load of 15 and are in
agreement to post " Maximum Occupant Load 15" near the main entrance of the suite.
Tha
u Vnk u
Y
rod�c&kBrodrickC�oDnstruction Inc.
Pilates Edmonds
206-949-1996
ccbrodrick@gmaii.com
JUL 0 1 2019
4 BUILDING EPARTMEW
D
CITY OF EDMONDS
2015 Washinqton State Eneray Code Compliance Forms for Commercial Buildinas includina R2 R3 R4 nvp.r.; nfnrip� nnei nil P1 R—A—A N—'M17
Project Title:
Pliates Edmonds
Date
5/20/2019
Calculation
New Construction o Addition -
o Addition
For Building Department Use
Area NOTE 9
stand alone
+ existing
Spaces where < 50% of 0 Spaces where 2:50% of
0 Spaces where the Use
luminaires are replaced luminaires are replaced
is changing (C505)
LPA
00 Standard 0 Additional Efficiency Package Option
Calculation
C406.3 Reduced Interior Lighting Power
User Notel
Type
To comply with C406.3, the Proposed LPD shall be 25% lower than the Target LPA.
Refer to C406.3 for
additional requirements.
Maximum Allowed Lighting Wattage"'
Location (plan #,
Height""'
Gross Interior
Allowed
Wafts Allowed
room #)
Space Type
2
Area in ft2
Watts per ft2
(waftsW x area)
office 1
Office: Enclosed
108
0.890
96
office 2
Office: Enclosed
80
0.890
71
lobbies
Lobby: all other
121
234
0.720
168
exercise rooms
Gymnasium/fitness center: Exercise area
121
600
0.580
348
training rooms
C ing ii�* t4
121
568
A;V
>6s—
restroom
Restroom: all other
ill
0.780
87
corridor
Corridor: all other
60
0.530
32
Total Area 1761
Retail Display Allowance from LTG-INT-DISPLAY
Lobby Art/Exhibit Display Allowance from LTG-INT-DISPLAY NOTE 8
Allowed Wafts
13-7-1
i I ?).-I, -
Proposed Lighting Wattage NUIL 3
Location (plan #,
room #)
Fixture Description NOTE 4, 5, 6
Number of
Fixtures
Wafts/
Fixture NOTE 7
Wafts
Proposed
office I
dimmable 2x4 LED light troffer t:�:,
1
39
39
office 1
dimmable led wall sconce
2
20
40
restroom
LED wall sconce
1
20
20
Lobby
dimmable led can light 0
2
11
22
lobbies
led pendant chandelier 12 C,
-2
80
160
exercise rooms
dimmable 2x4 LED flat panel light T
2
39
78
exercise rooms
dimmable led wall light A
2
43
86
training rooms
dimmable 2x4 LED flat panel light T *41
2
39
78
training rooms
dimmable LED wall light 15
3
20
60
training rooms
dimmable 2x4 LED flat panel light A 114
2
43
86
corridor
dimmable led wall sconce
2
20
40
Proposed Retail Display Lighting from LTG-INT-DISPLAY
Total Proposed Watts may not exceed Total Allowed Watts for Interior Lighting Total Proposed Wafts
70=
Interior Lighting Power Allowance COMPLIES
I
Note I - List all unique space types per Table C405.4-2(2) that occur in the project scope. Select space type category from drop down menu.
Note 2 - Indicate ceiling height for atriums and spaces utilizing the ceiling height adjustment per Table C405.4.2(2), Footnotes d thru f
Note 3 - List all proposed lighting fixtures including exempt lighting equipment and existing -to -remain fixtures.
Note 4 - For proposed Fixture Description, indicate fixture type, lamp type (a. g. T-8), number of lamps in the fixture, and ballast type (if included). For
track lighting, list the length of the track (in feet) in addition to the fixture, lamp, and ballast information.
Note 5 - For lighting equipment eligible for exemption per C405.4- 1, note exception number and leave WattslFixture blank.
Note 6 - Existing -to -remain fixtures shall be included in the Proposed Lighting Wattage table in the same manner as new fixtures. Identify as existing
in fixture description.
Note 7 - For proposed WattslFixture enter the iuminaire wattage for installed lamp and ballast using manufacturer or other approved source. For
luminaires with screw -in lamps, enter the manufacturer's listed maximum input wattage of the fixture (not the lamp wattage). For low voltage
lighting, enter the wattage of the transformer. For line voltage track1busway systems, enter the larger of the attached luminaire wattage or 50
watts4ineal foot, or enter the wattage limit of permanent current limiting device.
Note 8 - Lobby ArtlExhibit Display Allowance is independent of the Maximum Allowed Lighting Wattage. Enter all proposed lobby�,.�axhibit display
fixtures in L TG-/N T-DISPLA Y form only. FRECEIVED
Note 9 - Calculation Area Details: K
a, Lighting fixtures in a building addition may comply as a stand alone project, or they may be combined with the overall existing building
MAY 3 0
10- lijhting systems to demonstrate compliance. Refer to C502. 1.
b. For alterations and building additions, provide Space Types and gross interior areas in the Maximum Allowed Lighting Wattage table. If a
building addition will comply as combined with the overall existing building lighting systems, include all applicable existing Space Types
and gross interior areas,
c. If less than 50% of existing lighting fixtures will be replaced, provide total existing lighting wattage (prior to alteration) in the space provided
in the Maximum Allowed Lighting Wattage table.
d. If lighting alteration project includes some building areas or spaces where < 50% of luminaires are replaced, and other areas or spaces
where 2: 50% of luminaires are replaced, then these areas or spaces may be documented separately. If multiple fonns will be completed
to demonstrate compliance for the total scope of the alteration project, describe scope covered in form in User Note section.
r .-*
2015 Washinaton State Enerav Code Comoliance Forms for Commercial Ruildinaq inpludinn R9 P.; PA nvarl Onriac ond all Q1 P—A-1 M '21117
Project Info
Project Title: PlIates; Edmonds
Date 5/20/2019
Compliance
Applicant Information. Provide contact information for individual who can
For Building Department Use
forms do not
respond to inquiries about compliance form information provided.
require a
password to
Company Name: Brodrick Construction Inc
Company Address: 14829 Cascadian Way
use.
Instructional and
Applicant Name: Curtis Brodrick
calculating cells
are write -
protected
Applicant Phone: 206-949-1"6
Applicant Email: ccbrodfick@gmall.com
Pro ect Description
E] New Building Addition Alteration No Lighting Scope
Include PROJ-SUM form (included in envelope forms workbook) with lighting compliance forms.
Interior Lighting System
led strip lights, dimmable wall sconces, dimmable 2x4 led recessed troffer, light reduction
Description
controls and manual controls
[-� Interior Lighting Plans Included
Interior Lighting Power
Building Area Method Space -by -space Method
Allowance Method
Select method used in project
Interior Lighting Controls
All C405.2.1 - C405.2.8 Lighting Controls C405.2 Exception 5 Luminaire Level
Lighting Controls (LLLC)
F-] Additional Efficiency Package Option
C406.4 Enhanced Digital Lighting Controls
To comply with C406.4, no less than 90% of the total installed interior lighting power shall comply with th(
required controls per C406.4.
Dwelling Unit Interior
Permanently installed interior lighting fixtures in dwelling units comply with: No Dwelling
Lighting
0 C405.2 thru C405.5 Commercial Lighting Controls and LPA Units
0 C406.3 High Efficacy Lighting
R404.1 Residential High Efficacy Lighting. Dwelling unit lighting complies with WSEC Residential
provisions in lieu of WSEC Commercial provisions.
Exterior Lighting System
Exterior lighting controlled by building landlord
Description
F-] Exterior Lighting Plans Included
Building Additions
Compliance Method I In . ter . i . o - r .- I - I - g h . t . in . g Exterior lighting
Lighting systems in addition area comply with all applicable
ED 11
provisions as a stand alone new construction project
Refer to Section C502.2.6 for additional
requirements.
Lighting systems in addition are combined with existing
building lighting systems to demonstrate compliance
Addition is combined with existing:
For interior lighting projects, include new + existing -to -remain interior lighting fixture wattage in
Proposed Lighting Wattage table in LTG-INT-BLD or LTG-INT-SPACE form.
For exterior lighting projects, include new + existing -to -remain exterior lighting fixture wattage in
Proposed Tradable and Proposed Non -Tradable Lighting Wattage tables in LTG-EXT form.
13LD2
RECEIVED
MAT 3 0 2019
BUILDING
NA,
�� V
2015 Washinoton State Enerav Code Comoliance Formq fnr rnmmprnial Ri fildinna innh A inn W7 Pl 0 ; AKE
Project Title: PlIates Edmonds Date 5/20/2019
'Change of Space Use
Existing interior lighting systems in areas under -going a change in space use are upgraded to
comply with LPAs for the new space types per Tables C405.4.2(l) or C405.4,2(2).
Identify interior spaces requiring LPD upgrade to the current Code in Proposed Lighting Wattage table
in L TG-INT-BLD or LTG-INT-SPACE form.
Interior and Exterior
Lighting Power Interior lighting Parking garage Exterior lighting
Lighting Alterations
50% or more of existing are replaced El El
Select a// Lighting Power and Lighting
Control elements that apply to the scope
Less than 50% of existing are replaced El
of the retrofit project If project includes a
combination of spaces where less than
Lamp and/or ballast replacement only
El El
50% of the existing fixtures are replaced
existing total wattage not increased
in some spaces, and 50% or more of the
fixtures are replaced in others, then
----
50% or more replaced - Total lighting power of new + existing -to -remain fixtures shall comply with total
provide separate lighting power
LPA per Sections C405.4.2 and C405.5.2. Include new + existing -to -remain fixtures in Proposed
compliance fonns for the two retrofit
Lighting Wattage table in LTG-INT-BLD, LTG-INT-SPACE or L TG-EXT form.
conditions. Spaces undergoing the same
Less than 50% replaced - Total lighting power of new + existing -to -remain Fixtures shall not exceed the
type of retrofit may be combined into one
total lighting power ptior to alteration. Include new+ existing -to -remain fixturesin the Proposed
lighting power compliance form.
Lighting Wattage table in LTG-INT-BLD, LTG-INT-SPACE or LTG-EXTform.
50% threshold applies to number of luminaires for interior spaces and parking garages, and total
Refer to Section C503.6 for additional
installed wattage for exterior luminaires.
requirements.
Lighting Controls Interior lighfing Parking garage Exterior lighting
All alteration lighting controls shall be
New wiring installed to serve added
commissioned per C408.3.
fixtures and/or fixtures relocated to new. Ll
circuit(s)
New or moved lighting panel
Interior space is reconfigured -
luminaires unchanged or relocated
New wiring or circuit - For interior lighting, provide required manual controls per C405.2.3, occupancy
sensor controls per C405.2. 1, daylight responsive controls per C405.2.4 and application specific lighting
F-] No changes are being made to
controls per C405.2.5. For exterior lighting, provide required controls per C405.2.7.
the interior or exterior lighting
New or moved panel - Provide all applicable lighting controls as noted for New Wiring and automatic
systems and existing space
time switch controls per C405.2.2.
uses and configuration are not
Reconrigured interior space - Provide all required lighting controls that apply to a new interior space.
changed.
Application specific lighting control provisions per C405.2.5 do not apply to reconfigured spaces.
Li�hting, Motor, and Electrical Permit Checklist, Pg. 1 LTG-OHK,
2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2, R3, R4 over 3 stories and all R1 Revised Nov 2017
Project Title: Pilates Edmonds I
Date 5/20/2019
The following information is necessary to check a permit application for compliance with the lighting, motor, and electrical requirements in the
Washington State Energy Code, Commercial Provisions.
Applicability I
Location in
15uo g Department
(yes,nc,na) I
Code Section
I Component
lCompliance information required in permit documents
Documents
Notes
LIGHTING
CONTROLS
yes
C405.2
Lighting controls,
For all lighting fixtures, indicate lighting control method on plans
lighting
general
for spaces and lighting zone(s) served, or exception taken
plan
Luminaire level
Indicate on plans all fixtures provided with LLLC in lieu of
na
C405.2
lighting controls
C405.2 lighting controls; provide description of control
(LLLC)
capabilities and performance parameters
For permanently installed lighting fixtures in dwelling units,
C405.1
Lighting in dwelling
indicate lighting control method on plans for spaces and
na
units
lighting zone(s) served, or demonstrate compliance with high
efficacy exception
C405.2.3
Indicate on plans the method of manual lighting control
C405.2.1.1
(whether combined with occupancy sensor, automatic light
yes
C405.2.2.2
Manual controls
reduction, daylight responsive or specific application controls),
lighting plan
C405.2.4
location of manual control device and area or specific
C405.2.5
application it serves
C405.2.2.1
Manual interior light
Indicate on plans which method of manual 50% lighting load
yes
C405.2.2.2
reduction controls
reduction is provided, or whether lighting load is reduced via
lighting plan
C405.2.3
occupancy sensors or daylight responsive controls
Indicate on plans the method of automatic shut-off control
during unoccupied periods (occupancy sensor, time switch or
C405.2.2
Method of automatic
digital timer switch) for all lighting zones;
na
shut-off control
Indicate locations where automatic shutoff is provided by other
methods (occupancy sensor or digital timer switch) or which
time switch control exception applies
Indicate on plans the spaces s erved by occupancy sensors;
restroom
C405.2.1
Occupancy sensor
Indicate whether occupancy sensor controls are configured to
yes
C405.2. 1.1
controls
be manual -on, automatic 50%-on, or serve a space eligible for
automatic 100%
automatic 1 00%-on per exception
on per exeption
Occupancy sensor
Indicate aisleways and open areas in warehouse spaces
na
C405.2.1.2
controls -
provided with occupancy sensor controls that reduce lighting
warehouses
power by 50%
na
C405,2.2.1
Automatic time
Indicate locations of override switches on plans and the lighting
switch controls
zone(s) served, include area sq. ft.
na
C405.2.6
Digital timer switch
Indicate digital timer switch control includes: manual on/off,
time delay, audible and visual indication of impending time-out
Indicate primary and secondary sidelight daylight zone areas
on plans, include sq. ft.;
Indicate toplight daylight zone areas on plans, include sq. ft.;
C405.2.4.2
Daylight zones -
na
C405.2.43
Sidelight and toplight
For small vertical fenestration assemblies (rough opening less
than 10 percent of primary daylight zone) where daylight
responsive controls are not required, provide fenestration area
to daylight zone calculation(s)
Indicate on plans lighting zone(s) served by daylight responsive
controls;
Identify sidelight and toplight daylight zones that are not
provided with daylight sensing controls and the exception(s)
na
C405.2.4
Daylight responsive
that apply;
Indicate on plans the lighting load reduction method -
controls
continuous dimming, or stepped dimming that provides at least
two even steps between 0%-100% of rated power;
Indicate that daylight sensing controls are configured to
completely shut off all controlled lights in the lighting zone
Additional controls -
Identify spaces and lighting fixtures on plans that require
na
C4052.5
Specific application
specific application lighting controls per this section
lighting controls
Indicate on plans that display and accent lighting, and display
C405.2.5 -
Display and accent
case lighting are controlled independently from both general
na
Items 1&2
lighting
area lighting and other lighting applications within the same
space;
Indicate manual and automatic lighting control method
BUILDING
Lighting, Motor, and Electrical Permit Checklist, Pg. 2 LTG-CHKI
2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2, R3, R4 over 3 stories and all RI Revised Nov 2017
Project Title: Pilates Edmonds
Date 5/20/2019
The following information is necessary to check a permit application for compliance with the fighting, motor, and electrical requirements in the
Applicability
Location in
Building Department
(yes,no,na)
Code Section
Component
Compliance information required in permit documents
Documents
Notes
C405.2.5 -
Hotel/motel guest
Indicate method of automatic control - vacancy or captive key
na
Item 3
rooms
control of all installed luminaires and switched receptacles in
guest room
C405.2.5 -
Supplemental task
Indicate method and location of automatic shut-off vacancy
na
Item 4
lighting
control for supplemental task lighting, including under -shelf or
under -cabinet lighting
Indicate on plans eligible non -visual lighting applications,
include sq. ft. area of each lighting control zone;
C405.2.5 -
Lighting for non-
Indicate on plans that non -visual lighting are controlled
na
Item 5
visual applications
independently from both general area lighting and other lighting
applications within the same space;
Indicate method of manual lighting control and applicable
automatic lighting control
Indicate on plans that lighting equipment for sale or
Lighting equipment
demonstration are controlled independently from both general
na
C405.2.5 -
for sale or
area lighting and other lighting applications within the same
Item 6
demonstration
space;
Indicate method of manual lighting control and applicable
automatic lighting control
Identify on plans egress fixtures that function as both normal
and emergency means of egress illumination;
na
Provide calculation of lighting power density of total egress
C405.2.5 -
Means of egress
lighting;
.0038w/sq ft
yes
Item 7
lighting
If total egress lighting power density is greater than 0.02 W/sq.
ft., indicate on plans egress fixtures requiring automatic shut-off
na
during unoccupied periods;
na
Indicate method of automatic shut-off control
Indicate on exterior lighting plans and fixture schedules the
automatic lighting control method, control sequence, and
locations served;
For building facade and landscape lighting, indicate automatic
Exterior lighting
controls shut off lighting as a function of dawn/dusk and fixed
na
C405.2.7
controls
opening/closing time;
For all other exterior lighting, indicate automatic controls shut
off lighting as a function of available daylight; include control
sequence that also reduces lighting power by at least 30%
between 12am-6am, or from 1 hour after closing to 1 hour
before opening, or based upon motion sensor
Exterior building
For building grounds fixtures greater than 100 wafts, indicate
na
C405.5.1
grounds lighting
on plans whether fixtures have efficacy greater than 80 lumens
controls
or; are controlled by motion sensor, or are exempt lighting per
C405.5.2
Area controls -
Indicate location(s) of master control switch(es) intended to
C405.2.5
Master control
control multiple independent switches; circuit breaker may not
na
(listed after
switches and circuit
be used as a master control switch;
Verify that no 20 amp circuit controlled by a single switch or
C405.2.7)
power limit
I
I
lautornatic control is loaded beyond 80%
ADDITIONAL
EFFICIENCY
PACKAGE OPTION - ENHANCED DIGITAL LIGHTING CONTROLS
To comply with additional efficiency package option, indicate on
plans all interior lighting fixtures that are individually addressed
and provided with continuous dimming, or exception taken;
na
C406.4
Enhanced digital
Include calculation of percent total installed interior lighting
lighting controls
power that is configured with required enhanced lighting control
functions (min 90% to comply with additional efficiency
I
package option)
I
=71
Lighting, Motor, and Electrical Permit Checklist, Pg. 3 LTG-CHK_
2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2, R3, R4 over 3 stories and all RI Revised Nov 2017
Project Title: Pilates Edmonds I
Date 5/20/2019
The following information is necessary to check a permit application for compliance with the lighting, motor, and electrical requirements in the
Applicability
I
I
Location in
E Fuil—dingDepariment
T
(yes,no,na)
JCode Sectiod
Compon ent
Compliance information required in permit documents
Documents
Notes
INTERIOR LIGHTING POWER & EFFICACY
Include all luminaires in lighting fixture schedule; indicate fixture
types, lamps, ballasts, and manufacturers rated wafts per
lighting plan
fixture;
Identify spaces eligible for lighting power exemption on plans
C405.4.1
Total connected
and in compliance forms; indicate the exception applied;
na
yes
C405.4.2
interior lighting power
Identify lighting equipment eligible for lighting power exemption
in fixture schedule and in compliance forms; indicate the
na
exception applied;
Indicate that exempt lighting equipment is in addition to general
area lighting and is controlled independently
na
yes
C405.3
Exit signs
Indicate location of exit signs on plans and rated watts per
lighting plan
fixture in lighting fixture schedule (maximum 5 wafts per side)
If high efficacy exception is applied to permanently installed
Lighting in dwelling
lighting fixtures in dwelling units, indicate in lighting fixture
na
C405.1
units - lamp efficacy
schedule if lamps in fixtures are high efficacy per R404.1.
Calculate percentage of fixtures with high efficacy lamps in
I
project (min 75% to comply with exception).
Interior Lig Ing Power Calculation - Indicate compliance path taken
Building Area
Complete required compliance forms — proposed wattage per
na
C405.4.2.1
Method
building area does not exceed maximum allowed wattage per
building area; identify locations of building areas on plans
Complete required compliance forms — total proposed wattage
yes
C405.4.2.2
Space -By -Space
does not exceed maximum allowed wattage; identify locations
lighting plan and
Method
of space types on plans, including retail display areas, lobby art
attached
& exhibit display areas, and ceiling heights as applicable
ADDITIONAL
EFFICIENCY
PACKAGE OPTION - REDUCED INTERIOR LIGHTING POWER
DENSITY
To comply with additional efficiency package option,
Reduced lighting
demonstrate in compliance forms that total connected interior
lighting plan and
yes
C406.3
power density
lighting wattage is 25% less than the total maximum allowed
attached
lighting wattage via Building Area Method or Space -By -Space
Method
Reduced lighting
For project with dwelling units, to comply with additional
power density -
efficiency package option indicate in lighting fixture schedule if
na
C406.3
dwelling unit lamp
lamps in interior fixtures have efficacy rating of 60 lumens per
efficacy
waft or more. Calculate percentage of fixtures with lamps that
have this efficacy rating (min 95% to comply with option)
EXTERIOR
LIGHTING POWER & EFFICACY
Include all luminaires in lighting fixture schedule; indicate fixture
types, lamps, ballasts, and manufacturer's rated watts per
fixture;
Total connected
Identify exterior applications eligible for lighting power
na
C405.5.2
exterior lighting
exemption on plans and in compliance forms; indicate
power
exception applied;
Indicate that exempt exterior lighting is controlled
independently from non-exempt exterior lighting; include
exception claimed for each fixture or group of fixtures under
exception category
na
Table
C405.5.2(l)
Exterior lighting zone
Indicate building exterior lighting zone as defined by the AHJ
Exterior building
For building grounds fixtures rated at greater than 100 wafts
na
C406.5.1
grounds lighting
that are complying based on efficacy, indicate rated lamp
efficacy (in lumens per waft) in fixture schedule
Exterior lightin
Complete required compliance form — proposed wattage for
na
C405,5.2
g
I power calculations
exterior lighting plus base site allowed does not exceed
imaximum
allowed
Lighting, Motor, and Electrical Permit Checklist, Pg. 4 LTG-CHKI
2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2, R3, R4 over 3 stories and all RI Revised Nov 2017
Pilates Edmonds
Date 5/20/2019
F
The following information is necessary to check a permit application for compliance with the lighting, motor, and electrical requirements in the
Applicability
lCompliance
Location in
Building Department
(yes,no,na)
Code Sectioni
Component
information required in permit documents
Documents
Notes
LIGHTING
ALTERATIONS
Where a 50% of existing luminaires in interior space(s) or
parking garage are replaced; indicate compliance path
(building area or space -by -space method); include all new and
lighting plan and
existing -to -remain luminaires in compliance form (LTG-INT-
attached
BLD or LTG-INT-SPACE); indicate proposed lighting wattage
Interior and parking
does not exceed maximum allowed per compliance path
yes
C503.6
garage lighting
Where < 50% of existing luminaires in interior space(s) or
fixture alterations
parking garage are replaced; indicate total existing lighting
wattage in each space prior to alteration; include all new and
existing -to -remain luminaires in LTG-INT-SPACE form; indicate
proposed total lighting wattage in alteration area does not
exceed total existing lighting wattage prior to alteration
Where �t 50% of existing exterior lighting wattage is replaced;
include all new and existing -to -remain luminaires in LTG-EXT
form; indicate proposed total exterior lighting wattage does not
exceed maximum allowed
na
C503.6
Exterior lighting
fixture alterations
Where < 50% of existing exterior lighting wattage is replaced;
indicate total existing lighting wattage prior to alteration; include
all new and existing -to -remain luminaires in LTG-EXT form;
indicate proposed total exterior lighting wattage does not
exceed total existing wattage prior to alteration
Where new wiring is installed to serve new interior luminaires
Interior lighting wiring
and /or luminaires are relocated to a new circuit; indicate
lighting plan and
yes
C503.6
alterations
lighting controls are provided (as applicable) - manual
attached
(C405.2.3); occupancy sensor (C405.2.1); daylight responsive
(C405.2.4); specific application (C405.2.5); exit signs (C405.3)
Exterior lighting
Where new wiring is installed to serve new exterior luminaires
na
C503.6
wiring alterations
and /or luminaires are relocated to new circuit; indicate exterior
lighting controls are provided (C405.2.7)
Where a new lighting panel is installed or an existing panel is
Lighting panel
moved (all new raceway and conductor wiring); indicate lighting
na
C503.6
alterations
controls are provided (as applicable) - same provisions as
wiring alterations; time switch controls and manual light
I
reduction controls (C405.2.2)
Where interior space(s) is reconfigured (permanently installed
yes
C503.6
Interior space
walls or ceiling -height partitions); indicate lighting controls are
lighting plan and
reconfiguration
provided (as applicable) - same provisions as lighting panel
attached
alterations
Identify existing luminaires being upgraded with bulb and / or
na
C504.2
Lighting repairs
ballast replacement; indicate fixture alteration does not
increase existing fixture wattage
Identify spaces on plans where the building area type or space
use type is being changed from one type to another per Tables
C405.4.2(l) or (2)
Indicate compliance path (building area or space -by -space
na
C505.1
Change of space use
method); include all new and existing -to -remain luminaires in
compliance form (LTG-INT-BLD or LTG-INT-SPACE); indicate
proposed lighting wattage does not exceed maximum allowed
per compliance path
RECEPTACLES
Identify all controlled and uncontrolled receptacles on electrical
plans in each space in which they are required; include
lighting plan and
Controlled
receptacle configuration such as spacing between controlled
attached
yes
C406.10
receptacles
and uncontrolled, duplex devices, etc;
Indicate on plans whether the method of auto�afic control for
each controlled receptacle zone is by occupant sensor or
programmable time -of -day control
Lighting, Motor, and Electrical Permit Checklist, Pg. 5 LTG-CHK
2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2, R3, R4 over 3 stories and all R1 Revised Nov 2017
Pilates Edmonds
Date 5/20/2019
The following information is necessary to check a permit application for compliance with the lighting, motor, and electrical requirements in the
Applicability
I
Location in
Building Department
(yes,no,na)
Code Sectiod
Component
Compliance information required in permit documents
Documents
Notes
MOTORS, TRANSFORMERS,
ELECTRIC
METERS, INTERIOR TRANSPORTATION
na
C405.6
Electrical
Include electrical transformer schedule on electrical plans;
transformers
indicate transformer size, efficiency, or exception taken
na
C405.7
Dwelling unit
electrical energy
Indicate on electrical plans that each dwelling unit in Group R-2
consumption
has a separate electrical energy meter
Electric motor
Include all motors, including fractional hp motors, in electric
na
C405.8
efficiency
motor schedule on electrical plans; indicate hp, rpm, rated
efficiency, or exception applied
For luminaires in each elevator cab, provide calculated average
efficacy of combined fixtures that indicates efficacy is not less
-than 35 lumens per waft;
Indicate rated wafts per cfm for elevator cab ventilation fans do
na
C405.9.1
Elevator cabs
not exceed 0.33 wafts per cfm;
Indicate automatic controls that de -energize lighting and
ventilation fans when elevator is stopped and unoccupied for a
period of 15 minutes or more
Escalators and
Indicate escalators comply with ASIVIE A17.1/CSA B44;
na
C405.9.2
moving walks
automatic controls are configured to reduce operational speed
to the minimum permitted when not in use
na
C405.9.3
Regenerative drive
Indicate all one-way down or reversible escalators are provided
with a variable frequency regenerative drive
DOCUMENTATION
AND
SYSTEM REQUIREMENTS TO SUPPORT COMMISSIONING (Cx)
Indicate that all electrical systems (receptacles, transformers,
motors, vertical and horizontal transportation) for which the
WSEC requires control functions and / or configuration to
Scope of electrical
perform specific functions are required to be commissioned;
na
C408,3
power and lighting
systems
Where total building lighting load is > 20 kW, or where total
commissioning
lighting load of luminaires requiring daylight sensing and / or
occupancy control > 10 kW, indicate that all automatic lighting
control systems are required to be commissioned; or provide
building lighting power calculation demonstrating eligibility for
exception;
Indicate Cx requirements in plans and specifications for all
applicable elec I ri ca I a nd lighting control systems per C408;
Include general summary with at minimum Items 1 thru 4 of the
C405.13
Commissioning
Cx plan per C408.1.2 including: narrative description of
C408.1.1
requirements in
activities, responsibilities of the Cx team, schedule of activities
na
C408.1.2
construction
including verification of project close out documentation per
C408.1.4.2
documents
C1 03.6, and conflict of interest plan (if required);
C103.6
Include in general summary that a Cx project report or
Compliance Checklist (Figure C408.1.4.2) shall be completed
by the Certified Cx Professional and provided to the owner prior
I
to the final electrical inspection
Functional
Identify in plans and specifications the intended operation of all
na
C408.3.1
performance testing
equipment and controls during all modes of operation, including
criteria
interfacing between new and existing -to -remain systems
PROJECT CLOSE OUT DOCUMENTATION
Indicate in plans that project close out documentation is
Project close out
required including WSEC lighting compliance forms and
na
C103.6.3
documentation
calculations that document all interior and exterior lighting area
requirements
and / or surface types, lighting power allowances and installed
densities
If "no" is selected for any question, provide explanation:
End of Lighting, Motor & Transformer Permit Documents Checklist
OUTLINE OF LEVEL I
BELOW
L
FIRE SEPARATION DISTANCE It DEGREE OF
OPENING PROTECTION PER IBC 2012 TABLE
705.8: UNPROTECTED, SPRINKLED, NO MAX (-38.75) USED FOR
OPENING REQUIRED SWCORNERHEIGHT
C CALC
=ULATION;?�
X
EXTENT OF RECTANGLE USED FOR HEIGHT
CALCULATION PER CITY OF EDMONDS
HANDOUTI 341 MAIN '0
LOT AREA: 160'X 120'= 19,20D SF STREET
REQUIRED OPEN SPACE (PER ECDC X
OPEI
SPA(
16.43.030E) = W - 42 - 371 = 971 SF E
P
9 00
,2 SF = 5.06% LU
LOTSLOPEVAMES-CALCULATEDNETO
SW=4% t2A
APARTMENT BUILDING
ENTRANCE
( 5531 S
A F) V
EMSTING POST OF
OUTLINE OF LEVEL
SECOND
COMMERCIAL
ENTRANCE F(
�F(H.I� ECDUFORIWOORNE1
E.'Tt rON
EASTING MANHOLE CC
USEDATHEIGHT
CALCULATION DATUM
45.05 PER SURVEY
A
45—
23'-9'
BASEMENT LEVEL PAR19NG
GARAGE ENTRANCIVEAT
FOR BOTH PHASE 1 & 2
PHASE I ROOF OUTLINE
ABOVE
—TRASHP.
TRASH ROOM IN BUILDING)
EXISTING EDMONDS POST
OFFICE BUILDING (PHASE 1)
!S
OPEN COU
LEVEL2
- - -
- - - -
--Jj
Ed
LLI
—PHASE
I & 2
TRANSFORMERS AT LEVEL 1
PHASE 1 ROOF OUTLINE
ABOVE
BELOW 4
N,
"-y6.,1, .E CORNER
41
HEI
��,��EXu,;�IINGOPENALLE
LIMIT OF CONSTRUODIN —
(-50.07) USBED F NE CORNER
-4
PROPERTY LINE
2.-
HEIG14T CALCULATION
ELECTRrA CONNECTION
50—f
FIRE SEPARATION DISTANCE & DEGREE OF OPENING FIRE SEPARATION DISTANCE It DEGREE OF OPENING
PROTECTION PER IBC 2012 TABLE 705.8: UNPROTECTED, PROTECTION NOT REQUIRED. PHASE 2 COMBINED WITH
SPRINKLED, 46% MAX OPENING ALLOWED. SEE IIA3.02 PHASE 1 INTO ONE BUILDING. SEPARATED OCCUPANCIES
CALCULATED PER IBC 2012 508.42 SEE SHEET GO.03.
D N
SITE PLAN
V= 20'-0" r""'L ..... I
0 10 20 40
I$Lpwtq- ou-50
CITY COPY
RECEIVED
MAY 3 0 205
BUILDING
HALLER
ARCHITECTS LLC
12216 Corliss Avenue North
Seattle, WA 98133
TEL 206.235.0935
email: boyeracottl (glipmall.com
PROJEM:
Edmonds Mixed Use
Building
LOCATI N:
201 Main Street
Edmonds, WA 98020
PREPARED FOR:
Edmonds 2020 LLC;
4/616 PERMIT SET
A8/18/16 PERMIT REVISIONS
&, 11/14/16 PERMIT REIASIONS
ZL 2W1 7 CONFORMED SET
513
Z
8117
REGISTERED
Hl T
SCOTT A, 8
STATEOFWA INGTON
'91TE PLAN
74601.00
A1.U1
CONFORMED SET
9401
W
0
Z61-, A"4e-
09
Ored ALLF—*,�
....... ......
PROJECTADDRESS:
201 MAIN ST #103
EDMONDS WA 98020
OWNERS:
EDMONDS 2020 LLC
TAX No, 0043 4400700700
LEGAI-i EDMONDS PLAT of BLK 007
D-00 LOT 8-9-10-11-12
NOW COMBINED TO: 00434 400 700 700
PER CITY of EDMONDS BLA No: 20130064
REC AFN 2014022 065003.
SCOPE OF PROJECT: EXISTING SPACE 15 NEW CONSTRUCTION.
VACANT SPACE WITH NO PREVIOUS TENENTS.
SPEE BLDG PERMIT # BLD2016 — 0506
CIO
ZQK BD 2
CONTRUCTION TYPE: VA
TRASH: SOUND DISPOSAL
TENENT: PILATESEDMONDS
U
CURT& CHEREE BRODRICK
206-949-1996
-Z�
206-550-9275
PILATES EDMONDS
IS A PILATES STUDIO THAT PROVIDES
I-ON-1 AND SMALL GROUP TRAINING FOR THE
z
EDMONDS AREA.
0
EMPLOYEES: 3
BUILDING SUPPUED WITH FIRE.SPRINKLER /FIRE ALARM SYSTEM
OCCUPANCY: GROUP B
TOTAL SQUARE FOOTAGE, 1697 SQ FT
0
PER IBC 1004.1.2 EXCEPTION DESIGN LOAD OCCUPANCY
OFFICE, RESTROOM, REAR CIRCULATION AREA 320 SQ FT
Ln
PILATES AREA 1377 SQ FT
The occupant load of this tenant space ha been
Z
LU
SPACE LIMITED TO 15 OCCUPANTS BY DESIGN
established at 15 maximum by an exceptie'n to IBC
1004.1.2 allowing a reduced occupant load based
LU
OCCUPANT LOAD TO BE POSTED NEAR MAIN ENTRY
on actual use. See owner's letter on file. Future
r
changes in the use o 0=,11pthis spa ill
V)
APPLICAL CODES:
be sub act to code req u
0
2015 INTERNATIONAL BUILDING CODE
LU
Z
2015 INTERNATIONAL MECHANICAL CODE
V)
;;�
2015 INTERNATIONAL FIRE CODE
LLJ
2015 INTERNATIONAL EXISTING BUILDING CODE
<
2015 WASHINGTON STATE ENERGY CODE
2015 UNIFORM PLUMBING CODE
CL
C)
C�j
EDMONDS COMMUNITY DEVELOPMENT CODE TITLE 19
04, of Edmonds BuDding Department
WASHINGTON STATE AMENDMENTS TO ICC
2014 NATIONAL ELECTRICAL CODE
1
WPROVEDPLMI
DEFERRED PERMIT SUBMITTALS:
HVAC
STATE ELECTRICAL
SIGN PERMIT.
A
CM(OFEDMONDS
BUILDING DEPARTMENT
WORK
ADDRESS —)ni 05—
OWNER
APPROVED DATE
INDEX:
BLDG. OFFICIAL:
1. SITE TITLE
P E F! IRA P T KU h/i D E R
2. EXISTNG / PROPOSED FLOOR PLAN
3. WALL RATING / HANDICAP ACCESS
4. LIGHTING PLAN
5. SUITE EQUIPTMENT AND USE LAYOUT
0 U F-Ii4l
CU)", 31 JUL 0 1 2019
BUILDINq 11 PART1,11511T
Cl_ry o'2 E%�,Q
P.T
;-T-1
4-1
V)
z
VACANT
. .......... -------
oil
- -cell
0�
PILATES EDTAAONDS
suITF.... Io5
NO PREVIOUS USE: NEW
14 VAC16v- 1-d'
tz) rml-
ENTRANCE SLIDING HORIZONTAL DOORS PER IBC 1010.1.2 EXCEPTION 9
C,01,I(E.F-II-F -1 , VFI!- 4'1
F _00V
TO COMPLY WITH IBC 1010.1.3
DOOR HARDWARE TYPICAL ADA COMPLIANT PER IBC 1010.9.1
y
EXISTING OPEN ALLEY
r C\Single user UNISEX Accessible Bathmom Details
P.T.D.
MAX. I
z F-\
z
t
0
KNEE CLR�
G.B., BACK WALL
VERTICAL GRAB
G.B., SIDE WALL
D..
54" MIN.
39"- 41 18" VERITACL
_36"' Ma� GRAB BAR
12"
MA
3:> 42" G.B.
T.P.D.
0
UN
N
li,
OFFICE
Drop Co-IL-Imcl
MeW f-AF-1-17101�
VJALLj�'
4 1- Z.,
�o 10
FIVE G AV-A�KAV-� (P
GARAGE
V)
WAL*,WA�
U
U
C4
U
HVAC UNIT ELECTRIC HEAT PUMP, HEAT AND COOL
PROPOSED FLOOR PLAN SUITE. 101) Ventilation provided with mechanical HVAC unit
77
'A 0 Handicap access is provided at both front and rear entrances.
Handicap parking stall in garage near rear entrance.
............
IL
7
EXISTING FLOOR PLAN
1/4" = 1' — 0"
U,
i14
M
0
z
LU
0
LLj
APPLICAL CODES:
LU
2015 INTERNATIONAL BUILDING CODE (IBC)
V)
<
2015 MECHANICAL CODE
LLJ
2015 INTERNATIONAL FIRE CODE
2015 EXISTING BUILDING CODE
2015 WASHINGTON STATE ENERGY CODE
b
2015 UNIFORM PLUMBING CODE
EDMONDS COMMUNITY DEVELOPMENT TITLE 19
WASHINGTON STATE AMENDMENTSTO ICC
2014 NATIONAL ELECTRICAL CODE
DEFERRED PERMIT SUBMITTALS:
PLUMBING ( less than 10 fixtures)
HVAC
STATE ELECTRICAL
SIGN PERMIT
ZONING: BD2
TYPE OF CONSTRUCTION: TYPE VA
OCCUPANCY: GROUP B
TOTAL sou-AkE 1697 SQ FT
PER IBC 1004.1.2 EXCEP11ON DESIGN LOAD OCCUPANCY �4
OFFICE, RESTROOM, REAR CIRCULATION AREA 320 SQ FT P-4
PILATES AREA 1377 SQ FT
6
SPACE LMTED TO 15 OCCUPANTS By DESIGN
1.4
�4
OCCUPANT LOAD TO BE POSTED NEAR MAIN ENTRY
P-4
EMPLOYEES: 3
C)
TENANT: ilates Edmonds is apilates studio that provides Ion Ian small En
group training for the Edmonds ama.
BUILDING/TENANT SPACE PROVIDED WITH FIRE/SPRINKLER
SYSTEM AND FIRE ALARM SYSTE
0
0 U,
JUL 0 1 2019
-e
56LJILDING�ELE Fr�NSNT
Cn,to :)�A
to
2- 7 GIRT$ 16- C.C�
—CONCRETE REVEAL PER ELEVATIONS
<'
--2- RION) IR-13) POLYISO INSULATION
CONCRETE WAL
R 112'TV X OVID
LAY R 112 1
PARTITION TYPE l' FOR
J1SEE
ADDITIONAL INFORMIATION
(SEE PIANS�
RATNG
HRE I ', 2A 3 HOUR
.,00ltERS
[A ICOLICRETEONLY-DELVEZGRTS.WSM&GW8
HCONCRETE WALL W/METAL STUD FURRING
4
EMULSIFIED ASPHALT
—?AIRRORDRAIN
OCCURS
—CONCRETE WALL
SEE PARTITION TYPEVFOR
ADDITIONAL INFORMATION
IVARMS-SEE
I Ir MIN
IHSHORED CONCRETE FOUNDATION
NALLS AND INTERIOR PARTIMN% NONCOMBUS-171BLE
GA FILE NO. WIP 1522 ISENERIC So STC
WIND
--UM WALLBOARD. STEEL STUDS
r W_ S dqwW,— 21'
t C FM Llyl., 6V ""II gyp_ �bI. vo.6p-um.
�t �,ghjNt" .� �-h I &V 1� S d,-..—. 12'
21' —by... .
7K-zw� t ile,
Ro�- w S�b.
R. T--. S., WP 1519
mH119 �36,
S—d T..,, NR= 80.4v. 2 34) 1
SHAFT OARTmON
EXERCISE ROOM
ENTRY/LOBBY
E31METAL
4
QA FILE NO. WP 1072 1 GENERIC 'H_ 41Z4
GYPSU'l WALLBOARD. STEEL STUDS llRFR U'.STC
0. b— sw Y "s-1— 911". 1:71'b 41., ff=;T==�
I, (NUB)
T�� A 7�'
7- S_ YIP IND
jFMw 4."O.,q-ft
OSUTP�T?G."I,
ULC 791�P� 19TW 71TI97.
NFCC $16 W. 2.3-81
RAING. mm-nm:
4
a DaE-E NSULATIO �OHTIESTOCOKCOUJN I
IEMTL STUD FRAME EXT BRICK VENEER
SEE FLOOR TYPE'46'FOR ADDITIONAL
INFORMATION
11111111 PER SCHEDULE
,_____�—I'LOOR
------ ----
— - 111.--. 1.
I—CONCRETE
STRUCTURAL
IL
'��R-11)
RIGID INSULATION
IKN'_M�_ i5 i
MP.T. CONCRETE SLAB VVI HEATED SPACE ABOVE
ACOUSTIC INSULATION
—CEMENT SIDING PER ELEVA710M
WRS
SEE PARTITION TYPE -7 FOR
ADDITIONAL INFORMATION
ROM. MODIFIERS:
JA
IC I
ID I
I im
JE2 HOUR SHAFT WALL - MTL SjUD CSIDING
SEE FLOOR TYPE'46' FOR ADDITIONAL
INFORMATION
—FLOOR FINIEH PER SCHEDULE
1—CONCRIETE ELAS - PER
STRUCTURAL
R-30. RIGID INSULATION TVP 0 30A
—METAL FURRING
�4
u
u
u
6
u
LIJ
Lu
AA
fW-V-4HO 6iAP_A6(E_-
Lr)
EXERCISE ROOM ENTRY 15A
ui Z
un
LU
OFFICE
c
CL n4
lf5A
10
W24KO
51
NA T11,
10
L47] Hr- co�z. F
%B AT
I-HIL 00C.CFAL_ I
H
TRAINING ROOM w
TRAINING ROOM
u
L u
------- - ----
............... .
u
1.4
WALL RATING LEGEND & HANDICAP ACCESS PLAN
ol u D
JUL 0 1 2019
r %
g
RE,
Hanger (Suspension) WhresFigeesseand5b)
\\1
Hangerand parimeterwires must m plumb within 1:6 unless (Figure5a)
counter sloping %Wires are provided (Figure 5b). s— �a &,. -,
Hanger wires shall be 12-gauge and spaced 4 It an center. s__ �snj is
c.06 5-11 .1. z 71
Any connection device at the supporting construction shall be capable 11UNNER FREM MOV r\
of carrying not less than 100 lb. z-. - --i
PowderActuated Fasteners (PAFs) are an approved method of V, MI—REAN Le�PE
attachment for hangerwires. s �scE: ...... semp.,� a z, s- ao�� C.Su� WN� To
EUREMG ATONEEND
\�:W'R:P.'
Terminal ends of each main bean and crow tee must be supported R1MMxoXzUFEANM
within 8 inches of each wall with a perimeter wire or approved wall CoNNE—CAP"LE'ro
support (see Figures 4a & so). &� ASIAI EW S - 2 5 suppou wLes
Wires shall not aftsch to or benclaround interfering material or FIGURE 18: PERIMETER
equipment. A trapeze or equivalent device shall be used where CLOSURE ANGLE w/
obstruction prec, ude direct suspension. Trapeze suspensions shall SEISMIC CLIP DETAIL
be sized to resist Me dead load and lateral forces appropriate for the
seismic category. s,,, sr,-, E-s-,a,
Electrical Fixtures
Lightfixtures weighing less thanIO lb shall haveone 12-gauge hanger Fiq,,re 6a
wine connected from the fixture tD the structure above. This wire may be
stack. �E Tm — s,...,, 5 z j
Light fixtures weighing more than 10 lb and few than 56 lb shall haw two
12-gauge wims attached at opposing comm of the light fixture to the
structure above. Thesewires maybe slack. ASTV15.1m5.1 5
Ught fixtures weighing mom than 56 to shall be supported directly from
the structure above byapprovedhangers-
Pendant-hung fixtures shall be drectly supported from the structure above
using a 9-gauge wire Or an approyed alternate support without using the
calling suspension system for direct support. I ASrM 3-1- sj 7
F'gure Gb
LIGHTING and REFLECTED CEILING PLAN
SCALE: 1/4' = 10"
CEILING PLAN LEGEND
2 x 4 LED LIGHT FIXTURE 30 WATT
F171 SUPPLY GRILL HVAC
2:1 ILLUMINATED EXIT SIGN w/ BATT BACK UP
DS DIMMABLE LIGHT SWITCH
ro EE LED LIGHT SCONCE 20W
r
LED FLAT PANEL FIXTURE:
CPANL 2 x 4 35 KW 39 WATTS o 1- 5 IM
LED FLAT PANEL FIXTURE 43 WATTS
---------- - ENTRY Model# LF 1089- PEW- 52LF4-G. OIZ- 51M
EXERCISE ROOM EXERCISE ROOM OFFICE 21
Ep 7( PENDANT CHANDELIER 80 WATT
A 0 LF-D CAIJ It WA'Tf,�'
OS OCCUPANCY SENSOR LIGHT CONTROL
FTI 2 x 4 LED recessed light toffer GLOBAL LUX LCB -24-40-MD-835 or similar.
U3 Wall sconce: ALLEN & ROTH VBL 1127MBK or similar.
LED PENDANT CHANDLELIER MODEL: HL487472 or similar.
LED strip lighting : 4w/ft
All lights controlled by dimmer switches. EXCEPTION: BATH OCCUPANCY SENSOR
D, il
42v
0j ICY ENTRY
LOBBY
=T
TRAINING ROOM TRAINING ROOM SINGLE USER UNISEX
ACCESSIBLE BATH
0
cl
EA0 :Aj
SUSPENDED CEILING INSTALLED TO IBC AND ASTM E 580 STANDARDS.
ASTM E 580 SECTION 1.4 CEILINGS LESS THAN OR EQUAL TO 144 SQ FT AMD
SURROUNDED BY WALLS CONNECTED TO THE STRUCTURE ABOVE ARE EXEMPT
LIGHTING.and REFLECTED CEILING PLAN FROM SEISMIC DESIGN REQUIREME . NTS.
Ili
P.
U
C"!
FRO
%�Va
Z
E U
'Cd
JUL 0 1 2019
BUILDING P'
Hanger (Suspension) Wires ii-7g-5-w5b)
Hanger and perimeter wires must be plumb within 1:6 unless (Figure Sa)
counter sloping wires are provided (Figure 5b). S— ASM Gioa 11.4
Hanger wires shall be 12-gauge and spaced 4 It on center. sn— As-nv
71
Any connection device at the supporting construction shall be capable
of carrying not less than 100 lb. s,— cscA — 3. 1
PowderActuated Fasteners (PAFs) are an approved method of
attachment for hangerwires. $010 AXE --'C �34 5F.—P.- 16 2.30'�aO�q�
!1-11-0i, - z , �11
Terminal ends of each main beare and crem bee must be supported
within 8 inches of each wall with a perimeter wire or approved wall
support (me Figures 4a & So). Sl— ASTM J55W 5-1- - P. 5
Wres shall not attach to or bend around interfering material or
equipment. A trapeze or equivalent device shall be used where
obstructions preclude direct suspension. Trapeze suspensions shall
be .1zed to resist the dead load and lateral forces appropriate for the
seismic category. S ASri,i E— S-'- 5 27A
Electrical Fixtures
Light fixtures weighing less than 10 lb shall have one 12-gauge hanger
wire connected from the fixture to the structure above. This wire may be
slack. s—,—sm—. sl—$31
Light fixtures weighing mom than 10 lb and lam than 56 lb shall have two
12-gauge wires attached at opposing carriers of the light flidure to the
structure above. These wires may be slack. ft— ASN— 5— �', 3 5
Light fixtures weighing more than 56 lb shall be supported directly frorn
the structure above by approved hangers. I. -I A— E5M -- 5 3 C
Pendant -hung fixtures shall be directly supported from the structure ab�
using a 9�g-ge wire or an approved alternate support without using the
cailing suspension system for direct support �,:— P.s-,k. r- .3—r. s�j ,
ROVI 63
5
.. ... ...... ... — ------ ENTRY
OFFICE
ILI
%� r
*+ V z
q lij 4-
1Z
77777
'77, 7
rz I
ENTRY EVE
LOBBY
""IS
-W �A�P- e%o�?
FIGURE 18: PERIMETER
CLOSURE ANGLE W/
SEISMIC CUP DETAIL
b
12`5
'lee
j
let JeS
PC 4 r- me, --
're 46 ir-�'
SUITE EQUIPTMENT AND USE LAYOUT
TO DETERMINE OCCUPANCY LOAD PLAN
DESIGN OCCUPANCY LOAD
SUITE SQUARE FEET: 1697 SQ FT
OFFICE, RESTROOM AND REAR CIRCULATION AREA 320 SQ FT
PELATES AREA 1377 SQ FT
PROPOSED OCCUPANCY OF SPACE TO BE LIMITED
TO 15 OCCUPANTS AS PER IBC 1004.1.2 EXCEPTION
OCCUPANCY DETERMINED BY FOR VMOM THE
SPACE IS DESIGNED
OCCUPANT LOAD TO BE POSTED NEAR MAIN ENTRY
SINGLE USER UNISEX
ACCESSIBLE BATH
SUSPENDED CEILING INSTALLED TO ISC AND ASTM E 580 STANDARDS.
ASTIM E 580 SECTION 1.4CEILINGS LESS THAN OR EQUALTO 144 SQ. FT AMD
SURROUNDED BY WALLS CONNECTED TO THE STRUCTURE ABOVE ARE EXEMPT
FROM SEISMIC DESIGN REQUIREMENTS.
U
A
M
C)
z
LU
0
LLJ
LLJ
Z
Ln
<
LU
I—
<
EL
r-4
�D
3 U 753
jUL 0 1 2019
BUIIWDE 6E III f
C OGF ER00112 S