Loading...
BLD20190630OV ED IV 51 (:�Y CITY OF EDMONDS 1215THAVENUENORTH -EDMONDS, WA 98020 PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISSUED 07/23/2019 Expiration Date: 07/23/2020 Parcel No: 00434400700800 PILATESEDMONDS C/O 2020 LLC EDMONDS 307 BELL ST EDMONDS, WA 98020 Permit #: BLD20190630 1�roject Address: 20 IMAIN ST #103, EDMONDS PILATES EDMONDS BRODRICK CONSTRUCTION INC 307 BELL ST 4103 C/O CURTIS BRODERICK EDMONDS, WA 98020 14829 CASCADIAN WY LYNNWOOD, WA 98087 (206) 550-9275 (206) 949-1996 LICENSE #: BRODRCI923JJ EXP:05/09/2020 T/1, ADDINGNEW PILATES TO NEW POST OFFICE I3LDG.,PLLJMBIN(3k.AN]D MECHANICAL UNDER SEPARATE PERMIT. A VALUATION: $10,000 PERMIT TYPE: Commercial ?15M�11;17 GROUP: 71 -Tenant Improvement GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: V-A RETAINING WALL ROCKERY: OCCUPANT GROUP: B OCCUPANT LOAD: 15 FENCE: 0 X 0 FT.) CODE: 2015 IBC ,OTHER: ------- OTHER DESC: IZONE: BD2 NUMBER OF STORIES: 0 IVESTED DATE: NUMBER OF DWELLING UNITS: 0 LOT #: �90621��� BASEMENT: 0 1 ST FLOOR: 1697 2ND FLOOR: 0 BASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 3 RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 3 RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 BEDROOMS: 0 BATHROOMS: 0 BEDROOMS: 0 BATHROOMS: 0 FRONTSEYBACK SIDESE"I'BACK REARSE'll'BACK REQUIRED: PROPOSED: IREQUIRED: PROPOSED: FQTIRED: PROPOSED� HEIGHT ALLOWED:O PROPOSED:O IREQUIRED: PROPOSED: SETBACK NOTE& No parking required for commercial uses. Fitness studio a1lo%ved in BD2. PERMIT APPROVAL I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSATION INSURANCE AND RCW 18:27. THIS APF)4CATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICLALQhR HIS/HER DEPUTY AND A" FEES ARE PAID, V ' Signature Print r4arne Date Released By te ATTENTION ITIS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED, UBC109/ IBCI 10/ iRCI 10� FIRE APPLICANT = ASSESSOR CrjFy v r STATUS: ISSUED BLD20190630 • Separate Pen -nit Required For: HVAC, Plumbing, Sign, L&I Electrical • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the buikling or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. • Any request foraltemate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any hem not to code specification. Sound/Noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites /activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold hanrdess the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly fi-omthe issuance for this permit. Issuance of this pen -nit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A) (6) BUILDING ENGINEERING (425) 771-0220 EXT. 1326 1. Go to: www.edmondswa.gov Building Department Inspections 2. Then: Services are now scheduled online. If you FIRE (425) 775-7720 3. Then: Permits/Dewlopment haw difficulties, please call the 4. Then: Online Permit Info Building Department front desk for PUBLIC WORKS (426) 771-0235 5: If you don't haNe one already, create a assistance during office hours. login (upper right hand comer) (425) 771-0220 RECYCLING (425) 275-4801 6: Schedule your inspection I When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Preferred, and whether you prefer morning or afternoon. • B-Preconstruction meeting • B-Ceiling Coid • B-Framing • B-SheetrockNail • B-Plumbing Final • B-Building Final • B-Other • F-Fire Final I4C. is 9 NJ BUILDING PERMIT Office Use Only APPLICATION I Permit #: 0 9 WVW%'PJJ111W" wlv�_'Ua Building Division 121 5th Ave N / Edmonds, WA 98020 425.771.0220 For handouts, submittal requirements, permit status and inspection scheduling information go to: www.edmondswa.gov. PLEASE NOTE: Intake appointments are required for New Single Family Residences, Large Additions, ADU's, New Commercial, and Major Tenant Improvement application submittals. If plans are prepared by a profession- al, electronic files are requested in addition to the hard copies. Please bring electronic files on a flash drive or coordinate for electronic transfer. Please call 425-771-0220 to schedule an intake appointment! JOB SITE INFORMATION/LOCATION: (Where the work is taking place) Job Site Address: _00/ Act �4 5-f- Parcel: 06q-Z Yq007()6 700 Loll Lot /Unit/Suite #: Subdivision: PROPERTY OWNER: Name: U11440qds we_'o Mailing Address: City/State/Zip: Phone #: Email: OWNER INSTALLATION: *If yes, read and sign* Will work be performed by the property owner? El Yes K No I own, reside in, or will reside in the completed structure. This installation is being made on property that I own which is not intended for sale, lease, rent, or exchange according to RCW 18.27.090. Owner Signature: APPLICANT/ CONTACT INFORMATION: Name of Applicant: PAL Q6rnICIS MailingAddress: �6_7 Rell �t J�/Q 3 City/State/Zip: TU h4 0 Vil Ld A- q6OZO Pho,ne#: [4/4-5-5'0—qZ75' E-mail: dniotid5' C-(j V" GENERAL CONTRACTOR: (If different from applicant) General Contractor&dn'r I — Mailing Address:N82� achnn We,_g City/Sti.te/Zip: L — "hi1Lvt6r?_ Vj`� Phone #: t 45-c/(0 E-mail: r gmet f� yn STATE UBI #: 60 Z -7,33 7W , or CITY OF EDMONDS BUSINESS LICENSE #: WA STATE CONTRACTOR L & I #: (CCB) & EXPIRATION DATE: TYPE OF PERMIT (Provide Details on Page 2) E] Accessory Structure/ El Addition Detached Garage • Demolition El Mechanical • New Single Family / Duplex 0 Plumbing El Fire Sprinkler 0 Remodel [I New Commercial/ Mixed Use 0 Re -Roof El Signs El Tank ATenant Improvement El Other Remodel Permit fees are based on: The value of the work performed. Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the work indicated on this application. Valuation: /0,' 06 o PROPOSED NEW SQUARE FOOTAGE FOR THIS APPLICATION Basement sq ft: Finished El Unfinished El 1st Floor, sq ft: LZol 2nd Floor, sq ft: Garage/Carport:, sq ft: Deck/Covered Porch/Patio: Other sq ft: PROJECT DESCRIPTION 'lb i�'L'Icf 10(4 n1 sko - - I certify that the information I have provided on this form/application is true, correct and complete, and that I am the property owner or duly authorized agent of the property owner to submit a permit application to the City of Edmonds. Print Name:Ckir 4-tks 9,4n-ct ff Signature: Date6�t9 —12 GENERAL COMMERCIAL DATA Occupancy Group(s): Occupant Load(s): S3 Type(s) of Construction: Fire Sprinklers: Yes No El WA STATE ENERGY CODE: If your project affects the building envelope, mechanical systems, and/or lighting, you must complete the appropriate WSEC forms. DEFERRED SUBMITTALS: All commercial building permits that will require associated plumbing, mechanical, fire sprinkler, and/or fire alarm permits are applied for separately. GCHANGE OF USE / NEW BLDG: Include TRAFFIC IMPACT worksheet MECHANICAL EQUIPMENT COUNTS (New and Relocated) BTUs Gas Elec Other Qty A/C Unit /Compressor Air Handler /VAV Boiler Dryer Duct Exhaust Fans Fireplace Furnace Heat Pump Unit Hydronic Heating Roof Top Unit (Provide eleva- tions if a Commercial Bldg) Other: PLUMBING FIXTURE COUNTS (New, Relocated or re -piped) Qty QtY Clothes Washer Tub/ Showers Dishwasher Backflow Device (RPBA, DCDA, AVB) Drinking Fountain Pressure Reduction/ Regulator Valve Floor Drain/Sink Refrigerator Water Supply Hose Bibs Water Heater - Tankless? Y or N Hydronic Heat Water Service Line Sinks Other: Toilets Other: GAS/FLIEL CONNECTION COUNTS (New, Relocated or re -piped) BTUs Qty BTUs Qty A/C Unit Outdoor BBQ / Fire pit Boiler Stove/Range/Oven Dryer Water Heater Fireplace/ Insert I I Other: I Furnace I Other: MEDICAL GAS, AIR VACUUM COUNTS (New, Relocated or re -piped) Qty Qty Carbon Dioxide Nitrous Oxide Helium Oxygen Medical Air Other: Medical - Surgical Vacuum Other: DEMOLITION Type of structure to be demolished: Square footage of structure to be demolished: AHERA Survey done? Y/N PSCAA Case #: Critical Areas Determination: Study Required 0 Conditional Waiver 0 Waiver El Fill in Place El Fill Material: Removal 0 �Sie of Tank (Gallons) Critical Areas Determination: Study Required El Conditional Waiver El Waiver 0 GRADE/FILL/EXCAVATE Grading: Cut cubic yards Fill cubic yards CLt / Fill in Critical Area: Yes El No El GENERAL PROVISIONS APPLICATIONS: Applications are valid for a maximum of I year. ESLHA Applications, 2 years. LICENSING: All contractors and subcontractors are required to be licensed wit Washington State Department of Labor & Industries and have a current City of Edmonds Business License. Scanneo DATE: June 28, 2019 TO: City of Edmonds Building Department FROM: Curt Brodrick, Brodrick Construction Inc. RE: Occupant Load Rational Plan Check: BLD2019-0630 Project: Tenant buildout for Pilates Edmonds Project Address: 201 Main Street #103 To whom it may concern; Pilates Edmonds asks for an approval of exception IBC 1004.1.2 Exception, where as approved by the building official the occupancy load may be determined by the actual number of occupants for whom the occupied space is designed, although less than those determined by calculation, and shall be permitted to be used in the determination of the design occupancy load. Here is our rational; Please find attached to the revised plan submittals a Suite Equiptment and Use Layout Plan that demonstrates the maximum number of single operator pilates equiptment appliances with required free space for safe operation. Due to the size and nature of the equiptment we feel the maximum number of pilates clients would be 7 with 3 instructors constituting a maximum of 10 occupants. The pilates sessions are 55 minutes with turnover every hour. Meaning when I client completes their session there is a 5 minute gap before the next client is scheduled, therefore there is no overlap of clients. We are pleased to concede to a mutual agreed occupant load of 15 and are in agreement to post " Maximum Occupant Load 15" near the main entrance of the suite. Tha u Vnk u Y rod�c&kBrodrickC�oDnstruction Inc. Pilates Edmonds 206-949-1996 ccbrodrick@gmaii.com JUL 0 1 2019 4 BUILDING EPARTMEW D CITY OF EDMONDS 2015 Washinqton State Eneray Code Compliance Forms for Commercial Buildinas includina R2 R3 R4 nvp.r.; nfnrip� nnei nil P1 R—A—A N—'M17 Project Title: Pliates Edmonds Date 5/20/2019 Calculation New Construction o Addition - o Addition For Building Department Use Area NOTE 9 stand alone + existing Spaces where < 50% of 0 Spaces where 2:50% of 0 Spaces where the Use luminaires are replaced luminaires are replaced is changing (C505) LPA 00 Standard 0 Additional Efficiency Package Option Calculation C406.3 Reduced Interior Lighting Power User Notel Type To comply with C406.3, the Proposed LPD shall be 25% lower than the Target LPA. Refer to C406.3 for additional requirements. Maximum Allowed Lighting Wattage"' Location (plan #, Height""' Gross Interior Allowed Wafts Allowed room #) Space Type 2 Area in ft2 Watts per ft2 (waftsW x area) office 1 Office: Enclosed 108 0.890 96 office 2 Office: Enclosed 80 0.890 71 lobbies Lobby: all other 121 234 0.720 168 exercise rooms Gymnasium/fitness center: Exercise area 121 600 0.580 348 training rooms C ing ii�* t4 121 568 A;V >6s— restroom Restroom: all other ill 0.780 87 corridor Corridor: all other 60 0.530 32 Total Area 1761 Retail Display Allowance from LTG-INT-DISPLAY Lobby Art/Exhibit Display Allowance from LTG-INT-DISPLAY NOTE 8 Allowed Wafts 13-7-1 i I ?).-I, - Proposed Lighting Wattage NUIL 3 Location (plan #, room #) Fixture Description NOTE 4, 5, 6 Number of Fixtures Wafts/ Fixture NOTE 7 Wafts Proposed office I dimmable 2x4 LED light troffer t:�:, 1 39 39 office 1 dimmable led wall sconce 2 20 40 restroom LED wall sconce 1 20 20 Lobby dimmable led can light 0 2 11 22 lobbies led pendant chandelier 12 C, -2 80 160 exercise rooms dimmable 2x4 LED flat panel light T 2 39 78 exercise rooms dimmable led wall light A 2 43 86 training rooms dimmable 2x4 LED flat panel light T *41 2 39 78 training rooms dimmable LED wall light 15 3 20 60 training rooms dimmable 2x4 LED flat panel light A 114 2 43 86 corridor dimmable led wall sconce 2 20 40 Proposed Retail Display Lighting from LTG-INT-DISPLAY Total Proposed Watts may not exceed Total Allowed Watts for Interior Lighting Total Proposed Wafts 70= Interior Lighting Power Allowance COMPLIES I Note I - List all unique space types per Table C405.4-2(2) that occur in the project scope. Select space type category from drop down menu. Note 2 - Indicate ceiling height for atriums and spaces utilizing the ceiling height adjustment per Table C405.4.2(2), Footnotes d thru f Note 3 - List all proposed lighting fixtures including exempt lighting equipment and existing -to -remain fixtures. Note 4 - For proposed Fixture Description, indicate fixture type, lamp type (a. g. T-8), number of lamps in the fixture, and ballast type (if included). For track lighting, list the length of the track (in feet) in addition to the fixture, lamp, and ballast information. Note 5 - For lighting equipment eligible for exemption per C405.4- 1, note exception number and leave WattslFixture blank. Note 6 - Existing -to -remain fixtures shall be included in the Proposed Lighting Wattage table in the same manner as new fixtures. Identify as existing in fixture description. Note 7 - For proposed WattslFixture enter the iuminaire wattage for installed lamp and ballast using manufacturer or other approved source. For luminaires with screw -in lamps, enter the manufacturer's listed maximum input wattage of the fixture (not the lamp wattage). For low voltage lighting, enter the wattage of the transformer. For line voltage track1busway systems, enter the larger of the attached luminaire wattage or 50 watts4ineal foot, or enter the wattage limit of permanent current limiting device. Note 8 - Lobby ArtlExhibit Display Allowance is independent of the Maximum Allowed Lighting Wattage. Enter all proposed lobby�,.�axhibit display fixtures in L TG-/N T-DISPLA Y form only. FRECEIVED Note 9 - Calculation Area Details: K a, Lighting fixtures in a building addition may comply as a stand alone project, or they may be combined with the overall existing building MAY 3 0 10- lijhting systems to demonstrate compliance. Refer to C502. 1. b. For alterations and building additions, provide Space Types and gross interior areas in the Maximum Allowed Lighting Wattage table. If a building addition will comply as combined with the overall existing building lighting systems, include all applicable existing Space Types and gross interior areas, c. If less than 50% of existing lighting fixtures will be replaced, provide total existing lighting wattage (prior to alteration) in the space provided in the Maximum Allowed Lighting Wattage table. d. If lighting alteration project includes some building areas or spaces where < 50% of luminaires are replaced, and other areas or spaces where 2: 50% of luminaires are replaced, then these areas or spaces may be documented separately. If multiple fonns will be completed to demonstrate compliance for the total scope of the alteration project, describe scope covered in form in User Note section. r .-* 2015 Washinaton State Enerav Code Comoliance Forms for Commercial Ruildinaq inpludinn R9 P.; PA nvarl Onriac ond all Q1 P—A-1 M­ '21117 Project Info Project Title: PlIates; Edmonds Date 5/20/2019 Compliance Applicant Information. Provide contact information for individual who can For Building Department Use forms do not respond to inquiries about compliance form information provided. require a password to Company Name: Brodrick Construction Inc Company Address: 14829 Cascadian Way use. Instructional and Applicant Name: Curtis Brodrick calculating cells are write - protected Applicant Phone: 206-949-1"6 Applicant Email: ccbrodfick@gmall.com Pro ect Description E] New Building Addition Alteration No Lighting Scope Include PROJ-SUM form (included in envelope forms workbook) with lighting compliance forms. Interior Lighting System led strip lights, dimmable wall sconces, dimmable 2x4 led recessed troffer, light reduction Description controls and manual controls [-� Interior Lighting Plans Included Interior Lighting Power Building Area Method Space -by -space Method Allowance Method Select method used in project Interior Lighting Controls All C405.2.1 - C405.2.8 Lighting Controls C405.2 Exception 5 Luminaire Level Lighting Controls (LLLC) F-] Additional Efficiency Package Option C406.4 Enhanced Digital Lighting Controls To comply with C406.4, no less than 90% of the total installed interior lighting power shall comply with th( required controls per C406.4. Dwelling Unit Interior Permanently installed interior lighting fixtures in dwelling units comply with: No Dwelling Lighting 0 C405.2 thru C405.5 Commercial Lighting Controls and LPA Units 0 C406.3 High Efficacy Lighting R404.1 Residential High Efficacy Lighting. Dwelling unit lighting complies with WSEC Residential provisions in lieu of WSEC Commercial provisions. Exterior Lighting System Exterior lighting controlled by building landlord Description F-] Exterior Lighting Plans Included Building Additions Compliance Method I In . ter . i . o - r .- I - I - g h . t . in . g Exterior lighting Lighting systems in addition area comply with all applicable ED 11 provisions as a stand alone new construction project Refer to Section C502.2.6 for additional requirements. Lighting systems in addition are combined with existing building lighting systems to demonstrate compliance Addition is combined with existing: For interior lighting projects, include new + existing -to -remain interior lighting fixture wattage in Proposed Lighting Wattage table in LTG-INT-BLD or LTG-INT-SPACE form. For exterior lighting projects, include new + existing -to -remain exterior lighting fixture wattage in Proposed Tradable and Proposed Non -Tradable Lighting Wattage tables in LTG-EXT form. 13LD2 RECEIVED MAT 3 0 2019 BUILDING NA, �� V 2015 Washinoton State Enerav Code Comoliance Formq fnr rnmmprnial Ri fildinna innh A inn W7 Pl 0 ; AKE Project Title: PlIates Edmonds Date 5/20/2019 'Change of Space Use Existing interior lighting systems in areas under -going a change in space use are upgraded to comply with LPAs for the new space types per Tables C405.4.2(l) or C405.4,2(2). Identify interior spaces requiring LPD upgrade to the current Code in Proposed Lighting Wattage table in L TG-INT-BLD or LTG-INT-SPACE form. Interior and Exterior Lighting Power Interior lighting Parking garage Exterior lighting Lighting Alterations 50% or more of existing are replaced El El Select a// Lighting Power and Lighting Control elements that apply to the scope Less than 50% of existing are replaced El of the retrofit project If project includes a combination of spaces where less than Lamp and/or ballast replacement only El El 50% of the existing fixtures are replaced existing total wattage not increased in some spaces, and 50% or more of the fixtures are replaced in others, then ---- 50% or more replaced - Total lighting power of new + existing -to -remain fixtures shall comply with total provide separate lighting power LPA per Sections C405.4.2 and C405.5.2. Include new + existing -to -remain fixtures in Proposed compliance fonns for the two retrofit Lighting Wattage table in LTG-INT-BLD, LTG-INT-SPACE or L TG-EXT form. conditions. Spaces undergoing the same Less than 50% replaced - Total lighting power of new + existing -to -remain Fixtures shall not exceed the type of retrofit may be combined into one total lighting power ptior to alteration. Include new+ existing -to -remain fixturesin the Proposed lighting power compliance form. Lighting Wattage table in LTG-INT-BLD, LTG-INT-SPACE or LTG-EXTform. 50% threshold applies to number of luminaires for interior spaces and parking garages, and total Refer to Section C503.6 for additional installed wattage for exterior luminaires. requirements. Lighting Controls Interior lighfing­ Parking garage Exterior lighting All alteration lighting controls shall be New wiring installed to serve added commissioned per C408.3. fixtures and/or fixtures relocated to new. Ll circuit(s) New or moved lighting panel Interior space is reconfigured - luminaires unchanged or relocated New wiring or circuit - For interior lighting, provide required manual controls per C405.2.3, occupancy sensor controls per C405.2. 1, daylight responsive controls per C405.2.4 and application specific lighting F-] No changes are being made to controls per C405.2.5. For exterior lighting, provide required controls per C405.2.7. the interior or exterior lighting New or moved panel - Provide all applicable lighting controls as noted for New Wiring and automatic systems and existing space time switch controls per C405.2.2. uses and configuration are not Reconrigured interior space - Provide all required lighting controls that apply to a new interior space. changed. Application specific lighting control provisions per C405.2.5 do not apply to reconfigured spaces. Li�hting, Motor, and Electrical Permit Checklist, Pg. 1 LTG-OHK, 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2, R3, R4 over 3 stories and all R1 Revised Nov 2017 Project Title: Pilates Edmonds I Date 5/20/2019 The following information is necessary to check a permit application for compliance with the lighting, motor, and electrical requirements in the Washington State Energy Code, Commercial Provisions. Applicability I Location in 15uo g Department (yes,nc,na) I Code Section I Component lCompliance information required in permit documents Documents Notes LIGHTING CONTROLS yes C405.2 Lighting controls, For all lighting fixtures, indicate lighting control method on plans lighting general for spaces and lighting zone(s) served, or exception taken plan Luminaire level Indicate on plans all fixtures provided with LLLC in lieu of na C405.2 lighting controls C405.2 lighting controls; provide description of control (LLLC) capabilities and performance parameters For permanently installed lighting fixtures in dwelling units, C405.1 Lighting in dwelling indicate lighting control method on plans for spaces and na units lighting zone(s) served, or demonstrate compliance with high efficacy exception C405.2.3 Indicate on plans the method of manual lighting control C405.2.1.1 (whether combined with occupancy sensor, automatic light yes C405.2.2.2 Manual controls reduction, daylight responsive or specific application controls), lighting plan C405.2.4 location of manual control device and area or specific C405.2.5 application it serves C405.2.2.1 Manual interior light Indicate on plans which method of manual 50% lighting load yes C405.2.2.2 reduction controls reduction is provided, or whether lighting load is reduced via lighting plan C405.2.3 occupancy sensors or daylight responsive controls Indicate on plans the method of automatic shut-off control during unoccupied periods (occupancy sensor, time switch or C405.2.2 Method of automatic digital timer switch) for all lighting zones; na shut-off control Indicate locations where automatic shutoff is provided by other methods (occupancy sensor or digital timer switch) or which time switch control exception applies Indicate on plans the spaces s erved by occupancy sensors; restroom C405.2.1 Occupancy sensor Indicate whether occupancy sensor controls are configured to yes C405.2. 1.1 controls be manual -on, automatic 50%-on, or serve a space eligible for automatic 100% automatic 1 00%-on per exception on per exeption Occupancy sensor Indicate aisleways and open areas in warehouse spaces na C405.2.1.2 controls - provided with occupancy sensor controls that reduce lighting warehouses power by 50% na C405,2.2.1 Automatic time Indicate locations of override switches on plans and the lighting switch controls zone(s) served, include area sq. ft. na C405.2.6 Digital timer switch Indicate digital timer switch control includes: manual on/off, time delay, audible and visual indication of impending time-out Indicate primary and secondary sidelight daylight zone areas on plans, include sq. ft.; Indicate toplight daylight zone areas on plans, include sq. ft.; C405.2.4.2 Daylight zones - na C405.2.43 Sidelight and toplight For small vertical fenestration assemblies (rough opening less than 10 percent of primary daylight zone) where daylight responsive controls are not required, provide fenestration area to daylight zone calculation(s) Indicate on plans lighting zone(s) served by daylight responsive controls; Identify sidelight and toplight daylight zones that are not provided with daylight sensing controls and the exception(s) na C405.2.4 Daylight responsive that apply; Indicate on plans the lighting load reduction method - controls continuous dimming, or stepped dimming that provides at least two even steps between 0%-100% of rated power; Indicate that daylight sensing controls are configured to completely shut off all controlled lights in the lighting zone Additional controls - Identify spaces and lighting fixtures on plans that require na C4052.5 Specific application specific application lighting controls per this section lighting controls Indicate on plans that display and accent lighting, and display C405.2.5 - Display and accent case lighting are controlled independently from both general na Items 1&2 lighting area lighting and other lighting applications within the same space; Indicate manual and automatic lighting control method BUILDING Lighting, Motor, and Electrical Permit Checklist, Pg. 2 LTG-CHKI 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2, R3, R4 over 3 stories and all RI Revised Nov 2017 Project Title: Pilates Edmonds Date 5/20/2019 The following information is necessary to check a permit application for compliance with the fighting, motor, and electrical requirements in the Applicability Location in Building Department (yes,no,na) Code Section Component Compliance information required in permit documents Documents Notes C405.2.5 - Hotel/motel guest Indicate method of automatic control - vacancy or captive key na Item 3 rooms control of all installed luminaires and switched receptacles in guest room C405.2.5 - Supplemental task Indicate method and location of automatic shut-off vacancy na Item 4 lighting control for supplemental task lighting, including under -shelf or under -cabinet lighting Indicate on plans eligible non -visual lighting applications, include sq. ft. area of each lighting control zone; C405.2.5 - Lighting for non- Indicate on plans that non -visual lighting are controlled na Item 5 visual applications independently from both general area lighting and other lighting applications within the same space; Indicate method of manual lighting control and applicable automatic lighting control Indicate on plans that lighting equipment for sale or Lighting equipment demonstration are controlled independently from both general na C405.2.5 - for sale or area lighting and other lighting applications within the same Item 6 demonstration space; Indicate method of manual lighting control and applicable automatic lighting control Identify on plans egress fixtures that function as both normal and emergency means of egress illumination; na Provide calculation of lighting power density of total egress C405.2.5 - Means of egress lighting; .0038w/sq ft yes Item 7 lighting If total egress lighting power density is greater than 0.02 W/sq. ft., indicate on plans egress fixtures requiring automatic shut-off na during unoccupied periods; na Indicate method of automatic shut-off control Indicate on exterior lighting plans and fixture schedules the automatic lighting control method, control sequence, and locations served; For building facade and landscape lighting, indicate automatic Exterior lighting controls shut off lighting as a function of dawn/dusk and fixed na C405.2.7 controls opening/closing time; For all other exterior lighting, indicate automatic controls shut off lighting as a function of available daylight; include control sequence that also reduces lighting power by at least 30% between 12am-6am, or from 1 hour after closing to 1 hour before opening, or based upon motion sensor Exterior building For building grounds fixtures greater than 100 wafts, indicate na C405.5.1 grounds lighting on plans whether fixtures have efficacy greater than 80 lumens controls or; are controlled by motion sensor, or are exempt lighting per C405.5.2 Area controls - Indicate location(s) of master control switch(es) intended to C405.2.5 Master control control multiple independent switches; circuit breaker may not na (listed after switches and circuit be used as a master control switch; Verify that no 20 amp circuit controlled by a single switch or C405.2.7) power limit I I lautornatic control is loaded beyond 80% ADDITIONAL EFFICIENCY PACKAGE OPTION - ENHANCED DIGITAL LIGHTING CONTROLS To comply with additional efficiency package option, indicate on plans all interior lighting fixtures that are individually addressed and provided with continuous dimming, or exception taken; na C406.4 Enhanced digital Include calculation of percent total installed interior lighting lighting controls power that is configured with required enhanced lighting control functions (min 90% to comply with additional efficiency I package option) I =71 Lighting, Motor, and Electrical Permit Checklist, Pg. 3 LTG-CHK_ 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2, R3, R4 over 3 stories and all RI Revised Nov 2017 Project Title: Pilates Edmonds I Date 5/20/2019 The following information is necessary to check a permit application for compliance with the lighting, motor, and electrical requirements in the Applicability I I Location in E Fuil—dingDepariment T (yes,no,na) JCode Sectiod Compon ent Compliance information required in permit documents Documents Notes INTERIOR LIGHTING POWER & EFFICACY Include all luminaires in lighting fixture schedule; indicate fixture types, lamps, ballasts, and manufacturers rated wafts per lighting plan fixture; Identify spaces eligible for lighting power exemption on plans C405.4.1 Total connected and in compliance forms; indicate the exception applied; na yes C405.4.2 interior lighting power Identify lighting equipment eligible for lighting power exemption in fixture schedule and in compliance forms; indicate the na exception applied; Indicate that exempt lighting equipment is in addition to general area lighting and is controlled independently na yes C405.3 Exit signs Indicate location of exit signs on plans and rated watts per lighting plan fixture in lighting fixture schedule (maximum 5 wafts per side) If high efficacy exception is applied to permanently installed Lighting in dwelling lighting fixtures in dwelling units, indicate in lighting fixture na C405.1 units - lamp efficacy schedule if lamps in fixtures are high efficacy per R404.1. Calculate percentage of fixtures with high efficacy lamps in I project (min 75% to comply with exception). Interior Lig Ing Power Calculation - Indicate compliance path taken Building Area Complete required compliance forms — proposed wattage per na C405.4.2.1 Method building area does not exceed maximum allowed wattage per building area; identify locations of building areas on plans Complete required compliance forms — total proposed wattage yes C405.4.2.2 Space -By -Space does not exceed maximum allowed wattage; identify locations lighting plan and Method of space types on plans, including retail display areas, lobby art attached & exhibit display areas, and ceiling heights as applicable ADDITIONAL EFFICIENCY PACKAGE OPTION - REDUCED INTERIOR LIGHTING POWER DENSITY To comply with additional efficiency package option, Reduced lighting demonstrate in compliance forms that total connected interior lighting plan and yes C406.3 power density lighting wattage is 25% less than the total maximum allowed attached lighting wattage via Building Area Method or Space -By -Space Method Reduced lighting For project with dwelling units, to comply with additional power density - efficiency package option indicate in lighting fixture schedule if na C406.3 dwelling unit lamp lamps in interior fixtures have efficacy rating of 60 lumens per efficacy waft or more. Calculate percentage of fixtures with lamps that have this efficacy rating (min 95% to comply with option) EXTERIOR LIGHTING POWER & EFFICACY Include all luminaires in lighting fixture schedule; indicate fixture types, lamps, ballasts, and manufacturer's rated watts per fixture; Total connected Identify exterior applications eligible for lighting power na C405.5.2 exterior lighting exemption on plans and in compliance forms; indicate power exception applied; Indicate that exempt exterior lighting is controlled independently from non-exempt exterior lighting; include exception claimed for each fixture or group of fixtures under exception category na Table C405.5.2(l) Exterior lighting zone Indicate building exterior lighting zone as defined by the AHJ Exterior building For building grounds fixtures rated at greater than 100 wafts na C406.5.1 grounds lighting that are complying based on efficacy, indicate rated lamp efficacy (in lumens per waft) in fixture schedule Exterior lightin Complete required compliance form — proposed wattage for na C405,5.2 g I power calculations exterior lighting plus base site allowed does not exceed imaximum allowed Lighting, Motor, and Electrical Permit Checklist, Pg. 4 LTG-CHKI 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2, R3, R4 over 3 stories and all RI Revised Nov 2017 Pilates Edmonds Date 5/20/2019 F The following information is necessary to check a permit application for compliance with the lighting, motor, and electrical requirements in the Applicability lCompliance Location in Building Department (yes,no,na) Code Sectioni Component information required in permit documents Documents Notes LIGHTING ALTERATIONS Where a 50% of existing luminaires in interior space(s) or parking garage are replaced; indicate compliance path (building area or space -by -space method); include all new and lighting plan and existing -to -remain luminaires in compliance form (LTG-INT- attached BLD or LTG-INT-SPACE); indicate proposed lighting wattage Interior and parking does not exceed maximum allowed per compliance path yes C503.6 garage lighting Where < 50% of existing luminaires in interior space(s) or fixture alterations parking garage are replaced; indicate total existing lighting wattage in each space prior to alteration; include all new and existing -to -remain luminaires in LTG-INT-SPACE form; indicate proposed total lighting wattage in alteration area does not exceed total existing lighting wattage prior to alteration Where �t 50% of existing exterior lighting wattage is replaced; include all new and existing -to -remain luminaires in LTG-EXT form; indicate proposed total exterior lighting wattage does not exceed maximum allowed na C503.6 Exterior lighting fixture alterations Where < 50% of existing exterior lighting wattage is replaced; indicate total existing lighting wattage prior to alteration; include all new and existing -to -remain luminaires in LTG-EXT form; indicate proposed total exterior lighting wattage does not exceed total existing wattage prior to alteration Where new wiring is installed to serve new interior luminaires Interior lighting wiring and /or luminaires are relocated to a new circuit; indicate lighting plan and yes C503.6 alterations lighting controls are provided (as applicable) - manual attached (C405.2.3); occupancy sensor (C405.2.1); daylight responsive (C405.2.4); specific application (C405.2.5); exit signs (C405.3) Exterior lighting Where new wiring is installed to serve new exterior luminaires na C503.6 wiring alterations and /or luminaires are relocated to new circuit; indicate exterior lighting controls are provided (C405.2.7) Where a new lighting panel is installed or an existing panel is Lighting panel moved (all new raceway and conductor wiring); indicate lighting na C503.6 alterations controls are provided (as applicable) - same provisions as wiring alterations; time switch controls and manual light I reduction controls (C405.2.2) Where interior space(s) is reconfigured (permanently installed yes C503.6 Interior space walls or ceiling -height partitions); indicate lighting controls are lighting plan and reconfiguration provided (as applicable) - same provisions as lighting panel attached alterations Identify existing luminaires being upgraded with bulb and / or na C504.2 Lighting repairs ballast replacement; indicate fixture alteration does not increase existing fixture wattage Identify spaces on plans where the building area type or space use type is being changed from one type to another per Tables C405.4.2(l) or (2) Indicate compliance path (building area or space -by -space na C505.1 Change of space use method); include all new and existing -to -remain luminaires in compliance form (LTG-INT-BLD or LTG-INT-SPACE); indicate proposed lighting wattage does not exceed maximum allowed per compliance path RECEPTACLES Identify all controlled and uncontrolled receptacles on electrical plans in each space in which they are required; include lighting plan and Controlled receptacle configuration such as spacing between controlled attached yes C406.10 receptacles and uncontrolled, duplex devices, etc; Indicate on plans whether the method of auto�afic control for each controlled receptacle zone is by occupant sensor or programmable time -of -day control Lighting, Motor, and Electrical Permit Checklist, Pg. 5 LTG-CHK 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2, R3, R4 over 3 stories and all R1 Revised Nov 2017 Pilates Edmonds Date 5/20/2019 The following information is necessary to check a permit application for compliance with the lighting, motor, and electrical requirements in the Applicability I Location in Building Department (yes,no,na) Code Sectiod Component Compliance information required in permit documents Documents Notes MOTORS, TRANSFORMERS, ELECTRIC METERS, INTERIOR TRANSPORTATION na C405.6 Electrical Include electrical transformer schedule on electrical plans; transformers indicate transformer size, efficiency, or exception taken na C405.7 Dwelling unit electrical energy Indicate on electrical plans that each dwelling unit in Group R-2 consumption has a separate electrical energy meter Electric motor Include all motors, including fractional hp motors, in electric na C405.8 efficiency motor schedule on electrical plans; indicate hp, rpm, rated efficiency, or exception applied For luminaires in each elevator cab, provide calculated average efficacy of combined fixtures that indicates efficacy is not less -than 35 lumens per waft; Indicate rated wafts per cfm for elevator cab ventilation fans do na C405.9.1 Elevator cabs not exceed 0.33 wafts per cfm; Indicate automatic controls that de -energize lighting and ventilation fans when elevator is stopped and unoccupied for a period of 15 minutes or more Escalators and Indicate escalators comply with ASIVIE A17.1/CSA B44; na C405.9.2 moving walks automatic controls are configured to reduce operational speed to the minimum permitted when not in use na C405.9.3 Regenerative drive Indicate all one-way down or reversible escalators are provided with a variable frequency regenerative drive DOCUMENTATION AND SYSTEM REQUIREMENTS TO SUPPORT COMMISSIONING (Cx) Indicate that all electrical systems (receptacles, transformers, motors, vertical and horizontal transportation) for which the WSEC requires control functions and / or configuration to Scope of electrical perform specific functions are required to be commissioned; na C408,3 power and lighting systems Where total building lighting load is > 20 kW, or where total commissioning lighting load of luminaires requiring daylight sensing and / or occupancy control > 10 kW, indicate that all automatic lighting control systems are required to be commissioned; or provide building lighting power calculation demonstrating eligibility for exception; Indicate Cx requirements in plans and specifications for all applicable elec I ri ca I a nd lighting control systems per C408; Include general summary with at minimum Items 1 thru 4 of the C405.13 Commissioning Cx plan per C408.1.2 including: narrative description of C408.1.1 requirements in activities, responsibilities of the Cx team, schedule of activities na C408.1.2 construction including verification of project close out documentation per C408.1.4.2 documents C1 03.6, and conflict of interest plan (if required); C103.6 Include in general summary that a Cx project report or Compliance Checklist (Figure C408.1.4.2) shall be completed by the Certified Cx Professional and provided to the owner prior I to the final electrical inspection Functional Identify in plans and specifications the intended operation of all na C408.3.1 performance testing equipment and controls during all modes of operation, including criteria interfacing between new and existing -to -remain systems PROJECT CLOSE OUT DOCUMENTATION Indicate in plans that project close out documentation is Project close out required including WSEC lighting compliance forms and na C103.6.3 documentation calculations that document all interior and exterior lighting area requirements and / or surface types, lighting power allowances and installed densities If "no" is selected for any question, provide explanation: End of Lighting, Motor & Transformer Permit Documents Checklist OUTLINE OF LEVEL I BELOW L FIRE SEPARATION DISTANCE It DEGREE OF OPENING PROTECTION PER IBC 2012 TABLE 705.8: UNPROTECTED, SPRINKLED, NO MAX (-38.75) USED FOR OPENING REQUIRED SWCORNERHEIGHT C CALC =ULATION;?� X EXTENT OF RECTANGLE USED FOR HEIGHT CALCULATION PER CITY OF EDMONDS HANDOUTI 341 MAIN '0 LOT AREA: 160'X 120'= 19,20D SF STREET REQUIRED OPEN SPACE (PER ECDC X OPEI SPA( 16.43.030E) = W - 42 - 371 = 971 SF E P 9 00 ,2 SF = 5.06% LU LOTSLOPEVAMES-CALCULATEDNETO SW=4% t2A APARTMENT BUILDING ENTRANCE ( 5531 S A F) V EMSTING POST OF OUTLINE OF LEVEL SECOND COMMERCIAL ENTRANCE F( �F(H.I� ECDUFORIWOORNE1 E.'Tt rON EASTING MANHOLE CC USEDATHEIGHT CALCULATION DATUM 45.05 PER SURVEY A 45— 23'-9' BASEMENT LEVEL PAR19NG GARAGE ENTRANCIVEAT FOR BOTH PHASE 1 & 2 PHASE I ROOF OUTLINE ABOVE —TRASHP. TRASH ROOM IN BUILDING) EXISTING EDMONDS POST OFFICE BUILDING (PHASE 1) !S OPEN COU LEVEL2 - - - - - - - --Jj Ed LLI —PHASE I & 2 TRANSFORMERS AT LEVEL 1 PHASE 1 ROOF OUTLINE ABOVE BELOW 4 N, "-y6.,1, .E CORNER 41 HEI ��,��EXu,;�IINGOPENALLE LIMIT OF CONSTRUODIN — (-50.07) USBED F NE CORNER -4 PROPERTY LINE 2.- HEIG14T CALCULATION ELECTRrA CONNECTION 50—f FIRE SEPARATION DISTANCE & DEGREE OF OPENING FIRE SEPARATION DISTANCE It DEGREE OF OPENING PROTECTION PER IBC 2012 TABLE 705.8: UNPROTECTED, PROTECTION NOT REQUIRED. PHASE 2 COMBINED WITH SPRINKLED, 46% MAX OPENING ALLOWED. SEE IIA3.02 PHASE 1 INTO ONE BUILDING. SEPARATED OCCUPANCIES CALCULATED PER IBC 2012 508.42 SEE SHEET GO.03. D N SITE PLAN V= 20'-0" r""'L ..... I 0 10 20 40 I$Lpwtq- ou-50 CITY COPY RECEIVED MAY 3 0 205 BUILDING HALLER ARCHITECTS LLC 12216 Corliss Avenue North Seattle, WA 98133 TEL 206.235.0935 email: boyeracottl (glipmall.com PROJEM: Edmonds Mixed Use Building LOCATI N: 201 Main Street Edmonds, WA 98020 PREPARED FOR: Edmonds 2020 LLC; 4/616 PERMIT SET A8/18/16 PERMIT REVISIONS &, 11/14/16 PERMIT REIASIONS ZL 2W1 7 CONFORMED SET 513 Z 8117 REGISTERED Hl T SCOTT A, 8 STATEOFWA INGTON '91TE PLAN 74601.00 A1.U1 CONFORMED SET 9401 W 0 Z61-, A"4e- 09 Ored ALLF—*,� ....... ...... PROJECTADDRESS: 201 MAIN ST #103 EDMONDS WA 98020 OWNERS: EDMONDS 2020 LLC TAX No, 0043 4400700700 LEGAI-i EDMONDS PLAT of BLK 007 D-00 LOT 8-9-10-11-12 NOW COMBINED TO: 00434 400 700 700 PER CITY of EDMONDS BLA No: 20130064 REC AFN 2014022 065003. SCOPE OF PROJECT: EXISTING SPACE 15 NEW CONSTRUCTION. VACANT SPACE WITH NO PREVIOUS TENENTS. SPEE BLDG PERMIT # BLD2016 — 0506 CIO ZQK BD 2 CONTRUCTION TYPE: VA TRASH: SOUND DISPOSAL TENENT: PILATESEDMONDS U CURT& CHEREE BRODRICK 206-949-1996 -Z� 206-550-9275 PILATES EDMONDS IS A PILATES STUDIO THAT PROVIDES I-ON-1 AND SMALL GROUP TRAINING FOR THE z EDMONDS AREA. 0 EMPLOYEES: 3 BUILDING SUPPUED WITH FIRE.SPRINKLER /FIRE ALARM SYSTEM OCCUPANCY: GROUP B TOTAL SQUARE FOOTAGE, 1697 SQ FT 0 PER IBC 1004.1.2 EXCEPTION DESIGN LOAD OCCUPANCY OFFICE, RESTROOM, REAR CIRCULATION AREA 320 SQ FT Ln PILATES AREA 1377 SQ FT The occupant load of this tenant space ha been Z LU SPACE LIMITED TO 15 OCCUPANTS BY DESIGN established at 15 maximum by an exceptie'n to IBC 1004.1.2 allowing a reduced occupant load based LU OCCUPANT LOAD TO BE POSTED NEAR MAIN ENTRY on actual use. See owner's letter on file. Future r changes in the use o 0=,11pthis spa ill V) APPLICAL CODES: be sub act to code req u 0 2015 INTERNATIONAL BUILDING CODE LU Z 2015 INTERNATIONAL MECHANICAL CODE V) ;;� 2015 INTERNATIONAL FIRE CODE LLJ 2015 INTERNATIONAL EXISTING BUILDING CODE < 2015 WASHINGTON STATE ENERGY CODE 2015 UNIFORM PLUMBING CODE CL C) C�j EDMONDS COMMUNITY DEVELOPMENT CODE TITLE 19 04, of Edmonds BuDding Department WASHINGTON STATE AMENDMENTS TO ICC 2014 NATIONAL ELECTRICAL CODE 1 WPROVEDPLMI DEFERRED PERMIT SUBMITTALS: HVAC STATE ELECTRICAL SIGN PERMIT. A CM(OFEDMONDS BUILDING DEPARTMENT WORK ADDRESS —)ni 05— OWNER APPROVED DATE INDEX: BLDG. OFFICIAL: 1. SITE TITLE P E F! IRA P T KU h/i D E R 2. EXISTNG / PROPOSED FLOOR PLAN 3. WALL RATING / HANDICAP ACCESS 4. LIGHTING PLAN 5. SUITE EQUIPTMENT AND USE LAYOUT 0 U F-Ii4l CU)", 31 JUL 0 1 2019 BUILDINq 11 PART1,11511T Cl_ry o'2 E%�,Q P.T ;-T-1 4-1 V) z VACANT . .......... ------- oil - -cell 0� PILATES EDTAAONDS suITF.... Io5 NO PREVIOUS USE: NEW 14 VAC16v- 1-d' tz) rml- ENTRANCE SLIDING HORIZONTAL DOORS PER IBC 1010.1.2 EXCEPTION 9 C,01,I(E.F-II-F -1 , VFI!- 4'1 F _00V TO COMPLY WITH IBC 1010.1.3 DOOR HARDWARE TYPICAL ADA COMPLIANT PER IBC 1010.9.1 y EXISTING OPEN ALLEY r C\Single user UNISEX Accessible Bathmom Details P.T.D. MAX. I z F-\ z t 0 KNEE CLR� G.B., BACK WALL VERTICAL GRAB G.B., SIDE WALL D.. 54" MIN. 39"- 41 18" VERITACL _36"' Ma� GRAB BAR 12" MA 3:> 42" G.B. T.P.D. 0 UN N li, OFFICE Drop Co-IL-Imcl MeW f-AF-1-17101� VJALLj�' 4 1- Z., �o 10 FIVE G AV-A�KAV-� (P GARAGE V) WAL*,WA� U U C4 U HVAC UNIT ELECTRIC HEAT PUMP, HEAT AND COOL PROPOSED FLOOR PLAN SUITE. 101) Ventilation provided with mechanical HVAC unit 77 'A 0 Handicap access is provided at both front and rear entrances. Handicap parking stall in garage near rear entrance. ............ IL 7 EXISTING FLOOR PLAN 1/4" = 1' — 0" U, i14 M 0 z LU 0 LLj APPLICAL CODES: LU 2015 INTERNATIONAL BUILDING CODE (IBC) V) < 2015 MECHANICAL CODE LLJ 2015 INTERNATIONAL FIRE CODE 2015 EXISTING BUILDING CODE 2015 WASHINGTON STATE ENERGY CODE b 2015 UNIFORM PLUMBING CODE EDMONDS COMMUNITY DEVELOPMENT TITLE 19 WASHINGTON STATE AMENDMENTSTO ICC 2014 NATIONAL ELECTRICAL CODE DEFERRED PERMIT SUBMITTALS: PLUMBING ( less than 10 fixtures) HVAC STATE ELECTRICAL SIGN PERMIT ZONING: BD2 TYPE OF CONSTRUCTION: TYPE VA OCCUPANCY: GROUP B TOTAL sou-AkE 1697 SQ FT PER IBC 1004.1.2 EXCEP11ON DESIGN LOAD OCCUPANCY �4 OFFICE, RESTROOM, REAR CIRCULATION AREA 320 SQ FT P-4 PILATES AREA 1377 SQ FT 6 SPACE LMTED TO 15 OCCUPANTS By DESIGN 1.4 �4 OCCUPANT LOAD TO BE POSTED NEAR MAIN ENTRY P-4 EMPLOYEES: 3 C) TENANT: ilates Edmonds is apilates studio that provides Ion Ian small En group training for the Edmonds ama. BUILDING/TENANT SPACE PROVIDED WITH FIRE/SPRINKLER SYSTEM AND FIRE ALARM SYSTE 0 0 U, JUL 0 1 2019 -e 56LJILDING�ELE Fr�NSNT Cn,to :)�A to 2- 7 GIRT$ 16- C.C� —CONCRETE REVEAL PER ELEVATIONS <' --2- RION) IR-13) POLYISO INSULATION CONCRETE WAL R 112'TV X OVID LAY R 112 1 PARTITION TYPE l' FOR J1SEE ADDITIONAL INFORMIATION (SEE PIANS� RATNG HRE I ', 2A 3 HOUR .,00ltERS [A ICOLICRETEONLY-DELVEZGRTS.WSM&GW8 HCONCRETE WALL W/METAL STUD FURRING 4 EMULSIFIED ASPHALT —?AIRRORDRAIN OCCURS —CONCRETE WALL SEE PARTITION TYPEVFOR ADDITIONAL INFORMATION IVARMS-SEE I Ir MIN IHSHORED CONCRETE FOUNDATION NALLS AND INTERIOR PARTIMN% NONCOMBUS-171BLE GA FILE NO. WIP 1522 ISENERIC So STC WIND --UM WALLBOARD. STEEL STUDS r W_ S dqwW,— 21' t C FM Llyl., 6V ""II gyp_ �bI. vo.6p-um. �t �,ghjNt" .� �-h I &V 1� S d,-..—. 12' 21' —by... ­. 7K-zw� t ile, Ro�- w S�b. R. T--. S., WP 1519 mH119 �36, S—d T..,, NR= 80.4v. 2 34) 1 SHAFT OARTmON EXERCISE ROOM ENTRY/LOBBY E31METAL 4 QA FILE NO. WP 1072 1 GENERIC 'H_ 41Z4 GYPSU'l WALLBOARD. STEEL STUDS llRFR U'.STC 0. b— sw Y "s-1— 911". 1:71'b­ ­41., ff=;T==� I, (NUB) T��­ A 7�' 7- S_ YIP IND jFMw 4."O.,q-ft OSUTP�T?G."I, ULC 791�P� 19TW 71TI97. NFCC $16 W. 2.3-81 RAING. mm-nm: 4 a DaE-E NSULATIO �OHTIESTOCOKCOUJN I IEMTL STUD FRAME EXT BRICK VENEER SEE FLOOR TYPE'46'FOR ADDITIONAL INFORMATION 11111111 PER SCHEDULE ,_____�—I'LOOR ------ ---- — - 111.--. 1. I—CONCRETE STRUCTURAL IL '��R-11) RIGID INSULATION IKN'_M�_ i5 i MP.T. CONCRETE SLAB VVI HEATED SPACE ABOVE ACOUSTIC INSULATION —CEMENT SIDING PER ELEVA710M WRS SEE PARTITION TYPE -7 FOR ADDITIONAL INFORMATION ROM. MODIFIERS: JA IC I ID I I im JE2 HOUR SHAFT WALL - MTL SjUD CSIDING SEE FLOOR TYPE'46' FOR ADDITIONAL INFORMATION —FLOOR FINIEH PER SCHEDULE 1—CONCRIETE ELAS - PER STRUCTURAL R-30. RIGID INSULATION TVP 0 30A —METAL FURRING �4 u u u 6 u LIJ Lu AA fW-V-4HO 6iAP_A6(E_- Lr) EXERCISE ROOM ENTRY 15A ui Z un LU OFFICE c CL n4 lf5A 10 W24KO 51 NA T11, 10 L47] Hr- co�z. F %B AT I-HIL 00C.CFAL_ I H TRAINING ROOM w TRAINING ROOM u L u ------- - ---- ............... . u 1.4 WALL RATING LEGEND & HANDICAP ACCESS PLAN ol u D JUL 0 1 2019 r % g RE, Hanger (Suspension) WhresFigeesseand5b) \\1 Hangerand parimeterwires must m plumb within 1:6 unless (Figure5a) counter sloping %Wires are provided (Figure 5b). s— �a &­,. -, Hanger wires shall be 12-gauge and spaced 4 It an center. s__ �snj is c.06 5-11 .1. z 71 Any connection device at the supporting construction shall be capable 11UNNER FREM MOV r\ of carrying not less than 100 lb. ­ z-. - --i PowderActuated Fasteners (PAFs) are an approved method of V, MI—REAN Le�PE attachment for hangerwires. s­ �scE: ...... semp.,�­ a z, s- ao�� C.Su� WN� To EUREMG ATONEEND \�:W'R:P.' Terminal ends of each main bean and crow tee must be supported R1MMxoXzUFEANM within 8 inches of each wall with a perimeter wire or approved wall CoNNE—CAP"LE'ro support (see Figures 4a & so). &� ASIAI EW S­­ - 2 5 suppou wLes Wires shall not aftsch to or benclaround interfering material or FIGURE 18: PERIMETER equipment. A trapeze or equivalent device shall be used where CLOSURE ANGLE w/ obstruction prec, ude direct suspension. Trapeze suspensions shall SEISMIC CLIP DETAIL be sized to resist Me dead load and lateral forces appropriate for the seismic category. s,,,­ sr,-, E-s-,a, Electrical Fixtures Lightfixtures weighing less thanIO lb shall haveone 12-gauge hanger Fiq,,re 6a wine connected from the fixture tD the structure above. This wire may be stack. �E Tm — s,...,, 5 z j Light fixtures weighing more than 10 lb and few than 56 lb shall haw two 12-gauge wims attached at opposing comm of the light fixture to the structure above. Thesewires maybe slack. ­­ ASTV­15.1m5.1 5 Ught fixtures weighing mom than 56 to shall be supported directly from the structure above byapprovedhangers- Pendant-hung fixtures shall be drectly supported from the structure above using a 9-gauge wire Or an approyed alternate support without using the calling suspension system for direct support. I ASrM 3-1- sj 7 F'gure Gb LIGHTING and REFLECTED CEILING PLAN SCALE: 1/4' = 10" CEILING PLAN LEGEND 2 x 4 LED LIGHT FIXTURE 30 WATT F171 SUPPLY GRILL HVAC 2:1 ILLUMINATED EXIT SIGN w/ BATT BACK UP DS DIMMABLE LIGHT SWITCH ro EE LED LIGHT SCONCE 20W r LED FLAT PANEL FIXTURE: CPANL 2 x 4 35 KW 39 WATTS o 1- 5 IM LED FLAT PANEL FIXTURE 43 WATTS ---------- - ENTRY Model# LF 1089- PEW- 52LF4-G. OIZ- 51M EXERCISE ROOM EXERCISE ROOM OFFICE 21 Ep 7( PENDANT CHANDELIER 80 WATT A 0 LF-D CAIJ It WA'Tf,�' OS OCCUPANCY SENSOR LIGHT CONTROL FTI 2 x 4 LED recessed light toffer GLOBAL LUX LCB -24-40-MD-835 or similar. U3 Wall sconce: ALLEN & ROTH VBL 1127MBK or similar. LED PENDANT CHANDLELIER MODEL: HL487472 or similar. LED strip lighting : 4w/ft All lights controlled by dimmer switches. EXCEPTION: BATH OCCUPANCY SENSOR D, il 42v 0j ICY ENTRY LOBBY =T TRAINING ROOM TRAINING ROOM SINGLE USER UNISEX ACCESSIBLE BATH 0 cl EA0 :Aj SUSPENDED CEILING INSTALLED TO IBC AND ASTM E 580 STANDARDS. ASTM E 580 SECTION 1.4 CEILINGS LESS THAN OR EQUAL TO 144 SQ FT AMD SURROUNDED BY WALLS CONNECTED TO THE STRUCTURE ABOVE ARE EXEMPT LIGHTING.and REFLECTED CEILING PLAN FROM SEISMIC DESIGN REQUIREME . NTS. Ili P. U C"! FRO %�Va Z E U 'Cd JUL 0 1 2019 BUILDING P' Hanger (Suspension) Wires ii-7g-5-w5b) Hanger and perimeter wires must be plumb within 1:6 unless (Figure Sa) counter sloping wires are provided (Figure 5b). S— ASM Gioa 11.4 Hanger wires shall be 12-gauge and spaced 4 It on center. sn— As-nv 71 Any connection device at the supporting construction shall be capable of carrying not less than 100 lb. s,— cscA — 3. 1 PowderActuated Fasteners (PAFs) are an approved method of attachment for hangerwires. $010 AXE --'C �34 5F.—P.- 16 2.30'�aO�q� !1-11-0i, - z , �11 Terminal ends of each main beare and crem bee must be supported within 8 inches of each wall with a perimeter wire or approved wall support (me Figures 4a & So). Sl— ASTM J55W 5-1- - P. 5 Wres shall not attach to or bend around interfering material or equipment. A trapeze or equivalent device shall be used where obstructions preclude direct suspension. Trapeze suspensions shall be .1zed to resist the dead load and lateral forces appropriate for the seismic category. S­ ASri,i E— S-'- 5 27A Electrical Fixtures Light fixtures weighing less than 10 lb shall have one 12-gauge hanger wire connected from the fixture to the structure above. This wire may be slack. s—,—sm—. sl—$31 Light fixtures weighing mom than 10 lb and lam than 56 lb shall have two 12-gauge wires attached at opposing carriers of the light flidure to the structure above. These wires may be slack. ft— ASN— 5— �', 3 5 Light fixtures weighing more than 56 lb shall be supported directly frorn the structure above by approved hangers. I. -I A— E5M -- 5 3 C Pendant -hung fixtures shall be directly supported from the structure ab� using a 9�g-ge wire or an approved alternate support without using the cailing suspension system for direct support �,:— P.s-,k. r- .3—r. s�j , ROVI 63 5 .. ... ...... ... — ------ ENTRY OFFICE ILI %� r *+ V z q lij 4- 1Z 77777 '77, 7 rz I ENTRY EVE LOBBY ""IS -W �A�P- e%o�? FIGURE 18: PERIMETER CLOSURE ANGLE W/ SEISMIC CUP DETAIL b 12`5 'lee j let JeS PC 4 r- me, -- 're 46 ir-�' SUITE EQUIPTMENT AND USE LAYOUT TO DETERMINE OCCUPANCY LOAD PLAN DESIGN OCCUPANCY LOAD SUITE SQUARE FEET: 1697 SQ FT OFFICE, RESTROOM AND REAR CIRCULATION AREA 320 SQ FT PELATES AREA 1377 SQ FT PROPOSED OCCUPANCY OF SPACE TO BE LIMITED TO 15 OCCUPANTS AS PER IBC 1004.1.2 EXCEPTION OCCUPANCY DETERMINED BY FOR VMOM THE SPACE IS DESIGNED OCCUPANT LOAD TO BE POSTED NEAR MAIN ENTRY SINGLE USER UNISEX ACCESSIBLE BATH SUSPENDED CEILING INSTALLED TO ISC AND ASTM E 580 STANDARDS. ASTIM E 580 SECTION 1.4CEILINGS LESS THAN OR EQUALTO 144 SQ. FT AMD SURROUNDED BY WALLS CONNECTED TO THE STRUCTURE ABOVE ARE EXEMPT FROM SEISMIC DESIGN REQUIREMENTS. U A M C) z LU 0 LLJ LLJ Z Ln < LU I— < EL r-4 �D 3 U 753 jUL 0 1 2019 BUIIWDE 6E III f C OGF ER00112 S