APPROVED ENG2024-0240 ROW PERMITRIGHT OF WAY EUC PERMIT
PERMIT NU BE
City of Edmonds
- 9:01 1
www.edmondswa.govi
Description: ZIPLY-REMOVE 10 BO POLES ISSUED: 07/10/2024
Address: 10204 244TH ST SW EDMONDS WA 98026
EXPIRES: 01/10/2025
it Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00597100000802
I 11-14111 a i
W
NAME TYPE NAME ADDRESS PHONE
APPLICANT ARIANNE MOMMSEN 426 E CASINO ROAD, EVERETT WA 98208 (402)670-8384
CONTACT ZIPLY FIBER 426 E CASINO ROAD, EVERETT WA 98208 (402)670-8384
CONTRACTOR ZIPLY FIBER 1800 41ST ST, EVERETT WA 98201 (425)949-0230
OWNER GARRETT J BEYER 10204 244TH ST SW, EDM0NDS WA 98020
FEE INFORMATION
DESCRIPTION AMOUNT PAID
CITY TECHNOLOGY FEE - PER PERMIT
$45.00 $45.00
ENG - INSPECTIONS - 4.1.24
$132.00 $132.00
ROW - STANDARD - 4.1.24 $396.00 $396.00
REQUIREMENTS
REQUIREMENT TYPE NOTES
TRAFFIC CONTROL
Traffic control and public safety shall be in accordance with City regulations as required by the City
Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification
verifying completion of the required training in their posession.
RESTORATION
Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with
asphalt or City approved material prior to the end of the workday - No Exceptions
WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final
inspection and acceptance of the work.
INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM
24 HR NOTICE REQUIRED
The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of
any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its
departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney
fees by reason of granting this permit.
RELEASED BY: MAJ DATE: 07/10/2024
Printed: Wednesday, July 10, 2024 9:40:17 AM 1 of 2
RIGHT OF WAY EUC PERMIT
PERMIT NUMBE3
City of Edmonds
,...Ave
N, Edmonds WA 9:01 1 1
www.edmondswa.gov • •
CONDITIONS
CONDITION TYPE
ALERT RESIDENTS
ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD
ESC REQUIREMENTS
REQUIREMENTS.
Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to
indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and
agents from any and all claims for damages of whatever nature, arising directly or indirectly from the
HOLD HARMLESS
issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any
requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance
provision.
SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT.
INSPECTIONS
www.mybuildingpermit.com
POTHOLING
VERIFY CLEAR BORE CROSSINGS.
RESTORE LANDSCAPE
Restore landscape to like or better conditions
Sound or noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND AND NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites and activities must comply with the noise
limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE DATE
RESULT
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL**
Printed: Wednesday, July 10, 2024 9:40:17 AM 2 of 2
RECEIVED
Lti�y of ED%�O�
ANC. 1 g90
SECTION A
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
Requirements outlined in Right -of -Way permit Handout E63.
May 20 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
If any field is not applicable to your project, write "N/A" instead of leaving blank.
All fields required. Incomplete Applications will be denied.
General Info
Project Name W0962295
Site Address or if no site address use Property Address at NW corner of project area: 10204 244th St SW, Edmonds, WA
Associated Permits: BLD PLN ENG
Owner and Entity Holding Franchise (if applicable)
Name of Company Ziply Fiber Northwest, LLC Franchise Ordinance No: WN U-17
PointofContact Mike Hakahan
Title Engineer
Address426 E Casino Rd
city Everett
State WA
zip 98208
Phone 425-949-0230
Email mike.hakahan@ziply.com
AuthorizedContractor and Agent •below)
NameofCompany Ziply Fiber Northwest, LLC
Primary Name Mike Hakahan
Agent Name Mike Hakahan
Title Engineer
Title Engineer
Mobile 425-949-0230
Address426 E Casino Rd.
Email mike.hakahan@ziply.com
city Everett
I State WA
zip 98208
Secondary Name
Phone 425-949-0230
Title
Email mike.hakahan@ziply.com
Mobile
City of Edmonds Business License No: 3 1 3-0 1 3-420
Email
State License No: ZIPLYFN782L3
0 Contractor verifies it is currently bonded
Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ❑ Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as well)
❑ Traffic Control Only (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
\-� Utility Franchise Work (no associated development)
Project Description
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Telecommunications and broadband provider Ziply Fiber to
Remove and replace poles R, S, T, U, V, W, X, Y, Z, & Z1
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
JxJ
LF
SF
Alley 72 hours +
LF
JxJ
F
SF
Parking 72 hours +
LF
JxJ
LF
SF
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
* telecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
1.
CompletedDetails of Work to be
Does the utility owner have existin overhead infrastructure in the area of work?
•
X
2.
Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)?
X
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
X
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility system?
X
5.
Does the work involve proposed additions to an aboveground utility system? If es:
X
Are the additions for the purpose of serving new commercial development?
X
Are the additions for the purpose of serving a single-family residential subdivision?
X
Details of • to be Completed
®i
6. Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
X
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
If yes, answer the following questions related to project area, i.e. the actual area in which the
project is proposed:
X
6a.
Does your project involve wires/cables/lines? If yes:
How many are existing? I I How many are to be added?
6b.
Does your project involve poles? If yes:
X
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
1
Are additional poles to be laced?
in
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
10
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: 7e4iuG-YjZ 11)4� QN✓
APPLICANT PRINTED NAME: Miriam Niman
APPLICANT TITLE: TCP AND PERMIT COORDINATOR
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
5/17/2024
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
LEGEND:
SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM
r
® EXISTING UTILITY POLE
® PROPOSED NEW POLE
w;
k �1
, If F-
_.. -
NO WORK NEEDED _
BO POLE HAS BEEN
REMOVED '
s
i
�1 - ref �, � :5 %/ 1- ., - y ' b_ 1 - � _• ..
AF\ ..
.4- ..� . •
1% -If
,` :{ '
BO POLE STILL IN ROW.
NEED TO REMOVE.
1''�
Mi'• °r
Ke wtwft beiOilAL
C810818 I Vwft
: i3
Y 11
RECEIVED
May 20 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
zi ly
fiber
Everett, WA 98208
>Q
N > Lu04
36
rn
Q a
>0 z T-
0 ~O 0)
o
N
W o6 I-
Cl) (0 z
I— �
U
N N
v
0
N
0 N
1�
O
�U
ED W
m
� o
Z Q Z u;
U U
Q
Z
0 �
DATE: 5.16.2024
DESIGNED BY: M. NIMAN
SCALE:
SHEET:
NOT TO
01
SCALE
NO: 1 OF 3
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING Applicant shall repair/replace all ENGINEERING DIVISION
OWNER/CONTRACTOR IS RESPONSIBLE FOR damage to utilities or frontage APPROVED AS NOTED
EROSION CONTROL AND DRAINAGE ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY improvements in City right-of-way
UTILITIES MAY REQUIRE A SEPERATE PERMIT. per city standards that is caused or ,�� �Q occurs during the permitted project. � ✓.1, $,44z 07/05/2024
LEGEND:
® EXISTING UTILITY POLE
® PROPOSED NEW POLE
4,
WORK DETAILS:
REMOVE AND REPLACE POLES R, S, T,
U, V, W, X, Y, Z, Z& Zl
15- N
mmooftbelax
colollelywft
y� d
r. I
1
L
.e
All
-
.k
NO WORK NEEDED 4
..�,
BO POLE HAS BEEN L '
REMOVED
ir
L
Ir-
t -
I 19
- tA,
RECEIVED
May 20 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
zipIy fiber
Everett, WA 98208
>Q T
N > Lu04
O
Q d
O z 2
O o rn
o
N
W o6
cl) co z
U ^/
N N
C)
0
N
Lu
0 N
1�
O
ED NWN
G LL
Z
Q
w
Z
U
U
O
<
Q
z
O
O
U
J
a
a
OJ
DATE: 5.165.2024
DESIGNED BY: M. NIMAN
SCALE:
SHEET:
NOT TO
02
SCALE
�NO:20F3
LEGEND:
® EXISTING UTILITY POLE
® PROPOSED NEW POLE
16' .W 1
WORK DETAILS:
REMOVE AND REPLACE POLES R, S, T,
U, V, W, X, Y, Z, & Z1
Ke whorls bekw
15-
cololleyn
Y 11
RECEIVED
May 20 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
zipIy fiber
Everett, WA 98208
Q o
N W
04
> a
rn Q
O z =
O o rn
� o N
N
W o6
cl)� z
U)
H � V 1�
7 �
N n N
V
O
1l!:
0
W
00
U
W
Z
U
Q
U
Z
O
W
W
W
H
Q
Z
O
a
O
a
U
OJ
J
DATE: 5.165.2024
DESIGNED BY: M. NIMAN
SCALE:
SHEET:
NOT TO
03
SCALE
�NO:30F3
SYMBOL LEGEND:
OSIGNALIZED
INTERSECTION
OCONE
(CANDLESTICK)
®
TYPE III BARRICADE
WORK TRUCK
WORK ZONE LIMITS
PORTABLE SIGN
Q
EXISTING SIGN
®
DRIVEWAY
ARRW BOARD
REQUIRED)
(WHERE
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER-SPOTTER
FLAGGER STATION
SIGN LEGEND:
ROAD ONE LANE
WORK ROAD
AHEAD AHEAD
W20-1 W20-4
WORK DETAILS:
REMOVE AND REPLACE POLE X
SPOTTER NEEDED FOR PEDESTRIAN TRAFFIC
AND DRIVEWAY ACCESS.
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
v1AKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
<i>
W20-7A R8-3a
244TH ST SW /
(25 MPH)
a
�W_20-1
W20-
W20-7AJ n n
0 JVL ill
RR-iA O
POLE X
ENGINEERING DIVISION
APPROVED AS NOTED
Jill 07/05/2024
vv
244TH ST SW
(25 MPH)
•
O
15'
PHASE 6
244TH ST SW
(25 MPH)
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER TANGENT
50 / 70 40 80
NOTE: 35 / 45 30 60
MON. - FRI. = 7:00am TO 4:00pm 25/30 20 40
RECEIVED
May 20 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55170 MPH
1500'±
RURAL HIGHWAYS 60165 MPH
8001±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35140 MPH
350'±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100' ± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
Ala
ATCO COMMUNICATIONS SERVICES, LLC
www,glcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
Fzi�iplyfiber
"I Everett, WA 98206
rn
(V
>Q
>
m
p
z
H
2
d
z U
o
2
�
<
W
N
otf
rn
J N
N
U)
U
co
O
U)
U)
J
�
O
N
0 v
N
04
O
U
U_
z
O
H
LL
m
�
o
U
W
LL
z
o
Q
LU
H
Z
U
U
U)
w
z
a
O
(if
O
fy_
a
w
z
w
D-
D-
z
LL
DATE:
4.24.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
M.NIMAN
ATCO CONTACT:
405.885.0712
MIRIAM.NIMAN@atcotelecom.com
SCALE:
SHEET:
1 "=50'
07
NO: 7 OF 10
EDMONDS
n
lL
Rahhers Rcost Rd
-
rn I
2361111 St SW
7-351h St SW
236th PI SW
Hi man Pain:
WORK A
AREA
Madrona K a school e
L
WORK AREA
,
(4 -
,,in F1 SIN
- o
� Faith Comrnun C`i zch
Reratlawn Mernarlal Fa:-k
` 23 hStS4Y
Meinehe Car Care Cent
Carlo Voll 9
sely, My
6lroodwav Center
Realty
3
WORK AREA;
s
0
240th PI SW 24Dth F'I SIT
WORK ARC
241 st P1
WOC ARIA
tiny o
4 la2nd I
243rd Pi SW 43rd PI Sty
Garden 7- Nt►'209rd St
--I -, NW 202ned St
tr
A leseed SchoDl, Inc W
T .6
4 , dI s PI MV
��� WORK AREA
SW ..
41 1 anu co-op v;
c
3 'a
z z
{i N
4 4
m rn
NW 203rd-St
NW202ndSS
z r
� z
< 01
s a
m �— NW-2Q 1st Pi
VICINITY MAP
G
Apartments
Rir_hrnl
244th,9t SW
HiljayHomes N 203rd sl
NW 201 st St z
i�
RECEIVED
May 20 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
ATCO COWAUN11CARONS SERVICES. LLC
www.alcoWecorn.com
360.563.9000
708 First Street
Snohomish, WA 98290
zi I�y f i ber
Everett, WA 98206
LO a
N W
M 0 Q
O z T-
O
o
o
w
U) C
rn u
d
� d
0
0
lY �
m
w
� o
� o
z Q z
U U O
w w
O O U
d d
W
w
U)
w
O
U
U
rn
N
N
rn
O
i
n
DATE:
5.7.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
M.NIMAN
ATCO CONTACT:
405.885.0712
MIRIAM.NIMAN@atcotelecom.com
SCALE:
SHEET:
NOT TO
O
SCALD
NO: 1 OF 10
SYMBOL LEGEND:
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
O SIGNALIZED INTERSECTION MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY PHASE 1
O ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
CONE (CANDLESTICK) SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
® TYPE III BARRICADE at o
ATCO COMMUNICATIONS SERVICES, LLC
WORK TRUCK www,Ulrotelecom.com
WORK ZONE LIMITS F71360.563.9000
x W20-1 708 First Street
Ewm PORTABLE SIGN Snohomish, WA 98290
4 EXISTING SIGN x W20-4 Sj NOT NEEDED NO WORK TO BE DONE IN THIS AREA F
I fi•
® DRIVEWAY r
ARROW BOARD x y N
(WHERE REQUIRED) W20-7q O
Everett, WA 98206
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
O O
m rn Q LU m
n FLAGGER-SPOTTER cV W q
Tzo Ln � U) �
�mj o W o ¢ a
FLAGGER STATION D J o ZO
v O =
M oo ' o
{ r0 W otf N
co
SIGN LEGEND: 16 Q
POLE R _
~ OC,
N A'
V r r
ROAD ONE LANE a 1••�
WORK ROAD
AHEAD AHEAD
> z
W20-1 W20-4 W20-7A V
POLE S
CU
z
o . o
WORK DETAILS: Im A' wLL
• � Qo W
REMOVE AND REPLACE POLES R & S l �' Z Q
y0
to G O 20"?A x w w W Z
y< W O O ¢ w
(if fy_ w
d d Z LL
W2.0"4 CHANNELIZATION DEVICE
SPOTTER NEEDED FOR PEDESTRIAN TRAFFIC SPACING (feet)
4
AND DRIVEWAY ACCESS. MPH TAPER TANGENT
X 50 / 70 40 80 DATE: 4.24.2024
W20"1 NOTE: 35 / 45 30 60
MON. - FRI. = 7:00am TO 4:00pm 25 / 30 20 40 REVIEWED BY: M. LUNA
1 WTCS# 013184
DESIGNED BY: M.NIMAN
ATCO CONTACT: 405.885.0712
MIRIAM.NIMAN@atcotelecom.com
RECEIVED SCALE: SHEET:
May 20 2024 1 "=50' (��
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT NO: 2 OF 10
SIGN SPACING = X (1)
FREEWAY &EXPRESSWAYS 55170 MPH
1500' ±
RURAL HIGHWAYS 60165 MPH
800'±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS &URBAN ARTERIALS 35/40 MPH
350'±
RURAL ROADS &URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL &BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100' ± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
SYMBOL LEGEND:
OSIGNALIZED
INTERSECTION
OCONE
(CANDLESTICK)
®
TYPE III BARRICADE
WORK TRUCK
WORK ZONE LIMITS
PORTABLE SIGN
Q
EXISTING SIGN
®
DRIVEWAY
ARRW BOARD
REQUIRED)
(WHERE
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER-SPOTTER
FLAGGER STATION
SIGN LEGEND:
ROAD SIDEWALK
WORK SHOULDER CLOSED
AHEAD WORK
> <
W20-1 W21-5 R9-9
WORK DETAILS:
REMOVE AND REPLACE POLE T
FLAGGERS WILL HAVE WORK STOP TO
ESCORT PEDESTRIANS THROUGH WORKZONE
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
X W2� 0
ob 4
= 1
� O •
D •
m•
•
12'-•
242ND PL SW
(25 MPH) _� J
G�
`W20-1
X
W�
0
co
PHASE 2
NOT NEEDED NO WORK TO BE DONE IN THIS AREA
T
,yo� o.
Tg'o )y
Q (1)6 A
4 o W20-1 X
J
RECEIVED
May 20 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
MINIMUM SHOULDER TAPER LENGTH = L/3 (feet)
SHOULDER
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
8
40
40
60
90
120
130
150
160
170
190
10
40
60
90
90
150
170
190
220
220
240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8'
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER TANGENT
50 / 70 40 80
F'mL,N.
OTE: 35 / 45 30 60
- FRI. = 7:00am TO 4:00pm 25/30 20 40
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55170 MPH
1500'±
RURAL HIGHWAYS 60165 MPH
8001±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35140 MPH
350'±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100' ± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
Ala
ATCO COMMUNICATIONS SERVICES, LLC
www,glcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
Fzi�iplyf i be r
"I Everett, WA 98206
m
N
>a
>
0)
O
z
a
0
a
U
O
Z
a
~
Q
0
W
N
06
eT
04
� N
U)
LU
co
0
a
J
~
�
a
~
o
N
v
O
o
CD
0
U
CU
z
o
LL
m
�
o
U
W
LL
z
o
Q
LU
H
Z
U
U
U)
w
z
a
O
LY
O
fY
�
a
W
z
w
J
Il
Il
z
LL
DATE:
4.24.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
M.NIMAN
ATCO CONTACT: 405.885.0712
MIRIAM.NIMAN@atcotelecom.com
SCALE:
1 "=50'
SHEET:
03
NO: 3 OF 10
SYMBOL LEGEND:
OSIGNALIZED
INTERSECTION
OCONE
(CANDLESTICK)
®
TYPE III BARRICADE
WORK TRUCK
WORK ZONE LIMITS
PORTABLE SIGN
Q
EXISTING SIGN
®
DRIVEWAY
ARRW BOARD
REQUIRED)
(WHERE
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER-SPOTTER
FLAGGER STATION
SIGN LEGEND:
ROAD ONE LANE
WORK ROAD
AHEAD AHEAD
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
W20-1 W20-4 W20-7A R8-3a
WORK DETAILS:
REMOVE AND REPLACE POLE U
CONTRACTOR TO PLACE NO
PARKING SIGNS 72 HOURS
PRIOR TO START WORK
SPOTTER NEEDED FOR PEDESTRIAN TRAFFIC
AND DRIVEWAY ACCESS.
PHASE 3
NOT NEEDED NO WORK TO BE DONE IN THIS AREA
50'-100,
ONE LANE, TWO WAY
TRAFFIC TAPER
IR83i
® G� o
W20-1 W20-4 W20-7A
X X X
RECEIVED
May 20 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
10015 242ND PL SW
U
50'-100'
ONE LANE, TWO WAY
TRAFFIC TAPER
7AI W20-41 I W20-1
.•••• -ov 6 • G�
242ND PL
(25 MPH)
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER TANGENT
50 / 70 40 80
NOTE: 35 / 45 30 60
MON. - FRI. = 7:00am TO 4:00pm 25/30 20 40
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55170 MPH
1500' ±
RURAL HIGHWAYS 60165 MPH
8001±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35140 MPH
350'±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100' ± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
dt"a
ATCOCOMMUNICATIONSSERVICES, LLC
www,glcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
Fzi�iplyfiber
"I Everett, WA 98206
�
N
>Q
>
W
m
p
z
>
Q
0-
z U
O
2
o
~
Q
w
W
otf
J N
N
U)
co
O
CL
J
M
z
N
O
N
V
0
7
N
A/
1LY`
04
O
U
CU
z
o
i=
LL
m
�
o
U
W
LL
z
o
Q
LU
H
Z
U
U
U)
w
w
z
a
O
Q'
O
Q'
¢
W
z
w
J
D_
D_
z
LL
DATE:
4.24.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
M.NIMAN
ATCO CONTACT: 405.885.0712
MIRIAM.NIMAN@atcotelecom.com
SCALE:
1 "=50'
SHEET:
04
NO: 4 OF 10
SYMBOL LEGEND:
OSIGNALIZED
INTERSECTION
OCONE
(CANDLESTICK)
®
TYPE III BARRICADE
llm
WORK TRUCK
WORK ZONE LIMITS
EWM
PORTABLE SIGN
Q
EXISTING SIGN
®
DRIVEWAY
ARRW BOARD
REQUIRED)
(WHERE
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER-SPOTTER
FLAGGER STATION
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
NOT NEEDED NO WORK TO BE DONE IN THIS AREA
SIGN LEGEND: z -I m
r
Tmc
-{*�
ROAD ONE LANE m O
WORK ROAD 70 v
AHEAD AHEAD <
POLE V
W20-1 W20-4 W20-7A
24310 101 ST AVE W
WORK DETAILS:
REMOVE AND REPLACE POLE V
SPOTTER NEEDED FOR PEDESTRIAN TRAFFIC
AND DRIVEWAY ACCESS.
H
i
J
70 1101 ST AVE W
p (25 MPH)
PHASE 4
X X X
O W20-7A
p W20-4 W20-1
•
oti� a
Tq ty So;
Z��
"NO
9y
RECEIVED
May 20 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER TANGENT
50 / 70 40 80
NOTE: 35 / 45 30 60
MON. - FRI. = 7:00am TO 4:00pm 25/30 20 40
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55170 MPH
1500' ±
RURAL HIGHWAYS 60165 MPH
8001±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35140 MPH
350'±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100' ± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
Ala
ATCO COMMUNICATIONS SERVICES, LLC
www,glcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
Fzi�iplyfiber
"I Everett, WA 98206
N
>a
>
W
m
0
o
Q
z 0
U
O
2
H
o
Q
LU
W
otf
J N
N
U)
o
LU
a
J
2
V
�
C,
o
0
N
a
04
Z
0
U
CU
z
o
LL
m
�
C)
U
W
LL
z
0
Q
LU
Z
U
U
U)
U-1
w
z
a
O
Q'
O
Q'
a
W
z
w
J
D_
D_
z
LL
DATE:
4.24.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
M.NIMAN
ATCO CONTACT: 405.885.0712
MIRIAM.NIMAN@atcotelecom.com
SCALE:
1 "=50'
SHEET:
05
NO: 5 OF 10
SYMBOL LEGEND:
OSIGNALIZED
INTERSECTION
OCONE
(CANDLESTICK)
®
TYPE III BARRICADE
WORK TRUCK
WORK ZONE LIMITS
PORTABLE SIGN
Q
EXISTING SIGN
®
DRIVEWAY
ARRW BOARD
REQUIRED)
(WHERE
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER-SPOTTER
FLAGGER STATION
SIGN LEGEND:
ROAD ONE LANE
WORK ROAD
AHEAD AHEAD
W20-1 W20-4
WORK DETAILS:
REMOVE AND REPLACE POLE W
SPOTTER NEEDED FOR PEDESTRIAN TRAFFIC
AND DRIVEWAY ACCESS.
W20-7A
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
v1AKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
W20-7A
9011mgq
Im
PHASE 5
NOT NEEDED NO WORK TO BE DONE IN THIS AREA
O
0�-21' 100TH AVE W
o (25 MPH)
O
ui
•
•
• ui
•
243RD PL SW r
(25 MPH)
�W20-1 �W20-4 �W20-7A�
X X X l � I 4
7A
W20-4
RECEIVED
May 20 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER TANGENT
50 L�L
80
NOTE: 35 60
MON. - FRI. = 7:00am TO 4:00pm 25 40
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55170 MPH
1500'±
RURAL HIGHWAYS 60165 MPH
8001±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35140 MPH
350'±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100' ± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
Ala
ATCO COMMUNICATIONS SERVICES, LLC
www,glcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
Fzi�iplyfiber
"I Everett, WA 98206
rn
N
a
W
0)
p
0
>
a
0-
z U
O
2
o
~
Q
W
otf
J N
N
U)
co
0
CL
J
�
o
M
0
N
v
0
N
A
1LY`
04
0
U
CU
z
o
LL
m
�
o
U
W
LL
Z
o
0
LU
H
Z
U
U
U)
U-1
W
z
a
Of
W-
W
z
J
D_
D_
Z
LL
DATE:
4.24.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
M.NIMAN
ATCO CONTACT:
405.885.0712
MIRIAM.NIMAN@atcotelecom.com
SCALE:
SHEET:
1 "=50'
06
NO: 6 OF 10
SYMBOL LEGEND:
OSIGNALIZED
INTERSECTION
OCONE
(CANDLESTICK)
®
TYPE III BARRICADE
WORK TRUCK
WORK ZONE LIMITS
Elam
PORTABLE SIGN
Q
EXISTING SIGN
®
DRIVEWAY
ARROW BOARD
REQUIRED)
(WHERE
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER-SPOTTER
FLAGGER STATION
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
NOT NEEDED NO WORK TO BE DONE IN THIS AREA
MINIMUM LANE SHIFT TAPER LENGTH = L/2 (feet)
LANE
POSTED SPEED (MPH)
WIDTH
(feet)
25
1 30
35
40
45
50
55
60
65
70
10
55
75
105
135
225
250
275
300
325
350
11
60
85
115
150
250
275
305
330
370
385
12
65
90
125
160
270
300
330
360
390
420
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25
30 35 40
45
50
55
60
64
70
LENGTH (feet)
155
200 250 305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150,
I I
I I
I I
I I
I QI
u l�
I I
I I
j MY j
Y I I
I I
o I I 3
I I 0
I I l
I
I to0
I P
Z7 b
b
b
0 Y
w b 3o
w
4
4
b
b
0
0
0
0
0
0
0
b °
°°
N o °
0 0
0 0
A 0
0 0
R3-5R----1 t °
0
p\� 0 0
V °- '
PHASE 7
SIGN LEGEND:
<9>
RIGHT LANE CENTER LANE SIDEWALK
CLOSED> > < CLOSED CLOSED
AHEAD AHEAD
W20-1 W20-5R W 1-4L W20-5C R9-9
Y
s
WORK DETAILS:
REMOVE AND REPLACE POLE Y
FLAGGERS WILL HAVE WORK STOP TO
ESCORT PEDESTRIANS THROUGH WORKZONE
RECEIVED
May 20 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES DEPARTMENT CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER TANGENT
50/70 40 80
FMOTNE: 35/45 30 60
. - FRI. = 7:00am TO 4:00pm 25/30 20 40
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55/70 MPH
1500'±
RURAL HIGHWAYS 60165 MPH
800' ±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH
350' ±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100' ± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
ATCO COMMUNICATIONS 3ERYICES. LLC
www.alcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
i !ly fi berEvett, WA 98206
un
N
>Q
>
O
O
o
Oco~
U
=
a
U
W
N
06
0')
J N
cn
W
Q
N
2
J
Q
0
J
ON
0
ILL
N
0
Z
O
U
U
z
o
LL
0000
�
W
U
W
of
LL
D
z
0
Q
W
z
W
U
U
U
<
Q
z
Of
Of
W
W
LL
D_
z
LL
DATE:
4.24.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
M.NIMAN
ATCO CONTACT:
405.885.0712
MIRIAM.NIMAN@atcotelecom.com
SCALE:
SHEET:
1 11=50'
08
NO: 8 OF 10
SYMBOL LEGEND:
OSIGNALIZED
INTERSECTION
OCONE
(CANDLESTICK)
®
TYPE III BARRICADE
WORK TRUCK
WORK ZONE LIMITS
PORTABLE SIGN
Q
EXISTING SIGN
®
DRIVEWAY
ARRW BOARD
REQUIRED)
(WHERE
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER-SPOTTER
FLAGGER STATION
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
NOT NEEDED NO WORK TO BE DONE IN THIS AREA
MINIMUM SHOULDER TAPER LENGTH = L/3 (feet)
SHOULDER
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35 40
45
50
55
60
65
70
8
40
40
60 90
120
130
150
160
170
190
10
40
60
90 90
150
170
190
220
220
240
USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8'
X W20-1
X W21-5
1 R8-3a
U
�o
r
POLE Z-
R8-3a
RECEIVED
May 20 2024
CITY OF EDMONDS
DEVELOPMENT SERVICES
DEPARTMENT
PHASE 8
SIGN LEGEND:
ROAD SHOULDER SIDEWALK
WORK CLOSED
AHEAD �NORK
W20-1 W21-5 R9-9
WORK DETAILS:
REMOVE AND REPLACE POLE Z
FLAGGERS WILL HAVE WORK STOP TO
ESCORT PEDESTRIANS THROUGH WORKZONE
CHANNELIZATION DEVICE
SPACING (feet)
MPH TAPER TANGENT
50 / 70 40 80
NOTE: 35 / 45 30 60
MON. - FRI. = 7:00am TO 4:OOpm 25/30 20 40
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55170 MPH
1500'±
RURAL HIGHWAYS 60165 MPH
8001±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35140 MPH
350'±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100' ± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
ATCO COMMUNICATIONS SERVICES, LLC
www,glcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
FzI ply f i be r
"I Everett, WA 98206
�
N
>Q
>
H
0)
p
z
2
d
z U
�
o00
W
N
06
J N
U)
W
Q
N
co
0
=
J
a
J
N
0
C
0
LL
N
0
z
0
U
CU
z
o
LL
m
�
o
U
W
LU
LL
z
o
¢
H
?
w
U
U
U)
a
z
O
Q'
O
Q'
¢
W
w
J
D-
D-
z
LL
DATE:
4.24.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
M.NIMAN
ATCO CONTACT:
405.885.0712
MIRIAM.NIMAN@atcotelecom.com
SCALE:
SHEET:
1 "=50'
U 9
NO: 9 OF 10
uy0�6
ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN,
MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION.
APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY
ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN
SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10)
NOT NEEDED NO WORK TO BE DONE IN THIS AREA
R w
O 00 O
o \O Q
0 O
�y O O
!� 0 O
o 0 Q 0
Q O
BUFFER AREA
LONGITUDINAL BUFFER SPACE = B
POSTED SPEED (MPH)
25
30 35 40
45
50
55
60
64
70
LENGTH (feet)
155
200 250 305
360
425
495
570
645
730
TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R
HOST VEHICLE WEIGHT (Ibs)
9,900 TO 22,000
HOST VEHICLE WEIGHT (Ibs)
> 22,000
< 45 MPH
45 - 55 MPH
> 55 MPH
< 45 MPH
45 - 55 MPH
> 55 MPH
100,
123'
172'
74'
100,
150'
MINIMUM LANE SHIFT TAPER LENGTH = L/2 (feet)
LANE
POSTED SPEED (MPH)
WIDTH
(feet)
25
30
35
40
45
50
55
60
65
70
10
55
75
105
135
225
250
275
300
325
350
11
60
85
115
150
250
275
305
330
370
385
12
65
90
125
160
270
300
330
360
390
420
GJv
SYMBOL LEGEND:
SIGNALIZED INTERSECTION
CONE (CANDLESTICK)
TYPE III BARRICADE
WORK TRUCK
WORK ZONE LIMITS
PORTABLE SIGN
EXISTING SIGN
DRIVEWAY
ARROW BOARD
(WHERE REQUIRED)
DIRECTION OF TRAFFIC
(NOT PAVEMENT MARKINGS)
FLAGGER-SPOTTER
FLAGGER STATION
0
PHASE 9
SIGN LEGEND:
ROAD RIGHT LANE
WORK CLOSED
AHEAD AHEAD > <
W20-1 W20-5R W1-4L
CENTER LANE SIDEWALK
CLOSED CLOSED
AHEAD
ONLY
W20-5C R9-9 R3-5R
KEEP
0017
RIGHT
R4-7B
WORK DETAILS:
REMOVE AND REPLACE POLE Z1
RECEIVED
May 20 2024
FLAGGERS WILL HAVE WORK STOP TO
ESCORT PEDESTRIANS THROUGH WORKZONE
CITY OF EDMONDS
DEVELOPMENT SERVICES
CHANNELIZATION DEVICE
DEPARTMENT
SPACING (feet)
MPH TAPER
TANGENT
50/70 40
80
NOTE:
35/45 30
60
MON. - FRI. = 7:00am TO 4:00pm
25/30 20
40
SIGN SPACING = X (1)
FREEWAY & EXPRESSWAYS 55170 MPH
1500' ±
RURAL HIGHWAYS 60165 MPH
8001±
RURAL ROADS 45 / 55 MPH
500' ±
RURAL ROADS & URBAN ARTERIALS 35140 MPH
350'±
RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH
RESIDENTIAL & BUSINESS DISTRICTS
200' ± (2)
URBAN STREETS 25 MPH OR LESS
100' ± (2)
(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS,
AT -GRADE INTERSECTIONS AND DRIVEWAYS
(2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
ATCO COMMUNICATIONS SERVICES, LLC
www,glcotelecom.com
360.563.9000
708 First Street
Snohomish, WA 98290
Fzi�iplyfib e r
"I Everett, WA 98206
a
N U)
H i
p Z U
2
O00
N < a)W 06 J N
N
W co
Q 0
J J
= a
ON LL
V
O
CD
04
O
U
CU
z
o
L.L
0°
�
o'
U
W
w
LL
z
0
¢
?
W
U
U
U)
a
z
(if
IL
fY
IL
W
z
J
Ii
DATE:
4.24.2024
REVIEWED BY:
M. LUNA
WTCS# 013184
DESIGNED BY:
M.NIMAN
ATCO CONTACT:
405.885.0712
MIRIAM.NIMAN@atcotelecom.com
SCALE:
SHEET:
1 "=50'
10
NO: 10 OF 10
RECEIVED
May 20 2024
CITY OF EDMONDS CITY OF EDMONDS MyBuildingPermit.com
DEVELOPMENT SERVICES
DEPARTMENT
Right -of -Way Application #1490306 - W0962295
Applicant
First Name Last Name Company Name
Arianne Mommsen Ziply Fiber
Number Street Apartment or Suite Number E-mail Address
426 E Casino Road grpatcopermits@ziplyfiber.com
City State Zip Phone Number Extension
Everett WA 98208 (402) 670-8384
Contractor
Company Name
ZIPLY FIBER NORTHWEST LLC
Number Street Apartment or Suite Number
1220 75th St SW
City State Zip Phone Number Extension
Everett WA 98203 (425) 231-3928
State License Number License Expiration Date UBI # E-mail Address
ZIPLYFN782L3 5/25/2024 iyini i4gn caitlin.reid@ziply.com
Project Location
Number Street Floor Number Suite or Room Number
10204 244TH ST SW
City Zip Code County Parcel Number
EDMONDS 98026 00597100000802
Associated Building Permit Number Tenant Name
Additional Information (i.e. equipment location or special instructions)_
Work Location
Property Owner
First Name Last Name or Company Name
Garrett J Beyer
Number Street Apartment or Suite Number
10204 244TH ST SW
City State Zip
EDMONDS WA 98020
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and
authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I
have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work
requires a licensed contractor to perform the work, the information will be provided prior to permit issuance.
Date Submitted: 5/17/2024 Submitted By: Arianne Mommsen
Page 1 of 2
CITY OF EDMONDS MyBuildingPermit.com
Right -of -Way Application #1490306 - W0962295
Project Contact
Company Name: Ziply Fiber
Name: Arianne Mommsen Email: grpatcopermits@ziplyfiber.com
Address: 426 E Casino Road Phone #: (402) 670-8384
Everett WA 98208
Project Type Activity Type Scope of Work
Utility Purveyor Utility Work Disturbance of Surface
Project Name: W0962295
Description of Work: Remove and replace 10 poles
Project Details
Project Information
Job Number
W0962295
Page 2 of 2