Loading...
APPROVED ENG2024-0240 ROW PERMITRIGHT OF WAY EUC PERMIT PERMIT NU BE City of Edmonds - 9:01 1 www.edmondswa.govi Description: ZIPLY-REMOVE 10 BO POLES ISSUED: 07/10/2024 Address: 10204 244TH ST SW EDMONDS WA 98026 EXPIRES: 01/10/2025 it Type: RIGHT OF WAY EUC Permit Subtype: STANDARD Parcel Number: 00597100000802 I 11-14111 a i W NAME TYPE NAME ADDRESS PHONE APPLICANT ARIANNE MOMMSEN 426 E CASINO ROAD, EVERETT WA 98208 (402)670-8384 CONTACT ZIPLY FIBER 426 E CASINO ROAD, EVERETT WA 98208 (402)670-8384 CONTRACTOR ZIPLY FIBER 1800 41ST ST, EVERETT WA 98201 (425)949-0230 OWNER GARRETT J BEYER 10204 244TH ST SW, EDM0NDS WA 98020 FEE INFORMATION DESCRIPTION AMOUNT PAID CITY TECHNOLOGY FEE - PER PERMIT $45.00 $45.00 ENG - INSPECTIONS - 4.1.24 $132.00 $132.00 ROW - STANDARD - 4.1.24 $396.00 $396.00 REQUIREMENTS REQUIREMENT TYPE NOTES TRAFFIC CONTROL Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their posession. RESTORATION Restoration is to be in accordance with City codes. All street -cut trench work shall be patched with asphalt or City approved material prior to the end of the workday - No Exceptions WARRANTY The contractor is responsible for workmanship and materials for a period of one year following the final inspection and acceptance of the work. INSPECTION SCHEDULING: WWW.MYBUILDING PERMIT.COM 24 HR NOTICE REQUIRED The Applicant has signed an application which states he/she holds the City of Edmonds harmless from injuries, damages or claims of any kind or description whatsoever, foreseen or unforeseen, that may be made against the City of Edmonds or any of its departments or employees, including but not limited to the defense of any legal proceedings including defense costs and attorney fees by reason of granting this permit. RELEASED BY: MAJ DATE: 07/10/2024 Printed: Wednesday, July 10, 2024 9:40:17 AM 1 of 2 RIGHT OF WAY EUC PERMIT PERMIT NUMBE3 City of Edmonds ,...Ave N, Edmonds WA 9:01 1 1 www.edmondswa.gov • • CONDITIONS CONDITION TYPE ALERT RESIDENTS ALERT AFFECTED RESIDENTS AND OR BUSINESSES PRIOR TO WORK START. It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in DAMAGE TO FRONTAGE City right of Ways or Easements to City Standards caused by or occurring during the permitted IMPROVEMENTS project. MAINTAIN EROSION AND SEDIMENTATION CONTROL PER CITY AND SWMMW STANDARD ESC REQUIREMENTS REQUIREMENTS. Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the HOLD HARMLESS issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. SCHEDULE REQUIRED INSPECTIONS AS NOTED THROUGH MY BUILDING PERMIT. INSPECTIONS www.mybuildingpermit.com POTHOLING VERIFY CLEAR BORE CROSSINGS. RESTORE LANDSCAPE Restore landscape to like or better conditions Sound or noise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on SOUND AND NOISE weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites and activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. All utilities shall be located prior to any excavation. New locates shall be called for if at time of UTILITY LOCATES excavation, original locates are no longer identifiable. INSPECTIONS INSPECTION TYPE DATE RESULT COMPLETE A-1 JOB START X-2 ENGINEERING FINAL** Printed: Wednesday, July 10, 2024 9:40:17 AM 2 of 2 RECEIVED Lti�y of ED%�O� ANC. 1 g90 SECTION A RIGHT OF WAY CONSTRUCTION PERMIT APPLICATION Complete and submit this Application in accordance with the Submittal Requirements outlined in Right -of -Way permit Handout E63. May 20 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT If any field is not applicable to your project, write "N/A" instead of leaving blank. All fields required. Incomplete Applications will be denied. General Info Project Name W0962295 Site Address or if no site address use Property Address at NW corner of project area: 10204 244th St SW, Edmonds, WA Associated Permits: BLD PLN ENG Owner and Entity Holding Franchise (if applicable) Name of Company Ziply Fiber Northwest, LLC Franchise Ordinance No: WN U-17 PointofContact Mike Hakahan Title Engineer Address426 E Casino Rd city Everett State WA zip 98208 Phone 425-949-0230 Email mike.hakahan@ziply.com AuthorizedContractor and Agent •below) NameofCompany Ziply Fiber Northwest, LLC Primary Name Mike Hakahan Agent Name Mike Hakahan Title Engineer Title Engineer Mobile 425-949-0230 Address426 E Casino Rd. Email mike.hakahan@ziply.com city Everett I State WA zip 98208 Secondary Name Phone 425-949-0230 Title Email mike.hakahan@ziply.com Mobile City of Edmonds Business License No: 3 1 3-0 1 3-420 Email State License No: ZIPLYFN782L3 0 Contractor verifies it is currently bonded Contractor verifies it currently has general liability insurance NOTE: ECDC 18.6o.02o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city engineer. ❑ Multifamily residential ❑ Commercial ❑ City project ❑ Single family residential subdivision ❑ Single family -other ❑ Industrial ❑ Demo and rebuild or from vacant land? ❑ Other, please specify: ❑ Utility Franchise Work associated with development (check one of the above boxes as well) ❑ Traffic Control Only (no associated development) City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021 \-� Utility Franchise Work (no associated development) Project Description Include an overall narrative description of the proposed work. Be specific and detailed: Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc. Include whether this is construction, maintenance, or repair. Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for underground utilities, etc.) Telecommunications and broadband provider Ziply Fiber to Remove and replace poles R, S, T, U, V, W, X, Y, Z, & Z1 RIGHT-OF-WAY CLOSURE AREA TOTAL DURATION (Number of Months) Sidewalk 72 hours + LF JxJ LF SF Alley 72 hours + LF JxJ F SF Parking 72 hours + LF JxJ LF SF SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C. 1. The work in the right of way is on or for the following type of facilities: * telecommunications ❑ cable ❑ power ❑ gas ❑ water ❑ sewer ❑ storm 1. CompletedDetails of Work to be Does the utility owner have existin overhead infrastructure in the area of work? • X 2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)? X If yes, describe: 3. Does the proposed work connect a lot or commercial development with utilities that serve more than one lot or commercial development? X 4. Does the work involve rebuilding or relocating an existing aboveground utility system which connects a lot or commercial development to an existing underground common utility system? X 5. Does the work involve proposed additions to an aboveground utility system? If es: X Are the additions for the purpose of serving new commercial development? X Are the additions for the purpose of serving a single-family residential subdivision? X Details of • to be Completed ®i 6. Does your project involve rebuilding or replacing utility equipment which currently serves more than one lot or commercial development? X City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021 If yes, answer the following questions related to project area, i.e. the actual area in which the project is proposed: X 6a. Does your project involve wires/cables/lines? If yes: How many are existing? I I How many are to be added? 6b. Does your project involve poles? If yes: X How many poles are existing in the project area? What is the height of the existing poles? How many poles are to be removed? 1 Are additional poles to be laced? in How many? I I What is the height of the additionalpoles? 6c. Are any poles to be modified/rebuilt/replaced? If yes: 10 How many? I I What is the height of the poles after? Describe the modification rebuild: SECTION C Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have certification verifying completion of the required training in their possession. Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS. Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to any permit approval. Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials, officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever, foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the expiration, revocation, or termination of any resulting permit approval. Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable requirements of state and federal law. Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by owner to act on its behalf and have authority to bind the owner to this application. Fees. The Applicant is responsible for all permit fees. APPLICANT SIGNATURE: 7e4iuG-YjZ 11)4� QN✓ APPLICANT PRINTED NAME: Miriam Niman APPLICANT TITLE: TCP AND PERMIT COORDINATOR NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE 5/17/2024 City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021 LEGEND: SCHEDULE ALL INSPECTIONS THROUGH MYBUILDINGPERMIT.COM r ® EXISTING UTILITY POLE ® PROPOSED NEW POLE w; k �1 , If F- _.. - NO WORK NEEDED _ BO POLE HAS BEEN REMOVED ' s i �1 - ref �, � :5 %/ 1- ., - y ' b_ 1 - � _• .. AF\ .. .4- ..� . • 1% -If ,` :{ ' BO POLE STILL IN ROW. NEED TO REMOVE. 1''� Mi'• °r Ke wtwft beiOilAL C810818 I Vwft : i3 Y 11 RECEIVED May 20 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT zi ly fiber Everett, WA 98208 >Q N > Lu04 36 rn Q a >0 z T- 0 ~O 0) o N W o6 I- Cl) (0 z I— � U N N v 0 N 0 N 1� O �U ED W m � o Z Q Z u; U U Q Z 0 � DATE: 5.16.2024 DESIGNED BY: M. NIMAN SCALE: SHEET: NOT TO 01 SCALE NO: 1 OF 3 OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING Applicant shall repair/replace all ENGINEERING DIVISION OWNER/CONTRACTOR IS RESPONSIBLE FOR damage to utilities or frontage APPROVED AS NOTED EROSION CONTROL AND DRAINAGE ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY improvements in City right-of-way UTILITIES MAY REQUIRE A SEPERATE PERMIT. per city standards that is caused or ,�� �Q occurs during the permitted project. � ✓.1, $,44z 07/05/2024 LEGEND: ® EXISTING UTILITY POLE ® PROPOSED NEW POLE 4, WORK DETAILS: REMOVE AND REPLACE POLES R, S, T, U, V, W, X, Y, Z, Z& Zl 15- N mmooftbelax colollelywft y� d r. I 1 L .e All - .k NO WORK NEEDED 4 ..�, BO POLE HAS BEEN L ' REMOVED ir L Ir- t - I 19 - tA, RECEIVED May 20 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT zipIy fiber Everett, WA 98208 >Q T N > Lu04 O Q d O z 2 O o rn o N W o6 cl) co z U ^/ N N C) 0 N Lu 0 N 1� O ED NWN G LL Z Q w Z U U O < Q z O O U J a a OJ DATE: 5.165.2024 DESIGNED BY: M. NIMAN SCALE: SHEET: NOT TO 02 SCALE �NO:20F3 LEGEND: ® EXISTING UTILITY POLE ® PROPOSED NEW POLE 16' .W 1 WORK DETAILS: REMOVE AND REPLACE POLES R, S, T, U, V, W, X, Y, Z, & Z1 Ke whorls bekw 15- cololleyn Y 11 RECEIVED May 20 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT zipIy fiber Everett, WA 98208 Q o N W 04 > a rn Q O z = O o rn � o N N W o6 cl)� z U) H � V 1� 7 � N n N V O 1l!: 0 W 00 U W Z U Q U Z O W W W H Q Z O a O a U OJ J DATE: 5.165.2024 DESIGNED BY: M. NIMAN SCALE: SHEET: NOT TO 03 SCALE �NO:30F3 SYMBOL LEGEND: OSIGNALIZED INTERSECTION OCONE (CANDLESTICK) ® TYPE III BARRICADE WORK TRUCK WORK ZONE LIMITS PORTABLE SIGN Q EXISTING SIGN ® DRIVEWAY ARRW BOARD REQUIRED) (WHERE DIRECTION OF TRAFFIC (NOT PAVEMENT MARKINGS) FLAGGER-SPOTTER FLAGGER STATION SIGN LEGEND: ROAD ONE LANE WORK ROAD AHEAD AHEAD W20-1 W20-4 WORK DETAILS: REMOVE AND REPLACE POLE X SPOTTER NEEDED FOR PEDESTRIAN TRAFFIC AND DRIVEWAY ACCESS. ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, v1AKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) <i> W20-7A R8-3a 244TH ST SW / (25 MPH) a �W_20-1 W20- W20-7AJ n n 0 JVL ill RR-iA O POLE X ENGINEERING DIVISION APPROVED AS NOTED Jill 07/05/2024 vv 244TH ST SW (25 MPH) • O 15' PHASE 6 244TH ST SW (25 MPH) CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 50 / 70 40 80 NOTE: 35 / 45 30 60 MON. - FRI. = 7:00am TO 4:00pm 25/30 20 40 RECEIVED May 20 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT SIGN SPACING = X (1) FREEWAY & EXPRESSWAYS 55170 MPH 1500'± RURAL HIGHWAYS 60165 MPH 8001± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS & URBAN ARTERIALS 35140 MPH 350'± RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100' ± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. Ala ATCO COMMUNICATIONS SERVICES, LLC www,glcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 Fzi�iplyfiber "I Everett, WA 98206 rn (V >Q > m p z H 2 d z U o 2 � < W N otf rn J N N U) U co O U) U) J � O N 0 v N 04 O U U_ z O H LL m � o U W LL z o Q LU H Z U U U) w z a O (if O fy_ a w z w D- D- z LL DATE: 4.24.2024 REVIEWED BY: M. LUNA WTCS# 013184 DESIGNED BY: M.NIMAN ATCO CONTACT: 405.885.0712 MIRIAM.NIMAN@atcotelecom.com SCALE: SHEET: 1 "=50' 07 NO: 7 OF 10 EDMONDS n lL Rahhers Rcost Rd - rn I 2361111 St SW 7-351h St SW 236th PI SW Hi man Pain: WORK A AREA Madrona K a school e L WORK AREA , (4 - ,,in F1 SIN - o � Faith Comrnun C`i zch Reratlawn Mernarlal Fa:-k ` 23 hStS4Y Meinehe Car Care Cent Carlo Voll 9 sely, My 6lroodwav Center Realty 3 WORK AREA; s 0 240th PI SW 24Dth F'I SIT WORK ARC 241 st P1 WOC ARIA tiny o 4 la2nd I 243rd Pi SW 43rd PI Sty Garden 7- Nt►'209rd St --I -, NW 202ned St tr A leseed SchoDl, Inc W T .6 4 , dI s PI MV ��� WORK AREA SW .. 41 1 anu co-op v; c 3 'a z z {i N 4 4 m rn NW 203rd-St NW202ndSS z r � z < 01 s a m �— NW-2Q 1st Pi VICINITY MAP G Apartments Rir_hrnl 244th,9t SW HiljayHomes N 203rd sl NW 201 st St z i� RECEIVED May 20 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT ATCO COWAUN11CARONS SERVICES. LLC www.alcoWecorn.com 360.563.9000 708 First Street Snohomish, WA 98290 zi I�y f i ber Everett, WA 98206 LO a N W M 0 Q O z T- O o o w U) C rn u d � d 0 0 lY � m w � o � o z Q z U U O w w O O U d d W w U) w O U U rn N N rn O i n DATE: 5.7.2024 REVIEWED BY: M. LUNA WTCS# 013184 DESIGNED BY: M.NIMAN ATCO CONTACT: 405.885.0712 MIRIAM.NIMAN@atcotelecom.com SCALE: SHEET: NOT TO O SCALD NO: 1 OF 10 SYMBOL LEGEND: ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, O SIGNALIZED INTERSECTION MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY PHASE 1 O ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN CONE (CANDLESTICK) SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) ® TYPE III BARRICADE at o ATCO COMMUNICATIONS SERVICES, LLC WORK TRUCK www,Ulrotelecom.com WORK ZONE LIMITS F71360.563.9000 x W20-1 708 First Street Ewm PORTABLE SIGN Snohomish, WA 98290 4 EXISTING SIGN x W20-4 Sj NOT NEEDED NO WORK TO BE DONE IN THIS AREA F I fi• ® DRIVEWAY r ARROW BOARD x y N (WHERE REQUIRED) W20-7q O Everett, WA 98206 DIRECTION OF TRAFFIC (NOT PAVEMENT MARKINGS) O O m rn Q LU m n FLAGGER-SPOTTER cV W q Tzo Ln � U) � �mj o W o ¢ a FLAGGER STATION D J o ZO v O = M oo ' o { r0 W otf N co SIGN LEGEND: 16 Q POLE R _ ~ OC, N A' V r r ROAD ONE LANE a 1••� WORK ROAD AHEAD AHEAD > z W20-1 W20-4 W20-7A V POLE S CU z o . o WORK DETAILS: Im A' wLL • � Qo W REMOVE AND REPLACE POLES R & S l �' Z Q y0 to G O 20"?A x w w W Z y< W O O ¢ w (if fy_ w d d Z LL W2.0"4 CHANNELIZATION DEVICE SPOTTER NEEDED FOR PEDESTRIAN TRAFFIC SPACING (feet) 4 AND DRIVEWAY ACCESS. MPH TAPER TANGENT X 50 / 70 40 80 DATE: 4.24.2024 W20"1 NOTE: 35 / 45 30 60 MON. - FRI. = 7:00am TO 4:00pm 25 / 30 20 40 REVIEWED BY: M. LUNA 1 WTCS# 013184 DESIGNED BY: M.NIMAN ATCO CONTACT: 405.885.0712 MIRIAM.NIMAN@atcotelecom.com RECEIVED SCALE: SHEET: May 20 2024 1 "=50' (�� CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT NO: 2 OF 10 SIGN SPACING = X (1) FREEWAY &EXPRESSWAYS 55170 MPH 1500' ± RURAL HIGHWAYS 60165 MPH 800'± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS &URBAN ARTERIALS 35/40 MPH 350'± RURAL ROADS &URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL &BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100' ± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. SYMBOL LEGEND: OSIGNALIZED INTERSECTION OCONE (CANDLESTICK) ® TYPE III BARRICADE WORK TRUCK WORK ZONE LIMITS PORTABLE SIGN Q EXISTING SIGN ® DRIVEWAY ARRW BOARD REQUIRED) (WHERE DIRECTION OF TRAFFIC (NOT PAVEMENT MARKINGS) FLAGGER-SPOTTER FLAGGER STATION SIGN LEGEND: ROAD SIDEWALK WORK SHOULDER CLOSED AHEAD WORK > < W20-1 W21-5 R9-9 WORK DETAILS: REMOVE AND REPLACE POLE T FLAGGERS WILL HAVE WORK STOP TO ESCORT PEDESTRIANS THROUGH WORKZONE ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) X W2� 0 ob 4 = 1 � O • D • m• • 12'-• 242ND PL SW (25 MPH) _� J G� `W20-1 X W� 0 co PHASE 2 NOT NEEDED NO WORK TO BE DONE IN THIS AREA T ,yo� o. Tg'o )y Q (1)6 A 4 o W20-1 X J RECEIVED May 20 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT MINIMUM SHOULDER TAPER LENGTH = L/3 (feet) SHOULDER POSTED SPEED (MPH) WIDTH (feet) 25 30 35 40 45 50 55 60 65 70 8 40 40 60 90 120 130 150 160 170 190 10 40 60 90 90 150 170 190 220 220 240 USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8' CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 50 / 70 40 80 F'mL,N. OTE: 35 / 45 30 60 - FRI. = 7:00am TO 4:00pm 25/30 20 40 SIGN SPACING = X (1) FREEWAY & EXPRESSWAYS 55170 MPH 1500'± RURAL HIGHWAYS 60165 MPH 8001± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS & URBAN ARTERIALS 35140 MPH 350'± RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100' ± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. Ala ATCO COMMUNICATIONS SERVICES, LLC www,glcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 Fzi�iplyf i be r "I Everett, WA 98206 m N >a > 0) O z a 0 a U O Z a ~ Q 0 W N 06 eT 04 � N U) LU co 0 a J ~ � a ~ o N v O o CD 0 U CU z o LL m � o U W LL z o Q LU H Z U U U) w z a O LY O fY � a W z w J Il Il z LL DATE: 4.24.2024 REVIEWED BY: M. LUNA WTCS# 013184 DESIGNED BY: M.NIMAN ATCO CONTACT: 405.885.0712 MIRIAM.NIMAN@atcotelecom.com SCALE: 1 "=50' SHEET: 03 NO: 3 OF 10 SYMBOL LEGEND: OSIGNALIZED INTERSECTION OCONE (CANDLESTICK) ® TYPE III BARRICADE WORK TRUCK WORK ZONE LIMITS PORTABLE SIGN Q EXISTING SIGN ® DRIVEWAY ARRW BOARD REQUIRED) (WHERE DIRECTION OF TRAFFIC (NOT PAVEMENT MARKINGS) FLAGGER-SPOTTER FLAGGER STATION SIGN LEGEND: ROAD ONE LANE WORK ROAD AHEAD AHEAD ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) W20-1 W20-4 W20-7A R8-3a WORK DETAILS: REMOVE AND REPLACE POLE U CONTRACTOR TO PLACE NO PARKING SIGNS 72 HOURS PRIOR TO START WORK SPOTTER NEEDED FOR PEDESTRIAN TRAFFIC AND DRIVEWAY ACCESS. PHASE 3 NOT NEEDED NO WORK TO BE DONE IN THIS AREA 50'-100, ONE LANE, TWO WAY TRAFFIC TAPER IR83i ® G� o W20-1 W20-4 W20-7A X X X RECEIVED May 20 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT 10015 242ND PL SW U 50'-100' ONE LANE, TWO WAY TRAFFIC TAPER 7AI W20-41 I W20-1 .•••• -ov 6 • G� 242ND PL (25 MPH) CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 50 / 70 40 80 NOTE: 35 / 45 30 60 MON. - FRI. = 7:00am TO 4:00pm 25/30 20 40 SIGN SPACING = X (1) FREEWAY & EXPRESSWAYS 55170 MPH 1500' ± RURAL HIGHWAYS 60165 MPH 8001± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS & URBAN ARTERIALS 35140 MPH 350'± RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100' ± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. dt"a ATCOCOMMUNICATIONSSERVICES, LLC www,glcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 Fzi�iplyfiber "I Everett, WA 98206 � N >Q > W m p z > Q 0- z U O 2 o ~ Q w W otf J N N U) co O CL J M z N O N V 0 7 N A/ 1LY` 04 O U CU z o i= LL m � o U W LL z o Q LU H Z U U U) w w z a O Q' O Q' ¢ W z w J D_ D_ z LL DATE: 4.24.2024 REVIEWED BY: M. LUNA WTCS# 013184 DESIGNED BY: M.NIMAN ATCO CONTACT: 405.885.0712 MIRIAM.NIMAN@atcotelecom.com SCALE: 1 "=50' SHEET: 04 NO: 4 OF 10 SYMBOL LEGEND: OSIGNALIZED INTERSECTION OCONE (CANDLESTICK) ® TYPE III BARRICADE llm WORK TRUCK WORK ZONE LIMITS EWM PORTABLE SIGN Q EXISTING SIGN ® DRIVEWAY ARRW BOARD REQUIRED) (WHERE DIRECTION OF TRAFFIC (NOT PAVEMENT MARKINGS) FLAGGER-SPOTTER FLAGGER STATION ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) NOT NEEDED NO WORK TO BE DONE IN THIS AREA SIGN LEGEND: z -I m r Tmc -{*� ROAD ONE LANE m O WORK ROAD 70 v AHEAD AHEAD < POLE V W20-1 W20-4 W20-7A 24310 101 ST AVE W WORK DETAILS: REMOVE AND REPLACE POLE V SPOTTER NEEDED FOR PEDESTRIAN TRAFFIC AND DRIVEWAY ACCESS. H i J 70 1101 ST AVE W p (25 MPH) PHASE 4 X X X O W20-7A p W20-4 W20-1 • oti� a Tq ty So; Z�� "NO 9y RECEIVED May 20 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 50 / 70 40 80 NOTE: 35 / 45 30 60 MON. - FRI. = 7:00am TO 4:00pm 25/30 20 40 SIGN SPACING = X (1) FREEWAY & EXPRESSWAYS 55170 MPH 1500' ± RURAL HIGHWAYS 60165 MPH 8001± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS & URBAN ARTERIALS 35140 MPH 350'± RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100' ± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. Ala ATCO COMMUNICATIONS SERVICES, LLC www,glcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 Fzi�iplyfiber "I Everett, WA 98206 N >a > W m 0 o Q z 0 U O 2 H o Q LU W otf J N N U) o LU a J 2 V � C, o 0 N a 04 Z 0 U CU z o LL m � C) U W LL z 0 Q LU Z U U U) U-1 w z a O Q' O Q' a W z w J D_ D_ z LL DATE: 4.24.2024 REVIEWED BY: M. LUNA WTCS# 013184 DESIGNED BY: M.NIMAN ATCO CONTACT: 405.885.0712 MIRIAM.NIMAN@atcotelecom.com SCALE: 1 "=50' SHEET: 05 NO: 5 OF 10 SYMBOL LEGEND: OSIGNALIZED INTERSECTION OCONE (CANDLESTICK) ® TYPE III BARRICADE WORK TRUCK WORK ZONE LIMITS PORTABLE SIGN Q EXISTING SIGN ® DRIVEWAY ARRW BOARD REQUIRED) (WHERE DIRECTION OF TRAFFIC (NOT PAVEMENT MARKINGS) FLAGGER-SPOTTER FLAGGER STATION SIGN LEGEND: ROAD ONE LANE WORK ROAD AHEAD AHEAD W20-1 W20-4 WORK DETAILS: REMOVE AND REPLACE POLE W SPOTTER NEEDED FOR PEDESTRIAN TRAFFIC AND DRIVEWAY ACCESS. W20-7A ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, v1AKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) W20-7A 9011mgq Im PHASE 5 NOT NEEDED NO WORK TO BE DONE IN THIS AREA O 0�-21' 100TH AVE W o (25 MPH) O ui • • • ui • 243RD PL SW r (25 MPH) �W20-1 �W20-4 �W20-7A� X X X l � I 4 7A W20-4 RECEIVED May 20 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 50 L�L 80 NOTE: 35 60 MON. - FRI. = 7:00am TO 4:00pm 25 40 SIGN SPACING = X (1) FREEWAY & EXPRESSWAYS 55170 MPH 1500'± RURAL HIGHWAYS 60165 MPH 8001± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS & URBAN ARTERIALS 35140 MPH 350'± RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100' ± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. Ala ATCO COMMUNICATIONS SERVICES, LLC www,glcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 Fzi�iplyfiber "I Everett, WA 98206 rn N a W 0) p 0 > a 0- z U O 2 o ~ Q W otf J N N U) co 0 CL J � o M 0 N v 0 N A 1LY` 04 0 U CU z o LL m � o U W LL Z o 0 LU H Z U U U) U-1 W z a Of W- W z J D_ D_ Z LL DATE: 4.24.2024 REVIEWED BY: M. LUNA WTCS# 013184 DESIGNED BY: M.NIMAN ATCO CONTACT: 405.885.0712 MIRIAM.NIMAN@atcotelecom.com SCALE: SHEET: 1 "=50' 06 NO: 6 OF 10 SYMBOL LEGEND: OSIGNALIZED INTERSECTION OCONE (CANDLESTICK) ® TYPE III BARRICADE WORK TRUCK WORK ZONE LIMITS Elam PORTABLE SIGN Q EXISTING SIGN ® DRIVEWAY ARROW BOARD REQUIRED) (WHERE DIRECTION OF TRAFFIC (NOT PAVEMENT MARKINGS) FLAGGER-SPOTTER FLAGGER STATION ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) NOT NEEDED NO WORK TO BE DONE IN THIS AREA MINIMUM LANE SHIFT TAPER LENGTH = L/2 (feet) LANE POSTED SPEED (MPH) WIDTH (feet) 25 1 30 35 40 45 50 55 60 65 70 10 55 75 105 135 225 250 275 300 325 350 11 60 85 115 150 250 275 305 330 370 385 12 65 90 125 160 270 300 330 360 390 420 BUFFER AREA LONGITUDINAL BUFFER SPACE = B POSTED SPEED (MPH) 25 30 35 40 45 50 55 60 64 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R HOST VEHICLE WEIGHT (Ibs) 9,900 TO 22,000 HOST VEHICLE WEIGHT (Ibs) > 22,000 < 45 MPH 45 - 55 MPH > 55 MPH < 45 MPH 45 - 55 MPH > 55 MPH 100, 123' 172' 74' 100, 150, I I I I I I I I I QI u l� I I I I j MY j Y I I I I o I I 3 I I 0 I I l I I to0 I P Z7 b b b 0 Y w b 3o w 4 4 b b 0 0 0 0 0 0 0 b ° °° N o ° 0 0 0 0 A 0 0 0 R3-5R----1 t ° 0 p\� 0 0 V °- ' PHASE 7 SIGN LEGEND: <9> RIGHT LANE CENTER LANE SIDEWALK CLOSED> > < CLOSED CLOSED AHEAD AHEAD W20-1 W20-5R W 1-4L W20-5C R9-9 Y s WORK DETAILS: REMOVE AND REPLACE POLE Y FLAGGERS WILL HAVE WORK STOP TO ESCORT PEDESTRIANS THROUGH WORKZONE RECEIVED May 20 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 50/70 40 80 FMOTNE: 35/45 30 60 . - FRI. = 7:00am TO 4:00pm 25/30 20 40 SIGN SPACING = X (1) FREEWAY & EXPRESSWAYS 55/70 MPH 1500'± RURAL HIGHWAYS 60165 MPH 800' ± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS & URBAN ARTERIALS 35 / 40 MPH 350' ± RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100' ± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. ATCO COMMUNICATIONS 3ERYICES. LLC www.alcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 i !ly fi berEvett, WA 98206 un N >Q > O O o Oco~ U = a U W N 06 0') J N cn W Q N 2 J Q 0 J ON 0 ILL N 0 Z O U U z o LL 0000 � W U W of LL D z 0 Q W z W U U U < Q z Of Of W W LL D_ z LL DATE: 4.24.2024 REVIEWED BY: M. LUNA WTCS# 013184 DESIGNED BY: M.NIMAN ATCO CONTACT: 405.885.0712 MIRIAM.NIMAN@atcotelecom.com SCALE: SHEET: 1 11=50' 08 NO: 8 OF 10 SYMBOL LEGEND: OSIGNALIZED INTERSECTION OCONE (CANDLESTICK) ® TYPE III BARRICADE WORK TRUCK WORK ZONE LIMITS PORTABLE SIGN Q EXISTING SIGN ® DRIVEWAY ARRW BOARD REQUIRED) (WHERE DIRECTION OF TRAFFIC (NOT PAVEMENT MARKINGS) FLAGGER-SPOTTER FLAGGER STATION ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) NOT NEEDED NO WORK TO BE DONE IN THIS AREA MINIMUM SHOULDER TAPER LENGTH = L/3 (feet) SHOULDER POSTED SPEED (MPH) WIDTH (feet) 25 30 35 40 45 50 55 60 65 70 8 40 40 60 90 120 130 150 160 170 190 10 40 60 90 90 150 170 190 220 220 240 USE A MINIMUM 3 DEVICES TAPER FOR SHOULDER LESS THAN 8' X W20-1 X W21-5 1 R8-3a U �o r POLE Z- R8-3a RECEIVED May 20 2024 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT PHASE 8 SIGN LEGEND: ROAD SHOULDER SIDEWALK WORK CLOSED AHEAD �NORK W20-1 W21-5 R9-9 WORK DETAILS: REMOVE AND REPLACE POLE Z FLAGGERS WILL HAVE WORK STOP TO ESCORT PEDESTRIANS THROUGH WORKZONE CHANNELIZATION DEVICE SPACING (feet) MPH TAPER TANGENT 50 / 70 40 80 NOTE: 35 / 45 30 60 MON. - FRI. = 7:00am TO 4:OOpm 25/30 20 40 SIGN SPACING = X (1) FREEWAY & EXPRESSWAYS 55170 MPH 1500'± RURAL HIGHWAYS 60165 MPH 8001± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS & URBAN ARTERIALS 35140 MPH 350'± RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100' ± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. ATCO COMMUNICATIONS SERVICES, LLC www,glcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 FzI ply f i be r "I Everett, WA 98206 � N >Q > H 0) p z 2 d z U � o00 W N 06 J N U) W Q N co 0 = J a J N 0 C 0 LL N 0 z 0 U CU z o LL m � o U W LU LL z o ¢ H ? w U U U) a z O Q' O Q' ¢ W w J D- D- z LL DATE: 4.24.2024 REVIEWED BY: M. LUNA WTCS# 013184 DESIGNED BY: M.NIMAN ATCO CONTACT: 405.885.0712 MIRIAM.NIMAN@atcotelecom.com SCALE: SHEET: 1 "=50' U 9 NO: 9 OF 10 uy0�6 ATCO COMMUNICATIONS SERVICES, LLC AS THE DESIGNER OF THIS TRAFFIC CONTROL PLAN, MAKES NO REPRESENTATION AS TO ITS GENERAL ADEQUACY OR BEING APPROVED FOR IMPLEMENTATION. APPROVAL MUST RESULT FROM THE TRAFFIC ENGINEER OR OTHER PUBLIC OFFICIAL HAVING STATUTORY ENFORCEMENT AUTHORITY IN THE JURISDICTION. UTILIZATION AND IMPLEMENTATION OF THIS PLAN SHALL BE A RESULT OF THE APPROVAL. REF. MUTCD 2009 6A - 01 (10) NOT NEEDED NO WORK TO BE DONE IN THIS AREA R w O 00 O o \O Q 0 O �y O O !� 0 O o 0 Q 0 Q O BUFFER AREA LONGITUDINAL BUFFER SPACE = B POSTED SPEED (MPH) 25 30 35 40 45 50 55 60 64 70 LENGTH (feet) 155 200 250 305 360 425 495 570 645 730 TRANSPORTABLE ATTENUATOR ROLL AHEAD DEVICE = R HOST VEHICLE WEIGHT (Ibs) 9,900 TO 22,000 HOST VEHICLE WEIGHT (Ibs) > 22,000 < 45 MPH 45 - 55 MPH > 55 MPH < 45 MPH 45 - 55 MPH > 55 MPH 100, 123' 172' 74' 100, 150' MINIMUM LANE SHIFT TAPER LENGTH = L/2 (feet) LANE POSTED SPEED (MPH) WIDTH (feet) 25 30 35 40 45 50 55 60 65 70 10 55 75 105 135 225 250 275 300 325 350 11 60 85 115 150 250 275 305 330 370 385 12 65 90 125 160 270 300 330 360 390 420 GJv SYMBOL LEGEND: SIGNALIZED INTERSECTION CONE (CANDLESTICK) TYPE III BARRICADE WORK TRUCK WORK ZONE LIMITS PORTABLE SIGN EXISTING SIGN DRIVEWAY ARROW BOARD (WHERE REQUIRED) DIRECTION OF TRAFFIC (NOT PAVEMENT MARKINGS) FLAGGER-SPOTTER FLAGGER STATION 0 PHASE 9 SIGN LEGEND: ROAD RIGHT LANE WORK CLOSED AHEAD AHEAD > < W20-1 W20-5R W1-4L CENTER LANE SIDEWALK CLOSED CLOSED AHEAD ONLY W20-5C R9-9 R3-5R KEEP 0017 RIGHT R4-7B WORK DETAILS: REMOVE AND REPLACE POLE Z1 RECEIVED May 20 2024 FLAGGERS WILL HAVE WORK STOP TO ESCORT PEDESTRIANS THROUGH WORKZONE CITY OF EDMONDS DEVELOPMENT SERVICES CHANNELIZATION DEVICE DEPARTMENT SPACING (feet) MPH TAPER TANGENT 50/70 40 80 NOTE: 35/45 30 60 MON. - FRI. = 7:00am TO 4:00pm 25/30 20 40 SIGN SPACING = X (1) FREEWAY & EXPRESSWAYS 55170 MPH 1500' ± RURAL HIGHWAYS 60165 MPH 8001± RURAL ROADS 45 / 55 MPH 500' ± RURAL ROADS & URBAN ARTERIALS 35140 MPH 350'± RURAL ROADS & URBAN ARTERIALS 25 / 30 MPH RESIDENTIAL & BUSINESS DISTRICTS 200' ± (2) URBAN STREETS 25 MPH OR LESS 100' ± (2) (1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT -GRADE INTERSECTIONS AND DRIVEWAYS (2) THIS SPACE MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. ATCO COMMUNICATIONS SERVICES, LLC www,glcotelecom.com 360.563.9000 708 First Street Snohomish, WA 98290 Fzi�iplyfib e r "I Everett, WA 98206 a N U) H i p Z U 2 O00 N < a)W 06 J N N W co Q 0 J J = a ON LL V O CD 04 O U CU z o L.L 0° � o' U W w LL z 0 ¢ ? W U U U) a z (if IL fY IL W z J Ii DATE: 4.24.2024 REVIEWED BY: M. LUNA WTCS# 013184 DESIGNED BY: M.NIMAN ATCO CONTACT: 405.885.0712 MIRIAM.NIMAN@atcotelecom.com SCALE: SHEET: 1 "=50' 10 NO: 10 OF 10 RECEIVED May 20 2024 CITY OF EDMONDS CITY OF EDMONDS MyBuildingPermit.com DEVELOPMENT SERVICES DEPARTMENT Right -of -Way Application #1490306 - W0962295 Applicant First Name Last Name Company Name Arianne Mommsen Ziply Fiber Number Street Apartment or Suite Number E-mail Address 426 E Casino Road grpatcopermits@ziplyfiber.com City State Zip Phone Number Extension Everett WA 98208 (402) 670-8384 Contractor Company Name ZIPLY FIBER NORTHWEST LLC Number Street Apartment or Suite Number 1220 75th St SW City State Zip Phone Number Extension Everett WA 98203 (425) 231-3928 State License Number License Expiration Date UBI # E-mail Address ZIPLYFN782L3 5/25/2024 iyini i4gn caitlin.reid@ziply.com Project Location Number Street Floor Number Suite or Room Number 10204 244TH ST SW City Zip Code County Parcel Number EDMONDS 98026 00597100000802 Associated Building Permit Number Tenant Name Additional Information (i.e. equipment location or special instructions)_ Work Location Property Owner First Name Last Name or Company Name Garrett J Beyer Number Street Apartment or Suite Number 10204 244TH ST SW City State Zip EDMONDS WA 98020 Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent. If acting as an authorized agent, I further certify that I have full power and authority to file this application and to perform, on behalf of the owner, all acts required to enable the jurisdiction to process and review such application. I have furnished true and correct information. I will comply with all provisions of law and ordinance governing this type of application. If the scope of work requires a licensed contractor to perform the work, the information will be provided prior to permit issuance. Date Submitted: 5/17/2024 Submitted By: Arianne Mommsen Page 1 of 2 CITY OF EDMONDS MyBuildingPermit.com Right -of -Way Application #1490306 - W0962295 Project Contact Company Name: Ziply Fiber Name: Arianne Mommsen Email: grpatcopermits@ziplyfiber.com Address: 426 E Casino Road Phone #: (402) 670-8384 Everett WA 98208 Project Type Activity Type Scope of Work Utility Purveyor Utility Work Disturbance of Surface Project Name: W0962295 Description of Work: Remove and replace 10 poles Project Details Project Information Job Number W0962295 Page 2 of 2