Loading...
BLD20190300OV ED111 C) CITY OF EDMONDS 121 5TH AVENUE NORTH - EDMONDS, WA 98020 1")c lsqo PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISSUED 04/05/2019 Peradt#: BLD20t90300 BUILDING PERMIT Expiration Date: 10/07/2019 Project Address: 21710 95TH AVE W, EDMONDS, Parcel No: 00527900000600 PROP —Dlv.'Fl OWIER APPLICAivr CONTRACTOR KAREN L KAALD CARLSON PRO CONSTRUCTION LLC CARLSON PRO CONSTRUCTION LLC 21710 95TH AVE W CIO THOMAS CARLSON C/O THOMAS CARLSON EDMONDS, WA 98020-3913 9509 217TH ST SW 9509 217TH ST SW EDMONDS, WA 98020 EDMONDS, WA 98020 (425) 775-3378 (425) 345-0542 (425) 345-0542 LICENSE#: CARLSPC8 3 3 02 EXP:09/22/2019 ft"C1111011061 IRWICC21111" W-410 VALUATION: $9,600 PERMIT TYPE- Commercial PERMIT GROUP: 22 - Deck/PorchfPatio Cover GRADING: N CYDS- 0 TYPE OF CONSTRUCTION - RETAINING WALL ROCKERY: OCCUPANT GROUP: OCCUPANT LOAD FENCE: 0 X 0 FT.) CODE: IOTHER ------- OTHER DESC: IZONE: RS-8 INUMBER OF STORIES: 0 1 VESTED DATE: INUMBER OF DWELLING UNIT S- 0 ILOT #: EXISTING ARFA I BA EMENT: 0 1 ST FLOOR 0 2ND FLOOR: 0 PRO PO S ED AREA [13ASEMENT� 0 1 ST FLOOR: 0 7ND FLOOR: 0 13RD FLOOR: 0 GARAGE: 0 DECK. 0 OTHER 0 13 RD FLOOR: 0 GARAGE: 0 DECK� 480 OTHER: 0 1BEDROOMS: 0 BATHROOMS: 0 1 BEDROOMS: 0 13ATHROOMS: 0 FRONTSET'BACK SIDESEFBACK REAR SEMACK REQUIRED: 25'E PROPOSED: 11 QUIRED: 7.5'S PROPOSED: 8.5'S (REQUIRED 1-5�W PROPOSED� HEIGiT ALLOWED:O PROPOSED:O IREQUIRED: 7.5'N PROPOSED: 32'N SETBACKNOTES: I AGREE TO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THE WORK AUTHORIZED THEREBY ' NO TI PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODE OF THE STATE OF WASHINGTON RELATING TO WORKMEN'S COMPENSAT ON INSURANCE AND RCW 18:27. THIS APPLICATION IS NOT A PERMIT UNTIL SIGNED BY THE BUILDING OFFICIAL OR HISMER DEPUTY AND ALL FEES ARE PAID. nature Date ATTENTION ITIS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTM A FINAL INSPECTION HAS BEEN MADE AND APPROVAL ORA CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/IBCIIO/ IRCI 10. = FIRE = APPLICANT = ASSESSOR = CITY STATUS: ISSUED BLD20190300 CONDITIONS • Lot line stakes must be in place at the time of foundation /setback inspection. • All new, extended, re -built or relocated electrical utility and/or service shall be placed underground. • Separate Permit Required For: • Obtain Electrical Permit from State Department of Labor & Industries. 425-290-1309 • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Checkthejob card for all required City inspections including final project approval and final occupancy inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • Sound/Noise originating fromtemporary construction sites as a result ofconstruction activity are exempt fromthe noise limits of ECC Chapter 5.30 only during the hours of 7:00amto 6:00pmon weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites /activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly ftom the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. • Applicant shall repair/replace all damage to utilities or frontage improvements in City right-of-way per City standards that is caused by or occurs during the permitted project. 0 THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATEPROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING ENGINEERING (425) 771-0220 EXT. 1326 1. Go to: www.edmondswa.gov Building Department Inspections 2. Then: SeNces are now scheduled online. If you FIRE (425) 776-7720 3. Then: Perm its/Development have difficulties, please call the 4. Then: Online Permit Info Building Department front desk for PUBLIC WORKS (426) 771-0235 5: If you don't haw one already, create a assistance during office hours. login (upper right hand corner) (425) 771-0220 RECYCLING (425) 275-4801 16: Schedule your inspection When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection being requested, Contact Name and Phone Number, Date Preferred, and whether you prefer morning or afternoon. • B-Setbacks • B-Isolated Footings/Piers • B-Framing • B-Building Final BUILDING PERMIT: Office Use Only APPLICATION Permit #: Development Services Building Division 121 Sth Ave N / Edmonds, WA 98020 ,F1 C. I g L) , 425.771.0220 For handouts, submittal requirements, permit status and inspection scheduling information go to: http://www.edmondswa.gov/ JOB SITE INFORMATION/LOCATION: (Where the work is taking place) Job Site Address: 21-71c, 95-t:b,4ve_ LI) Qm,45 Wh "79JZO Parcel: Lot /Unit/Suite #: Subdivision: PROPERTY OWNER: Name: �_'6t ( e- 6 ��q 0 1 � Mailing Address: "� 1-7 1 o 9 5--L�7 4 tc C—) City/State/Zip: R4",,0dj b-14 q X0 Z(D Phone#: Email: OWNER INSTALLATION: *If yes, read and sign* Will work be performed by the property owner? E]Yes 1211�11D I own, reside in, or will reside in the completed structure, This installation is being made on property that I own which is not intended for sale, lease, rent, or exchange according to RCW 18.27.090, Owner Signature: APPLICANT / CONTACT INFORMATION: Name of Applicant: Ctrl!500 pi-t' MailingAddress: _9 5_05 Z 1776 5-� City/State/Zi p: Lld 4100 6 C-LA C) Phone #: 4 Z5�- - -� Y7 -Os-� -? E-mail: Ca rl�_Qo Coin 5�/Z�C+b--' G­'q 'yPM'?' I cot—, GENERAL CONTRACTOR: (if different from applicant) General Contractor: Mailing Address: City/State/Zip: Phone #: E-mail: WA STATE CONTRACTOR L & I # (CCB) & EXPIRATION DATE: CITY OF EDMONDS BUSINESS LICENSE #: TYPE OF PERMIT (Provide Details on Page 2) 13 Accessory Structure/ 0 Addition Detached Garage 0 Demolition 13 Mechanical 0 New Single Family / Duplex 0 Plumbing El Fire Sprinkler 0 Remodel 0 New Commercial/ Mixed Use 0 Re -Roof 0 Signs 0 Tank El Te na nt Improvement PeC. Remodel Permit fees are based on: The value of the work performed. Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the work indicated on this application. Valuation: / PROPOSED NEW SQUARE FOOTAGE FOR THIS APPLICATION Basement sq ft: Finished El Unfinished 0 1st Floor, sq ft: 2nd Floor, sqft: Garage/Carport:, sq ft: Deck/Covered Porch/Patio: LL- Othersq ft: PROJECT DESCRIPTION Vo rion 0 aPA-Q I certify that the information I have provided on this form/application is true, correct and complete, and that I am the property owner or duly authorized agent of the property owner to submit a permit application to the City of Edmonds. Print Name: Signature: Date'-� - GENERAL COMMERCIAL DATA Occupancy Group(s): Occupant Load(s): Type(s) of Construction: Fire Sprinklers: Yes El No 0 WA STATE ENERGY CODE: If your project affects the building envelope, mechanical systems, and/or lighting, you must complete the appropriate WSEC forms. DEFERRED SUBMITTALS: All commercial building permits that will require associated plumbing, mechanical, fire sprinkler, and/or fire alarm permits are applied for separately. TI / CHANGE OF USE / NEW BLDG: Include TRAFFIC IMPACT worksheet MECHANICAL EQUIPMENT COUNTS (New and Relocated) BTUs Gas Elec Other Qty A/C Unit /Compressor Air Handler /VAV Boiler Dryer Duct Exhaust Fans Fireplace Furnace Heat Pump Unit Hydronic Heating Roof Top Unit (Provide eleva- tions if a Commercial Bldg) Other: PLUMBING FIXTURE COUNTS (New, Relocated or re -piped) Qty QtY Clothes Washer Tub/ Showers Dishwasher Backflow Device (RPBA, DCDA, AVB) Drinking Fountain Pressure Reduction/ Regulator Valve Floor Drain/Sink Refrigerator Water Supply Hose Bibs Water Heater - Tankless? Y or N Hydronic Heat Water Service Line Sinks Other: Toilets Other: GAS/FU EL CONNECTION COUNTS (New, Relocated or re -piped) BTUs Qty BTUs Qty A/C Unit Outdoor BBQ / Fire pit Boiler Stove/Range/Oven Dryer Water Heater Fireplace/ Insert Other: Furnace Other: MEDICAL GAS, AIR VACUUM COUNTS (New, Relocated or re -piped) QtY Qty Carbon Dioxide Nitrous Oxide Helium Oxygen Medical Air Other: Medical - Surgical Vacuum Other: DEMOLITION Type of structure to be demolished: Square footage of structure to be demolished: AHERA Survey done? Y/N PSCAA Case #: Critical Areas Determination: Study Required 0 Conditional Waiver El Waiver 11 Fill in Place El Fill Material: Removal El Size of Tank (Gallons) Critical Areas Determination: Study Required El Conditional Waiver El Waiver [I GRADE/FILL/EXCAVATE Grading: Cut cubic yards Fill cubic yards Cut / Fill in Critical Area: Yes El No 0 GENERAL PROVISIONS APPLICATIONS: Applications are valid for a maximum of 1 year. ESLHA Applications, 2 years. LICENSING: All contractors and subcontractors are required to be licensed with Washington State Department of Labor & Industries and have a current City of Edmonds Business License. 2171095 1h Ave W Edmonds, WA 98020 Deck Specs West facing deck (12'x4O') with 42" stairs *No impervious surface spaced non covered decking 2x12x12 pressure treated lumber used for stringers and ledger board. Stringers will be every 12" 2x6x10 Trex deck boards spaced Min 4" lag screws per code every 5.5" and min 2" away from sides, top and bottom of ledger 412 horizontal support beam supported everyA*ftwhich exceeds code requirements 4x4 vertical pressure treated support lumber with 20"x20'x18"cement slabs Cedar deck rails less than 4" gap and min 36" tall per code to support 200lbs pressure at top Flashing for ledger boards and secured to code Stairs are a minimum of 42" wide, 11" deep and no more than 7.5" rise Vertical support posts out min 10' from house with max canaleaver of 24" Install appropriate knee and cross bracing Entire deck will be built matching specs for fasteners and other size req's as provided by engineering Critical area study has been completed. No new impervious surface being added. &A-C Mk -",. A *-% 4,'Als � &�, 9, sma- 4 ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE CITY OF EDMONDS BUILDING DEPARTMENT WORK---Nf,%/ Df-Vulr% - Znj> ADDRESS 7-121n CIFtho OWNER APPROVED DATE: B L D G. 0 F F I C I A L: --il - f�' 7V '4-0 : I!. '- RECEIVED MAR 2 0 2019 BUILDING I kA �u P 32-1 ti elvu D 4� C, A rs % w5lr 0\ rl f- 14) < c� R 10 cv*-b A vc LAJ O'A 50ZD 0 /io vkomo 5 01,,00 c-v%e,-rczl 3�j— SCANNED k?R qs 10 RESUB MAR 2 6 2019 BUILDING DEPAORTMENT CITY OF EDM NDS pjt,,�,A zl�' * c-c,rl5..o Plro t? % I -7-6 %+hw� � i ( k? lje-�>+ Fac'j- p echz�- 1 -7 1 o 5--t:h P�V,� w / Ld M O�Y?O/� 6,�m 1 go-zc) '3 6 ,3,5 It yr� t, lll+�`,--� L4 x4v-1 \Cne-e- b W'AVN V-"a4-. Fq I � 1% 1 3's yqf>, L f W b- vvq / t Led � J?ujr*A 410,;W to coo�e- E-A+e,-lO-r ovel 114- / edja' ymp Y) al(;,fk -fr,��r deck �oc4v-d-s X 5 Pc? ced OLD201q—bwo ---7 Veep i,'V5 " RECEWEI MAR 2 0 2UIJ BUILDING M BuildingPermitxom y a service of eCityGov.net CONSTRUCTION TIP SHEET 5 Basic Decks w/ 60 psf Live Loading April 1, 2017 This Tip Sheet reflects code requirements of the 2015 International Residential Code (IRC) with Washington State Amendments which update the live load to 60 lost, This document provides building code information applicable to prescriptive residential wood deck design. You may need to hire a licensed architect or an engineer to design a deck where any of the following conditions apply: • The deck serves other than a one- or two-family dwelling building • The deck design includes more than one level • The deck will support a hot tub, spa or other heavy object, including heavy deck covering (such as pavers) • The walking surface is more than 10' above grade • The deck ledger is attached to house overhangs, bay windows, bricks, stone or concrete block • The deck is bearing on ground with a slope greater than 1' horizontal for every Vvertical • The deck is self-supporting (not attached to an exterior wall) Joist Decking Verity span ratimos of proposod docking. Joist Overhang 24'Ma4fWM. Tyl2ical Deck See Page 6 Joist Spacing for Ledger Attachment Soo $pan table am tooting O'ChO&IO. Post T 40 Min, up lo 8*-W hef" joist Span W Min, up to I ar,0' hfthl See opari tribW Beam Non-oorrosive metal See spon lable, post/6eam connector Note: Guards are Footing required when the deck Continuous solid blocking walking surface is more See Wan table and between joists than 300 above grade. footing Sthedule, Beam Overhang 24" maximum G E N E R A L I N F 0 R IMAT 10 IN: • Ine intent of !his Tip Sheet is to provide a general understanding of the code recluiremerds and does -:0 address the subiect in great detail. ;m i� • A,-i(-iiii,)ricil;nforrT,.ai'ion con be obtained frorn your local participatir,g tion. !_ lurisdic Page I of 6 pal5c. SRECEIVED MAR 2 0 2019 13UDZO ICHOWO BUILDING Basic Decks Deck Construction Notes Please note that due to the new 60 psf loading, previous lumber spans and footing sizes have changed. The illustrations and information in this Tip Sheet may be used for decks whether or not they require a permit. See Tip Sheet 0 for when a permit is required. All wood must be pressure treated or naturally resistant to decay. Treat cuts, holes and notches with end -cut solution. Fasteners, hangers, nails, etc., must be stainless steel, hot -dipped galvanized, or as specifically required for the specified wood preservative used. The coating weights for zinc -coated fasteners to be in accordance with ASTIVI A 153. Provide documentation in the field showing the required fastener protection for the wood chosen for your deck. You may modify any components of this Tip Sheet using accepted engineering practices. Any modifications must be reviewed prior to permit issuance. All attachments must be per manufacturer's installation instructions. This Tip Sheet is intended to represent good construction practices for deck construction and related IRC requirements. See related Tip Sheets: 1 for stairs, 2 for handrails, and 3 for guards. TvDical Deck Section 36* minimum high guard Existing building wth intermediate rags spaced so that a sphere Flashing 4' in diameter cannot See detail 1 4 to,( Pass through (See Tip ledger WITCRMOOM options $heel 3), Seel do 4 ill 2 e4 or I , iardrall PT COMA on X11 L A . ....... . . .................. Secure ballusters with (%Aad wood E-7--screw op & bottom Y4- spacing Note: mco"tended for drainage braces are required if distance Contractor to field velify from grade to top of adequacy of solid lumber post exceeds 48'. for ledger connection. See detail on page I If an ex" or e� from the .9re" e)d4* building passes undlerle pro%sed deck, or if there is an exi ng patio 4x4 posts min. wl under the proposed deck, 8'-0" max, height W-8* minimum clearance and 6x6 must be maintained. Please for V-0, to indicate openings in existing 10'-O"max. height wag in elevation view, Manufactured post base with i'standoff. 3,000psl concrete (no special inspection required) Finished grade 1* clear —4-1 (2) #4 ea. way, 3, I clear to bottom of l footing I _ Footing 1 tll i� �,i to bear on =I lip! Aill"llmil": IWININIFE41 "I In, undisturbed earth, C",IENERAL INFORIMATI.,)N: • Theirlientof 11his Tip Sheet is to piovide a cienerol uncleistarld".rIg of the code reouiieryient� criciGoes rv'_e6tyGov.net not address the subJect in greal detatil. • Addiikonal inifornicaflon con be obtained frorn your locafl partic'pating jurisdiction, Page 2 of 6 Post to Beam Connection w/ Knee Brace (Knee braces are required on posts greater than 4 feet in height.) Or 1/3 the hetghl of the post, whichever is greater Corro'slon rtsistant, metal column cap, Follow manufacturers installation instructions, Alternate Knee Brace Detail: 2x4 knee brace face nailed ea, side of post and beam with 4-16d nails at each face and connection 1 16' max J ou�5 13- Basic Decks Beam splices must occur over posts with 1-112* min. bearing Girder beam 4 x 4 knee brace (1) &8" diameter thru-ball or 112 * tag screws with washers, top & bottom (typical) Pressure treated wood post Guardrail Attachment (Guardrails are required when the deck is more than 30 inches above grade.) 16, /,-- 4x4 min. post MI ax A 0,D. galvanized bolt T-1 @ 6'0"o.c. max., Typ or threaded rod wl nuts & washers Tmin 2x8 min. deck joists & rims 4'rnln and Fmax Min. 1800# tension device Section A 5/8" O.D. galvanized bolt or threaded rod w/ nuts & washers 2,� Kin anc Use above details for guard connections or provide engineered design that shows Guards can resist a single concentrated load of 200 1bg applied in any direction at any point along the top and have attachment devices and supporting structure to transfer this load to a propriate structural elements of the building per IBC sec 160T7.1.1 I Min. 1800# tension straps 2x8 min. blocking 2'min G E NI E R A L I N' CiRl V;A [ I () N: K, T.1he i.nteni o*'IN5 Tip Sheet is Ito p!ovide a general undetstand'ng of the code requiremer-05 and does .,e,<c yGov.net noi address the sub iect in, gread detail, 200 --.MAkOft. Page 3 of 6 Basic Decks Detail 1 — Ledger Attachment for Lateral Loads (Knee braces are required on posts greater than 4 feet in height.) Hold-down or Sheathing tenslondevice Siding vath 15,00 # c ca V,aclt�y Floor sheathi ng nailing Flashing at 6- o.c. (max) to joist Flashing hold-down. Decking Joists Joist Hangers Treated 2x ledger 2" min. Dock Joist Floorloist 750# capacity holddown device at 4 locations evenly distributed Floor joists along the deck and within 2 ft of each end. Install per manufacturer Fully threaded 3/8" diameter lag screw Option # 1 predrilled with a minimum of 3 in Option # 2 (Required for New Construction) embedment into solid framing. (Existing Construction Only) Deck Connections (All f;;Rtpnprq n;;ils hnitq qrrpw-.; Rnd ronnertors must be corrosion resistant.) Connection: Fastening: Manufactured Connectors Follow manufacturer's instructions Post to Footing Post base is required Post to Footing (High Winds) Consult with jurisdiction about additional uplift loads where wind exposure is greater than Risk Category B. Post to Beam Connector is required Ledger to House Framing See information on Sheet 5 and Sheet 6 Joist to Beam or Girder (3) 8d — Toe nailed Blocking or Bridging to Joist (2) 1 Od —Toe nailed @ each end Wooden Deck Boards (2) 8d threaded nails OR (2) No. 8 screws Composite Decking Follow manufacturer's instructions C',ENLRAL INFOR11YAW11"IN: XyGov.net -his Tip Sheet is to provide a gerietal urideistariding ol q-ie cocle requiterf)en15 ond Coes _0;�,,P: 0 T' �e inteni of I not addiess lhe subje-f in gr(�,ai detail, 0 ,,an obtairied fro,ryl your loccil participating jurisdiction� Page 4 of 6 Basic Decks Span Table and Footing Schedule for Decks Spans and footings assume the maximum 24" cantilever using Hem-Fir/Doug Fir No. 2 or better framing lumber. Table uses 70 Dsf. loadinq, N 0 Psf. dead load + 60 psf live load) and 2000 psf. soil bearing pressure. Joist Size Joist Spacing Max. Joist Span Girder Beam Size and Max. Span Between Support Posts FootingType 4x6 Footing 4x8 Footing 4x1 0 Footing 4xI2 Footing 12" o.c. T-5" 5-11 " 14x14 T-9" 16x16 9'-6" 18xl 8 11.41 18xI8 2x6 16" o.c. 6'-9" 5'-11 " 14x14 T-9" 16x16 9'-6" 18x18 11.41 18x18 24" o.c. 5'-9" 6'-3" 14xI4 8'-9" 16x1 6 1 V-0" 18xl 8 12'-10" 18x1 8 W 12" o.c. 9'-7" 4--1 1 " 1414 6'-6" 16xI6 8'-3" 18x18 101-01, 20x2O 16" o.c. 81-8.. 4'-11 " 14x14 6'-6" 16x16 8'-3" 18xl 8 101-01, 18x1 8 24" o.c. T-T' 5-11 " 1414 T-9" 16x16 9'-6" 18xI8 11A., 18x18 12" o.c. 13'-3" T-6" 1414 4'-8" 16x16 5A 1 " 18X18 T-2" 18X18 2xI0 16" o.c. 1 V-6" 4'-1 " 1414 5'-5" 16x16 6A 1 " 18x1 8 8'-5" 20x2O 24" o.c. 9'-5" 4'-11 " 1414 6'-6" 16x16 8'-Y 18x1 8 101-01, 3PAi9:� (f2i o.c.. 5'-5" T-l" 1414 4'-1 " 16x16 5'-2" 16x16 6'-3" 1 8xla/ 2x1 2 I-M_0�c. T-6" 1414 4'-8" 16x16 5'-11 " 18xI 8 _-7r-_2" 18x18 24" o.c. 10'-11 4--1 " 1414 5'-5" 16xI6 6-11" 18xI8 8'-5" 18xI8 Footings must have a minimum reinforcement of (2) #4 bars each way with a 3" clearance to the bottom of the footing. Note: Footing sizes are based on decks designed with single span joists where there is no center bearing beam. Deck Ledger Connection to Band JoiSt a, b (Reference I RC Table R507.2 - Deck live load = 60 psf, deck dead load = 10 psf, snow load:5 40 psf) For SI: 1 inch = 25.4 mm, 1 foot = 304.8 mm, 1 pound per square foot = 0.0479 kPa. Joist Span 6'and less 6'1 " to 8' 8'1" to 10' 1 10"1" to 12' C121" to 14'1" to 16' 16-1" to 18' Connection Details On -center spacing of asteners 1/2 inch diameter lag screw with 22 16 13 11 9 8 7 % inch maximum sheathing C.. d 1/2 inch diame er bolt with 1/2 inch 30 q26 22 18 15 13 11 10 maximum sheathing d Y2 inch diameter bolt with 1 inch 19 16 13 11 10 9 maximum sheathing e I I I a. Ledgers shall be flashed in accordance with Section R703.4 to prevent water from contacting the house band joist. b. Snow load shall not be assumed to act concurrently with live load. C. The tip of the lag screw shall fully extend beyond the inside face of the band joist. d. Sheathing shall be wood structural panel or solid sawn lumber. e. Sheathing shall be permitted to be wood structural panel, gypsum board, fiberboard, lumber or foam sheathing. Up to 1/2-inch thickness of stacked washers shall be permitted to substitute for up to Y2-inch of allowable sheathing thickness where combined with wood structural panel or lumbersheathing. G)ENIERAL INFORM A 110 IN: • The inteni o; 4.1 iis Tip Shee fis to pi ovide a ger ier al understandi,m- oi the code t equif ernents crid" does .el KAYGOY'no ol oddress the subJect in, greofl d e.;f oil, • Addlitionol inic),ri-io"O'n con be obicined"roryj your locol participating jurisdkction, Page 5 of 6 Basic Decks Placement of Lag Screws and Bolts in Ledgers and Band Joists (Reference I RC Table 507.2. 1) Minimum End and Edge Distance and Spacing Between Rows Top Edge Boftom Edge Ends Row Spacing Ledger a 2 inches d 3/4 inch 2 inches b 1 5/8 inches b Band joist c 3/4 inch 2 inches e 2 incheS b 1 5/8 inches b For SI: 1 inch = 25.4mm a. Lag screws or bolts must be staggered from the top and bottom along the horizontal run. See figure below. b. Maximum 5 inches. c. For engineered rim joists, the manufacturers recommendations govern. d. The minimum distance from the bottom row to the top edge of the ledger must be in accordance with figure below. e. 2 inches may be reduced to 3/4 inch when the band joist is directly supported by a mudsill, header, or by double top wall plates. 51 NAX a Placement of Lag Screws and Bolts in Ledgers (Reference IRC Figure 507.2.1(1)) LEDGER LAG SCREW OR BOLT STAGGER FASTENERS I I/- IN 2 ROWS 5.5" MIN FOR 2X8 * 6.5'.'M:N FOR 2X11 0 7.5 M N FOR 2X 2 314"MIN *DISTANCE CAN BE REDUCED TO 4.5" IF LAG SCREWS ARE USED OR IF BOLT SPACING IS REDUCED TO THAT OF LAG SCREWS TO ATTACH 2X8 LEDGERS TO 2X8 BAND JOISTS. Placement of Lag Screws and Bolts in Ledgers (Reference IRC Figure 507.2.1(2)) EXTERIOR SHEATHING EXISTING STUD WALL Existing 2x BAND JOIST OR ENGINEERING RIM BOARD TMINT 1111 1. DECK JOIST 5"MAX LAG SCREWS OR BOLTS 2" VIN JOIST HANGER GENERAL VORNAA I k")IN: a The intent of 11 iis T';p Shee I is lo p� ovlde a �jei ie�ral undeistanding al the f '�-'qu:rer, ients crrJ �-s -e�(,CityGov.nef not -address lhe subject in greoi detail. be obtained frorr,, yoiUr local perticilpating Page 6 of 6