Loading...
BLD20181076OV ED Af Al tp CITY OF EDMONDS I I I ITH A VENUE NORTH - EDM ONDI, WA 11111 PHONE: (425) 771-0220 - FAX: (425) 771-0221 STATUS: ISS D 09/06/201!8,� Petndt#: BLD20181076 — 09/06/2019 Project Address: 118 5TH AVE N, EDMONDS Expiration Date: iL Parcel No: 00434202100100 PROP-n'T1'OAA'n-n APPLICANT CONTRACTOR MUSEUM CITY OF EDMONDS SEATTLE HISTORIC WINDOW COMP C/O CITY OF EDMONDS CIO THOM SULLIVAN C/O MICHAEL KUNNEN 250 5TH AVENUE N 121 5TH AVE N 3045 22ND AVE W EDMONDS, WA 98020 EDMONDS, WA 98020 SEATTLE, WA 98199 (425) 760-3330 (4 25) 760-3 3 30 (206) 849-1714 - LICENSE #: SEATTHW85 I J9 EXP:04/29/2019 JOB DESCRIPTION RrPLACING 12 WINDOWS AT THEMUSEUM VALUATION: $0 PERMIT TYPE: Commercial PERMIT GROUP: 43 - Miscellaneous GRADING: N CYDS: 0 TYPE OF CONSTRUCTION: RETAINING WALL ROCKERY: OCCUPANT GROUP: OCCUPANT LOAD: FENCE: 0 X 0 FT.) CODE: 2015 IOTHER: ------- OTHER DESC: ZONE: INUMBER OF STORIES: 0 VESTED DATE: INUMBER OF DWELLING UNITS: 0 ILOT #� EXISTING AREA BASEMENT: 0 — I ST FLOOR: 0 2ND FLOOR: 0 PROPOSO) ARFA �13ASEMENT: 0 1 ST FLOOR: 0 2ND FLOOR: 0 3RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 13RD FLOOR: 0 GARAGE: 0 DECK: 0 OTHER: 0 BEDROOMS: 0 BATHROOMS: 0 1BEDROOMS: 0 BATHROOMS: 0 FRONTS EMACK SIDESEMACK REARSETBACK REQUIRED: PROPOSED: MRUIRED: PROPOSED: REQUIRED: PROPOSED HEIGHT ALLOWED:O PROPOSED:O IREQUIRED: PROPOSED: SETBACK NOTES: I AGREETO COMPLY WITH CITY AND STATE LAWS REGULATING CONSTRUCTION AND IN DOING THEWORK AUTHORIZED THEREBY, NO PERSON WILL BE EMPLOYED IN VIOLATION OF THE LABOR CODEOF THESTATEOF WASHINGTON RELATING TO WORKMENS COMPENSATION INSURANCE AND RCW 18:27. THIS APPLICAT10filS NOT A PERMIT UN11L SIGNED BY THE BUILDING OFFICIAL OR HIS/HER DE]PUTY AND ALL FEES ARE PAID. Sign—ature-1 Print Na-RiL� Date Released By Date ATTENTION ITIS UNLAWFUL T'O USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL A FINAL INISPEC11ON HAS BEEN' MADE AND APPROVAL OR A CERTTFICATE OF OCCUPANCY HAS BEEN GRANTED. UBCI 09/ IBCI 10/ IRCI I 0� FTRE APPLICANT ASSESSOR CITY STATUS: ISSUED BLD20181076 CONDITIONS • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check thejob card for all required City inspections including final project approval and final occupancy inspections. • Any request foralternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. • SoundNoise originating from temporary construction sites as a result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:00am to 6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. THIS PERMITAUTHORIZ_ES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY- ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES, ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6) BUILDING ENGINEERING (425) 771-0220 EXT. 1326 1. Go to: www.edmondswa.gov Building Department Inspections 2. Then: SeNces are now scheduled online. If you FIRE (425) 775-7720 3. Then: Perm its/Development have difficulties, please call the 4. Then: Online Permit Info Building Department front desk for PUBLIC WORKS (425) 771-0235 5: If you don't ha\e one already, create a assistance during office hours. login (upper right hand corner) (425) 771-0220 RECYCLING (425) 275-4801 6: Schedule your inspection When calling for an inspection please leave the following information: Permit Number, Job Site Address, Type of Inspection — being requested, Contact Name and Phone Number, Date Preferred, and whether you prefer morning or afternoon. • B-Preconstruction meeting • B-.Building Final BUILDING PERMIT APPLICATION Development Services Building Division 121 5th Ave N / Edmonds, WA 98020 '11c, I g9v 425.771.0220 For handouts, submittal requirements, permit status and inspection scheduling information go to: http://www.edmondswa.gov/ JOB SITE INFORMATION/LOCATION: (Where the work is taking place) Job Site Address: P5 5 7"'? '4 to J Parcel: K)C)L-1 54� ZO—L' too I'Do Lot /Unit/Suite #: Subdivision: PROPERTY OWNER: Name: C C> Z Mailing Address: )41 d4 AJ City/State/Zip: 07 4:3 Phone #: 42� _Z_ Email: 17,),L" OWNER INSTALLATION: *If yes, read and sign* Will work be performed by the property owner? 0 Yes 0 No I own, reside in, or will r6side in the completed structure. This installation is being made on property that I own which is not intended for sale, lease,,r RCW` 18.27.090. �en according to Owner Signature: APPLICANT / CONTACT INFORMATION: Name of Applicant: C, L'/ 12 _"'A Mailing Address: /2- 1 '.5 -'%1 A-) City/State/Zip: 7,jeLj WA- zz* --Z Phone #: 112--5 76o E-mail GENERAL CONTRACTOR: (if different from applicant) General Contractor: 15 ec'_41e Mailing Address: City/State/Zip: Phone #: E-mail: WA STATE CONTRACTOR L & I # (CCB) & EXPIRATION DATE: CITY OF EDMONDS BUSINESS LICENSE #: Office Use Only TYPE OF PERMIT (Provide 0 Accessory Structure/ Detached Garage Details on Page 2) ID Addition O%A limp El Mechanical * New Single Family/ Duplex 0 Plumbing * Fire Sprinkler 0 Remodel * New Commercial/ Mixed Use 0 Re -Roof 0 Signs 0 Tank E]Tenant Improvement \� Otherw - i MLYA"W's Remodel Permit fees are based on: The value of the work performed. Indicate the value (rounded to the nearest dollar) of all equipment, matehals, labor, overhead, and the profit for the work indicated on this application. Valuation: PROPOSED NEW SQUARE FOOTAGE FOR THIS APPLICATION Basement sq ft: Finished El Unfinished El 1st Floor, sq ft: 2nd Floor, sqft: Garage/Carport:, sq ft: Deck/Covered Porch/Patio: other sq ft: I PROJECT DESCRIPTION 19LCQ 1-a neAo LA r-<�D( A) '7) I cerdfy that the information I have provided on this I form/application is true, correct and complete, and that I am the property owner or duly authorized agent of the property owner to submit a permit application to the City of Edmonds. Print Name: Signature: Date GENERAL COMMERCIAL DATA Occupancy Group(s): Occupant Load(s): Type(s) of Construction: Fire Sprinklers: Yes El No 0 WA STATE ENERGY CODE: If your project affects the building envelope, mechanical systems, and/or lighting, you must complete the appropriate WSEC forms. DEFERRED SUBMITTALS: All commercial building permits that will require associated plumbing, mechanical, fire sprinkler, and/or fire alarm permits are applied for separately. TI / CHANGE OF USE / NEW BLDG: Include TRAFFIC IMPACT worksheet MECHANICAL EQUIPMENT COUNTS (New and Relocated) BTUs Gas Elec Other QtY A/C Unit /Compressor Air Handler /VAV Boiler Dryer Duct Exhaust Fans Fireplace Furnace Heat Pump Unit Hydronic Heating Roof Top Unit (Provide eleva- tions if a Commercial Bldg) Other: PLUMBING FIXTURE COUNTS (New, Relocated or re -piped) Qty Qty Clothes Washer Tub/ Showers Dishwasher Backflow Device (RPBA, DCDA, AVB) Drinking Fountain Pressure Reduction/ Regulator Valve Floor Drain/Sink Refrigerator Water Supply Hose Bibs Water Heater - Tankless? Y or N Hydronic Heat Water Service Line Sinks Other: Toilets Other: GAS/FUEL CONNECTION COUNTS (New, Relocated or re -piped) BTUs Qty BTUs Qty A/C Unit Outdoor BBQ/ Fire pit Boiler Stove/Range/Oven Dryer Water Heater Fireplace/ Insert I Other: Furnace Other: MEDICAL GAS, AIR VACUUM COUNTS (New, Relocated or re -piped) Qty Qty Carbon Dioxide Nitrous Oxide Helium Oxygen Medical Air Other: Medical - Surg DEMOLITION Type of structure to be demolished: Square footage of structure to be demolished: AHERA Survey done? Y / N PSCAA Case #: Critical Areas Determination: Study Required El Conditional Waiver EJ Waiver El Fi in Place El Fill Material: 77 Removal El Size of Tank (Gallons) Critical Areas Determination: Study Required El Conditional Waiver El Waiver El GRAD E/F1 LL/ EXCAVATE Grading: Cut cubic yards Fill cubic yards Cut / Fill in Critical Area: Yes El No 11 GENERAL PROVISIONS APPLICATIONS: Applications are valid for a maximum of I year. ESLHA Applications, 2 years. LICENSING: All contractors and subcontractors are required to be licensed with Washington State Department of Labor & Industries and have a current City of Edmonds Business License. 9%J SCANRED CITY OF EDMONDS AUG 14 7018 121 5'h Avenue North, Edmonds WA 98020 Phone: 425.771.0220 - Fax: 425.771.0221 - Web: www.edmondswa.gov DEVELOPMENT SERVICES DEPARTMENT - PLANNING DIVISION CERTIFICATE OF APPROPRIATENESS Project: Edmonds Historical Museum —Winclow Replacements (BLD20181076) Location: 120 _ Sth Avenue North Property Owner: City of Edmonds 121-5 1h Avenue N Edmonds, WA 98020 Applicant: Thom Sullivan Facilities Maintenance Manager City of Edmonds 121-5 th Avenue North Edmonds, WA 98020 Certificate of Appropriateness Pursuant to Edmonds Community Development Code (ECDC) 20.45.040.13, prior to the commencement of any work on a register property, the owner must request and receive a Certificate of Appropriateness from the Historic Preservation Commission (HPC) for the proposed work. Findings 1. Scope. The City of Edmonds is proposing to replace twelve windows on the on the second floor of the Museum with historically accurate replacements. The three other windows on the second floor were replaced in 2017. 2. Review Criteria. The following Secretary of the Interior's Standards for Rehabilitation as codified in 36 CIFIR 67 apply to the skylight replacement project: (2) The historic character of a property shall be retained and preserved. The removal of historic materials or alteration offeatures and spaces that characterize a property shall be avoided. (3) Each property shall be recognized as a physical record of its time, place, and use. Changes that create afalse sense of historical development, such as adding conjectural features or architectural elementsfrorn other buildings, shall not be undertaken. (5) Distinctive features, finishes, and construction techniques or examples of craftsmanship that characterize a historic property shall be preserved. Page I of 2 (6) Deteriorated historic features shall be repaired rather than replaced. Where the severity of deterioration requires replacement of a distinctive feature, the newfeature shall match the old in design, color, texture, and other visual qualities and, where possible, materials. Replacement of missing features shall be substantiated by documentary, physical, or pictorial evidence. (9) New additions, exterior alterations, or related new construction shall not destroy historic materials that characterize the property. The new work shall be differentiated from the old and shall be compatible with the massing, size, scale, and architectural features to protect the historic integrity of the property and its environment. 3. Significance. The Edmonds Historical Museum (Edmonds Carnegie Library) was listed on the Edmonds Register of Historic Places in April 2004 under Ordinance No. 3493. The exterior of the building was designated as the significant feature. 4. Historic Preservation Commission Review. The City of Edmonds Historic Preservation Commission reviewed the proposed window replacement project for consistency with the Secretary of the Interior's Standards for Rehabilitation at their regular meetings on August 9, 2018. S. Findings. The Historic Preservation Commission found the proposed window replacements under BR20181076 to be consistent with the Secretary of the Interior's Standards for Rehabilitation and /4pproved a CertifiM,� of Appropriateness for the window replacements. August 14, 2018 en Lien, Envir-&m-fental Programs Manager Date Page 2 of 2 Edmonds Museum Window Replacement Project Our intent is to replace the existing single pane double insulated glazing (approximately 4'x9') on the second floor and replace with traditional wooden double hung sash with a 50/50 upper and lower sash split and a individual sash glazing split to match original historic installation. The double hung sash will be sinde pane glazed functional historically accurate representations of the original 1910-11 sash. Glazing will be point mounted and putty sealed and finished and painted to match existing exterior. The upper and lower sash will be fully operable by use of in wall iron counter balanced weights. The lower sash will be lift grasp handle operated, and upper sash will be operated by a pull/push hook system as specified in the 1910 specification document. All hardware and locks will be original refurbished or modern equivalent of historic design. All wood molding details will match existing or be reused if existing. CAY of Edmonds Building Department ROVED Y PLANNING 0 J— A 'Il)PLR, 0 VE"91 D PLAN J �di CITY OF EDMONDS BUILDING DEPARTMENT WOR'k JQ ujlnoows-��- (-t' ADDRESS LAd OWNER MLA-5-g�u-rn APPROVED DATE: BLDG. OFFICIAL: PERMIT NUiJi3'L'-'1q �B Q 20 V9 - 1-021!�O-- A, t I r-% I i-.uo - 0 2010 OEVELOPMENT SERVICES COUNTER 1W t I rrl M *-ju . FT�l Vic . . . . . . . .... O&W-W t N T- JPb J-4t A-* Wood, Windows i J lug, brick mold (gacm, *400 IM&MMAi0a) bUd " (dUnmd-) USII tOp fail cftwam pxWb-d) muntin Avc.wkw ad deptb of _Udar) QW&) nuttv WvCI 11 am &C mh Am 10 aw 0— —WO sash bottom rau (hdAa) Sm (Wshl IW AOPC) (dimm= fi'm wa ram to Wb*W) Ming jamb stop parting bad RECEIVED N,jG i 0 21513 I)EVELOPMENT SERVICES COumTER 31-7 1volt �)- e ock RECEIVIED 20A SERVICES COUNTER � I T, Y-r-.j P-11 kN 10- e_010A, RECEIVED i 0 2013 5/-7 )EVELOPMENT SERWES COUNTER ItU M Ft4c PTV X114 rLI tKa! GWAMMMM MUM SLIA INIM I if all kL all