Loading...
Fld Rpt 4 Vista Del MarFIELD REPOT n son GEOTEMICAL ASSOCIATES, inc 17311 135th Ave. NE #A-500 Woodinville, WA 98072 (425) 486-1669 FAX 481-2510 105 Palouse Street Wenatchee, WA 98801 (509)665-7696 Project: Vista Del Mar Residence Development NGA File: 1065318 Owner: Garth Hitchens Date: 6/4/2021 Location: 17901—Vista Del Mar Drive, Edmonds Report No: 4 Weather: Sunny, 60's Page 1 of 2 Purpose of Geotechnical Consultation and By: ABR Visit: Construction Monitoring We visited the site today at the request of the Robin Kearsley on behalf of the homeowner to provide geotechnical consultation and earthwork construction monitoring services for the residence development project located at 17901 Vista Del Mar Drive in Edmonds, Washington. Upon arrival to the site contractors were not present. We observed the drilled piers and foundation form work for the planned residence had been completed. Cuts along the perimeter of the residence excavation generally ranged from approximately 3- to 5.5-feet along the western portion of the residence footprint and 8- to 11-feet along the eastern portions. At the base of the excavations native granular soils were exposed consistent with our previous explorations and observations during excavation monitoring. Steel sheets anchored with driven pipe piles were utilized along the taller eastern cuts to temporarily shore the excavations. Additionally, taller cuts were benched along the eastern edge. We evaluated the subgrade soils within the form work with a %-inch dimeter steel probe rod under moderate pressure. Probing generally yielded 1- to 3-inches which we interpreted as medium dense or better conditions. In our opinion the subgrade has been prepared in accordance with the approved plans and our recommendations and should support the designed loads. Temporary erosion control measures consisted of silt fencing around the perimeter of the site. In our opinion TESC BMP's appear to be performing adequately. We have been providing geotechnical consultation and construction monitoring services on a part-time basis. Our findings and conclusions are based on specific observations made while on site. We can return to the site for further geotechnical consultation upon request. Attachment: Site Plan Signed: 4146oly Distribution: FmND *ezoo :s(pt"*br s-B• .ra. I+zTc 14twS Rgszt Eem e7 D��COj' M CNT N 60 PccF No. to 633l8 - ---------- FR ------- , ------ I 1po yz- . I ira• I x•-b w,• sl'a In• r 1 i 1 1 ,'s yr � rl yr ram' 1 _ � \\ 9 � I I i,\I I I ICI s I I\ �_ © I E sa• ba I r Halrs• L J+ I I\ \\ -----------------, o L_J I \ zlFT— \ •• I — I I \\ \ I It I SLA6-0N-GRADE I I \\ I I I m bML.MV. Biev'P•� I �I I \ rJ LJ I I I \ `\ s I I I I L----J i LJ I I P•w�xxeNleb� E\ \ • � I I I� \I � I � o I I m I \�" \ \ \ \ I I ' I I L---� Y P ,ao• Pd1HDATIGN NO'fES� Leanxwme�rnBrrPu xJlHi.aeHL1Hl u------� � ,�.. is Arco ruAOYi o�m�,Br smxr.vosrro lrm. s ..0 mw n wTwrunl rawro xe meax�,aFwlBo ea• b I v, + _ T samlr, van, L n.urz wimLevHao �, l' L N�ilwriex . � � �rin�ns �•rc°mau rawPmxrms�rz cabinrnH. B; Baoo iB4 9N' B rst.AYlMC90�srarbwwlrT4wi aaHur®mrIHD. b. n1 GQElgtMn TH CpP.TTE IHL. ADD ALL FPTC PIN IDBALLW&. II, ICCPTBNBID 00H1 /![W1M11 ro fGfFP'NAlE1iM 9W VWL HOFOxYtl IHgt u. vc BrtabltPM. HBPle roxrmnaxu rmnPnax wwmwwx b. Hl oinex_vae, Pne rnabb rH nvaHb no aPma wluw_xP�rL lNCIaEH5 . B FOUNDATION PLAN w. Il l/YT�� ,Dols m•oL yr nBrvrw>�saupibu®no xx� e. II IV lrwes�zPown.v sr lmcH. PrreeneleL IB. PxMdE Ba_.asnumee ai.rn+wLa ruuz lxLrB.,tao xBxelxw xeu rs I nx,H��eB�,HIL�Pr�Lx�rzPr,K�rB�H,bLn� C4XW ZOt4 S AQpRpX , N rS