FG APPROVED Site Improvement Bond WorksheetSite Improvement Bond Quantity Worksheet
L41 King County
Department of Permitting & Environmental Review
35030 SE Douglas Street, Suite 210
Snoqualmie, Washington 98065-9266
206-296-6600 TTY Relay 711
Project Name:
Location:
302 6th Ave S Edmonds
302 6th Ave S Edmonds
Clearing greater than or equal to 5,000 board feet of timber?
yes X no
If yes,
Forest Practice Permit Number:
(RCW 76.09)
Page 1 of 9
S15 Web date: 04/03/2015
For alternate formats, call 206-296-6600.
Date: 11 /25/2020
Project No.: BLD2020-0388
Activity No.:
Note: All prices include labor, equipment, materials, overhead and
profit. Prices are from RS Means data adjusted for the Seattle area
or from local sources if not included in the RS Means database.
Inspection Fees: 3.3% of all cost to complete project
3.3% x $177,559.07 = $5,859.45
Performance Bond Amount: 120% (TESC + ROW)
120% x $78,822.77 = $94,587.32
Future Maintenance Bond Amount: 15% (120% of all cost to complete project)
15% (120% x $177,559.07) = $31,960.63
ENGINEERING DIVISION
APPROVED AS NOTED
08/11/2021
Unit prices updated: 3/2/2015
Version: 3/2/2015
KC BQ Worksheet Complete.xls Report Date: 11/25/2020
Site Improvement Bond Quantity Worksheet S15 Web date: 04/03/2015
Reference #
Unit
Price
Unit
Quantity
# of
Applications
Cost
EROSION/SEDIMENT CONTROL
Number
Backfill & compaction -embankment
ESC-1
$ 6.00
CY
Check dams, 4" minus rock
ESC-2
SWDM 5.4.6.3
$ 80.00
Each
Crushed surfacing 1 1/4" minus
ESC-3
WSDOT 9-03.9(3)
$ 95.00
CY
Ditching
ESC-4
$ 9.00
CY
Excavation -bulk
ESC-5
$ 2.00
CY
Fence, silt
ESC-6
SWDM 5.4.3.1
$ 1.50
LF
227
1
$ 340.50
Fence, Temporary (NGPE)
ESC-7
$ 1.50
LF
209
1
$ 313.50
Hydroseeding
ESC-8
SWDM 5.4.2.4
$ 0.80
SY
Jute Mesh
ESC-9
SWDM 5.4.2.2
$ 3.50
SY
$ -
Mulch, by hand, straw, 3" deep
ESC-10
SWDM 5.4.2.1
$ 2.50
SY
$ -
Mulch, by machine, straw, 2" deep
ESC-11
SWDM 5.4.2.1
$ 2.00
SY
$ -
Piping, temporary, CPP, 6"
ESC-12
$ 12.00
LF
$ -
Piping, temporary, CPP, 8"
ESC-13
$ 14.00
LF
$ -
Piping, temporary, CPP, 12"
ESC-14
$ 18.00
LF
$ -
Plastic covering, 6mm thick, sandbagged
ESC-15
SWDM 5.4.2.3
$ 4.00
SY
$ -
Rip Rap, machine placed; slopes
ESC-16
WSDOT 9-13.1(2)
$ 45.00
CY
$ -
Rock Construction Entrance, 50'x15'x1'
ESC-17
SWDM 5.4.4.1
$ 1,800.00
Each
1
1
$ 1,800.00
Rock Construction Entrance, 100'x15'x1'
ESC-18
SWDM 5.4.4.1
$ 3,200.00
Each
Sediment pond riser assembly
ESC-19
SWDM 5.4.5.2
$ 2,200.00
Each
$ -
Sediment trap, 5' high berm
ESC-20
SWDM 5.4.5.1
$ 19.00
LF
$ -
Sed. trap, 5' high, riprapped spillway berm section
ESC-21
SWDM 5.4.5.1
$ 70.00
LF
$ -
Seeding, by hand
Sodding, 1" deep, level ground
ESC-22
SWDM 5.4.2.4
$ 1.00
SY
$ -
ESC-23
SWDM 5.4.2.5
$ 8.00
SY
$ -
Sodding, 1" deep, sloped ground
ESC-24
SWDM 5.4.2.5
$ 10.00
SY
$ -
TESC Supervisor
ESC-25
$ 110.00
HR
40
1
$ 4,400.00
Water truck, dust control
ESC-26
SWDM 5.4.7
$ 140.00
HR
$ -
WRITE -IN -ITEMS **** (see page 9)
Inlet Protection
$ 74.00
Each
8
1
592
ESC SUBTOTAL:
30% CONTINGENCY & MOBILIZATION:
ESC TOTAL:
COLUMN:
Page 2 of 9
KC BQ Worksheet Complete.xls
$ 7,446.00
$ 2,233.80
$ 9,679.80
A
Unit prices updated: 3/2/2015
Version: 3/2/2015
Report Date: 11/25/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right -of -Way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
GENERAL ITEMS
No.
Backfill & Compaction- embankment
GI - 1
$ 6.00
CY
Backfill & Compaction- trench
GI - 2
$ 9.00
CY
124
1,116.00
65
585.00
Clear/Remove Brush, by hand
GI - 3
$ 1.00
SY
Clearing/Grubbing/Tree Removal
GI - 4
$ 10,000.00
Acre
0.15
1,500.00
Excavation - bulk
GI - 5
$ 2.00
CY
Excavation - Trench
GI - 6
$ 5.00
CY
124
620.00
65
325.00
Fencing, cedar, 6' high
GI - 7
$ 20.00
LF
Fencing, chain link, vinyl coated, 6' high
GI - 8
$ 20.00
LF
Fencing, chain link, gate, vinyl coated, 20
GI - 9
$ 1,400.00
Each
Fencing, split rail, 3' high
GI - 10
$ 15.00
LF
Fill & compact - common barrow
GI - 11
$ 25.00
CY
Fill & compact - gravel base
GI - 12
$ 27.00
CY
Fill & compact - screened topsoil
GI - 13
$ 39.00
CY
Gabion, 12" deep, stone filled mesh
GI - 14
$ 65.00
SY
Gabion, 18" deep, stone filled mesh
GI - 15
$ 90.00
SY
Gabion, 36" deep, stone filled mesh
GI - 16
$ 150.00
SY
Grading, fine, by hand
GI - 17
$ 2.50
SY
Grading, fine, with grader
GI - 18
$ 2.00
SY
400
800.00
Monuments, 3' long
GI - 19
$ 250.00
Each
Sensitive Areas Sign
GI - 20
$ 7.00
Each
Sodding, 1" deep, sloped ground
GI - 21
$ 8.00
SY
Surveying, line & grade
GI - 22
$ 850.00
Day
Surveying, lot location/lines
GI - 23
$ 1,800.00
Acre
Traffic control crew ( 2 flaggers)
GI - 24
$ 120.00
HR
40
4,800.00
Trail, 4" chipped wood
GI - 25
$ 8.00
SY
Trail, 4" crushed cinder
GI - 26
$ 9.00
SY
Trail, 4" top course
GI - 27
$ 12.00
SY
Wall, retaining, concrete
GI - 28
$ 55.00
SF
90
4,950.00
Wall, rockery
GI - 29
$ 15.00
SF
Page 3 of 9
SUBTOTAL
6,536.00
8,160.00
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction. Version: 03/02/2015
KC BQ Worksheet_Complete.xls Report Date: 11/25/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
ROAD IMPROVEMENT
No.
AC Grinding, 4' wide machine < 1000sy
RI - 1
$ 30.00
SY
AC Grinding, 4' wide machine 1000-2000
RI - 2
$ 16.00
SY
AC Grinding, 4' wide machine > 2000sy
RI - 3
$ 10.00
SY
AC Removal/Disposal
RI - 4
$ 35.00
SY
77
2,695.00
Barricade, type III ( Permanent)
RI - 6
$ 56.00
LF
Curb & Gutter, rolled
RI - 7
$ 17.00
LF
Curb & Gutter, vertical
RI - 8
$ 12.50
LF
50
625.00
Curb and Gutter, demolition and disposal
RI - 9
$ 18.00
LF
50
900.00
Curb, extruded asphalt
RI - 10
$ 5.50
LF
Curb, extruded concrete
RI - 11
$ 7.00
LF
Sawcut, asphalt, 3" depth
RI - 12
$ 1.85
LF
458
847.30
Sawcut, concrete, per 1" depth
RI - 13
$ 3.00
LF
Sealant, asphalt
RI - 14
$ 2.00
LF
Shoulder, AC, ( see AC road unit price)
RI - 15
$ -
SY
Shoulder, gravel, 4" thick
RI - 16
$ 15.00
SY
Sidewalk, 4" thick
RI - 17
$ 38.00
SY
135
5,130.00
Sidewalk, 4" thick, demolition and dispose
RI - 18
$ 32.00
SY
135
4,320.00
Sidewalk, 5" thick
RI - 19
$ 41.00
SY
Sidewalk, 5" thick, demolition and dispose
RI - 20
$ 40.00
SY
Sign, handicap
RI - 21
$ 85.00
Each
Striping, per stall
RI - 22
$ 7.00
Each
Striping, thermoplastic, ( for crosswalk)
RI - 23
$ 3.00
SF
Striping, 4" reflectorized line
RI - 24
$ 0.50
LF
449
224.50
Page 4 of 9
SUBTOTAL
14,517.30
224.50
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction. Version: 03/02/2015
KC BQ Worksheet_Complete.xls Report Date: 11/25/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
ROAD SURFACING
No.
(4" Rock = 2.5 base & 1.5" top course) 9 1/2" Rock= 8" base & 1.5" top course)
Additional 2.5" Crushed Surfacing
RS - 1
$ 3.60
SY
HMA 1/2" Overlay, 1.5"
RS - 2
$ 14.00
SY
HMA 1/2" Overlay 2"
RS - 3
$ 18.00
SY
HMA Road, 2", 4" rock, First 2500 SY
RS - 4
$ 28.00
SY
HMA Road, 2", 4" rock, Qty. over 2500 S
RS - 5
$ 21.00
SY
HMA Road, 3", 9 1/2" Rock, First 2500 S
RS - 6
$ 42.00
SY
HMA Road, 3", 9 1/2" Rock, Qty Over 25C
RS - 7
$ 35.00
SY
Not Used
RS - 8
Not Used
RS - 9
HMA Road, 6" Depth, First 2500 SY
RS - 10
$ 33.10
SY
166
5,494.60
HMA Road, 6" Depth, Qty. Over 2500 SY
RS - 11
$ 30.00
SY
HMA 3/4" or 1", 4" Depth
RS - 12
$ 20.00
SY
Gravel Road, 4" rock, First 2500 SY
RS - 13
$ 15.00
SY
Gravel Road, 4" rock, Qty. over 2500 SY
RS - 14
$ 10.00
SY
PCC Road (Add Under Write -Ins w/Desig
RS - 15
Thickened Edge
RS - 17
$ 8.60
LF
Page 5 of 9
SUBTOTAL
5,494.60
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction. Version: 03/02/2015
KC BQ Worksheet_Complete.xls Report Date: 11/25/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Cost
Quant. Cost
Quant. Cost
DRAINAGE (CPP = Corrugated Plastic Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.
Access Road, R/D
D - 1
$ 21.00
SY
Bollards - fixed
D - 2
$ 240.74
Each
Bollards - removable
D - 3
$ 452.34
Each
" (CBs include frame and lid)
CB Type I
D - 4
$ 1,500.00
Each
0 4
0.00 +5AA-99
3
4,500.00
CB Type IL
D - 5
$ 1,750.00
Each
CB Type II, 48" diameter
D - 6
$ 2,300.00
Each
2
4,600.00
for additional depth over 4'
D - 7
$ 480.00
FT
7
3,360.0
CB Type II, 54" diameter
D - 8
$ 2,500.00
Each
2
5,000.00
for additional depth over 4'
D - 9
$ 495.00
FT
5.7
2,821.50
CB Type II, 60" diameter
D - 10
$ 2,800.00
Each
for additional depth over 4'
D - 11
$ 600.00
FT
CB Type II, 72" diameter
D - 12
$ 3,600.00
Each
for additional depth over 4'
D - 13
$ 850.00
FT
Through -curb Inlet Framework (Add)
D- 14
$ 400.00
Each
Cleanout, PVC, 4"
D- 15
$ 150.00
Each
Cleanout, PVC, 6"
D- 16
$ 170.00
Each
5
850.00
Cleanout, PVC, 8"
D- 17
$ 200.00
Each
Culvert, PVC, 4"
D- 18
$ 10.00
LF
14
140.00
Culvert, PVC, 6"
D- 19
$ 13.00
LF
293
3,809.00
245
3,185.00
Culvert, PVC, 8"
D - 20
$ 15.00
LF
Culvert, PVC, 12'
D - 21
$ 23.00
LF
10
230.0
Culvert, CMP, 8"
D - 22
$ 19.00
LF
Culvert, CMP, 12"
D - 23
$ 29.00
LF
Culvert, CMP, 15"
D - 24
$ 35.00
LF
Culvert, CMP, 18"
D - 25
$ 41.00
LF
Culvert, CMP, 24"
D - 26
$ 56.00
LF
Culvert, CMP, 30"
D - 27
$ 78.00
LF
Culvert, CMP, 36"
D - 28
$ 130.00
LF
Culvert, CMP, 48"
D - 29
$ 190.00
LF
Culvert, CMP, 60"
D - 30
$ 270.00
LF
Culvert, CMP, 72"
D - 31
$ 350.00
LF
"KCC 27A authorizes only one bond reduction.
KC BQ Worksheet_Complete.xls
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 11 /25/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Page 6 of 9
"KCC 27A authorizes only one bond reduction.
KC BQ Worksheet_Complete.xls
SUBTOTAL
12,139.00 8,4 49.()()
16,356.50-g�,�,-g�
Unit prices updated: 03/02/2015
Version: 03/02/2015
Report Date: 11 /25/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
DRAINAGE CONTINUED
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
No.
Unit Price
Unit
Quant.
Cost
Quant.
Cost
Quant.
Cost
Culvert, Concrete, 8"
D- 32
$ 25.00
LF
Culvert, Concrete, 12"
D - 33
$ 36.00
LF
Culvert, Concrete, 15"
D - 34
$ 42.00
LF
Culvert, Concrete, 18"
D - 35
$ 48.00
LF
Culvert, Concrete, 24"
D - 36
$ 78.00
LF
Culvert, Concrete, 30"
D - 37
$ 125.00
LF
Culvert, Concrete, 36"
D - 38
$ 150.00
LF
Culvert, Concrete, 42"
D - 39
$ 175.00
LF
Culvert, Concrete, 48"
D - 40
$ 205.00
LF
Culvert, CPP, 6"
D - 41
$ 14.00
LF
Culvert, CPP, 8"
D - 42
$ 16.00
LF
Culvert, CPP, 12"
D - 43
$ 24.00
LF
Culvert, CPP, 15"
D - 44
$ 35.00
LF
Culvert, CPP, 18'
D - 45
$ 41.00
LF
Culvert, CPP, 24"
D - 46
$ 56.00
LF
Culvert, CPP, 30"
D - 47
$ 78.00
LF
Culvert, CPP, 36"
D - 48
$ 130.00
LF
Ditching
D - 49
$ 9.50
CY
Flow Dispersal Trench (1,436 base+)
D - 50
$ 28.00
LF
French Drain (3' depth)
D - 51
$ 26.00
LF
Geotextile, laid in trench, polypropylene
D - 52
$ 3.00
SY
Mid -tank Access Riser, 48" dia, 6' deep
D - 54
$ 2,000.00
Each
Pond Overflow Spillway
D - 55
$ 16.00
SY
Restrictor/Oil Separator, 12"
D - 56
$ 1,150.00
Each
Restrictor/Oil Separator, 15"
D - 57
$ 1,350.00
Each
Restrictor/Oil Separator, 18"
D - 58
$ 1,700.00
Each
Riprap, placed
D - 59
$ 42.00
CY
Tank End Reducer (36" diameter)
D - 60
$ 1,200.00
Each
Trash Rack, 12"
D - 61
$ 350.00
Each
Trash Rack, 15"
D - 62
$ 410.00
Each
Trash Rack, 18"
D - 63
$ 480.00
Each
Trash Rack, 21"
D - 64
$ 550.00
Each
Page 7 of 9
SUBTOTAL
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction. Version: 03/02/2015
KC BQ Worksheet_Complete.xls Report Date: 11/25/2020
Site Improvement Bond Quantity Worksheet
Web date: 04/03/2015
Existing
Right-of-way
Future Public
Right of Way
& Drainage Facilities
Private
Improvements
Unit Price
Unit
Quant. Price
Quant. Cost
Quant. Cost
PARKING LOT SURFACING Not To Be Used For Roads Or Shoulders
No.
2" AC, 2" top course rock & 4" borrow
PL - 1
$ 21.00
SY
NA
NA
2" AC, 1.5" top course & 2.5" base cour
PL - 2
$ 28.00
SY
NA
NA
4" select borrow
PL - 3
$ 5.00
SY
NA
NA
1.5" top course rock & 2.5" base course
PL - 4
$ 14.00
SY
NA
NA
UTILITY POLES & STREET LIGHTING Utility pole relocation costs must be accompanied by Franchise Utility's Cost Estimate
Utility Pole(s) Relocation
UP-1
Lump Sum
Street Light Poles w/Luminaires
UP-2
$ 7,500.00 Each
WRITE -IN -ITEMS
(Such as detention/water quality vaults.)
No.
Permeable Ballast, 1.5-1.75"
WI - 1
$ 30.00
CY
-3-&
- 366-60
Permeable Concrete
WI - 2
$ 120.00
SY
494-
zaM1q8Q.-W
Remove OHP, Install UGP
WI - 3
$ 5,000.00
LS
2 4
10,000.00- 95 D
4
6,909.0
New 1" Water Service/Meter/Connection
WI - 4
$ 1,500.00
LS
3
4500
New Gas Services/Connection
WI - 5
$ 3,000.00
LS
4-
9999
6" Concrete Driveway
WI - 6
$ 65.00
SY
14
910.00
Concrete Stairs
WI - 7
$ 50.00
SY
6
300.00
On Site Stormwater Management
WI - 8
1
50,000.00
WI-9
WI-10
SUBTOTAL 14,500.00 Wit}
SUBTOTAL (SUM ALL PAGES): 53,186.90 4.7.. g
30% CONTINGENCY & MOBILIZATION: 15,956.07 ^",�T
GRANDTOTAL: 69,142.97 44..�
COLUMN: B
Page 8 of 9
51,210.00
75,951.00, 399�
22,785.30 444Q245
98,736.30 &
D
Unit prices updated: 03/02/2015
"KCC 27A authorizes only one bond reduction. Version: 03/02/2015
KC BQ Worksheet_Complete.xls Report Date: 11/25/2020
Site Improvement Bond Quantity Worksheet
Original bond computations prepared by:
Name: Ben Iddins, PE Date:
PE Registration Number: 54904 Tel. #:
Firm Name: Davido Consulting Group, Inc.
Address: 9706 4th Ave NE Suite 300, Seattle, WA 98115 Project No:
Stabilization/Erosion Sediment Control (ESC)
Existing Right -of -Way Improvements
Future Public Right of Way & Drainage Facilities
Private Improvements
Calculated Quantity Completed
Total Right -of Way and/or Site Restoration Bond*/**
(First $7,500 of bond* shall be cash.)
Performance Bond* Amount (A+B+C+D) = TOTAL
Maintenance/Defect Bond* Total
NAME OF PERSON PREPARING BOND* REDUCTION:
(A)
Web date: 04/03/2015
11 /18/2020
206-523-0024
TBD
FINANCIAL GUARANTEE REQUIREMENTS
PERFORMANCE BOND* MINIMUM BOND* AMOUNT PUBLIC ROAD & DRAINAGE
AMOUNT REQUIRED FOR RECORDING OR MAINTENANCE/DEFECT BOND*
TEMPORARY OCCUPANCY AT
$ 9,679.8 SUBSTANTIAL COMPLETION ***
(B)
$
69,142.97 $fig
(C)
$
-
(D)
$
98,736.30 -64_
(A+B)
$
78,822.77 4-425-f�-
(T)
$
177,559.07 '
Minimum
is $2000.
Tx0.30 $ 398�84
Minimum is $2000.
Date:
(B+C) x
0.25 = $ � �—
Minimum is $2000.
* NOTE: The word "bond" as used in this document means a financial guarantee acceptable to King County.
** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required.
The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included.
Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration
needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity.
*** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes.
REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY KING COUNTY
Page 9 of 9 Unit prices updated: 03/02/2015
Check out the DDES Web site at www.kin_gcounty-goy/permits Version: 03/02/2015
KC BQ Worksheet Complete.xls Report Date: 11/25/2020