REVIEWED RESUB2 BLD2022-1025+Geotechnical_Report+10.24.2022_11.05.16_AM+3180980PIT INFILTRATION TEST AND STANDARD SUBSURFACE INVESTIGATION REPORT October 11, 2022 INTRODUCTION The subject property is located at 23511 70 Avenue W, Edmonds WA. The site is 25,976 sf in size and is adjacent to Lake Ballinger. Once developed, the site will add a new home with a total of 3,100 sf of new impervious area in the form of a roof for the home. Approximately 220 sf of existing gravel driveway will be paved in front to the new garage. The existing rockeries and driveway will remain and contains an existing home, garage, shed and driveway with a cover of lawn and landscaping. This report is being prepared using Section 5 of the 2019 DOE Stormwater Management Manual as adopted by the City of Edmonds SUBSURFACE CONDITIONS The soils were visually classified in general accordance with the Unified Soil Classification System, presented in Figure 1. The logs of the test pits are attached to this report and are presented as Figure 3. The soils at the surface of Test Pits to down approximately 6-inches consisted of roots and top soils. Underlying the surficial weathered soils from depth of 6-inches to just over 2.5 —feet, the soils consisted of a clay silt/fill materials HYDROGEOLOGIC CONDITIONS The soils were moist with indications of mottling when the test pit was excavated down to 3 feet after the PIT infiltration test was performed. INFILTRATION TESTING: A small-scale Pilot Infiltration Test (PIT) was performed per test procedures provided in "Reference 6-A" of the 2019 DOE Stormwater Management Manual as adopted by the City of Edmonds (SL-1) to evaluate the infiltration of the soil. The infiltration test was conducted at a depth of 2.5 - feet below the ground surface, which is close to the anticipated bottom of the infiltration facility (2.5- feet below ground surface) if infiltration trenches are to be used. Setup: The test pit dug was rectangular in shape, and measured roughly 4.0'x 4.5'x 2.6' (width x length x depth). A vertical measuring rod was installed in the pit for the purpose of measuring the depth of ponded water Based on the geometry of the test pit dug for SL-1, the total plan area of the bottom of the test pit is calculated as follows: Test Pit Bottom Area = (4.01)(4.51) Test Pit Bottom Area = 18.0 ft2 Soaking Period: In preparation for the soaking period, the test pit was filled with water to a depth of over 12-inches. A plastic tray was utilized as a splash block to help prevent water flowing into the test pit from disturbing soils at the bottom of the pit, and the hose administering water to the pit was held in place over the splash block using a clamp. The water level in the pit was maintained at a depth of a minimum of 12-inches for over 6-hours, as required by the test procedure. Measurement of Infiltration Rate: Upon completion of the soaking period, the water was allowed to drain until achieving a water depth of between 8 and 14 inches, and the flow rate of the water into Duffy Geotech Rpt Page 1 the test pit was adjusted to a rate that was expected to maintain the water level at the same point between 8 to 14inches in depth over the course of an hour. The instantaneous flow -rate and water depth were then measured and recorded every 15-minutes (approximately) over the course an hour. A summary of this recorded data is provided in the table below Table 1: Measured Infiltration Data During Flow Period 15-min Interval Time of Measurement Instantaneous Flow Rate Water Depth - hour:minute gal/min inches 1 1:00 0.04 11 7/16 2 1:31 0.03 11 6/16 Stabilized Flow Period: 3 1:42 0.00 10 5/16 4 1:59 0.00 10 5/16 5 2:14 0.00 10 5/16 6 2:31 0.00 10 5/16 Average Stabilized Flow Rate = 0.00 The flow -rate was adjusted after the first two 15-minute intervals, so that a stabilized flow rate was achieved that would maintain a depth of water at the same point over a one -hour time period. Accordingly, readings shown in table 1 above represent data collected during this 1-hour period of stabilized flow. Measured Stabilized Flow Rate Calculation: From the data presented in table 1, the measured stabilized flow infiltration rate was computed by dividing the average flow -rate by the horizontal bottom area of the test pit and converting to inches per hour Drawdown Time: Upon completion of the 1-hour stabilized flow period, the water flowing into the test pit was shut off to allow the water -level in the test pit to drop. During this "drawdown" time, measurements of the water -level were taken periodically for one -hour. The data measurements are provided in table 2 below: Table 2: Measured Infiltration Data for Drawdown Time Time A Time Depth A Depth Infiltration Rate hour:minute minutes inches inches inches/hour 1:00 - 16 - - 1:15 15 16 0.00 0.00 1:30 15 16 0.00 0.00 1:45 15 16 0.00 0.00 2:00 15 16 0.00 0.00 TEST TERMINATED Average Infiltration Rate = 0.00 Duffy Geotech Rpt Page 2 Measured Infiltration Rate: Based the measured infiltration data above it was determined that the average infiltration rate is less than 0.30 inches per hour () Therefore, infiltration is not feasible. I ....urea = 0.00 inches/hour Ftesting = 0.50 For PIT test F Geometry = 4 D/W + 0.05 = 4 (2/4) + 0.05 = 2.05 = 1.0 (Must be between 0.25 & 1) F plugging = 0.7 I Design = TEST TERMINATED Therefore, the use of Infiltration Or The Use Of Biorientation Is Not Feasible . 10/11/22 Duffy Geotech Rpt Page 3 SOILS EXPLORATION LOG DEPTH (INCHES) USC SOILS DESCRIPTION SL-1 TEST PIT 0-611 GRASS ROOTS 6" - 12" SC BLACK SILTY CLAY 1211- 3611 SC SILTY SANDY CLAY EVIDENCE MOTTLING AT 24" TP-1 INFILTRATION PIT 0-611 GRASS ROOTS 6"-24" SC FILL/SILTY CLAY 2411- 6011 SC SILTY SANDY CLAY EVIDENCE MOTTLING AT 48" �I PETER CHO t TM 27043200202900 N88° t6'26"E 206.00 — — �j j a wood 11�-� �' Fwr:ox ans-IHF act\ to' I �� �//� �1 � Jl•SC"�: axe ;1.. ,ql / "`«-.� aI L cr.• GAS -I" 10' BS ,°" METER - �' + *k f �'r,� )max• 'r I � m k: 10YYL' :1 HOUSF1t P3511 .y.yb` .I FOOTPRINT .'.e; .. O •,`-`, ' REST OF HOUSE DEMOS _ •j 1 - AT THE OF SUR1rEy AWROX, SIDE SEWER 60.0000 � t � \\\ I 1 I \\ WETLAND BUFFER -� • iI. if 1 O 44.0' - g I/ 1 9.0000 I 7. ti• W ~> a I I 27043200200100 + ;13 1 IIiS' jj 1 tee'- -- - x t \ • / I ±25,434 SO. FT. J . l� BASE FL 4 NAVD88SEW'maoE j �\ ASPHALT 0.8seL AUREL'HEDGE SOILS LOGS I f 11 j N88°1626"W 200.00'; n SL-1 NORTI l$ -6" GRASS ROOTS IV 1 6-12" BLACK SILTY CLAY 12"- 36" SILTY SANDY CLAY EVIDENCE MOTTLING AT 24" P-1 INFILTRATION PIT 0-6" GRASS ROOTS 6-24" FILL/SILTY CLAY 24"- 60" SILTY SANDY CLAY EVIDENCE MOTTLING AT 48" FIGURE 2: SOILS LOG LOCATION Duffy Geotech Rpt Page 4 UNIFIED SOIL CLASSIFICATION SYSTEM GROUP MAJOR DIVISIONS GROUP NAME SYMBOL CLEAN GW WELL -GRADED, FINE TO COARSE GRAVEL COARSE- GRAVEL GRAVEL GP POORLY -GRADED GRAVEL GRAINED MORE THAN 50 % GRAVEL GM SILTY GRAVEL OF COARSE FRACTION RETAINED ON SOILS NO 4 SIEVE WITH FINES GC CLAYEY GRAVEL SAND CLEAN SW WELL -GRADED SAND, FINE TO COARSE SAND SAND SP POORLY GRADED SAND MORE THAN 50 RETAINED ON MORE THAN 50 %, NO. 200 SIEVE OF COARSE FRACTION SAND SM SILTY SAND PASSES NO 4 SIEVE SC WITH FINES CLAYEY SAND FINE - SILT AND CLAY ML SILT INORGANIC GRAINED LIQUID LIMIT CL CLAY LESS THAN 50 SOILS ORGANIC OL ORGANIC SILT, ORGANIC CLAY SILT AND CLAY MH SILT OF HIGH PLASTICITY, ELASTIC SILT INORGANIC MORE THAN 50 % PASSES LIQUID LIMIT CH CLAY OF HIGH PLASTICITY, FAT CLAY NO, 200 SIEVE 50 % OR MORE ORGANIC OH ORGANIC CLAY, ORGANIC SILT HIGHLY ORGANIC SOILS PT PEAT NOTES 1) Field classification is based on visual SOIL MOISTURE MODIFIERS: examination of soil in general accordance with ASTM D 2488-93. Dry - Absence of moisture, dusty, dry to the touch 2) Soil classification using laboratory tests is based on ASTM D 2488-93. Moist - Damp, but no visible water_ 3) Descriptions of soil density or Wet - Visible free water or saturated, consistency are based on usually soil is obtained from interpretation of blowcount data, below water table visual appearance of soils, and/or test data. Project Number No. Date Revision By CI( DECC10 Engineering Figure 1(2M) 17217 7" AVENUE WEST -374 20 (3495)W]4819-24 FIGURE l : UNIFIED SOIL CLASSIFICATION Duffy Geotech Rpt Page 5