Loading...
REV1 REVIEWED BLD2022-1025+Structural_Calculations+11.18.2022_8.02.12_AM+3227309SHEAR WALL PER PLAN. SEE 20/S7 FOR CONNTECTIONS. CONT. 2x RIM JOIST SHEAR WALL SHEAR CLIPS 11.14.2022 A35 EACH JOIST BOTH SIDES STAGGERED DOUBLE PRESSURE TREATED 2x8 SILL PLATE NAILED WITH (2) ROWS 10d AT 6" o.c. %" DIA. ANCHOR BOLTS.[ 1 1-1/2" CUR. AT 16" o.c. FROM INSIDE FACE (+1/4", -0") DRAINAGE PANEL OR 12" THICK LAYER OF FREE -DRAINING GRAVEL FULL HEIGHT OF WALL 0 N PERF. FTG. DRAIN IN 12" GRAVEL 8" THICK CONCRETE WALL REINF. WITH #5 VERT. AT 12" o.c. AND #4 HORIZ. AT 18" o.c. AND (2) AT TOP. #4 DOWEL AT 18" o.c. CENTERED ALTERNATE HOOK AT BASE SLAB ON GRADE PER PLAN JOISTS PERPENDICULAR TO WALL DUFFY REMODEL JOB#: 21018 24" WIDE x 8" THICK CONT. FOOTING WITH (3) #4 CONT. AT BOTTOM SKS-1 I ROSS RESTRAINED BASEMENT WALL ENGINEERING JOISTS PERPENDICULAR DESIGN ryan.ross@mssengineer.com SHEAR WALL PER PLAN. SEE 20/S7 FOR CONNTECTIONS. CONT. 2x RIM JOIST SHEAR WALL SHEAR CLIPS DIA. ANCHOR BOLTS AT 16" o.c. DRAINAGE PANEL OR 12" THICK LAYER OF FREE -DRAINING GRAVEL FULL HEIGHT OF WALL PERF. FTG. DRAIN IN 12" GRAVEL 11.14.2022 A35 EACH BLOCK BOTH SIDES STAGGERED 10d AT 4" o.c. TO BLOCKING FLOOR JOISTS PER PLAN EXTEND BLOCKING AND NAILING TO 3RD� BAY AT 32" o.c. . BAYS OF 2x BLOCKING AT • AT 16" o.c. DOUBLE PRESSURE TREATED 2x8 SILL PLATE NAILED WITH (2) ROWS 10d AT 6" o.c. 1-1/2" CLR. FROM INSIDE FACE (+1/4",-0") `8" THICK CONCRETE WALL R WITH #5 VERT. AT 12" o.c. AND 114 HORIZ. AT 18" o.c. AND (2) AT TOP. #4 DOWEL AT 18" o.c. CENTERED ALTERNATE HOOK AT BASE • SLAB ON GRADE PER PLAN 24" WIDE x 8" THICK CONT. FOOTING WITH (3) #4 CONT. AT BOTTOM JOISTS PARALLEL TO WALL SKS-2 ROSS DUFFY REMODEL RESTRAINED BASEMENT WALL ENGINEERING JOISTS PARALLEL DESIGN JOB#: 21018 ryan.ross@mssengineer.com 11.14.2022 yPNN.Ro Q� of WASHs 2 o�FSS�ONT STUD WALL PER PLAN PRESSURE TREATED SILL PLATE (SHEAR WALL WHERE AND ANCHOR BOLTS PER SHEAR APPLICABLE) WALL SCHEDULE SHEAR WALL EDGE NAIL FINAL GRADE (UPHILL) #4 HORIZ. AT 18" o.c. AND (2) AT TOP OF WALL DRAINAGE PANEL OR 12" THICK LAYER OF VERT. REINF. BARS PER FREE -DRAINING GRAVEL SCHEDULE FULL HEIGHT OF WALL 8" DOWELS MATCH VERT. BARS. LAP PER F- 2" CUR. SCHEDULE. ALTERNATE FROM UPHILL FACE HOOK AT BASE. K/4", -0") J u PERF. DRAIN 0„ SLAB ON GRADE PER PLAN (DOWNHILL) m• TRANS. REINF. BARS PER SCHEDULE N d = U wo (4) CONT. AT 12" LL d "HEEL" "TOE" PER SCHED. PER SCHED. M U (2) #4 CONT. SKS-3 ROSS DUFFY REMODEL UNRESTRAINED RETAINING ENGINEERING WALL DESIGN JOB#: 21018 rya n. ross@ rosse ng i neer. co m CANTILE ERED RETAINING WALL SCHEDULE BACKFILL HEIGHT "HEEL" "TOE" "FTG DEPTH" VERT. REINF. TRANS. REINF. LAP 4'-0" MAX SEE 2/S1 5'-0" MAX 16" 12" 10" #4 @ 18" o.c. NA 33" 6'-0" MAX 22" 14" 10" #4 @ 18" o.c. #4 @ 24" o.c. 33" 7'-0" MAX 30" 14" 10" #4 @ 15" o.c. #4 @ 15" o.c. 33" FLOOR BOUNDARY NAILING CONT. 2x BLOCKING %" DIA. ANCHOR BOLTS AT 16" o.c. DRAINAGE PANEL OR 12" THICK LAYER OF FREE -DRAINING GRAVEL FULL HEIGHT OF WALL A35 EACH JOIST BOTH SIDES STAGGERED ,I ] `DOUBLE PRESSURE TREATED 3 2x8 SILL PLATE NAILED WITH (2) ROWS 10d AT 6" o.c. [ [ 1-1/2" CLR. ' FROM INSIDE FACE 8" THICK CONCRETE WALL REINF. WITH #5 VERT. AT 12" o.c. AND #4 HORIZ. AT 18" o.c. AND (2) AT TOP. 11.15.2022 'r #4 DOWEL AT 18" o.c. CENTERED :=r ALTERNATE HOOK AT BASE r '=x SLAB ON GRADE PER PLAN 0 N -r • PERF. FTG. DRAIN IN 12" GRAVEL 24" WIDE x 8" THICK CONT. FOOTING WITH (3) #4 CONT. AT BOTTOM JOISTS CONTINUOUS OVER WALL DUFFY REMODEL JOB#: 21018 SKS-4 ROSS RESTRAINED BASEMENT WALL ENGINEERING AT CONTINUOUS JOISTS DESIGN ryan.ross@mssengineer.com