APPROVED Transportation Impact Analysis Worksheet (2)APPENDIX A
Page 1 of 2
Transportation Impact Analysis
Worksheet
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
www.edmondswa.gov
Name of Proposed Project: P I GkE9-1IQG -,=,* ?—' S
Owner/Applicant
G�{(Z.IS PICKE�IN�
Name
_;�0 4 M AP UE S�-
Street/Mailing Address
1p:lbM OVJb6 Iry ��bzo
City State Zip
Telephone: Z0 6 — 1+5 q —
Applicant Contact Person:
Li, AiJ nEP_ !zM
Name
7?oci 6 155W w0o6 AU6 N
Street/Mailing Address
56 ATTI, WA; `18 Io 7=1
City State Zip
Telephone: 2-0 6 — Y8 2 —2-ot I l
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
Firm Name
Telephone:
1. PROJECT DESCRIPTION
Contact Name
E-mail:
a. Location -Street address: 2 4 AO Z
(Attach a vicinity map and site plan.)
b. Specify existing land use: ��N� �%'i — • 5 W/ 6kl ST N 6
SCR. WZ OE 1,4WED &AR- AkK6f-d
c. Specify proposed type and size of development: W tt 25P a LOT U1 V5 SW5
(# of residential units and/or square footage of building)
d. Date construction will begin and be completed:
e. Define proposed access locations: GU CUT' OW N AP LZ ST .
ALL15 X AC:5E;S p N 6+11
APPENDIX A
Page 2 of 2
f. Define proposed sight distance at site egress locations:
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
I_ I CHANGE IN USE
Fee for prior use shall be based on fee established at the time the prior use was permitted. If
the previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used.
Units in
ITE Land Use Category Per Unit square feet, Fee
Fee Rate # of dwelling,
vfo. etc.
New Use I I $ I X
Prior Use $ I X
_ t
New Use Fee: $ - Prior Use Fee: $ $
NEW DEVELOPMENT
Units in
ITE Land Use Category Per Unit square feet, Fee
Fee Rate # of dwelling,
of , etc.
New Use $ 4,219.1 X ? - $
pR�O'� vS� 1 Sfir� ��MO gv��� I Wb1+J SCR $12,498.28
1 OTHER
MITIGATION FEE RECOMMENDATION:
INDEPENDENT FEE CALCULATION: $240.00 + consultant fee $
TOTAL TRANSPORTATION IMPACT FEE $
8/11 /2021
City of Edmonds, Engineering Division Approval Date
No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.