Loading...
APPROVED BLD2021-0742+Transportation_Impact_Form+6.25.2021_6.51.42_PM+2270962APPENDIX A Page 1 of 2 Transportation Impact Analysis Worksheet "?C. 1 xy., PERMITTING & DEVELOPMENT ENGINEERING DIVISION 121 5th Avenue N P: 425.771.0220 www.edmondswa.gov Name of Proposed Project: Ramella-Pezza SFR Owner/Applicant Massimo Ramella-Pezza Name 702 Cedar Street Street/Mailing Address Edmonds, WA 98020 City Telephone: (206) 618-5205 Applicant Contact Person: Same as owner Name Street/Mailing Address State Zip City State Zip Telephone: Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): N/A Firm Name Telephone: 1. PROJECT DESCRIPTION a. Location - Street address: 702 Cedar Street Contact Name E-mail: (Attach a vicinity map and site plan.) b. Specify existing land use: Single -Family Residential (R-6) c. Specify proposed type and size of development: One new 2,167 SF single-family residence. (# of residential units and/or square footage of building) d. Date construction will begin and be completed: TBD e. Define proposed access locations: The site will continue to take access from 7th Ave South. APPENDIX A Page 2 of 2 f. Define proposed sight distance at site egress locations: The sight distance on 7th Ave S appears adequate to serve the site. 2. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. ❑ CHANGE IN USE N/A. Existing SFR will be replaced by antoher SFR Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. ITE Land Use Category New Use Prior Use Per Unit Fee Rate $ X $ IX Units in square feet, # of dwelling, vfb. etc. Fee New Use Fee: $ - Prior Use Fee: $ $ 1 ❑ NEW DEVELOPMENT Units in ITE Land Use Category Per Unit square feet, Fee Rate # of dwelling, vfp, etc. New Use $ X ❑ OTHER MITIGATION FEE RECOMMENDATION: INDEPENDENT FEE CALCULATION: $240.00 + consultant fee $ TOTAL TRANSPORTATION IMPACT FEE $ 0 --� 10/21 /2021 City of Edmonds, Engineering Division Approval Date No change in use (SFR to SFR). 1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.