Loading...
APPROVED DEF SUB1 BLD2021-0742+RET WALL CLARIFICATION +3.30.2023_10.24.45_AM+3453109SLAB PEI EMBE FOOTING WALL VERT HEIGHT BASE TOE WALL THK HEEL FOOTING REINF THK REINF (ft) (ft) (ft) (in) (ft) (in) 6 4.67 2 8 2 18 #5@12"O.C. #5@9"O.C. 8 6.67 4 8 2 18 #5@6"O.C. #5@9"O.C. 9 7.37 4.7 8 2 21 #6@6"O.C. #5@8"O.C. RETAINING WALL SCHEDULE (NO SCALE) NOTES: 1. ALL REINFORCING GRADE 60. 3" COVER FROM SOIL REQUIRED. 2. 5-1/2 SACK CONCRETE MIX (F'c = 2500 psi MIN). 3. SOIL BACK FILL IN FRONT AND BASE OF WALL MUST BE COMPACTED TO MINIMUM RELATIVE COMPACTION OF 90% FOR FILL AND 95% FOR SLAB SUPPORT. MINIMUM RELATIVE COMPACTION IS THE RATIO, EXPRESSED IN PERCENTAGES, OF THE COMPACTED DRY DENSITY TO THE MAXIMUM DRY DENSITY, AS DETERMINED IN ACCORDANCE WITH ASTM TEST DESIGNATION D 1557-91. (MODIFIED PROCTOR). 4. BACK FILL SHALL BE CLEAN SAND - NO ORGANIC MATERIAL 5. EQUIVALENT FLUID PRESS = 35 PCF. 6. SOIL BEARING CAPACITY = 2000 PSF. 7. SOIL PASSIVE PRESSURE = 300 PCF. 8. SEISMIC PRESSURE = 8 X HEIGHT OF WALL, PSF. 9. 100 PSF TRAFFIC SURCHARGE. ALL WORK SUBJECT TO FIELD INSPECTION FOR CODE COMPLIANCE APPROVED PLANS MUST BE ON JOB SITE .,.,.,.,.,..,.,.,.,.,., REVIEWED BY CITY OF EDMONDS BUILDING DEPARTMENT! THE ENTIRE WALL (HEEL, TOE, ETC.) SHALL BE LOCATED ON PRIVATE PROPERTY. DEFERRED SUBMITTAL 4/4/2023 CITY OF EDMONDS DEVELOPMENT BLD2021-0742 SERVICES DEPARTMENT � W H 0 oC o U U Ln U WO� C) U���� M §-,N. Zt Q) Lu U z Lu O p CV C/D O C0 Lu C!� 00 Q Q N p Lu u CJ3 � U p J o CD J ~ Lu p Lu Q w Q z � � U w C--D w O Cc CD c\j N O N r ^ V / J CD � O N Q Lu p J J Q C z z Lu zw 6 o z w cc cD w OC U w J CD E z I 36923 Cs L �SIONALCs PROJECT # X4=2748 SHEET NO