Loading...
REV1 APPROVED PLN BLD2021-0742_Site_Plan_12-26-2022_12_19_12_A20_113_702_CEDAR_ST_CD_05_REVISED_SITE_PLAN_BUILDING_MOVE_22-12-15I / / SITE PLAN KEY NOTES A.O.E. DIAGRAM 1"= 20'-0- TREE DENSITY CALCULATION ONSITE TREES TREE NUMBER SPECIES ACTION EXISTING #1 WESTERN RED CEDAR RETAIN REPLACEMENT TREES TREE NUMBER SPECIES ACTION NATIVE IIS EDDIES WHITE WONDER DOGWOOD PLANT NATIVE #4 EDDIES WHITE WONDER DOGWOOD PLANT OFFSITE TREES TREE NUMBER SPECIES ACTION EXISTING #2 EUROPEAN WHITE BIRCH RETAIN LOT SIZE 6,582 SF / 0.15 ACRES REQUIRED TREES PER SF 1PER 2,666 SF NUMBER OF TREES NEEDED 2.4 TREES TREES PROVIDED 3 TREES NOTES: ' RE PLACEMENT TREES TO MEET REQUIREMENTS OF ECC 23,10,080 LOT COVERAGE CALCULATION LOT SIZE 6,582.00 IF. ALLOWABLE COVERAGE (35%) 2.303.T0 SF BUILDING FOOTPRINT (REST DENCE 1459.06 SE+GARAGE 72Z-SF) 2,181.69 SF MASTER BEDROOM OVERHANG 108.56 SF TOTAL: 2,290.25 SF AMOUNT UNDER (34.8%) 13A5 SF JURISDICTION: CITY OF EDMONDS ZONING'. RS-6 PARCEL ASSESSOR'S #: 00484500300100 LOT SIZE: 6,582 SF = 0.15 ACRE LEGAL DESCRIPTION: KELLOGG PLAT OF EDMONDS BLK W3 D - 00 - LOTS 1.2 MAXIMUMS: MAX FAR: NIA MAX LOT COVERAGE: 35% (2,303.70 SF) MAX HEIGHT: 25' ABOVE ME SETBACKS: REQUIRED FRONT: MIN. 20' REQUIREDSIDE: MIN. 5' REQU RED REAR: MIN. 15' GROSS FLOOR AREA FIRST FLOOR 1,361.29 SF SECOND FLOOR 1,312SF .T9 BASEMENT T52.22 SF GARAGE 3,466.30 SF S99.T2 SF TOTAL GROSS FLOOR AREA 4,155.02 SF A.O.E. CALCULATION ELEV. A 186.00' B 194.5 C 194.53 D 189.89' TOTAL 755.01 AVERAGE OVERALL ELEV.: 188.T5' MAX HEIGHT ALLOWED = 2" MAX ELEVATION = 213.75' PROPOSED TOP OF BLDG = 213.32' - AMOUNTBELOWMAX - .43 TREE PROTECTION GUIDELINES ALL REMAINING TREES ARE TO HAVE A TREE PROTECTION ZONE (TPZ) ESTABLISHED BEFORE COMMENCEMENT OF ANY CONSTRUCTION OR DELIVERY ACTIVITIES. THEFOLLOWING GUIDELINES ARE TO BE OBSERVED AND PRACTICED DURING ALL CONSTRUCTION ACTIVITIES. 1. ACCESS IS TO BE RESTRICTED INTO TPES WITH READILY VISIBLE TEMPORARY TREE FENCING ALONG THE LOD WHICH COMPLETELY SURROUNDS THE PROTECTED AREAS OF RETAINED TREES. FENCES SHALL BE CONSTRUCTED OF CHAIN LINK AND BE AT LEAST 4 FT TALL, CONSTRUCTED USING PIER BLOCK, AND MAJOR ROOTS SHOULD BE AVOIDED WHILE STAKING. 2. HIGHLY VISIBLE SIGNS SPACED NO FURTHER THAN 15 FEET SHALL BE PLACED ALONG SIDES OF THE TPZ FENCING. 3. CONSTRUCTION MATERIALS OR SUPPLIES, SOIL, DEBRIS, VEHICLES, AND EQUIPMENT ARE NOT TO BE PARKED OR STORED WITHIN TPZ. 4. TPZ FENCES MUST BE INSPECTED PRIOR TO THE BEGINNING OF ANY CONSTRUCTION ACTIVITIES. 5. ASSESS CREW AND CONTRACTOR PENALTIES, IF NECESSARY, TO KEEP THE TRES INTACT. 6. CHECK THE INTEGRITY OF TPZ FENCES WEEKLY, AND REPAIR OR REPLACE AS NEEDED. ]. WOOD CHIPS SHOULD BE USED IF POSSIBLE TO SPREAD ABOVE ROOT ZONES W ITHIN THE TPZ'S TO A DEPTH OF" INCHES FORTEMPORARY PROTECTION. B. CEMENT TRUCKS MUST NOT DEPOSIT WASTE OR RINSE OUT TRUCKS IN THE TPZ. 9. AVOID GRADE CHANGES OR TRENCHING WITHIN OR NEAR THE TPZ. IF IT IS UNAVOIDABLE, THEN FOLLOW THE GUIDELINES BELOW. 10. TPZ'S MAY ONLY BE MOVED OR ACCESSED WITH PERMISSION FROM CITY OFFICIALS, AND ANY WORK DONE WITHIN TPZ'S MUST BE DONE WITH A CERTIFIED ARBORIST PRESENT. 11. IF ROOTS NEED TO PRUNED, THEY SHOULD BE CUT WITH PRUNING SAWS, MADE FLUSH WITH THE S1DE OF THE TRENCH. 12. TREES SHOULD BE WATERED TWICE A WEEK IF CONSTRUCTION IS TO TAKE PLACE DURING HOT SUMMER MONTHS IF EXCAVATION OCCURS WITHIN THE DRIPLINES OF TREES SCHEDULED FOR RETENTION, THE FOLLOWING PROCEDURES MUST BE FOLLOWED TO PROTECT THEM: 1. THE CONTRACTOR SHALL VERIFY THE VERTICAL AND HORIZONTAL LOCATION OF EXISTING UTILITIES TO AVOID CONFLICTS AND MAINTAIN MINIMUM CLEARANCES; ADJUSTMENT SHALL BE MADE TO THE GRADE OF THE NEW UTILITY AS REQUIRED. 2. THE INNER ROOT ZONE SHALL NOT BE DISTURBED OR CUT (INNER ROOT ZONE = HALF THE DRIP LINE RADIUS). 3. ISA CERTIFIED ARBORIST MUST WORK WITH EQUIPMENT OPERATORS DURING TRENCHING/EXCAVATION. THE ARBORIST SHOULD HAVE A SHOVEL, HAND PRUNERS, LOPPERS, HANDSAW, AND A SAWSALL. 4. RELOCATION OF TREE PROTECTION FENCING AND ANY ACTIVITY WITHIN THE LIMITS OF DISTURBANCEIDRIPLINE OF TREES SHALL BE PERFORMED BY AN ISA CERTIFIED ARBORIST. SEE A0.0 FOR ARBORIST CONTACT INFORMATION. 5. IF ROOTS ONE INCH OR LARGER ARE DAMAGED BY EQUIPMENT, THE ARBORIST SHALL STOP THE EQUIPMENT AND HAVE THE DIRT EXCAVATED BY HAND UNTIL THE ROOT CAN BE CLEANLY CUT. A CLEAN STRAIGHT CUT SHALL BE MADE TO REMOVE THE DAMAGED PORTION OF ROOT, AND IF POSSIBLE THE ROOTS SHOULD BE COVERED IN MOIST BURLAP UNTIL RECOVERED WITH DIRT THE SAME DAY. 6. BORING OR TUNNELING UNDER ROOTS OF EXISTING TREES IS A VIABLE ALTERNATIVE TO TRENCHING THROUGH ROOTS. IT SHALL BE PERFORMED UNDER THE SUPERVISION OF AN ISA CERTIFIED ARBORIST, AND NO ROOTS 1 INCH IN DIAMETER OR LARGER SHALL BE CUT. T. THE GRADE SHALL NOT BE ELEVATED OR REDUCED WITHIN THE CRITICAL ROOT ZONE OF TREES TO BE PRESERVED WITHOUT THE PLANNING OFFICIAL'S AUTHORIZATION BASED ON RECOMMENDATIONS FROM A QUALIFIED PROFESSIONAL. THE PLANNING OFFICIAL MAY ALLOW COVERAGE OF UP TO ONE HALF OF THE AREA OF THE TREES CRITICAL ROOT ZONE WITH LIGHT SOILS (NO CLAY) TO THE MINIMUM DEPTH NECESSARY TO CARRY OUT GRADING OR LANDSCAPING PLANS, IF IT WILL NOT IMPERIL THE SURVIVAL OF THE TREE. AERATION DEVICES MAY BE REQUIRED TO ENSURE THE TREE'S SURVIVAL. CALL" HOURS BEFORE YOU DIG W OR 1-800424-5555 /1/\l MEDICI ARCHITECTS I I]11 SE 8TH STREET 200 W. RIVER Sr. SUITE I00 SURE WI BELLEVUE, WA 98M KETCHUM, ID 83340 TEL: (425) 453-9298 TEL:(208) 726-0194 REGISTRATION: ro INTAKE DATE: 01/2BQM REVISIONS: DATE: 1 CORRECTIONS 10/22121 2 POSTPERMIT01 12/15/22 PROJECT/CLIENT: M&M CEDAR RESIDENCE MASSIMO & MELINDA RAMELLA-PEZZA PROJECT ADDRESS: 702 CEDAR ST EDMONDS WA 9W20 DRAWING NAME: SITE PLAN DRAWN BY: KKH CHECKED By: ST PHASE: CONSTRUCTION DRAWINGS This Jr .g is the exclusive Property of MEDICI ARCHITECTS, slid can be reprotluced only with the permission of the Amhitecl. Vsnstions antl modifications to work shown on this dewing shall not be carried out without wntten permission from the Architect. r L J PROJECT No.: A20113 DATE: 12/15/2022 A0.1 PLOT SCALE: 1:1