APPROVED ENG BLD2023-0433+Transportation_Impact_Form+4.6.2023_3.06.32_PM+3468279BLD2023-0433 APPENDIX A
Page 1 of 2
Transportation Impact Analysis RECEIVED
Apr 21 2023
W o r ks h e e t °E DEPARTMENTOPMENT ES
")C. 1 xqv
PERMITTING & DEVELOPMENT
ENGINEERING
DIVISION
121 5th Avenue N
P: 425.771.0220
www.edmondswa.gov
Name of Proposed Project: 840 Daley Street SFR
Owner/Applicant
Peter and Jia Tang
Name
648 Bell Street
Street/Mailing Address
Edmonds WA 98020
Applicant Contact Person:
Same as Owner/Applicant
Name
Street/Mailing Address
City State Zip City
Telephone: (206) 372-2584 Telephone:
Traffic Engineer who prepared the Traffic Impact Analysis (if applicable):
RAM Engineering, Inc. Rob Long, PE
Firm Name Contact Name
Telephone: (425) 678-6960
1. PROJECT DESCRIPTION
a. Location - Street address: 840 Daley Street
State Zip
E-mail: RobL@RAMengineeringlnc.com
(Attach a vicinity map and site plan.)
b. Specify existing land use: Single Family Residential
c. Specify proposed type and size of development: One Single Family Residential with an
Attached Dwelling Unit (ADU) (# of residential units and/or square footage of building)
d. Date construction will begin and be completed: Start June 2023 / End March 2024
e. Define proposed access locations: Access drive off Daley Street and Alley (for ADU).
APPENDIX A
Page 2 of 2
f Define proposed sight distance at site egress locations:
Low volume dead end Daley Street and Alley have adequate access sight distance.
2. MITIGATION RECOMMENDATIONS
State recommended measures and fees required to mitigate project specific traffic impacts.
Traffic impact fee shall be calculated from the attached Impact Fee Rate Tables and as identified
in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC
18.82.130.
No change IIANGE IN USE
in use. e for prior use shall be based on fee established at the time the prior use was permitted. If
t e previous use was permitted prior to the adoption of Ordinance 3516 (effective date:
09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used.
New Use
ITE Land Use Category
same use
Prior Use 15"'v;
Units in
Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
$ 6,249.14 X
Fee
6,249.14
n 'w .
New Use Fee: $ 6,249.14 - Prior Use Fee: $ 6,249.14 = $ 0
i
❑ NEW DEVELOPMENT
Units in
ITE Land Use Category Per Unit square feet,
Fee Rate # of dwelling,
vfp, etc.
New Use $ X
❑ OTHER
MITIGATION FEE RECOMMENDATION:
0.00
INDEPENDENT FEE CALCULATION: $240.00 + consultant fee
$
TOTAL TRANSPORTATION IMPACT FEE
$ 0.00
Jo -A n4ie, Z uiavf, EvigmqzexL*iq-T ju*iP/15, 2023
City of Edmonds, Engineering Division Approval Date
1 No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative.