Loading...
ENG COMPACTION TESTEarth Solutions NW«C 15365 NE 90" Street, Suite 100 FIELD REPORT Redmond, WA 98052 Office (425) 449-4704 1 esnw.com Branch Office: Pasco, WA Project No. 9040.02 Page 1 of 3 Report ID 9040.02 E 2024 0219 Date Mon 2/19/2024 Weather 45T, Overcast Arrival/Departure Time(s) 0900 — 0930 Travel Time (hr) 1.0 Project Name Tang Residence Location 840 Daley St, Edmonds ESNW Rep. & Phone Chris Jacobe (206) 928 — 1597 Client Info/Contact PNT Group, LLC General Contractor Info/Contact Shane Fortney Reviewed By LAC U1__ HTW 6fitW Field Supervisor Initials/Date Project Manager Initials/Date Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the Feld representative's observations and testing of the contractor's work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our Feld representative. Jobsite safety, including compliance with all applicable state orfederal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. As requested, ESNW representative was onsite for storm system backfill and density test observations. While onsite the following was observed: Storm System Backfill Observations: While onsite, ESNW representative observed the contractor continued backfilling for the storm system at the approximate Northern locations of the site, on Daley St. ESNW representative observed the contractor bedded the installed sections of storm system in a 1'/4-inch minus rock at approximately 12-inches per lift, and then compacted via vibratory hoe -pack. ESNW representative observed adequate compaction of 95% or greater from the modified proctor at the tested locations of backfill. Please see attached map below for approximate location of backfill and test locations. An ESNW representative will return at client's request. Report ID 9040.02 E 2024 0219 Pagr 2 of 3 Test Reference Maximum Test Test % of Number Test Location Elevation Proctor Dry Density Moisture Dry Density MDD (pcf) N (Pcf) 1 Storm System Backfill -31 1 110.5 5.7 109.8 99 2 Storm System Backfill -1 f 1 110.5 5.6 109.2 99 DALEY STREET �, , a 2 (nµ3 M Storm System Install --- fer fe i I ,Ip•�mn m��iiin� �' �mal. r ae v I y�e I I SIT AREA fore ZI tars / 10r 1! fw 11 fm IS If)I 11 far II fa f1 ter ID jl or ..W a fllUl/ _ �g Z I � e1 I p �■ g bl- L IC..f F I f' v �r�o � I r00 � -•4 r wm /1/� rc IDI¢ fwr e � I i ALLEY ------— — — — — — — — — — — — — — — — — -- — — — — — — --- 7— ___—_________---_---- T_T_ Earth Solutions NW. LLC W, 0 M 0 a N O N O N W N O O It O 0 r 0 ry 0