Design Clarification Memo
Port of Edmonds Administration Building
Project No. 21060.10
DCM No. 1
To: City of Edmonds Building Department
From: Dennis Titus, PE, SE
CC:
Date: 2/9/24
BLD2024-0180
REVIEWED
BY
CITY OF EDMONDS
A new administration building has been constructed. It is a steel framed building. The roof is framed with steel joists
spaced at 6'-0" OC and metal deck. The roof gravity system and building lateral system were both designed with a 5psf
allowance over the entire roof. Please refer to the attached design load summary from the original structural
calculations. Per the solar panel submittal, the solar array has an average weight of 4.3psf.
The structure is adequate to support the weight of the solar array. If any additional information is required, please do
not hesitate to contact me.
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph.425.778.8500 I f.425.778.5536
www.cgengineering.com
Gravity Design Loads
Roof DL
18 ga metal deck
3 psf
8" rigid insulation
12 psf
(2) gypsum
5.6 psf
solar
5 psf
mechanical
1.5 psf
misc
1 psf
joists
5 psf
33.1
psf
USE 34.0
psf
Floor DL
Decking + conc 36.0
psf
Insulation 1.0
psf
(2) gypsum 5.6
psf
Joists 5.0
psf
M/E 1.0
psf
Misc 1.5
psf
50.1
psf
USE 52.0
psf
Roof ILL (Snow) 25.0
psf
Floor ILL 50.0
psf
+ 20 psf (partitions)
Description Gravity Design Loads
By RMK
Date 08/02/21
0
Checked
Date
ENGINEERING
Scale
Sheet No.
250 4th Ave. South
Suite 200
project
Port of Edmonds
Job No.
2
Edmonds, WA 98020
21160.10