Loading...
FIR2022-0003+Calculations+1.12.2022_1.04.57_PM+2617357RECEIVED Jan 20 2022 CITY OF EDMONDS DEVELOPMENT SERVICES DEPARTMENT REVIEWED BY CITY OF EDMONDS r--m-... a............. WAMINOTON STATE CEQM/ICATE Of COMPETENCY PM MICTECTION SMRNN M SYSTEMS � Michael Balsley i2437-0991- Level 3 iAdvanced n, c Ni 6 ADVANFPI 6 HYDRAULIC CALCULATIONS FOR Paradise Lane Building A 548 Paradise Lane Edmonds, WA. 98020 DRAWING NUMBER: WC5251 DATE: 12-27-21 -DESIGN DATA - REMOTE AREA NUMBER: 1 REMOTE AREA LOCATION: Unit 302 OCCUPANCY CLASSIFICATION: Residential NFPA 13R DENSITY: .05 gpm/sq. ft. AREA OF APPLICATION: 4 Heads COVERAGE PER SPRINKLER: 256 sq. ft. TYPE OF SPRINKLERS CALCULATED: NUMBER OF SPRINKLERS CALCULATED: 4 TOTAL WATER REQUIRED (INCLUDING HOSE): 54.5gpm FLOW AND PRESSURE (BFI): 54.5 gpm @ 42.2 psi TYPE OF SYSTEM: Wet *DETAILS: WATER SUPPLY Source: City Test Date: 11-19-21 Test By: M.B. Location: Site Static: 65 psi Residual: 20 psi Flow: 350 gpm Source Elevation Relative to Finished Flow Level: 0 ft. INSTALLING CONTRACTOR Name: Advanced Fire Protection Address: P.O. Box 1543 Woodinville, WA. 98072 Phone: 425-483-5657 Certification number: ADVANFP199B6 NAME OF DESIGNER: Michael Balsley AUTHORITY HAVING JURISDICTION: City of Edmonds NOTES: Calculations performed by HASS under license # 64618593 , granted by HRS SYSTEMS, INC. (Notes continue after pipe calculations results.) (Notes continue after pipe calculations results.) SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 2 DATE: 1/11/2022 C:\USERS\MIKE\PARADISE LANE BUILDING A.SDF JOB TITLE: Paradise Lane Building A WATER SUPPLY ANALYSIS Static: 65.00 psi Resid: 20.00 psi Flow: 350.0 gpm 80.0 70.0 1 60.0 G A U50.0 G 2 E 40.0 P R30.0 E S S 20.0 U B R 10.0 E N LEGEND Available pressure 63.56 psi @ 54.5 gpm q Required pressure 47.24 psi @ 54.5 gpm A. Source Supply Curve B. System Demand Curve 80120160 200 240 280 320 360 400 FLOW (GPM) Note: (1) Dashed Lines indicate extrapolated values from Test Results SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 3 DATE: 1/11/2022 C:\USERS\MIKE\PARADISE LANE BUILDING A.SDF JOB TITLE: Paradise Lane Building A NFPA WATER SUPPLY DATA SOURCE STATIC RESID. FLOW AVAIL TOTAL REQ'D NODE PRESS. PRESS. @ PRESS. @ DEMAND PRESS. TAG (PSI) (PSI) (GPM) (PSI) (GPM) (PSI) SRC 65.0 20.0 350.0 63.6 54.5 47.2 AGGREGATE FLOW ANALYSIS: TOTAL FLOW AT SOURCE 54.5 GPM TOTAL HOSE STREAM ALLOWANCE AT SOURCE 0.0 GPM OTHER HOSE STREAM ALLOWANCES 0.0 GPM TOTAL DISCHARGE FROM ACTIVE SPRINKLERS 54.5 GPM NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) SRC 0.0 SOURCE 47.2 54.5 BFI 7.0 - - - - 42.2 - - - BFO 7.0 - - - - 36.4 - - - TOR 13.0 - - - - 33.6 - - - W1 13.0 - - - - 29.1 - - - W1A 13.0 - - - - 27.1 - - - W2 13.0 - - - - 25.5 - - - W3 31.0 - - - - 15.4 - - - W4 31.0 - - - - 18.3 - - - W5 31.0 - - - - 13.7 - - - W6 31.0 - - - - 9.8 - - - W7 31.0 - - - - 8.3 - - - W8 31.0 - - - - 7.9 - - - S1 31.0 K= 4.90 9.0 14.7 S2 31.0 K= 4.90 7.7 13.6 S3 31.0 K= 4.90 7.2 13.2 S4 31.0 K= 4.90 7.0 13.0 NOTES SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 4 DATE: 1/11/2022 C:\USERS\MIKE\PARADISE LANE BUILDING A.SDF JOB TITLE: Paradise Lane Building A NFPA PIPE DATA Pipe Tag K-fac Add F1 Add F1 To Fit: L C Frm Node El (ft) PT (q) Node/ Nom ID Eq.Ln. F To Node E1 (ft) PT Tot.(Q) Disch Act ID (ft.) T Pf/ft. Pipe: 1 Source 0.0 54.00 150 SRC 0.0 47.2 54.5 BFO K2.000 4E:24.0 24.00 BFI 7.0 42.2 54.5 1.959 78.00 0.026 Pipe: 2 0.0 Fixed Pressure Loss Device BFI 7.0 42.2 54.5 TOR 5.8 psi, 54.4 gpm BFO 7.0 36.4 54.4 Pipe: 3 0.0 0.0 6.00 120 BFO 7.0 36.4 54.5 W1 A2.000 ---- 0.00 TOR 13.0 33.6 54.5 2.067 6.00 0.031 Pipe: 4 0.0 21.8 W4 3E:27.0 17.00 150 TOR 13.0 33.6 32.7 W1A F1.500 2T:16.8 46.50 W1 13.0 29.1 54.5 1.598 R: 2.7 63.50 0.071 Pipe: 4A 0.0 0.0 2E:18.0 37.00 150 Wi 13.0 29.1 32.7 W2 F1.500 T: 8.4 34.50 W1A 13.0 27.1 32.7 1.598 3R: 8.1 71.50 0.027 Pipe: 5 0.0 0.0 2E:18.0 27.00 150 W1A 13.0 27.1 32.7 W3 F1.500 T: 8.4 31.80 W2 13.0 25.5 32.7 1.598 2R: 5.4 58.80 0.027 Pipe: 6 0.0 0.0 20.00 150 W2 13.0 25.5 32.7 W5 F1.250 2E:16.0 23.30 W3 31.0 15.4 32.7 1.394 T: 7.3 43.30 0.053 Pipe: 7 0.0 0.0 4E:32.0 60.00 150 W1 13.0 29.1 21.8 W5 F1.250 2T:14.6 58.10 W4 31.0 18.3 21.8 1.394 5R:11.5 118.10 0.025 Pipe: 8 0.0 54.5 W6 4.00 150 W3 31.0 15.4 -21.8 W4 F1.000 T: 6.0 6.00 W5 31.0 13.7 32.7 1.101 10.00 0.169 Pipe: 9 0.0 54.5 W6 2E:14.0 25.00 150 W4 31.0 18.3 -32.7 W3 F1.000 2T:12.0 32.80 W5 31.0 13.7 21.8 1.101 4R: 6.8 57.80 0.080 Pipe: 10 0.0 14.7 S1 3.00 150 W5 31.0 13.7 39.8 W7 F1.000 T: 6.0 6.00 W6 31.0 9.8 54.5 1.101 9.00 0.434 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 5 DATE: 1/11/2022 C:\USERS\MIKE\PARADISE LANE BUILDING A.SDF JOB TITLE: Paradise Lane Building A Pipe Tag K-fac Add F1 Add F1 To Fit: L C Frm Node E1 (ft) PT (q) Node/ Nom ID Eq.Ln. F To Node E1 (ft) PT Tot.(Q) Disch Act ID (ft.) T Pf/ft. Pipe: 11 0.0 13.6 S2 6.00 150 W6 31.0 9.8 26.2 W8 F1.000 ---- 0.00 W7 31.0 8.3 39.8 1.101 6.00 0.243 Pipe: 12 0.0 13.0 S4 4.00 150 W7 31.0 8.3 13.2 S3 F1.000 ---- 0.00 W8 31.0 7.9 26.2 1.101 4.00 0.112 Pipe: 13 4.90 14.7 Disch 8.00 150 W6 31.0 9.8 0.0 F1.000 E: 7.0 13.00 S1 31.0 9.0 14.7 1.101 T: 6.0 21.00 0.038 Pipe: 14 4.90 13.6 Disch 7.00 150 W7 31.0 8.3 0.0 F1.000 E: 7.0 13.00 S2 31.0 7.7 13.6 1.101 T: 6.0 20.00 0.033 Pipe: 15 4.90 13.2 Disch 8.00 150 W8 31.0 7.9 0.0 F1.000 E: 7.0 13.00 S3 31.0 7.2 13.2 1.101 T: 6.0 21.00 0.031 Pipe: 16 4.90 13.0 Disch 14.00 150 W8 31.0 7.9 0.0 F1.000 2E:14.0 14.00 S4 31.0 7.0 13.0 1.101 28.00 0.031 NOTES (HASS): (1) Calculations were performed by the HASS 2021 D computer program in accordance with NFPA13 (2020) under license no. 64618593 granted by HRS Systems, Inc. 208 Southside Square Petersburg, TN 37144 (931) 659-9760 (2) The system has been calculated to provide an average imbalance at each node of 0.009 gpm and a maximum imbalance at any node of 0.146 gpm. (3) Total pressure at each node is used in balancing the system. Maximum water velocity is 18.4 ft/sec at pipe 10. (4) Items listed in bold print on the cover sheet are automatically transferred from the calculation report. SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 6 DATE: 1/11/2022 C:\USERS\MIKE\PARADISE LANE BUILDING A.SDF JOB TITLE: Paradise Lane Building A (5) Available pressure at source node SRC under full flow conditions is 62.78 psi with a flow of 68.76 gpm. (6) PIPE FITTINGS TABLE HASS Pipe Table Name: standard PAGE: A MATERIAL: S40 HWC: 120 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D N Ell Tee LngEll ChkVly BfyVly GatVly A1mChk DPVly NTee -------------------------------------------------------- F F45Ell 2.067 5.00 10.00 3.00 11.00 6.00 1.00 10.00 10.00 10.00 2.50 PAGE: F MATERIAL: CPVC HWC: 150 Diameter Equivalent Fitting Lengths in Feet ( in) F E T R K C G F45 Ell Tee RunT Kplg ChkVly Gate 1.101 1.40 7.00 6.00 1.70 1.00 8.00 0.40 1.394 1.80 8.00 7.30 2.30 1.00 11.00 0.80 1.598 2.10 9.00 8.40 2.70 1.00 14.00 1.00 PAGE: K MATERIAL: CT-K HWC: 150 Diameter Equivalent Fitting Lengths in Feet (in) E T F R K C G N Ell Tee 45-Ell TeeRun Kouplg ChkVly GatVly NPTee 1.959 6.00 12.00 ' 3.00 4.00 0.50 13.00 1.00 12.00 ......■■.■■.■...............� WASINI TON >1TATE ■ CM"n"To O! 00WITRICY ■ P"ke PMTWTION >NRINNUIR SYOTUU ■ Michael Balsley 0 ■ 2437-0991-CG Level 3 i Advanced 're Prot Inc cJ; ■ ADVANF -Z ■ ■ nowennowe m HYDRAULIC CALCULATIONS FOR Paradise Lane Building A 548 Paradise Lane Edmonds, WA. 98020 DRAWING NUMBER: WC5251 DATE: 12-27-21 -DESIGN DATA - REMOTE AREA NUMBER: 2 REMOTE AREA LOCATION: Storage 302 OCCUPANCY CLASSIFICATION: Residential NFPA 13R DENSITY: .05 gpm/sq. ft. AREA OF APPLICATION: 4 Heads COVERAGE PER SPRINKLER: 225 sq. ft. TYPE OF SPRINKLERS CALCULATED: Vic.V3606 NUMBER OF SPRINKLERS CALCULATED: 4 TOTAL WATER REQUIRED (INCLUDING HOSE): 67.0 gpm FLOW AND PRESSURE (BFI): 67.0 gpm @ 47.5 psi TYPE OF SYSTEM: Wet *DETAILS: WATER SUPPLY Source: City Test Date: 11-19-21 Test By: M.B. Location: Site Static: 65 psi Residual: 20 psi Flow: 350 gpm Source Elevation Relative to Finished Flow Level: 0 ft. INSTALLING CONTRACTOR Name: Advanced Fire Protection Address: P.O. Box 1543 Woodinville, WA. 98072 Phone: 425-483-5657 Certification number: ADVANFP199B6 NAME OF DESIGNER: Michael Balsley AUTHORITY HAVING JURISDICTION: City of Edmonds NOTES: Calculations performed by HASS under license # 64618593 granted by HRS SYSTEMS, INC. (Notes continue after pipe calculations results.) (Notes continue after pipe calculations results.) SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 2 DATE: 1/11/2022 C:\USERS\MIKE\PARADISE LANE BUILDING A GARAGE.SDF JOB TITLE: Paradise Lane Building A WATER SUPPLY ANALYSIS Static: 65.00 psi Resid: 20.00 psi Flow: 350.0 gpm 80. 70.0 60.0 G A U50.0 G E 40.0 P R 30.0 E S S 20.0 U R 10.0 E ( 0.0 P s i 14.7 LEGEND 1 g Available pressure 62.89 psi @ 67.0 gpm 2 q Required pressure 53.57 psi @ 67.0 gpm A. Source Supply Curve B. System Demand Curve 80120160 200 240 280 320 360 400 FLOW (GPM) Note: (1) Dashed Lines indicate extrapolated values from Test Results SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 3 DATE: 1/11/2022 C:\USERS\MIKE\PARADISE LANE BUILDING A GARAGE.SDF JOB TITLE: Paradise Lane Building A NFPA WATER SUPPLY DATA SOURCE STATIC RESID. FLOW AVAIL. TOTAL REQ'D NODE PRESS. PRESS. @ PRESS. @ DEMAND PRESS. TAG (PSI) (PSI) (GPM) (PSI) (GPM) (PSI) SRC 65.0 20.0 350.0 62.9 67.0 53.6 AGGREGATE FLOW ANALYSIS: TOTAL FLOW AT SOURCE 67.0 GPM TOTAL HOSE STREAM ALLOWANCE AT SOURCE 0.0 GPM OTHER HOSE STREAM ALLOWANCES 0.0 GPM TOTAL DISCHARGE FROM ACTIVE SPRINKLERS 67.0 GPM NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE (FT) (PSI) (GPM) SRC 0.0 SOURCE 53.6 67.0 BFI 7.0 - - - - 47.5 - - - BFO 7.0 - - - - 41.7 - - - TOR 13.0 - - - - 38.9 - - - Wl 13.0 - - - - 33.2 - - - W1A 13.0 - - - - 25.8 - - - D1 13.0 K= 5.60 12.6 19.9 D2 13.0 K= 5.60 9.2 17.0 D3 13.0 K= 5.60 7.5 15.3 D4 13.0 K= 5.60 7.0 14.8 NOTES SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 4 DATE: 1/11/2022 C:\USERS\MIKE\PARADISE LANE BUILDING A GARAGE.SDF JOB TITLE: Paradise Lane Building A NFPA PIPE DATA Pipe Tag K-fac Add F1 Add F1 To Fit: L C Frm Node E1 (ft) PT (q) Node/ Nom ID Eq.Ln. F To Node E1 (ft) PT Tot.(Q) Disch Act ID (ft.) T Pf/ft. Pipe: 1 Source 0.0 54.00 150 SRC 0.0 53.6 67.0 BFO K2.000 4E:24.0 24.00 BFI 7.0 47.5 67.0 1.959 78.00 0.038 Pipe: 2 0.0 Fixed Pressure Loss Device BFI 7.0 47.5 67.0 TOR 5.8 psi, 67.0 gpm BFO 7.0 41.7 67.0 Pipe: 3 0.0 0.0 6.00 120 BFO 7.0 41.7 67.0 W1 A2.000 ---- 0.00 TOR 13.0 38.9 67.0 2.067 6.00 0.045 Pipe: 4 0.0 0.0 2E:18.0 17.00 150 TOR 13.0 38.9 67.0 W1A F1.500 2T:16.8 37.50 W1 13.0 33.2 67.0 1.598 R: 2.7 54.50 0.104 Pipe: 5 0.0 0.0 2E:18.0 37.00 150 W1 13.0 33.2 67.0 D1 F1.500 T: 8.4 34.50 W1A 13.0 25.8 67.0 1.598 3R: 8.1 71.50 0.104 Pipe: 6 5.60 19.9 Disch 38.00 150 W1A 13.0 25.8 47.1 D2 F1.250 2E:16.0 27.50 D1 13.0 12.6 67.0 1.394 5R:11.5 65.50 0.202 Pipe: 7 5.60 17.0 Disch 16.00 150 D1 13.0 12.6 30.1 D3 F1.250 2E:16.0 16.00 D2 13.0 9.2 47.1 1.394 32.00 0.105 Pipe: 8 5.60 15.3 Disch 12.00 150 D2 13.0 9.2 14.8 D4 F1.000 ---- 0.00 D3 13.0 7.5 30.1 1.101 12.00 0.145 Pipe: 9 5.60 14.8 Disch 12.00 150 D3 13.0 7.5 0.0 F1.000 ---- 0.00 D4 13.0 7.0 14.8 1.101 12.00 0.039 NOTES (HASS): (1) Calculations were performed by the HASS 2021 D computer program in accordance with NFPA13 (2020) under license no. 64618593 granted by HRS Systems, Inc. 208 Southside Square Petersburg, TN 37144 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 5 DATE: 1/11/2022 C:\USERS\MIKE\PARADISE LANE BUILDING A GARAGE.SDF JOB TITLE: Paradise Lane Building A (931) 659-9760 (2) The system has been calculated to provide an average imbalance at each node of 0.010 gpm and a maximum imbalance at any node of 0.086 gpm. (3) Total pressure at each node is used in balancing the system. Maximum water velocity is 14.1 ft/sec at pipe 6. (4) Items listed in bold print on the cover sheet are automatically transferred from the calculation report. (5) Available pressure at source node SRC under full flow conditions is 62.45 psi with a flow of 74.15 gpm. (6) PIPE FITTINGS TABLE HASS Pipe Table Name: standard PAGE: A MATERIAL: S40 HWC: 120 Diameter Equivalent Fitting Lengths in Feet (in) E T L C B G A D N Ell Tee LngEll ChkVly BfyVly GatVly AlmChk DPVly NTee ----- F -------------------------------------------------- F45Ell 2.067 5.00 10.00 3.00 11.00 6.00 1.00 10.00 10.00 10.00 2.50 PAGE: F MATERIAL: CPVC HWC: 150 Diameter Equivalent Fitting Lengths in Feet (in) F E T R K C G F45 Ell Tee RunT Kplg ChkVly Gate 1.101 1.40 7.00 6.00 1.70 1.00 8.00 0.40 1.394 1.80 8.00 7.30 2.30 1.00 11.00 0.80 1.598 2.10 9.00 8.40 2.70 1.00 14.00 1.00 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 6 DATE: 1/11/2022 C:\USERS\MIKE\PARADISE LANE BUILDING A GARAGE.SDF JOB TITLE: Paradise Lane Building A PAGE: K MATERIAL: CT-K HWC: 150 Diameter Equivalent Fitting Lengths in Feet (in) E T F R K C G N Ell Tee 45-Ell TeeRun Kouplg ChkVly GatVly NPTee 1.959 6.00 12.00 3.00 4.00 0.50 13.00 1.00 12.00